CN216075776U - GRC exterior plate curtain wall installation construction structures - Google Patents

GRC exterior plate curtain wall installation construction structures Download PDF

Info

Publication number
CN216075776U
CN216075776U CN202122457712.4U CN202122457712U CN216075776U CN 216075776 U CN216075776 U CN 216075776U CN 202122457712 U CN202122457712 U CN 202122457712U CN 216075776 U CN216075776 U CN 216075776U
Authority
CN
China
Prior art keywords
frame
structural frame
lifting rod
curtain wall
structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122457712.4U
Other languages
Chinese (zh)
Inventor
单琳琳
权国力
潘璠
张可
陈思宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Engineering Group First Engineering Co ltd
Jiangsu Provincial Construction Group Co Ltd
Original Assignee
Jiangsu Construction Engineering Group First Engineering Co ltd
Jiangsu Provincial Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Construction Engineering Group First Engineering Co ltd, Jiangsu Provincial Construction Group Co Ltd filed Critical Jiangsu Construction Engineering Group First Engineering Co ltd
Priority to CN202122457712.4U priority Critical patent/CN216075776U/en
Application granted granted Critical
Publication of CN216075776U publication Critical patent/CN216075776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a GRC external decorative plate curtain wall installation construction structure, which comprises a structural frame and an outer plate, wherein the outer plate is arranged at the rear end of the structural frame, fixed blocks are arranged on the outer walls of the front ends of the left side and the right side of the structural frame, vertical support frames are arranged on the inner walls of the upper end and the lower end of the structural frame, and transverse support frames are arranged on the inner walls of the left end and the right end of the structural frame, so that the device is convenient to operate and greatly saves the working efficiency when in use, binding is not needed to be carried out by means of a hoisting belt when the structural frame needs to be hoisted, the installation is directly carried out through a hoisting rod at the top end, the risk that the hoisting belt drops after being hoisted is effectively avoided, the gravity center is concentrated on a connecting hole in the middle part after hoisting, the situation of deflection is not generated in the installation, the installation angle can be more quickly positioned and accurately found, time and labor are saved during the use, and the working difficulty of workers is greatly reduced.

