CN211947971U - A standardized multifunctional work trolley for bridge anti-collision wall - Google Patents
A standardized multifunctional work trolley for bridge anti-collision wall Download PDFInfo
- Publication number
- CN211947971U CN211947971U CN201922462418.5U CN201922462418U CN211947971U CN 211947971 U CN211947971 U CN 211947971U CN 201922462418 U CN201922462418 U CN 201922462418U CN 211947971 U CN211947971 U CN 211947971U
- Authority
- CN
- China
- Prior art keywords
- collision wall
- trolley
- hanging basket
- fixed
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种桥梁防撞墙标准化多功能作业台车,涉及桥梁工程施工技术领域,包括台车本体、施工挂篮和吊装装置,所述台车本体用于沿防撞墙长度方向运动,所述施工挂篮与所述台车本体间隔固定,且所述施工挂篮与所述台车本体间形成容纳防撞墙的容纳区间,所述吊装装置固定于所述台车本体上,所述吊装装置用于吊装防撞墙模板、防撞墙模板支架和所述施工挂篮,本实用新型具有结构简单,安全性较高的特点。
The utility model discloses a standardized multifunctional working trolley for a bridge anti-collision wall, which relates to the technical field of bridge engineering construction. The utility model comprises a trolley body, a construction hanging basket and a hoisting device. movement, the construction hanging basket and the trolley body are fixed at intervals, and an accommodation area for accommodating an anti-collision wall is formed between the construction hanging basket and the trolley body, and the hoisting device is fixed on the trolley body The hoisting device is used for hoisting the anti-collision wall formwork, the anti-collision wall formwork support and the construction hanging basket, and the utility model has the characteristics of simple structure and high safety.
Description
技术领域technical field
本实用新型涉及桥梁工程施工技术领域,具体涉及一种桥梁防撞墙标准化多功能作业台车。The utility model relates to the technical field of bridge engineering construction, in particular to a standardized multifunctional operation trolley for a bridge anti-collision wall.
背景技术Background technique
随着城市大型公路、市政建设的飞速发展,钢模板体系的应用越来越广泛,同时,对于防撞墙这类构造物的钢模板的安装施工也提出了兼顾安全、简便及实用的要求。With the rapid development of large urban highways and municipal construction, the application of steel formwork systems has become more and more extensive. At the same time, the installation and construction of steel formwork for structures such as anti-collision walls have also put forward requirements for safety, simplicity and practicality.
由于防撞墙钢模板的安装施工属于高空作业,因此,所采用的施工台车既要保证施工方便,又要确保安全,同时,施工台车自身材料的刚度还要满足最大受力的要求。而目前用于架设防撞墙墙体刚模板的施工台车,存在结构复杂,安装防撞墙模板时安全性较低的缺点。Since the installation and construction of the anti-collision wall steel formwork is a high-altitude operation, the construction trolley used must not only ensure the convenience of construction, but also ensure safety. At the same time, the rigidity of the construction trolley itself must meet the requirements of maximum force. However, the construction trolley currently used for erecting the rigid formwork of the anti-collision wall has the disadvantages of complicated structure and low safety when installing the formwork of the anti-collision wall.
实用新型内容Utility model content
针对现有技术中存在的缺陷,本实用新型的目的在于提供一种桥梁防撞墙标准化多功能作业台车,具有结构简单,安全性较高的特点。Aiming at the defects existing in the prior art, the purpose of the present utility model is to provide a standardized multifunctional work trolley for a bridge anti-collision wall, which has the characteristics of simple structure and high safety.
为达到以上目的,本实用新型采取的技术方案是:In order to achieve the above purpose, the technical scheme adopted by the present utility model is:
提供一种桥梁防撞墙标准化多功能作业台车,包括:Provide a standardized multi-functional work trolley for bridge collision walls, including:
台车本体,所述台车本体用于沿防撞墙长度方向运动;a trolley body, the trolley body is used to move along the length of the anti-collision wall;
施工挂篮,所述施工挂篮与所述台车本体间隔固定,且所述施工挂篮与所述台车本体间形成容纳防撞墙的容纳区间;a construction hanging basket, the construction hanging basket and the trolley body are fixed at intervals, and a accommodating area for accommodating an anti-collision wall is formed between the construction hanging basket and the trolley body;
吊装装置,所述吊装装置固定于所述台车本体上,所述吊装装置用于吊装防撞墙模板、防撞墙模板支架和所述施工挂篮。A hoisting device, the hoisting device is fixed on the trolley body, and the hoisting device is used for hoisting the anti-collision wall formwork, the anti-collision wall formwork bracket and the construction hanging basket.
在上述技术方案的基础上,所述多功能作业台车还包括至少两间隔设置的挑梁,所述挑梁两端分别与所述施工挂篮和台车本体可拆卸固定。On the basis of the above technical solutions, the multifunctional work trolley further includes at least two cantilever beams arranged at intervals, and the two ends of the cantilever beams are respectively detachably fixed to the construction hanging basket and the trolley body.
在上述技术方案的基础上,所述施工挂篮包括两竖梁和支架,两所述竖梁分别与两所述挑梁可拆卸固定,所述支架固定于两所述竖梁远离所述挑梁的一端,所述支架底部设有走行板。On the basis of the above technical solution, the construction hanging basket includes two vertical beams and brackets, the two vertical beams are detachably fixed to the two cantilever beams, and the brackets are fixed to the two vertical beams away from the cantilever beams. At one end of the beam, the bottom of the bracket is provided with a running board.
在上述技术方案的基础上,所述支架侧面设有一延长板,所述延长板与所述支架底部转动连接,所述延长板通过多个限位绳与所述支架连接,所述延长板与所述走行板平行时,所述限位绳为绷紧状态。On the basis of the above technical solution, an extension plate is provided on the side of the bracket, the extension plate is rotatably connected to the bottom of the bracket, the extension plate is connected to the bracket through a plurality of limit ropes, and the extension plate is connected to the bracket. When the running boards are parallel, the limiting rope is in a taut state.
在上述技术方案的基础上,所述延长板周围设有若干安装孔,所述支架内设有多个护板,所述护板上设有多个安装杆,所述安装杆直径与安装孔直径匹配。On the basis of the above technical solution, a plurality of installation holes are arranged around the extension plate, a plurality of guard plates are arranged in the bracket, and a plurality of installation rods are arranged on the guard plate. Diameter matching.
在上述技术方案的基础上,所述挑梁与靠近所述竖梁的一端设有滑动通道,所述挑梁滑动固定于所述滑动通道内。On the basis of the above technical solution, the cantilever beam and the end close to the vertical beam are provided with a sliding channel, and the cantilever beam is slidably fixed in the sliding channel.
在上述技术方案的基础上,所述挑梁为桁架。On the basis of the above technical solution, the cantilever beam is a truss.
在上述技术方案的基础上,所述台车本体上设有吊装支架,所述吊装支架包括立柱和横杆,所述立柱一端与所述台车本体固定,另一端与所述横杆固定,所述横杆上设有所述吊装装置。On the basis of the above technical solutions, the trolley body is provided with a hoisting bracket, the hoisting bracket includes a column and a cross bar, one end of the column is fixed to the trolley body, and the other end is fixed to the cross bar, The hoisting device is provided on the cross bar.
在上述技术方案的基础上,所述吊装装置包括走形轨道和吊机,所述走形轨道固定于所述横杆上,所述吊机滑动设于所述走形轨道上,且所述走形轨道的两端分别位于所述台车本体和施工挂篮的上方。On the basis of the above technical solutions, the hoisting device includes a running track and a hoist, the running track is fixed on the cross bar, the hoist is slidably arranged on the running track, and the Both ends of the running track are respectively located above the trolley body and the construction hanging basket.
在上述技术方案的基础上,所述台车本体包括行走机构和设于所述行走机构上的本体桁架,所述本体桁架与所述施工挂篮间隔固定。On the basis of the above technical solutions, the trolley body includes a traveling mechanism and a body truss provided on the traveling mechanism, and the body truss and the construction hanging basket are fixed at intervals.
与现有技术相比,本实用新型的优点在于:Compared with the prior art, the advantages of the present utility model are:
本实用新型的一种桥梁防撞墙标准化多功能作业台车,通过设置的吊装装置,能够完成防撞墙模板和防撞墙模板支架的吊装,能够避免现有采用在手拉葫芦吊装防撞墙模板和防撞墙模板支架的方式,从而能够提高吊装防撞墙模板和防撞墙模板支架的安全性,同时,减少了现有作业台车顶部吊挂电动葫芦的结构,从而简化了整体结构。The utility model is a standardized multifunctional work trolley for a bridge anti-collision wall. The hoisting device can be used to complete the hoisting of the anti-collision wall formwork and the anti-collision wall formwork bracket, and can avoid the existing use of chain hoists for hoisting anti-collision. The method of wall formwork and anti-collision wall formwork bracket can improve the safety of hoisting the anti-collision wall formwork and the anti-collision wall formwork bracket, and at the same time, reduce the structure of the electric hoist hanging on the top of the existing work trolley, thereby simplifying the overall structure.
附图说明Description of drawings
图1为本实用新型实施例中作业台车的结构示意图;Fig. 1 is the structural representation of the working trolley in the embodiment of the utility model;
图2为本实用新型实施例中吊装装置吊装施工挂篮的结构示意图。2 is a schematic structural diagram of a hoisting device for hoisting a construction hanging basket in an embodiment of the present invention.
图中:1-台车本体,11-行走机构,12-本体桁架,2-施工挂篮,21-竖梁,22-支架,23-延长板,24-限位绳,3-吊装装置,31-走形轨道,32-吊机,4-挑梁,5-吊装支架,51-立柱,52-横杆。In the picture: 1- Trolley body, 11- Travel mechanism, 12- Main body truss, 2- Construction hanging basket, 21- Vertical beam, 22- Bracket, 23- Extension plate, 24- Limit rope, 3- Hoisting device, 31- walking track, 32- crane, 4- cantilever beam, 5- hoisting bracket, 51- column, 52- cross bar.
具体实施方式Detailed ways
以下结合附图及实施例对本实用新型作进一步详细说明。The present utility model will be described in further detail below in conjunction with the accompanying drawings and embodiments.
参见图1和图2所示,本实用新型实施例提供一种桥梁防撞墙标准化多功能作业台车,包括台车本体1、施工挂篮2和吊装装置3,台车本体1用于沿防撞墙长度方向运动,施工挂篮2与台车本体1间隔固定,且施工挂篮2与台车本体1间形成容纳防撞墙的容纳区间,吊装装置3固定于台车本体1上,吊装装置3用于吊装防撞墙模板、防撞墙模板支架和施工挂篮2。Referring to FIG. 1 and FIG. 2 , an embodiment of the present invention provides a standardized multi-functional work trolley for a bridge anti-collision wall, including a
在进行防撞墙的修建时,通过台车本体1移动至桥梁待修改防撞墙位置,通过吊装装置3吊装施工挂篮2,在施工挂篮2安装完成后,使施工人员位于施工挂篮2内,并由吊装装置3起吊防撞墙模板和防撞墙模板支架,以使施工人员完成对防撞墙模板和防撞墙模板支架的安装固定,通过台车本体1的行走功能,完成对桥梁行车方向上的防撞墙设置;在进行防撞墙的维护时,将台车本体1移动至桥梁待修改防撞墙位置,通过吊装装置3吊装施工挂篮2,在施工挂篮2安装完成后,使施工人员位于施工挂篮2内,以完成对防撞墙的维护操作,其中,在完成对防撞墙的修建或维护后,通过吊装装置3完成对施工挂篮2的起吊拆除操作。When constructing the anti-collision wall, move the
其中,采用的吊装装置3,能够完成防撞墙模板和防撞墙模板支架的吊装,进而能够避免现有采用在手拉葫芦吊装防撞墙模板和防撞墙模板支架的方式,提高了吊装防撞墙模板和防撞墙模板支架的安全性,同时,减少了现有作业台车顶部吊挂电动葫芦的结构,从而简化了整体结构。Among them, the adopted hoisting
多功能作业台车还包括至少两间隔设置的挑梁4,挑梁4两端分别与施工挂篮2和台车本体1可拆卸固定,优选地,挑梁4为桁架,通过挑梁4的设置,能够在满足抗弯刚度的前提下,简化整体的结构,进而降低了该作业台车的施工成本。The multi-functional operation trolley also includes at least two
施工挂篮2包括两竖梁21和支架22,两竖梁21分别与两挑梁4可拆卸固定,支架22固定于两竖梁21远离挑梁4的一端,支架22内设有走行区域,支架22底部设有走行板,即在走形区域底部设有走行板,能够使施工人员在施工挂篮2中走行,完成对防撞墙的修建和维护操作;进一步的,施工挂篮2呈L型,即施工挂篮2向桥梁底部水平延伸,其水平延伸部分便于施工人员在桥梁底部进行封头钢板的安装及固定,操作方便,在台车本体1的带动下,施工挂篮2与防撞墙墙体施工同步推进,避免了施工挂篮2的反复拆装工作,简化了施工流程,提高了施工效率。The construction hanging
参见图1所示,支架22侧面设有一延长板23,延长板23与支架22底部转动连接,延长板23通过多个限位绳24与支架22连接,延长板23与走行板平行时,限位绳24为绷紧状态,通过延长板23的设置,能够便于施工人员完成对桥梁底部封头钢板的安装及固定,且该延长板23在未使用时,可以转动收起,避免施工挂篮2运动过程中,该延长板23与桥梁结构发生碰撞而出现损坏的现象;1, an
延长板23周围设有若干安装孔,支架22内设有多个护板,护板上设有多个安装杆,安装杆直径与安装孔直径匹配,其中,在延长板23处于使用状态时,即延长板23与走行板平行时,通过在延长板23周围安装护板,以达到对施工人员的防护作用。A plurality of mounting holes are arranged around the
挑梁4与靠近竖梁21的一端设有滑动通道,挑梁4滑动固定于滑动通道内,竖梁21相对挑梁4滑动的设置,能够在施工防撞墙的过程中,完成对施工挂篮2的高度调节,其中,在进行施工挂篮2的高度调节时,通过吊装装置3进行调节。The
台车本体1上设有吊装支架5,吊装支架5包括立柱51和横杆52,立柱51一端与台车本体1固定,另一端与横杆52固定,横杆52上设有吊装装置3,通过吊装支架5的设置,能够提高设置吊装装置3时的安全性能,避免吊装装置3吊装防撞墙模板、防撞墙模板支架和施工挂篮2时的荷载较大,导致吊装装置3出现掉落的情况,进而提高了该作业台车的安全性能。The
吊装装置3包括走形轨道31和吊机32,走形轨道31固定于横杆52上,吊机32滑动设于走形轨道31上,且走形轨道31的两端分别位于台车本体1和施工挂篮2的上方,通过走形轨道31的设置,能够使吊机32起吊待安装的防撞墙模板、防撞墙模板支架和施工挂篮2至预定安装位置,进而提高该作业台车的安装可靠性。The
台车本体1包括行走机构11和设于行走机构11上的本体桁架12,本体桁架12与施工挂篮2间隔固定,台车本体1通过行走机构11完成沿防撞墙长度方向运动的功能,并通过本体桁架12与施工挂篮2进行固定,其中,行走机构11为履带式行走机构,能够提高该作业台车行走时的稳定性。The
其中,由于主体桁架12和挑梁5的设置,其整体抗弯刚度较大,能够减少其内部单一杆件的挠度,且,主体桁架12和挑梁5的桁架结构较现有技术中的主体车架,用钢量明显减少,制作简单,操作方便,降低了施工成本。Among them, due to the arrangement of the
本实用新型不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本实用新型的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The present invention is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principles of the present invention, several improvements and modifications can also be made. These improvements and modifications are also regarded as the present invention. within the scope of the new protection. Contents not described in detail in this specification belong to the prior art known to those skilled in the art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922462418.5U CN211947971U (en) | 2019-12-31 | 2019-12-31 | A standardized multifunctional work trolley for bridge anti-collision wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922462418.5U CN211947971U (en) | 2019-12-31 | 2019-12-31 | A standardized multifunctional work trolley for bridge anti-collision wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211947971U true CN211947971U (en) | 2020-11-17 |
Family
ID=73188571
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922462418.5U Expired - Fee Related CN211947971U (en) | 2019-12-31 | 2019-12-31 | A standardized multifunctional work trolley for bridge anti-collision wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211947971U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110924314A (en) * | 2019-12-31 | 2020-03-27 | 中铁大桥局集团第六工程有限公司 | Standardized multi-functional operation platform truck of bridge anticollision wall |
-
2019
- 2019-12-31 CN CN201922462418.5U patent/CN211947971U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110924314A (en) * | 2019-12-31 | 2020-03-27 | 中铁大桥局集团第六工程有限公司 | Standardized multi-functional operation platform truck of bridge anticollision wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107201719B (en) | Viaduct anti-collision wall template hoisting transfer machine and anti-collision wall construction method | |
| CN213013952U (en) | Highway bridge anticollision wall template dismouting construction operation platform truck | |
| RU2418735C1 (en) | Lifting crane system | |
| CN106917360A (en) | Lift leg formula frame plate machine and its frame plate method | |
| CN209227377U (en) | Rail-mounted bridge-collision-avoidance wall form trolley | |
| CN103787203B (en) | For installing the bracing frame of precast beam jack | |
| CN103628411B (en) | Attached tower cantilevered bale handle purlin, high-altitude, mountain area crane system | |
| CN103601078B (en) | Suspension type hanging device | |
| CN111115461B (en) | Reinforcing steel bar and mould transportation and automatic assembling equipment | |
| CN208308288U (en) | A kind of anti-swing device of gantry container crane | |
| CN208249734U (en) | One kind is built the road gantry crane | |
| JP2008180016A (en) | Self-climbing overhead crane | |
| CN210341680U (en) | Door type corrugated steel web plate installation and overhanging type hanging bracket structure | |
| CN110714611A (en) | Light climbing formwork steel frame system | |
| CN214143337U (en) | Installation device for composite cable saddles in narrow caverns of suspension bridges in mountainous areas | |
| CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
| CN210797269U (en) | Platform truck for disassembling and assembling guardrail templates on bridge | |
| CN116101910B (en) | Prefabricated slab beam lifting system of hoisting machine | |
| CN108078479A (en) | A kind of full hydraulic drive telescopic boom window cleaning equipment | |
| CN1737267A (en) | Walking box girder bridge erecting machine | |
| CN203684097U (en) | Mountain overhead tower-attached cantilever type beam-lifting purlin-hoisting system | |
| CN116695589A (en) | A construction method for overall assembly and lifting of a dragline hanging basket structure | |
| CN212688727U (en) | Bridge erecting machine | |
| CN210712555U (en) | A trolley for pouring anti-collision walls | |
| CN110924314A (en) | Standardized multi-functional operation platform truck of bridge anticollision wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201117 |