CN216043755U - Assembled temporary support for large-span dome cavern - Google Patents

Assembled temporary support for large-span dome cavern Download PDF

Info

Publication number
CN216043755U
CN216043755U CN202121506251.9U CN202121506251U CN216043755U CN 216043755 U CN216043755 U CN 216043755U CN 202121506251 U CN202121506251 U CN 202121506251U CN 216043755 U CN216043755 U CN 216043755U
Authority
CN
China
Prior art keywords
column
support
telescopic
adjusting
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121506251.9U
Other languages
Chinese (zh)
Inventor
刘长红
袁兆廷
梁向东
蒋亚龙
姜大欢
彭浩东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
China Railway 24th Bureau Group Co Ltd
Nanchang Railway Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
East China Jiaotong University
China Railway 24th Bureau Group Co Ltd
Nanchang Railway Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University, China Railway 24th Bureau Group Co Ltd, Nanchang Railway Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical East China Jiaotong University
Priority to CN202121506251.9U priority Critical patent/CN216043755U/en
Application granted granted Critical
Publication of CN216043755U publication Critical patent/CN216043755U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

An assembled temporary support for a large-span dome cavern comprises a quadrilateral component (15), an upper support column (2), a lower support column (1), an adjusting column (5) and a support plate (11). The quadrilateral component comprises two telescopic steel upright posts (3) and two telescopic parallel links (9); the two parallel telescopic parallel couplings are vertically arranged on the two parallel telescopic steel upright posts; the telescopic horizontal communication is vertically connected between the telescopic steel upright posts through the vertical flange; a cross brace (8) is arranged in the quadrilateral component; the cross brace is used for adjusting the height and the width of the bracket and supporting the quadrilateral component. Two pier studs (10) are welded on the supporting plate; two inclined struts (12) are arranged between the upper supporting column and the supporting plate. The utility model can realize the accurate adjustment of the height and the width of the bracket; the utility model has simple structure, fast bracket installation speed, no need of large human input, repeated utilization of bracket materials and saving of a large amount of time.