Description

GRC exterior plate curtain wall installation construction structures
Technical Field
The utility model belongs to the technical field related to GRC external decorative plate curtain wall mounting construction structures, and particularly relates to a GRC external decorative plate curtain wall mounting construction structure.
Background
In recent years, the types of exterior decorative curtain walls of buildings are various, GRC exterior decorative plates, non-closed exterior wall sunshade glass plates, stone-like coating integrated plates, recycled stone decorative concrete light-weight plates and the like, and novel plates are various in types, so that good conditions are provided for enclosure and decoration of buildings.
The prior curtain wall mounting construction structure technology has the following problems: the existing installation and construction structure for the curtain wall of the external decorative plate needs to be lifted and installed, because a lifting belt needs to be bound above a construction structure frame before lifting, not only is the operation troublesome but also the falling risk can be generated, and after lifting, because the binding can generate the inclined installation, the inclined angle still needs to be continuously adjusted, so that the work difficulty is greatly increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a GRC external decorative plate curtain wall installation construction structure, which solves the problems that when the external decorative plate curtain wall installation construction structure provided in the background technology needs to be lifted and installed, because a lifting belt needs to be bound above a construction structure frame before lifting, the operation is troublesome, the falling risk can be generated, and the inclined angle needs to be continuously adjusted during inclined installation due to binding after lifting, so that the working difficulty is greatly increased.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a GRC exterior trim panel curtain construction and installation structure, includes structural framework and planking, the rear end at structural framework is installed to the planking, all be provided with the fixed block on structural framework's the left and right sides front end outer wall, all be provided with perpendicular support frame on structural framework's the upper and lower both ends inner wall, all be provided with the cross bracing frame on structural framework's the both ends inner wall of controlling, structural framework's top is provided with portable hoisting accessory, portable hoisting accessory is including lifting groove, connecting hole, mergence opening, lifting rod and accomodating the groove, structural framework's the inside groove of accomodating that is provided with in top, the upper end of accomodating the groove is provided with the lifting rod, the top of lifting rod is provided with carries puts the groove, the lifting rod is close to the inside connecting hole that runs through of left side outer wall, the left side front end of lifting rod is provided with the mergence opening.
Preferably, the structural frame, the transverse support frame, the vertical support frame and the lifting rod are all made of metal materials, and paint is sprayed on the outer walls of the structural frame, the transverse support frame, the vertical support frame and the lifting rod.
Preferably, the structural frame adopts a square structural design, the length and the width of the assembled outer plate are larger than those of the structural frame, and the structural frame is fixedly connected with the two fixing blocks through screws.
Preferably, two the size shape of fixed block is all the same, two both ends outer wall and structural framework about the fixed block all keep the parallel and level.
Preferably, the length of the transverse support frame is smaller than that of the vertical support frame, and the structural frame, the transverse support frame and the vertical support frame are fixedly connected through welding.
Preferably, the lifting rod is provided with two, and two the lifting rod length is the same, two the lifting rod all keeps the parallel and level with the top outer wall of structural framework after putting into the inside of accomodating the groove.
Compared with the prior art, the utility model provides a GRC external decorative plate curtain wall mounting construction structure, which has the following beneficial effects:
1. according to the utility model, the novel portable lifting device is additionally arranged at the upper end of the GRC external decorative plate curtain wall installation construction structure, the device is convenient to operate and greatly saves the working efficiency when in use, when a structural framework needs to be lifted, binding is not required by means of lifting belts, and the installation is directly operated through the lifting rod at the top end, so that the risk of falling off after the lifting belts are lifted is effectively avoided, and the gravity center is concentrated on the connecting hole in the middle part after lifting, the condition of deflection cannot be generated in installation, the installation angle can be more quickly positioned and accurately, the time and labor are saved during use, and the working difficulty of workers is greatly reduced;
2. the utility model relates to a portable lifting device, which has the specific use process that when a structural frame needs to be lifted and installed, firstly, fingers are required to be inserted into the lifting and placing grooves, then, lifting rods at two ends are slowly turned upwards, because the rear ends of the two lifting rods are movably connected with the accommodating grooves through an internal movable rotating shaft, the two lifting rods are slowly combined together, because the front ends and the rear ends of the two lifting rods are both provided with combined notches, when the two connecting holes at the top ends are gradually close to each other until the two connecting holes can be inserted in, then, a lifting hook or a lifting lug is inserted into the two connecting holes to be firmly fixed and then lifted, the time is saved, the operation is simple and convenient, the lifting hook is fixedly installed after being lifted to the position needing to be installed, and the situation of inclination, unevenness and the like can not occur when the center position is concentrated after the lifting is lifted, the operation difficulty of workers is reduced during installation.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model without limiting the utility model in which:
FIG. 1 is a schematic structural view of a GRC external decorative plate curtain wall installation construction structure provided by the utility model;
FIG. 2 is a schematic structural diagram of a portable lifting device according to the present invention;
in the figure: 1. a structural frame; 2. a transverse support frame; 3. erecting a support frame; 4. a fixed block; 5. an outer plate; 6. a portable lifting device; 7. a lifting and placing groove; 8. connecting holes; 9. combining the gaps; 10. a lifting rod; 11. a receiving groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a GRC exterior decorative plate curtain wall mounting construction structure comprises a structural frame 1 and an outer plate 5, wherein the outer plate 5 is mounted at the rear end of the structural frame 1, the outer walls of the front ends of the left side and the right side of the structural frame 1 are respectively provided with a fixed block 4, the two fixed blocks 4 are identical in size and shape, the outer walls of the left end and the right end of the two fixed blocks 4 and the outer walls of the left end and the right end of the structural frame 1 are flush, because the two fixed blocks 4 are identical in size and shape, if screws are lost or damaged during use, the assembling is very convenient, and the assembling with the same model is more convenient and faster when the outer plate is not mounted, the structural frame 1 adopts a square structural design, the length and the width of the assembled outer plate 5 are larger than those of the structural frame 1, the structural frame 1 and the two fixed blocks 4 are fixedly connected through the screws, and flexible adjustment and fixation can be carried out during use, the structure frame has the advantages of simple structure, reliable connection, convenient assembly and disassembly, and the like, the inner walls of the upper end and the lower end of the structure frame 1 are respectively provided with a vertical support frame 3, the inner walls of the left end and the right end of the structure frame 1 are respectively provided with a transverse support frame 2, the length of the transverse support frame 2 is smaller than that of the vertical support frame 3, the structure frame 1, the transverse support frames 2 and the vertical support frames 3 are fixedly connected by welding, and are fixedly connected by welding, so that the structure frame is firmer and more durable in later use, and the joint has high strength and tightness without using street fittings and the like, thereby effectively avoiding the occurrence of potential safety hazards, the top end of the structure frame 1 is provided with a portable hoisting device 6, the portable hoisting device 6 comprises a lifting groove 7, a connecting hole 8, a combined opening 9, a hoisting rod 10 and a collection groove 11, the collection groove 11 is arranged inside the top end of the structure frame 1, the upper end of the accommodating groove 11 is provided with a lifting rod 10, the structural frame 1, the horizontal support frame 2, the vertical support frame 3 and the lifting rod 10 are made of metal materials, the structural frame 1, the horizontal support frame 2, the outer walls of the vertical support frame 3 and the lifting rod 10 are all sprayed with paint, if the surface is not sprayed with paint, the surface can be rusted and corroded, the service life of the frame is influenced, after the paint is sprayed, the occurrence of the situations such as rusting and corrosion can be better avoided, the top end of the lifting rod 10 is provided with a lifting groove 7, a connecting hole 8 penetrates through the lifting rod 10 close to the inner part of the outer wall on the left side, the front end on the left side of the lifting rod 10 is provided with a combining notch 9, the lifting rods 10 are two, the lengths of the two lifting rods 10 are the same, the two lifting rods 10 are placed in the accommodating groove 11 and are all kept parallel and level with the outer wall on the top end of the structural frame 1, the angles can be kept consistent in the use and are convenient to combine, and the lifting rod 10 is kept flush with the top outer wall of the structural frame 1 after being placed in the receiving groove 11, and the installation and use of the next structural frame 1 are not affected after the installation is finished.
The working principle and the using process of the utility model are as follows: after the utility model is installed, all parts of the structural frame 1 are assembled on the ground in advance, the outer plates 5 are spliced and fixed on the structural frame 1, the transverse support frame 2 and the vertical support frame 3 one by one, after the parts are connected and fixed by the invisible screws at the rear end, the condition that the parts are loosened and the like at one time is checked, the lifting rods 10 inside the top end of the structural frame 1 are pulled up by external force after the installation is checked to be correct, then the two lifting rods 10 are slowly combined together to be triangular, the triangular shape has strong stability, the lifting is firmer when being lifted and installed, at the moment, lifting lugs of a crane are inserted into the connecting holes 8, the structural frame 1 is slowly lifted to be moved to an outer wall needing to be installed, then the fixing blocks 4 are installed and fixed by the screws after the left and right positions are adjusted, the lifting rods 10 at the top of the structural frame 1 are placed into the accommodating grooves 11 after all the screws are firmly installed, then, the lifting installation is continued again to return to the ground.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a GRC exterior plate curtain wall installation construction structures, includes structural framework (1) and planking (5), its characterized in that: the outer plate (5) is installed at the rear end of the structural frame (1), the front end outer walls of the left side and the right side of the structural frame (1) are respectively provided with a fixed block (4), the inner walls of the upper end and the lower end of the structural frame (1) are respectively provided with a vertical support frame (3), the inner walls of the left end and the right end of the structural frame (1) are respectively provided with a transverse support frame (2), the top end of the structural frame (1) is provided with a portable hoisting device (6), the portable hoisting device (6) comprises a hoisting groove (7), a connecting hole (8), a combined opening (9), a lifting rod (10) and a storage groove (11), the storage groove (11) is arranged inside the top end of the structural frame (1), the upper end of the storage groove (11) is provided with a lifting rod (10), the top end of the lifting rod (10) is provided with the hoisting groove (7), the connecting hole (8) penetrates through the rod (10) close to the inner part of the outer wall of the left side, the front end of the left side of the lifting rod (10) is provided with a combined notch (9).
2. The GRC exterior plate curtain wall installation and construction structure as claimed in claim 1, wherein: the structure frame (1), the transverse supporting frame (2), the vertical supporting frame (3) and the lifting rod (10) are made of metal materials, and paint is sprayed on the outer walls of the structure frame (1), the transverse supporting frame (2), the vertical supporting frame (3) and the lifting rod (10).
3. The GRC exterior plate curtain wall installation and construction structure as claimed in claim 1, wherein: the structure frame (1) adopts a square structure design, the length and the width of the outer plate (5) after the assembly are larger than those of the structure frame (1), and the structure frame (1) is fixedly connected with the two fixing blocks (4) through screws.
4. The GRC exterior plate curtain wall installation and construction structure as claimed in claim 1, wherein: the size and the shape of the two fixing blocks (4) are the same, and the outer walls of the left end and the right end of the two fixing blocks (4) and the outer walls of the left end and the right end of the structural frame (1) are all kept flush.
5. The GRC exterior plate curtain wall installation and construction structure as claimed in claim 1, wherein: the length of the transverse support frame (2) is smaller than that of the vertical support frame (3), and the structural frame (1), the transverse support frame (2) and the vertical support frame (3) are fixedly connected through welding.
6. The GRC exterior plate curtain wall installation and construction structure as claimed in claim 1, wherein: the lifting rod (10) is provided with two, and two the length of lifting rod (10) is all the same, two lifting rod (10) all keep the parallel and level with the top outer wall of structural frame (1) after putting into the inside of accomodating groove (11).
CN202122457712.4U 2021-10-12 2021-10-12 GRC exterior plate curtain wall installation construction structures Expired - Fee Related CN216075776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122457712.4U CN216075776U (en) 2021-10-12 2021-10-12 GRC exterior plate curtain wall installation construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122457712.4U CN216075776U (en) 2021-10-12 2021-10-12 GRC exterior plate curtain wall installation construction structures

