CN216038278U - Novel installation of bridge crane parallel operation connecting rod device - Google Patents

Novel installation of bridge crane parallel operation connecting rod device Download PDF

Info

Publication number
CN216038278U
CN216038278U CN202122222415.1U CN202122222415U CN216038278U CN 216038278 U CN216038278 U CN 216038278U CN 202122222415 U CN202122222415 U CN 202122222415U CN 216038278 U CN216038278 U CN 216038278U
Authority
CN
China
Prior art keywords
bridge crane
connecting rod
hinge
bridge
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122222415.1U
Other languages
Chinese (zh)
Inventor
左文
黄金库
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN202122222415.1U priority Critical patent/CN216038278U/en
Application granted granted Critical
Publication of CN216038278U publication Critical patent/CN216038278U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a novel installation of bridge crane connecting rod device, including pulley yoke, bridge crane girder and backup pad, the bottom plate has been installed to the lateral wall department of bridge crane girder, and the upper end of bottom plate is equipped with first hinge and articulates with the backup pad, and the one end of backup pad centers on first hinge free rotation, and the other end of backup pad has been installed the second hinge and articulates with the bracing piece, and the pulley yoke has been installed to the up end of bridge crane girder and backup pad, and the fixed pulley has been installed at the middle part of pulley yoke. The upper end surface of the main beam of the bridge crane is also provided with a fixing device which can clamp the connecting rods and enable a plurality of bridge cranes to run in parallel; according to the utility model, the mounting step of the connecting rod is changed from traditional manual carrying to pulley rolling carrying, so that a large amount of manpower is saved for mounting work, the mounting efficiency of the connecting rod is greatly improved, and the personal safety of mounting personnel is ensured.

