CN215930123U - Multiple preheating device - Google Patents

Multiple preheating device Download PDF

Info

Publication number
CN215930123U
CN215930123U CN202122390979.6U CN202122390979U CN215930123U CN 215930123 U CN215930123 U CN 215930123U CN 202122390979 U CN202122390979 U CN 202122390979U CN 215930123 U CN215930123 U CN 215930123U
Authority
CN
China
Prior art keywords
air
wall
arrangement according
box
multiple preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122390979.6U
Other languages
Chinese (zh)
Inventor
许晗
许建平
李国荣
李建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dangyang Fuhao Industrial Co ltd
Original Assignee
Dangyang Fuhao Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dangyang Fuhao Industrial Co ltd filed Critical Dangyang Fuhao Industrial Co ltd
Priority to CN202122390979.6U priority Critical patent/CN215930123U/en
Application granted granted Critical
Publication of CN215930123U publication Critical patent/CN215930123U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a multiple preheating device which comprises a support, wherein an air blower is arranged on one side of the bottom of the support, a fixing frame is fixed at the top end of the support, a conical cylinder is arranged on one side of the bottom of the air blower, one end of the conical cylinder is mutually connected with the output end of the air blower, a purification box is arranged at the other end of the conical cylinder, a flat plate is arranged on the outer wall of one side of the purification box, a guide box is fixed on the outer wall of one side of the flat plate, an air guide pipe is arranged on the outer wall of one side of the guide box, a liquid injection port is arranged on one side of the top end of the air guide pipe, electric heating rods are arranged on one side of the bottom of the purification box, and two groups of the electric heating rods are arranged. The utility model not only shortens the time for raising the temperature of the air in the furnace, improves the working efficiency of the preheating device, facilitates the later maintenance of workers, enhances the maintenance convenience of the device, but also can control the air inlet speed of the mixed gas.

Description

Multiple preheating device
Technical Field
The utility model relates to the technical field of paper product production preheating, in particular to a multiple preheating device.
Background
Heating device is needed to be adopted to heat in the production process of paper products, the preheating device preheats materials before production, the preheating device is a device for improving the heat exchange performance of the paper products and reducing energy consumption, and the device mainly extracts heat carried in hot air exhausted from a tail flue of the heating device through an air preheater so that the part of heat is guided into an air inlet pipe of a production line again.
This type of preheating device on the market is various today, can satisfy people's user demand basically, but still have certain weak point, this type of preheating device of present in the use, the oxygen content in cyclic utilization's the flue gas reduces, lead to the inside material of heating device to conduct heat inadequately, reduce heating device's heating efficiency, and present preheating device is accomplishing the back of preheating, and organism cooling rate is slower, lead to the device still to be in the high temperature state, the later maintenance work for the staff has brought the inconvenience.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a multiple preheating device, so as to solve the problems of the prior art that the combustion efficiency of the subsequent heating device is reduced during the introduction of hot gas, and the cooling speed of the machine body is slow after the preheating is completed.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a multiple preheating device, includes the support, the air-blower is installed to one side of support bottom, the top of support is fixed with the mount, just a toper section of thick bamboo is installed to one side of air-blower bottom, the one end of a toper section of thick bamboo and the output interconnect of air-blower, the purifying box is installed to the other end of a toper section of thick bamboo, install the flat board on the outer wall of purifying box one side, just be fixed with the guide box on the outer wall of flat board one side, install the guide duct on the outer wall of guide duct one side, the liquid mouth is installed to one side on guide duct top, electric heating rod is installed to one side of purifying box bottom, just electric heating rod is provided with two sets ofly.
Preferably, one side of the bottom of the purification box is provided with a dust removal net, and the bottom of the purification box on one side of the dust removal net is provided with an initial effect particle filter screen.
Preferably, an electric push rod is installed on the outer wall of one side of the flat plate, equidistant center shafts are rotatably installed inside the guide box, and a connecting sheet is fixed at one end of each center shaft.
Preferably, a liquid outlet is installed at one side of the bottom end of the air guide pipe, and a switch valve is installed at the bottom end of the liquid outlet.
Preferably, the inner container is arranged inside the air guide pipe, the heat insulation layer is arranged on the inner wall of the inner container, and the electric heating wire is wound on the outer peripheral surface of the inner container.
Preferably, one end of the connecting sheet is movably provided with a connecting plate, the top end of the connecting plate is movably connected with the bottom end of a piston rod of the electric push rod, and a wind shield is fixed on one side of the surface of the middle shaft.
Preferably, the wind deflector is made of alloy steel, and the cross section of the wind deflector is rectangular.
Preferably, the dust removal net is a nylon net, and the dust removal net is four hundred meshes.
Compared with the prior art, the utility model has the beneficial effects that: the multiple preheating device not only shortens the time for raising the temperature of the air in the furnace, improves the working efficiency of the heating device, facilitates the later maintenance of workers, enhances the convenience of the maintenance of the device, but also can control the air inlet speed of the mixed gas;
(1) through the arrangement of the mutually matched structures of the air blower, the inner container and the like, the air blower introduces external fresh air into the conical barrel and the purifying box, at the moment, tail gas and the fresh air are mixed, the oxygen content in the mixed gas is increased, so that materials in the heating device can conduct heat fully, the gas after primary temperature rise is sent into the inner container, at the moment, the inner container is heated through the electric heating wire, at the moment, the mixed gas is heated secondarily, the heat of the gas is fully improved by utilizing double heating, the time of temperature rise of the air in the furnace is shortened, and the production efficiency is improved;
(2) through the arrangement of the mutually matched structures such as the liquid injection port and the inner container, cooling water is introduced into the interlayer between the air guide pipe and the inner container through the liquid injection port, at the moment, the inner container and the air guide pipe are integrally and rapidly cooled, and the used cooling liquid can be discharged to the outside through the liquid discharge port and the switch valve, so that the later maintenance of workers is facilitated, and the maintenance convenience of the device is enhanced;
(3) through being provided with the structure of mutually supporting such as connection piece and deep bead, the staff can open electric putter work, then electric putter pulling connecting plate shifts up, then the connecting plate drives multiunit connection piece, axis and rotates together, and the axis drives the deep bead and rotates promptly, and the angle of deep bead is adjusted this moment, through the angle control mixed gas's of deep bead intake.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic side sectional view of the guide box of the present invention;
FIG. 4 is a schematic cross-sectional front view of the present invention;
FIG. 5 is an enlarged view of the structure at A in FIG. 4 according to the present invention;
in the figure: 1. a support; 2. a blower; 3. a fixed mount; 4. a tapered barrel; 5. a purification box; 6. a flat plate; 7. an electric push rod; 8. a guide box; 9. an air guide pipe; 10. a liquid injection port; 11. a liquid discharge port; 12. an on-off valve; 13. a middle shaft; 14. connecting sheets; 15. a connecting plate; 16. a wind deflector; 17. an electrical heating rod; 18. A dust removal net; 19. a primary effect particulate filter screen; 20. an inner container; 21. an electric heating wire; 22. and (7) an insulating layer.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention is shown: a multiple preheating device comprises a support 1, wherein an air blower 2 is installed on one side of the bottom of the support 1, the air blower 2 can be RB-200S in type, a fixing frame 3 is fixed to the top end of the support 1, a conical barrel 4 is installed on one side of the bottom of the air blower 2, one end of the conical barrel 4 is connected with the output end of the air blower 2, a purifying box 5 is installed at the other end of the conical barrel 4, an air inlet at the top end of the purifying box 5 is connected to a tail gas supply end of a heating device, then the air blower 2 is started to work through an external control end, external fresh air is introduced into the conical barrel 4 and the purifying box 5 through the air blower 2, and the tail gas and the fresh air are mixed at the moment;
a dust removal net 18 is arranged on one side of the bottom of the purification box 5, the dust removal net 18 is a nylon net, the dust removal net 18 is four hundred meshes, a primary particle filter screen 19 is arranged on the bottom of the purification box 5 on one side of the dust removal net 18, and a flat plate 6 is arranged on the outer wall on one side of the purification box 5;
an electric push rod 7 is installed on the outer wall of one side of the flat plate 6, the type of the electric push rod 7 can be DT100, a guide box 8 is fixed on the outer wall of one side of the flat plate 6, a middle shaft 13 with equal intervals is rotatably installed inside the guide box 8, a connecting sheet 14 is fixed at one end of the middle shaft 13, a connecting plate 15 is movably installed at one end of the connecting sheet 14, the top end of the connecting plate 15 is movably connected with the bottom end of a piston rod of the electric push rod 7, a wind shield 16 is fixed on one side of the surface of the middle shaft 13, the wind shield 16 is made of alloy steel, and the section of the wind shield 16 is rectangular;
when the electric push rod 7 is started to work, the electric push rod 7 pulls the connecting plate 15 to move upwards, the connecting plate 15 drives the connecting plates 14 and the middle shaft 13 to rotate together, namely the middle shaft 13 drives the wind shield 16 to rotate, the angle of the wind shield 16 is adjusted at the moment, and the air intake of the mixed gas is controlled through the angle of the wind shield 16;
the outer wall of one side of the guide box 8 is provided with the air guide pipe 9, the inner container 20 is arranged inside the air guide pipe 9, the inner wall of the inner container 20 is provided with the heat preservation layer 22, the outer peripheral surface of the inner container 20 is wound with the electric heating wire 21, the primarily heated gas is sent into the inner container 20, the inner container 20 is heated through the electric heating wire 21 at the moment, and the mixed gas is heated secondarily, so that the heat of the gas is fully improved by utilizing double heating, the time for increasing the temperature of the air in the furnace is shortened, and the working efficiency of the heating device is improved;
when a worker needs to cool the machine body, cooling water is introduced into the interlayer between the air guide pipe 9 and the inner container 20 through the liquid injection port 10, the inner container 20 and the air guide pipe 9 are integrally and rapidly cooled, and the used cooling liquid can be discharged to the outside through the liquid discharge port 11 and the switch valve 12, so that the later maintenance of the worker is facilitated, and the maintenance convenience of the device is enhanced,
electric heating rod 17 is installed to one side of purifying box 5 bottom, and electric heating rod 17 is provided with two sets ofly, utilizes electric heating rod 17 to heat, heat up the gas after mixing to through the new trend of blowing in, improve the oxygen content in the gas.
When the device is used, firstly, an air inlet at the top end of the purifying box 5 is connected to a tail gas supply end of the heating device, then the air blower 2 is started to work through an external control end, the air blower 2 introduces external fresh air into the conical barrel 4 and the purifying box 5, at the moment, the tail gas and the fresh air are mixed, the mixed gas is heated and heated by the electric heating rod 17, so that the oxygen content in the gas is improved by blowing the fresh air, the material in the heating device can fully transfer heat, the gas after primary heating is sent into the inner container 20, at the moment, the inner container 20 is heated by the electric heating wire 21, at the moment, the mixed gas is heated secondarily, so that the heat of the gas is fully improved by utilizing dual heating, the time of temperature rise of the air in the furnace is shortened, the working efficiency of the heating device is improved, when a worker needs to cool a machine body, the cooling water is guided into the interlayer between the air guide pipe 9 and the inner container 20 through the liquid injection port 10, at the moment, the inner container 20 and the air guide pipe 9 are integrally and rapidly cooled, the used cooling liquid can be discharged to the outside through the liquid discharge port 11 and the switch valve 12, so that the later maintenance of a worker is facilitated, the maintenance convenience of the device is enhanced, the worker can open the electric push rod 7 to work, the electric push rod 7 pulls the connecting plate 15 to move upwards, the connecting plate 15 drives the multiple groups of connecting pieces 14, the middle shaft 13 rotates together, namely, the middle shaft 13 drives the wind shield 16 to rotate, the angle of the wind shield 16 is adjusted at the moment, and the air intake of the mixed gas is controlled through the angle of the wind shield 16.

Claims (8)

1. A multiple preheating device, characterized in that: the air blower comprises a support (1), wherein an air blower (2) is installed on one side of the bottom of the support (1), a fixing frame (3) is fixed to the top end of the support (1), a conical barrel (4) is installed on one side of the bottom of the air blower (2), one end of the conical barrel (4) is connected with the output end of the air blower (2) in an interconnecting mode, a purifying box (5) is installed at the other end of the conical barrel (4), a flat plate (6) is installed on the outer wall of one side of the purifying box (5), a guide box (8) is fixed on the outer wall of one side of the flat plate (6), an air guide pipe (9) is installed on the outer wall of one side of the guide box (8), a liquid injection port (10) is installed on one side of the top end of the air guide pipe (9), an electric heating rod (17) is installed on one side of the bottom of the purifying box (5), and the electric heating rod (17) is provided with two groups.
2. A multiple preheating arrangement according to claim 1, wherein: dust removal net (18) are installed to one side of purifying box (5) bottom, primary effect particle filter screen (19) are installed to purifying box (5) bottom of dust removal net (18) one side.
3. A multiple preheating arrangement according to claim 1, wherein: an electric push rod (7) is installed on the outer wall of one side of the flat plate (6), the middle shafts (13) with equal intervals are rotatably installed inside the guide box (8), and a connecting piece (14) is fixed at one end of each middle shaft (13).
4. A multiple preheating arrangement according to claim 1, wherein: a liquid outlet (11) is installed on one side of the bottom end of the air guide pipe (9), and a switch valve (12) is installed at the bottom end of the liquid outlet (11).
5. A multiple preheating arrangement according to claim 1, wherein: an inner container (20) is arranged inside the air guide pipe (9), a heat insulation layer (22) is arranged on the inner wall of the inner container (20), and an electric heating wire (21) is wound on the outer peripheral surface of the inner container (20).
6. A multiple preheating arrangement according to claim 3, wherein: one end of the connecting sheet (14) is movably provided with a connecting plate (15), the top end of the connecting plate (15) is movably connected with the bottom end of a piston rod of the electric push rod (7), and one side of the surface of the middle shaft (13) is fixed with a wind shield (16).
7. A multiple preheating arrangement according to claim 6, wherein: the wind shield (16) is made of alloy steel, and the cross section of the wind shield (16) is rectangular.
8. A multiple preheating arrangement according to claim 2, wherein: the dust removal net (18) is a nylon net, and the dust removal net (18) is four hundred meshes.
CN202122390979.6U 2021-09-30 2021-09-30 Multiple preheating device Active CN215930123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122390979.6U CN215930123U (en) 2021-09-30 2021-09-30 Multiple preheating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122390979.6U CN215930123U (en) 2021-09-30 2021-09-30 Multiple preheating device

Publications (1)

Publication Number Publication Date
CN215930123U true CN215930123U (en) 2022-03-01

Family

ID=80406961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122390979.6U Active CN215930123U (en) 2021-09-30 2021-09-30 Multiple preheating device

Country Status (1)

Country Link
CN (1) CN215930123U (en)

Similar Documents

Publication Publication Date Title
CN207721061U (en) A kind of energy-saving continuous tunnel furnace of food-baking
CN201122464Y (en) Energy-saving environment-friendly enamelling machine oven
CN209689332U (en) A kind of acryl plate hot-air drying unit
CN215930123U (en) Multiple preheating device
CN204111586U (en) A kind of strengthening convection device of annealing furnace
CN205917326U (en) Titanium sponge reducing furnace ventilation pipe structure
CN209388781U (en) A kind of horizontal enameling machine
CN206538449U (en) Improved aluminum profile aging furnace
CN202808604U (en) Device for drying glass by infrared radiation
CN203569337U (en) Energy-saving type cloth drying furnace
CN209738516U (en) drying device convenient to energy saving and emission reduction
CN217715902U (en) Aluminum melting furnace capable of preventing heat loss
CN106642679A (en) Jet metal hot-blast stove for tea heating dehumidification
CN206670297U (en) A kind of continuous feed formula automatic tea dryer
CN2558939Y (en) Hot air reverse circulation vertical wire enamelling machine oven internal chamber
CN201093854Y (en) Varnished wire baking heated air circulation apparatus
CN2841165Y (en) Efficient energy-saving plastic-coating drying apparatus
CN212456898U (en) Enameled wire energy-saving environment-friendly vertical air pressing device
CN203795176U (en) Setting machine with drying oven
CN211420265U (en) Cable processing annealing device
CN215471953U (en) Drying box for ceramic pigment
CN220103633U (en) Energy-saving hot air baking equipment
CN201809492U (en) Ultra-high molecular weight polyethylene fiber drying oven
CN215524027U (en) Drying equipment after starter propagation is soaked to chinese-medicinal material
CN213865398U (en) Efficient and energy-saving Vickers furnace for zinc oxide production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A multiple preheating device

Granted publication date: 20220301

Pledgee: China Postal Savings Bank Co.,Ltd. Yichang Branch

Pledgor: Dangyang Fuhao Industrial Co.,Ltd.

Registration number: Y2024980000388

PE01 Entry into force of the registration of the contract for pledge of patent right