Publications (1)

Publication Number Publication Date
CN216075776U true CN216075776U (en) 2022-03-18

Family

ID=80638606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122457712.4U Expired - Fee Related CN216075776U (en) 2021-10-12 2021-10-12 GRC exterior plate curtain wall installation construction structures

Country Status (1)

Country Link
CN (1) CN216075776U (en)

Similar Documents

Publication Publication Date Title
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN101892717A (en) Large autoclaved lightweight aerated concrete slab and installation method thereof
CN209942029U (en) Light prefabricated assembled external wall panel
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN216075776U (en) GRC exterior plate curtain wall installation construction structures
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN112081245A (en) Disc type building steel beam mounting structure and construction method thereof
CN218060737U (en) Prefabricated light steel construction house
CN215368834U (en) Prefabricated wallboard strutting arrangement is used in room construction
CN210947661U (en) Installation device of socket type overhanging scaffold
CN211666339U (en) Building site is with interim worker's canopy convenient to installation and dismantlement
CN213573080U (en) Prefabricated plate installation auxiliary device
CN211775988U (en) Steel construction high-rise tower high altitude protector
CN209837654U (en) Connecting structure of diagonal outer frame type scaffold
CN208870243U (en) A kind of curtain wall installing structure
CN219451491U (en) Horizontal reserved hole plugging template
CN216239024U (en) Wall connecting piece
CN212613030U (en) Variable steel frame for super high-rise building construction
CN215443196U (en) Building wall curtain wall installation location construction equipment
CN214195836U (en) Municipal construction rail guard
CN215253935U (en) Wall board
CN213297193U (en) Precast concrete board assembly quality of building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220318