Description

Assembled temporary support for large-span dome cavern
Technical Field
The utility model relates to an assembled temporary support for a large-span dome cavern, and belongs to the technical field of geotechnical engineering.
Background
At present, in the process of excavation and support of a large-span dome cavern, the research on temporary supports is less, prefabricated rectangular steel supports are mostly adopted, a reinforcing mesh is arranged between the steel supports, concrete is sprayed and protected, two anchor rods are driven into the reinforcing mesh at intervals of about one meter, the anchor rods are welded on steel struts, and the effect of fixing the steel supports is achieved.
However, supports with different lengths are often needed in the supporting process, so that the steel pillars must be cut, and the recycling difficulty of the cut fragmentary steel pillars is high, thereby causing a great deal of waste. Moreover, the traditional support is complex to install in the construction process, takes a large amount of time and delays the progress of the project.
Disclosure of Invention
The utility model aims to solve the problems of excavation and support of a large-span dome cavern, and provides an assembled temporary support for the large-span dome cavern.
The technical scheme of the utility model is that the assembled temporary support for the large-span dome cavern comprises a quadrilateral component, an upper support column, a lower support column, an adjusting column and a support plate.
The quadrilateral component comprises two telescopic steel upright posts and two telescopic parallel links; the two parallel telescopic parallel couplings are vertically arranged on the two parallel telescopic steel upright posts; the telescopic horizontal communication is vertically connected between the telescopic steel upright posts through the vertical flange; a cross brace is arranged in the quadrilateral component; the cross brace is used for adjusting the height and the width of the bracket and supporting the quadrilateral component.
The telescopic steel upright column is vertically embedded between the adjusting column and the lower supporting column and is connected through a horizontal flange; the rigid base is arranged below the lower support column.
The upper end of the upper support column is welded with the backing plate, and the lower end of the upper support column is connected with the adjusting column; the backing plate is fixed with the supporting plate through bolts.
Two pier stud welding are in the backup pad, pier stud upper end and for the bolted connection of the connecting piece on the framework of steel reinforcement.
A plurality of axial circular through holes with the same diameter are uniformly formed in the length direction of the upper supporting column and the adjusting column; go up the support column plug bush in adjusting the post, flexible screw rod passes round through-hole on adjusting the post and goes up round through-hole on the support column and links together with telescopic nut, adjusts the position of going up the through-hole on support column and the regulation post, finely tunes the height of support.
The quadrilateral components are used for adjusting the height and the width of the bracket by changing the angle of the cross braces.
The four ends of the scissor supports are fixed on the telescopic parallel pull lugs.
The rigid base and the lower support column are connected through bolts.
Two inclined struts are arranged between the upper supporting column and the supporting plate.
The two pier studs are symmetrically distributed on the supporting plate.
The utility model has the advantages that the structure is simple, the mounting speed of the bracket is high, a large amount of manpower investment is not needed, the bracket material can be repeatedly utilized, and a large amount of time is saved; in addition, the utility model can realize the accurate adjustment of the height and the width of the bracket, change the angle of the cross brace to control the quadrilateral component and support the quadrilateral component; can carry out a general regulation to the height and the width of support like this, set up on this basis and adjust the post and go up the support column and come to finely tune the height of support, reach the purpose of accurate adjustment.
Drawings
FIG. 1 is an elevation view of a fabricated temporary support for a large span dome cavern in accordance with an embodiment of the present invention;
FIG. 2 is a top pier side view of a fabricated temporary support for a large span dome cavern in accordance with an embodiment of the present invention;
fig. 3 is a partial connection schematic view of an upper support column and an adjusting column of an assembled temporary support for a large-span dome cavern according to an embodiment of the utility model.
In the figure, 1 is a lower support column; 2 is an upper supporting column; 3 is a telescopic steel upright post; 4 is a rigid base; 5 is an adjusting column; 6 is a flange; 7 is a telescopic screw rod; 8 is a cross brace; 9 is a telescopic parallel connection; 10 is a pier stud; 11 is a supporting plate; 12 is an inclined strut; 13 is a backing plate; 14 is a connecting piece; 15 is a quadrangular member; 16 is a telescopic nut.
Detailed Description
A specific embodiment of the present invention is shown in fig. 1.
The embodiment relates to an assembled temporary support for a large-span dome cavern, which comprises a quadrilateral member 15, an upper support column 2, a lower support column 1, an adjusting column 5 and a support plate 11.
Two parallel lower support columns 1 are respectively fixed with the rigid base 4 by bolts; two telescopic steel upright posts 3 are vertically embedded between the lower support column 1 and the adjusting column 5 respectively and are connected through a horizontal flange 6; the two parallel telescopic parallel couplings 9 are vertically arranged between the two parallel telescopic steel upright posts 3 to form a quadrilateral component 15; set up a scissors support 8 between the quadrangle component 15, four ends of scissors support all are fixed on the flexible parallel connection 9 tab, change the height and the width that the support can roughly be adjusted to the angle of scissors support 8 to can support quadrangle component 15, adjust the through-hole position of last support column 2 and regulation post 5, and fix with telescopic screw 7 and telescopic nut 5, reach the effect to the high accurate regulation of support, as shown in fig. 3.
A backing plate 13 is welded at the upper end of the upper supporting column 2, the backing plate 13 is connected with the supporting plate 11 through a bolt, two symmetrical inclined supports 12 are arranged between the upper supporting column 2 and the supporting plate 11, two pier columns 10 are welded on the supporting plate 11, and the top ends of the pier columns 10 are connected with a connecting piece 14 welded on a steel reinforcement framework through bolts, as shown in figure 2.
The manufacturing and using steps of the utility model comprise:
the lower support column 1, the upper support column 2, the telescopic steel upright column 3, the telescopic parallel connection 9, the adjusting column 5 and the support plate 11 are connected into a whole through a flange 6, a telescopic screw rod 7 and a telescopic nut 16.
Mounting the inclined strut 12; the pull lugs are prefabricated on the upper support column 2 and the support plate 11, and the inclined support 12 connects the upper support column 2 and the support plate 11 together through the pull lugs, so that the stress of the support plate is more reasonable.
The placement of the rigid base 4; the foundation is treated first to support the force from the top of the support, anchor bolts are embedded, and concrete is poured into the rigid base.

Claims (7)

1. An assembled temporary support for a large-span dome cavern, which is characterized by comprising a quadrilateral member, an upper support column, a lower support column, an adjusting column and a support plate;
the quadrilateral component comprises two telescopic steel upright posts and two telescopic parallel links; the two parallel telescopic parallel couplings are vertically arranged on the two parallel telescopic steel upright posts; the telescopic horizontal communication is vertically connected between the telescopic steel upright posts through the vertical flange; a cross brace is arranged in the quadrilateral component; the cross braces are used for adjusting the height and the width of the bracket and supporting the quadrilateral components;
the telescopic steel upright column is vertically embedded between the adjusting column and the lower supporting column and is connected through a horizontal flange; the rigid base is arranged below the lower support column;
the upper end of the upper support column is welded with the backing plate, and the lower end of the upper support column is connected with the adjusting column; the backing plate is fixed with the supporting plate through a bolt;
two pier stud welding are in the backup pad, pier stud upper end and for the bolted connection of the connecting piece on the framework of steel reinforcement.
2. The assembled temporary support for the large-span dome cavern as recited in claim 1, wherein a plurality of axial circular through holes with the same diameter are uniformly formed in the length direction of the upper support column and the adjusting column; go up the support column plug bush in adjusting the post, flexible screw rod passes round through-hole on adjusting the post and goes up round through-hole on the support column and links together with telescopic nut, adjusts the position of going up the through-hole on support column and the regulation post, finely tunes the height of support.
3. The fabricated temporary support for a large-span dome cavern as recited in claim 1, wherein the quadrilateral members are used for adjusting the height and width of the support by changing the angle of the cross braces.
4. The fabricated temporary support for a large-span dome cavern of claim 1, wherein the scissors four ends are fixed on telescopic parallel pulling lugs.
5. The fabricated temporary support for a large-span dome cavern of claim 1, wherein the rigid base and the lower support column are connected by bolts.
6. The fabricated temporary support for a large-span dome cavern of claim 1, wherein two inclined struts are arranged between the upper support column and the support plate.
7. The fabricated temporary support for a large-span dome cavern of claim 1, wherein the two piers are symmetrically distributed on the support plate.
CN202121506251.9U 2021-07-05 2021-07-05 Assembled temporary support for large-span dome cavern Active CN216043755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121506251.9U CN216043755U (en) 2021-07-05 2021-07-05 Assembled temporary support for large-span dome cavern

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121506251.9U CN216043755U (en) 2021-07-05 2021-07-05 Assembled temporary support for large-span dome cavern

Publications (1)

Publication Number Publication Date
CN216043755U true CN216043755U (en) 2022-03-15

Family

ID=80554858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121506251.9U Active CN216043755U (en) 2021-07-05 2021-07-05 Assembled temporary support for large-span dome cavern

Country Status (1)

Country Link
CN (1) CN216043755U (en)

Similar Documents

Publication Publication Date Title
CN101787732B (en) Cable-stayed multi-layer framework structure and construction control method thereof
CN102127966B (en) Fixing device for template of cast-in-place reinforced concrete column
CN110004832B (en) Large-span cantilever truss type bent cap bracket system and construction method
CN111663449A (en) Combined cast-in-place box girder support system and construction method
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN209323990U (en) Concrete blanking device
CN113175091B (en) Fully assembled prestressed frame cable system combined structure
CN102277835A (en) Method for constructing single-column bent cap by adopting hoop and A-frame composite system
CN103410102A (en) H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN212175502U (en) Can dismantle bent cap construction support
CN216043755U (en) Assembled temporary support for large-span dome cavern
CN110593115A (en) Cast-in-place box girder support system and construction method thereof
CN114837090A (en) Combined support system for high tower beam construction and construction method
CN110468960B (en) Supporting structure capable of adjusting node displacement of net rack and construction method
CN209907223U (en) Temporary anchoring device for bridge tower and n-shaped main beam of cable-stayed bridge
CN112962427A (en) Off-standard span cast-in-place beam support across valley and construction method
CN207553651U (en) A kind of support device for the composite beam construction stage
CN111519949A (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN202007527U (en) Cast-in-place steel reinforcing bar concrete column template fixing device
CN114182694B (en) Gate beam reinforcing and supporting device
CN212612004U (en) Modular cast-in-place box girder braced system
CN217326794U (en) Typhoon-resistant device capable of quickly installing and reinforcing enclosure baffle
CN214739866U (en) Prestressing force mount system of independent type location, bearing reinforced concrete form
CN219908622U (en) Bridge bracket structure
CN219833633U (en) Unilateral cantilever belt diagonal bracing photovoltaic bridge support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant