CN215977091U - Pipe laying and paying-off device for hydraulic engineering - Google Patents

Pipe laying and paying-off device for hydraulic engineering Download PDF

Info

Publication number
CN215977091U
CN215977091U CN202122491134.6U CN202122491134U CN215977091U CN 215977091 U CN215977091 U CN 215977091U CN 202122491134 U CN202122491134 U CN 202122491134U CN 215977091 U CN215977091 U CN 215977091U
Authority
CN
China
Prior art keywords
main part
hydraulic engineering
paying
pipe laying
shallow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122491134.6U
Other languages
Chinese (zh)
Inventor
程川兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuanyuan Construction Fujian Co ltd
Original Assignee
Chuanyuan Construction Fujian Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuanyuan Construction Fujian Co ltd filed Critical Chuanyuan Construction Fujian Co ltd
Priority to CN202122491134.6U priority Critical patent/CN215977091U/en
Application granted granted Critical
Publication of CN215977091U publication Critical patent/CN215977091U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a pipe laying and paying off device for hydraulic engineering, and relates to the field of hydraulic engineering. This pipe laying pay-off for hydraulic engineering, including the shallow main part, the bottom fixedly connected with lift pay-off of shallow main part, one side fixed connection lift rooter of shallow main part, shallow main part bottom fixed connection backfill device can carry out three kinds of work simultaneously and has reduced a large amount of manpowers, material resources and time. The inside notch of seting up of gyro wheel, and rotate on the inner wall of notch and install the pulley, the pulley passes through the belt and is connected with the transmission shaft transmission, the articulated runner in both sides of transmission shaft, the runner is fixed at the backfiller inner wall by fixed buckle, the runner passes through track B and smashes the flabellum bottom and rotate to be connected, through having set up crushing flabellum on backfilling device, to the clod, the stone is spilled for backfill progress.

Description

Pipe laying and paying-off device for hydraulic engineering
Technical Field
The utility model relates to the field of hydraulic engineering, in particular to a pipe laying and paying-off device for hydraulic engineering
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. In the years, the construction scale of the hydraulic engineering in China is getting larger, places needing to build the hydraulic engineering are more and more, a buried pipe paying-off device is generally needed in the construction process of the hydraulic engineering and used for laying underground pipelines and cables, in the process of laying the cables, the pipelines need to be dug manually, the pipelines need to be buried, the time is wasted, a large amount of soil is turned over in the grooving process, the manpower is wasted, and stones are generated in the backfilling process, the soil blocks and the stones affect the working process, thereby delaying the working efficiency.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a pipe laying and paying off device for hydraulic engineering, which solves the problems mentioned in the background technology.
(II) technical scheme
In order to achieve the purpose, the pipe laying and paying off device for the hydraulic engineering is realized by the following technical scheme: including the shallow main part, the bottom fixedly connected with lift pay-off of shallow main part, and shallow main part bottom and support A's one end fixed connection, support A's the other end rotates and connects the gyro wheel, shallow main part top fixedly connected with motor, shallow main part top fixedly connected with shallow handrail, and shallow main part top fixed connection stores up the line ware, one side fixed connection lift device of digging of shallow main part, shallow main part bottom fixed connection backfills the device.
Preferably, the support A and the rollers are provided with four groups, and the four groups of the support A and the rollers are distributed at the bottom of the cart main body.
Preferably, the outer wall of the cart handrail is provided with a rubber sleeve.
Preferably, the output shaft of the motor is rotatably connected with the threaded rod A through a transmission belt A and is in transmission connection with the threaded rod B through a rotating belt B.
Preferably, the lifting pay-off device is hollow, the inner wall of the lifting pay-off device is penetrated through by a threaded rod A, a support B is connected to the threaded rod A in a threaded mode, the support B is rotatably connected with a pay-off wheel, and the pay-off wheel is in transmission connection with an advancing wheel through a crawler belt A.
Preferably, the lifting and soil turning device is hollow, the inner wall of the lifting and soil turning device is penetrated through by a threaded rod B, the threaded rod B is in threaded connection with a support C, the support C is in transmission connection with a soil turning wheel, and the soil turning wheel is fixedly connected with a small-sized rotating motor.
Preferably, the inside notch of seting up of gyro wheel, and rotate on the inner wall of notch and install the pulley, the pulley passes through the belt and is connected with the transmission shaft transmission, the articulated runner in both sides of transmission shaft, the runner passes through track B and smashes the flabellum bottom and rotate and be connected, the one end fixed connection of runner and cassette, the other end fixed connection of cassette is in one side of backfill device inner wall.
Preferably, the two groups of crushing fan blades are symmetrically arranged and are symmetrically distributed by taking the center line of the backfilling device as an axis.
(III) advantageous effects
The utility model provides a pipe laying and paying off device for hydraulic engineering. The method has the following beneficial effects:
(1) this pipe laying pay-off for hydraulic engineering through having set up crushing flabellum on backfilling device, comes to the stone that exists in the earth of turning over after the grooving, and the clod is beaten and is spilt, and when being in of shallow and remove the in-process, the pulley that the inside setting of rear wheel begins to rotate gives the transmission shaft through belt drive, and the transmission shaft gives both sides articulated runner in the transmission, and the runner drives through track B and smashes the flabellum rotation and to the clod, and the stone is beaten and is spilt for backfill progress.
(2) This pipe laying pay-off for hydraulic engineering, through installation lift turning device, lift pay-off, and backfill device, when the shallow begins to remove, the motor drives lift turning device, lift unwrapping wire ware descends to adjust suitable position, the rotating electrical machines begins the operation to drive the soil turning wheel rotatory, open out the soil groove, the advancing wheel drives the rotatory unwrapping wire that carries out of unwrapping wire wheel through track A, the V type that is in last position is backfilled the device through with the stone, the stone is beated and is spilled and backfill, improve backfill efficiency, three kinds of work of carrying out simultaneously has reduced a large amount of manpowers, material resources and time.
Drawings
FIG. 1 is a schematic diagram of an overall apparatus according to the present invention;
FIG. 2 is a partial schematic view of the lifting and soil-turning device and the lifting and wire-releasing device of the present invention;
FIG. 3 is a partial schematic view of a structural backfill apparatus according to the present invention;
FIG. 4 is a schematic view of a backfill apparatus according to the present invention;
FIG. 5 is a schematic view of the backfill apparatus with the structure of the present invention.
In the figure: 1. a cart body; 2. a lifting pay-off device; 201. a threaded rod A; 202. a bracket B; 203. a paying-off wheel; 204. a forward wheel; 205. a crawler belt A; 3. a wire storage device; 4. a motor; 401. a transmission belt A; 402. a rotating belt B; 5. a lifting and soil turning device; 501. a threaded rod B; 502. a support C; 503. a soil turning wheel; 504. a small-sized rotating electrical machine; 6. a bracket A; 7. a roller; 8. a cart armrest; 9. a backfilling device; 901. a pulley; 902. a belt; 903. a drive shaft; 904. a crawler belt B; 905. crushing fan blades; 906. a rotating wheel; 907. a card seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a pipe burying and paying off device for hydraulic engineering comprises a cart main body 1, wherein the bottom of the cart main body 1 is fixedly connected with a lifting paying off device 2, the bottom of the cart main body 1 is fixedly connected with one end of a support A6, the other end of the support A6 is rotatably connected with a roller 7, four groups of supports A6 and rollers 7 are arranged on the support A6 and the rollers 7, the four groups of supports A6 and the rollers 7 are distributed at the bottom of the cart main body 1, the top of the cart main body 1 is fixedly connected with a motor 4, the top of the cart main body 1 is fixedly connected with a cart handrail 8, the outer wall of the cart handrail 8 is provided with a rubber sleeve, the top of the cart main body 1 is fixedly connected with a wire storage device 3 which can be used for placing cables and facilitating the use of the paying off device, the cart main body 1 is provided with a notch for paying off the lifting paying off device 2 by the wire storage device 3, one side of the cart main body 1 is fixedly connected with a lifting soil turning device 5, and the bottom of the cart main body 1 is fixedly connected with a backfilling device 9, an output shaft of the motor 4 is rotatably connected with a threaded rod A201 through a transmission belt A401 and is in transmission connection with a threaded rod B501 through a rotating belt B402, the interior of the lifting pay-off device 2 is hollow, the inner wall of the lifting pay-off device 2 is penetrated through by the threaded rod A201, the threaded rod A201 is in threaded connection with a support B202, the support B202 is rotatably connected with a pay-off wheel 203, the pay-off wheel 203 is in transmission connection with a forward wheel 204 through a crawler belt A205, the interior of the lifting soil turning device 5 is hollow, the threaded rod B501 on the inner wall of the lifting soil turning device 5 is penetrated through, the threaded rod B501 is in threaded connection with a support C502, the support C502 is in transmission connection with a soil turning wheel 503, the soil turning wheel 503 is fixedly connected with a small rotating motor 504, when the cart starts to move, the motor 4 drives the lifting soil turning device 5, the lifting pay-off device 2 descends to adjust a proper position, the small rotating motor 504 starts to operate to drive the soil turning wheel 503 to rotate to open a soil groove, the forward wheel 204 drives the pay-off wheel 203 to rotate through the crawler belt A205, the wire storage device 3 is driven to rotate, a cable in the wire storage device 3 is transmitted to the paying-off wheel 203 to be paid off, the backfilling device 9 at the last position is backfilled, and a large amount of manpower, material resources and time are reduced by performing three kinds of work simultaneously.
In the embodiment, a notch is formed in the roller 7, a pulley 901 is rotatably mounted on the inner wall of the notch, the pulley 901 is in transmission connection with a transmission shaft 903 through a belt 902, two sides of the transmission shaft 903 are hinged with rotating wheels 906, the rotating wheels 906 are in rotation connection with the bottom ends of crushing fan blades 905 through a crawler B904, the crushing fan blades 905 are symmetrically arranged in two groups, the rotating wheels 906 are fixedly connected with one end of a clamping seat 907, the other end of the clamping seat 907 is fixedly connected with one side of the inner wall of a backfilling device 9, the crushing fan blades 906 are arranged on the backfilling device 9 to break stones and soil blocks in soil which is turned over after the notch is grooved, when the cart is in a moving process, the pulley 901 arranged in the roller 7 starts to rotate and transmits the transmission shaft 903 through the belt 902, the transmission shaft 903 is in transmission connection with the rotating wheels 906 on two sides, the rotating wheels 906 drive the crushing fan blades 905 to rotate to break the soil blocks and the stones through the crawler B904, to speed up the backfill progress.
When the pipe-burying pay-off device for hydraulic engineering is in use, after the cart body 1 is pushed to a designated position, after the heights of the soil-turning device 5 and the pay-off device are adjusted, the soil-turning wheel 503 starts to rotate through the small-sized rotating motor 504 to start grooving, the advancing wheel 204 rolls by pushing the cart body 1, the advancing wheel 204 drives the pay-off wheel 203 to rotate through the crawler A205 to drive the wire storage device 3 to rotate, a cable in the wire storage device 3 is transmitted to the pay-off wheel 203 to perform the pay-off, the V-shaped backfill device 9 at the last position is provided with the crushing fan blades 905 to scatter stones and soil blocks in soil turned out after grooving, when the cart body 1 is in the moving process, the advancing wheel 204 rotates, the transmission shaft 903 transmits the rotating wheels 906 hinged to two sides, the rotating wheels 906 drive the crushing fan blades 905 to rotate through the crawler B904 to the soil blocks, the stones are scattered to accelerate the backfilling progress.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a pipe laying pay-off for hydraulic engineering, includes shallow main part (1), its characterized in that: the utility model discloses a shallow soil preparation device, including shallow main part (1), the bottom fixedly connected with of shallow main part (1) goes up and down pay-off (2), and the one end fixed connection of shallow main part (1) bottom and support A (6), the other end of support A (6) rotates and connects gyro wheel (7), shallow main part (1) top fixedly connected with motor (4), shallow main part (1) top fixedly connected with shallow handrail (8), and shallow main part (1) top fixed connection stores up line ware (3), one side fixed connection of shallow main part (1) goes up and down to turn over native device (5), shallow main part (1) bottom fixed connection backfills device (9).
2. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the trolley is characterized in that four groups of supports A (6) and four groups of rollers (7) are arranged, and the four groups of supports A (6) and the four groups of rollers (7) are distributed at the bottom of the trolley main body (1).
3. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the outer wall of the cart handrail (8) is provided with a rubber sleeve.
4. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the output shaft of the motor (4) is rotatably connected with the threaded rod A (201) through a transmission belt A (401), and is in transmission connection with the threaded rod B (501) through a rotating belt B (402).
5. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the inside cavity form that is of lift pay-off (2), and lift pay-off (2) inner wall is run through by threaded rod A (201), threaded connection has support B (202) on threaded rod A (201), support B (202) rotate with actinobacillus wheel (203) and are connected, actinobacillus wheel (203) are connected through track A (205) transmission with advancing wheel (204).
6. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the lifting soil turning device (5) is internally hollow, the inner wall of the lifting soil turning device (5) is penetrated through by a threaded rod B (501), the threaded rod B (501) is in threaded connection with a support C (502), a soil turning wheel (503) is connected with the support C (502) in a transmission mode, and the soil turning wheel (503) is fixedly connected with a small rotating motor (504).
7. The pipe laying and paying-off device for the hydraulic engineering as claimed in claim 1, wherein: the inside notch of seting up of gyro wheel (7), and rotate on the inner wall of notch and install pulley (901), pulley (901) pass through belt (902) and are connected with transmission shaft (903) transmission, the both sides of transmission shaft (903) articulate runner (906), runner (906) rotate through track B (904) and crushing flabellum (905) bottom and are connected, runner (906) and the one end fixed connection of cassette (907), the other end fixed connection of cassette (907) is in one side of backfill device (9) inner wall.
8. A pipe laying and paying off device for hydraulic engineering according to claim 7, wherein: two sets of crushing flabellum (905) are provided with in the symmetry.
CN202122491134.6U 2021-10-16 2021-10-16 Pipe laying and paying-off device for hydraulic engineering Expired - Fee Related CN215977091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122491134.6U CN215977091U (en) 2021-10-16 2021-10-16 Pipe laying and paying-off device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122491134.6U CN215977091U (en) 2021-10-16 2021-10-16 Pipe laying and paying-off device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN215977091U true CN215977091U (en) 2022-03-08

Family

ID=80511842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122491134.6U Expired - Fee Related CN215977091U (en) 2021-10-16 2021-10-16 Pipe laying and paying-off device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN215977091U (en)

Similar Documents

Publication Publication Date Title
CN103015479B (en) Biological dredging platform and method
CN214301914U (en) Directly buried cable trench excavation device
CN206694038U (en) Hob type push pipe excavator
CN109687353A (en) A kind of the sea cable paving system and its laying method of high-quality and high-efficiency
CN209133994U (en) A kind of sea cable paving system for booster stations
CN105780837B (en) The continuous method for digging and its excavating gear of diaphram wall
CN211285754U (en) Ditching device is used in gardens construction
CN215977091U (en) Pipe laying and paying-off device for hydraulic engineering
CN101864781B (en) Mining machine for dredging
CN109672114B (en) Cable laying device
CN207295821U (en) One kind is based on hydraulic engineering environment-protective desilting device
US4314414A (en) Trench digging apparatus and bearing therefor
CN219420119U (en) Automatic cable laying device
CN116093828A (en) Hydraulic engineering is with automatic integrated mechanical equipment of line is buried in scarfing cinder
CN201377098Y (en) Base level refinement and remaining soil collecting device for lining machine
CN204570774U (en) The shaping trenching machine in self-propelled seabed
CN206157887U (en) Sewer cleaning device
CN202131624U (en) Screw type ditching device
CN107060799A (en) A kind of drum-type jacking excavator
CN201520993U (en) Novel efficient automatic-controlled walking hydraulic silt remover
CN213445641U (en) Water conservancy construction pipe laying pay-off
CN204583437U (en) A kind of portable wood chipping equipment
CN204579562U (en) One digs egg machine automatically
CN209914448U (en) Weeding and ditching integrated device for sealwort planting
CN213682260U (en) Water conservancy construction pipeline pre-embedding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220308