Description

Novel installation of bridge crane parallel operation connecting rod device
Technical Field
The utility model belongs to the technical field of hoisting equipment, and particularly relates to a novel mounting device for a parallel operation connecting rod of a bridge crane.
Background
The size and the weight of a rotor in a large hydroelectric generating set are usually large, some rotors even reach 2000T, and when the large rotor is hoisted, a single bridge crane is very difficult to hoist. At present, each large hydroelectric power plant is generally hoisted in a way of combining two bridge cranes. Namely, the two bridge cranes operate independently and do not influence each other at ordinary times. When the rotor is hoisted, the two bridge cranes are parallelly connected by adopting the balance beam and the connecting rod, so that the two bridge cranes work cooperatively, and the hoisting work of the large rotor is realized.
When the bridge cranes are combined, the bridge cranes are usually connected by connecting rods with the diameter of 150mm because the main beams of the bridge cranes are spaced by about 3 m. The connecting rod is about 3.5m long and weighs about 500 kg. When the bridge machines are connected, the connecting rod is placed on one of the bridge machines and then penetrates through a gap of about 3m between the main beams of the two bridge machines. In the process of installing the connecting rod, because the length and the weight of the connecting rod are large, and no hoisting tool is arranged on the connecting rod, the installation process is completely installed in a manual mode, so that the connecting rod is easy to fall when passing through the neutral position between the main beams, and great potential safety hazards are caused.
Disclosure of Invention
In view of the technical problems in the prior art, the novel mounting device for the connecting rod of the bridge crane in parallel operation provided by the utility model changes the mounting step of the connecting rod from the traditional manual carrying to the pulley rolling carrying, saves a large amount of manpower for the mounting work, greatly improves the mounting efficiency of the connecting rod and ensures the personal safety of mounting personnel.
In order to solve the technical problems, the utility model adopts the following technical scheme to realize:
a novel mounting device for a bridge crane parallel connection connecting rod comprises a pulley yoke, a bridge crane main beam and a supporting plate, wherein a bottom plate is arranged on the side wall of the bridge crane main beam, a first hinge is arranged at the upper end of the bottom plate and is hinged with the supporting plate, one end of the supporting plate freely rotates around the first hinge, a second hinge is arranged at the other end of the supporting plate and is hinged with the supporting rod, the pulley yoke is arranged on the upper end faces of the bridge crane main beam and the supporting plate, and a fixed pulley is arranged in the middle of the pulley yoke; the upper end face of the main beam of the bridge crane is also provided with a fixing device which can clamp the connecting rods and enable the multiple bridge cranes to run in parallel.
In the preferred scheme, seted up the spout on the bottom plate, the one end of bracing piece rotates around the second hinge, and the other end joint of bracing piece is in the spout and along spout vertical slip.
In the preferred scheme, be equipped with the draw-in groove in the spout, when the one end of bracing piece slided in the draw-in groove, bracing piece and backup pad were in the dead fixed state of lock.
In a preferred scheme, the fixing device comprises a base, an upper clamping plate and a fixing bolt; a concave groove is formed between the base and the upper clamping plate, and the base and the upper clamping plate are connected with each other through a fixing bolt and clamp the connecting rod tightly.
This patent can reach following beneficial effect:
1. the device changes the traditional manual carrying mode into the pulley rolling carrying mode, reduces the labor intensity of operators and improves the working efficiency;
2. the device is carried out on the pulley support frame in the whole transfer process of the connecting rod, so that the risk of high-altitude falling of the connecting rod is effectively prevented;
3. the supporting plate and the main beam of the bridge crane are hinged by the hinge, and the supporting plate can be rotated and folded when the bridge crane operates independently, so that the independent walking range of the bridge crane is not influenced.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the mounting device of the present invention;
FIG. 3 is a plan elevation view of the mounting device of the present invention;
fig. 4 is a connection diagram of the overall structure of the present invention.
In the figure: the bridge crane comprises a main beam 1 of the bridge crane, a connecting rod 2, a pulley frame 3, a fixed pulley 4, a supporting plate 5, a base 6, an upper clamping plate 7, a fixing bolt 8, a bottom plate 9, a sliding groove 10, a clamping groove 11, a first hinge 12, a second hinge 13, a supporting rod 14, a bridge crane 15, a bridge crane walking wheel 16 and a walking track 17.
Detailed Description
As shown in fig. 1 and 4, a novel mounting device for a bridge crane parallel operation connecting rod comprises a pulley yoke 3, a bridge crane main beam 1 and a supporting plate 5, wherein a working bridge crane 15 is arranged on the bridge crane main beam 1, a traveling rail 17 is arranged below the bridge crane 15, a bridge crane traveling wheel 16 is arranged below the bridge crane main beam 1, and the bridge crane traveling wheel 16 is clamped in the traveling rail 17 and moves along the traveling rail 17 in a limiting manner;
a bottom plate 9 is arranged on the side wall of a main beam 1 of the bridge crane, a first hinge 12 is arranged at the upper end of the bottom plate 9 and is hinged with a support plate 5, one end of the support plate 5 freely rotates around the first hinge 12, when the support plate 5 rotates to the downward vertical direction, the support plate 5 and the bottom plate 9 can be completely overlapped and folded, and when the support plate 5 rotates by 90 degrees and is in a horizontal state, the support plate 5 is unfolded and the length of the upper end face of the bottom plate 9 is prolonged; the other end of the supporting plate 5 is provided with a second hinge 13 and is hinged with a supporting rod 14, the upper end surfaces of the main beam 1 of the bridge crane and the supporting plate 5 are provided with pulley frames 3, and the middle parts of the pulley frames 3 are provided with fixed pulleys 4 and used for conveying the connecting rods 2; the upper end face of the main beam 1 of the bridge crane is also provided with a fixing device which can clamp the connecting rod 2 and enable a plurality of bridge cranes 15 to run in parallel.
As shown in fig. 2 and 3, a sliding groove 10 is formed in the bottom plate 9, one end of a supporting rod 14 rotates around a second hinge 13, and the other end of the supporting rod 14 is clamped in the sliding groove 10 and vertically slides along the sliding groove 10; a clamping groove 11 is arranged in the sliding groove 10;
when the support plate 5 is turned upwards, one end of the support rod 14 rotates along the second hinge 13, and the other end of the support rod 14 moves upwards along the sliding groove 10;
when the support plate 5 is turned downwards, one end of the support rod 14 rotates along the second hinge 13, and the other end of the support rod 14 moves downwards along the sliding groove 10;
when the supporting plate 5 is turned to the horizontal position, one end of the supporting rod 14 in the sliding groove 10 just moves into the clamping groove 11, at the moment, the supporting rod 14 is fixed by the clamping groove 11, and the supporting plate 5 is also in the horizontal locking state.
As shown in fig. 2 and 3, the fixing device comprises a base 6, an upper clamping plate 7 and a fixing bolt 8; a concave groove is formed between the base 6 and the upper clamping plate 7, and the base 6 and the upper clamping plate 7 are connected with each other through a fixing bolt 8 and clamp the connecting rod 2.
The working principle of the whole device is as follows:
1. before working, the supporting plate 5 is turned upwards, one end of the supporting rod 14 rotates along the second hinge 13, and the other end of the supporting rod 14 moves upwards along the sliding groove 10;
2. when the support plate 5 is turned to the horizontal position, one end of the support rod 14 in the sliding groove 10 just moves into the clamping groove 11, and the support plate 5 is also in the horizontal locking state;
3. placing the connecting rod 2 on the fixed pulley 4, and pushing towards the interval of the two main girders 1 of the bridge crane to place the connecting rod 2 in the grooves of the two bases 6 of the bridge crane;
4. the upper clamping plate 7 is buckled on the base 6, the fixing bolt 8 is screwed and the two clamp the connecting rod 2, and the parallel operation of the two bridge cranes is completed;
5. after the parallel operation is finished, the connecting rod 2 is firstly drawn out, then the supporting plate 5 is rotated downwards until the supporting plate 5 and the bottom plate 9 are completely overlapped and folded, and at the moment, each car machine can independently operate without influencing the stroke range.
The above-described embodiments are merely preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention is defined by the claims, and equivalents including technical features described in the claims. I.e., equivalent alterations and modifications within the scope hereof, are also intended to be within the scope of the utility model.

Claims (4)

1. The utility model provides a novel installation of bridge crane connecting rod device, including pulley yoke (3), bridge crane girder (1) and backup pad (5), its characterized in that: a bottom plate (9) is arranged on the side wall of a main beam (1) of the bridge crane, a first hinge (12) is arranged at the upper end of the bottom plate (9) and hinged with a support plate (5), one end of the support plate (5) freely rotates around the first hinge (12), a second hinge (13) is arranged at the other end of the support plate (5) and hinged with a support rod (14), a pulley frame (3) is arranged on the upper end faces of the main beam (1) of the bridge crane and the support plate (5), and a fixed pulley (4) is arranged in the middle of the pulley frame (3); the upper end face of the main beam (1) of the bridge crane is also provided with a fixing device which can clamp the connecting rod (2) and enable a plurality of bridge cranes (15) to run in parallel.
2. The novel mounting device for the connecting rod of the bridge crane in parallel according to claim 1, is characterized in that: a sliding groove (10) is formed in the bottom plate (9), one end of the supporting rod (14) rotates around the second hinge (13), and the other end of the supporting rod (14) is clamped in the sliding groove (10) and slides vertically along the sliding groove (10).
3. The novel mounting device for the connecting rod of the bridge crane in parallel according to claim 2, is characterized in that: a clamping groove (11) is formed in the sliding groove (10), and when one end of the supporting rod (14) slides into the clamping groove (11), the supporting rod (14) and the supporting plate (5) are in a locked and fixed state.
4. The novel mounting device for the connecting rod of the bridge crane in parallel according to claim 1, is characterized in that: the fixing device comprises a base (6), an upper clamping plate (7) and a fixing bolt (8); a concave groove is formed between the base (6) and the upper clamping plate (7), and the base (6) and the upper clamping plate (7) are connected with each other through a fixing bolt (8) and clamp the connecting rod (2).
CN202122222415.1U 2021-09-14 2021-09-14 Novel installation of bridge crane parallel operation connecting rod device Active CN216038278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122222415.1U CN216038278U (en) 2021-09-14 2021-09-14 Novel installation of bridge crane parallel operation connecting rod device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122222415.1U CN216038278U (en) 2021-09-14 2021-09-14 Novel installation of bridge crane parallel operation connecting rod device

Publications (1)

Publication Number Publication Date
CN216038278U true CN216038278U (en) 2022-03-15

Family

ID=80598654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122222415.1U Active CN216038278U (en) 2021-09-14 2021-09-14 Novel installation of bridge crane parallel operation connecting rod device

Country Status (1)

Country Link
CN (1) CN216038278U (en)

Similar Documents

Publication Publication Date Title
CN106892365A (en) A kind of parallel flat-top tower crane of both arms
CN206466885U (en) A kind of milling train inner structural member dismounts special hanger
CN217054271U (en) Movable type overhead welding operation platform
CN202594654U (en) Moving rotary equipment mounting bracket
CN216038278U (en) Novel installation of bridge crane parallel operation connecting rod device
JP3074765U (en) Pillar building construction system equipment
CN204371545U (en) A kind of power station impeller apparatus for examination and repair
CN110005250A (en) Friction plate girdle ring device
CN206969995U (en) A kind of suspender of nuclear power plant nuclear island main equipment
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN211419365U (en) Mobile suspension cage device for installing crane track sliding contact line
CN211947971U (en) Standardized multi-functional operation platform truck of bridge anticollision wall
CN113291968A (en) Auxiliary mounting device for sound barrier stand column
CN212334358U (en) Prefabricated staircase hoisting machine constructs
CN210702528U (en) Temporary fixing device for ladle turret revolving arm of large slab caster
CN219259316U (en) Wind-driven generator blade hoisting structure
CN211899570U (en) Suspension type steel truss structure construction platform
CN201024038Y (en) Suspension girder for two trolleys synchronous hoisting
CN218174462U (en) A hoist device for installing promote motor
CN217051474U (en) Height-adjustable's material hoist for building engineering
CN212925773U (en) Suspension type workstation is used in bridge maintenance
CN220549924U (en) Land and rail dual-purpose light hoisting device
CN220098312U (en) GIL bus overhaul and installation operation platform
CN215101540U (en) Derailing prevention device of bridge crane
CN220220483U (en) Railway contact net is with hanging shoulder frame convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant