CN215926643U - Double-layer indoor scaffold provided with protective air cushion - Google Patents

Double-layer indoor scaffold provided with protective air cushion Download PDF

Info

Publication number
CN215926643U
CN215926643U CN202120983843.3U CN202120983843U CN215926643U CN 215926643 U CN215926643 U CN 215926643U CN 202120983843 U CN202120983843 U CN 202120983843U CN 215926643 U CN215926643 U CN 215926643U
Authority
CN
China
Prior art keywords
guardrail
steelframe
air cushion
railing
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120983843.3U
Other languages
Chinese (zh)
Inventor
刘伟
杨玉军
杨西民
陈江
郭芳欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120983843.3U priority Critical patent/CN215926643U/en
Application granted granted Critical
Publication of CN215926643U publication Critical patent/CN215926643U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a double-layer indoor scaffold for installing a protective air cushion, which comprises a guardrail A, a steel frame and an iron frame plate, wherein one side of the guardrail A is provided with a connecting block through a hinge, the connecting block is fixed on one side of the steel frame, the other side of the guardrail A is fixed on the other side of the steel frame through a hook, the inner side of the steel frame is provided with a railing and a rolling bolt which are used in a matched mode, the railing is positioned below the guardrail A, the iron frame plate is fixed between the steel frames, the iron frame plate is positioned right below the railing, the steel frame is provided with the bolt A, and the bolt A is matched with the railing and the guardrail B for use. The guardrail A is arranged between the steel frames, and the connecting block and the hinge which are arranged on one side of the steel frames and used in a matched mode are connected with the guardrail A, so that protection of a master worker during high-altitude operation at a higher layer is achieved, and secondary protection of the master worker during operation is achieved by combining and installing the guardrail at the bottom of the guardrail A.

Description

Double-layer indoor scaffold provided with protective air cushion
Technical Field
The utility model relates to the field of building construction tools, in particular to a double-layer indoor scaffold provided with a protective air cushion.
Background
Scaffold frame wide application is in the construction field, and the constructor of being convenient for supports to trample the use tool that carries out work, indicates that the job site is used in outer wall, interior decoration or the higher place that can't directly be under construction on the building site for the workman operates and solve perpendicular and horizontal transportation and set up various supports.
At present traditional scaffold frame does not set up protection device, and constructor when working on the scaffold frame, because the job site has the gravel and sand, easily lead to the constructor sole to skid, cause to tumble, and the workman wimble can cause to cut the piece to the scratch to the wall when promoting the scaffold frame without paying close attention to slightly, cause the unnecessary wall body to damage.
SUMMERY OF THE UTILITY MODEL
The present invention aims at providing a double-layer indoor scaffold with protective air cushion to solve the problems in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an installation protection air cushion's double-deck indoor scaffolding, includes guardrail A, steelframe and iron stand board, there is the connecting block one side of guardrail A through hinged joint, and the connecting block is fixed in one side of steelframe, and guardrail A's opposite side is passed through the couple and is fixed at the opposite side of steelframe, install railing and the roll bolt that the cooperation was used on the inboard of steelframe, and the railing is located guardrail A's below, be fixed with iron stand board between the steelframe, and the iron stand board is located the railing under, and install bolt A on the steelframe, and bolt A uses with railing and guardrail B cooperation, there is the walking wheel bottom of steelframe through bolt B fixed mounting.
Preferably, an air cushion box is installed on one side of the steel frame, and the air cushion box releases the inflatable air cushion through an air cushion opening.
Preferably, a box body is installed on one side of the steel frame, and a small-sized inflator pump is installed inside the box body.
Preferably, a climbing frame is welded and installed between the inner parts of the steel frames.
Preferably, the inside of iron frame board installs the steel mesh, the couple is installed at the both ends of iron frame board, and the couple uses with the cooperation of installing the barb mouth on the steelframe.
Compared with the prior art, the utility model has the beneficial effects that: this double-deck indoor scaffold equipment of installation protection air cushion is rational in infrastructure, has following advantage:
(1) guardrail A is joined in marriage through the installation between the steelframe, and connecting block and the hinge that one side installation cooperation through the steelframe was used are connected with guardrail A, have realized the protection when the high altitude construction of master worker at the higher floor, have installed the railing through the bottom composite mounting at guardrail A, have realized the secondary protection when the operation to master worker.
(2) Through four air cushion boxes of group of both sides installation at the steelframe, release by the air cushion box and aerify the air cushion, install small-size pump through one side at the steelframe, the manual work uses and aerifys the back, has realized that the scaffold plays the guard action to the wall body when removing, through installing the walking wheel that can fix at any time in the bottom of steelframe, has made things convenient for the workman's operation, has improved work efficiency.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is an expanded view of the air cushion box of the elevational structure of the present invention;
FIG. 3 is a schematic side view of the present invention;
FIG. 4 is a schematic top view of the present invention;
FIG. 5 is a schematic view of the steel frame back structure of the present invention;
fig. 6 is an enlarged schematic view of the iron frame plate of the present invention.
In the figure: 1. a guardrail A; 101. connecting blocks; 102. a hinge; 2. an air cushion box; 201. inflating the air cushion; 202. an air cushion port; 3. a steel frame; 301. a barb opening; 302. a guardrail B; 303. a climbing frame; 304. a bolt A; 4. a railing; 401. a roll bolt; 5. an iron frame plate; 501. a steel mesh; 502. hooking; 6. a box body; 601. a small inflator; 7. a traveling wheel; 701. and B, a bolt B.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, an embodiment of the present invention is shown: a double-layer indoor scaffold for installing a protective air cushion comprises a guardrail A1, a steel frame 3 and an iron frame plate 5, wherein a connecting block 101 is installed on one side of a guardrail A1 through a hinge 102, the connecting block 101 is fixed on one side of the steel frame 3, the other side of the guardrail A1 is fixed on the other side of the steel frame (3) through a hook 502, a railing 4 and a rolling bolt 401 which are used in a matched mode are installed on the inner side of the steel frame 3, the railing 4 is located below the guardrail A1, the iron frame plate 5 is fixed between the steel frames 3, the iron frame plate 5 is located right below the railing 4, a bolt A304 is installed on the steel frame 3, the bolt A304 is matched with the railing 4 and a guardrail B302 for use, and a traveling wheel 7 is fixedly installed at the bottom of the steel frame 3 through a bolt B701;
specifically, when in use, the device components are moved to a construction site, assembled after reaching the construction site, and after the assembly is completed, four groups of travelling wheels 7 which can move at any time are arranged at the bottoms of the two groups of steel frames 3 to realize the movement of the scaffold, after the scaffold reaches a specified position, the small-sized inflator pump 601 in the box body 6 is taken out, the inflatable air cushion 201 in the air cushion box 2 is drawn out from the air cushion port 202 to realize inflation, the protection effect on the wall body is enhanced, by installing the iron frame plates 5 at intervals between the two steel frames 3, a worker moves up and down from the climbing frame 303 on the steel frame 3, the problem that fragment residues generated when a worker rotates holes in the opposite top are remained in the scaffold is solved by installing the steel mesh 501 in the iron frame plate 5, and finally, the scaffold is dismantled and removed from a construction site after the operation is finished;
a climbing frame 303 is welded and installed between the inner parts of the steel frame 3, a connecting block 101 is installed on one side of a guardrail A1 through a hinge 102, the connecting block 101 is fixed on one side of the steel frame 3, and the other side of a guardrail A1 is fixed on the other side of the steel frame 3 through a hook 502;
specifically, the guard rails A1 are installed between the steel frames 3, the connecting blocks 101 and the hinges 102 which are installed on one sides of the steel frames 3 and used in a matched mode are connected with the guard rails A1, protection of a master worker during high-altitude operation at a higher level is achieved, the guard rails 4 are installed at the bottoms of the guard rails A1 in a combined mode, secondary protection of the master worker during operation is achieved, and the climbing frame 303 facilitates up-and-down work of the master worker;
a box body 6 is installed on one side of the steel frame 3, a small inflator pump 601 is installed inside the box body 6, an air cushion box 2 is installed on one side of the steel frame 3, and the air cushion box 2 releases an inflation air cushion 201 through an air cushion port 202;
specifically, through four air cushion boxes 2 of group of installation in the both sides of steelframe 3, release by air cushion box 2 and aerify air cushion 201, through install small-size pump 601 in one side of steelframe 3, the manual work is used and is aerifyd the back, has realized that scaffold has played the guard action to the wall body when removing, through installing walking wheel 7 that can fix at any time in the bottom of steelframe 3, has made things convenient for the workman to operate, has improved work efficiency.
The working principle is as follows: when in use, firstly, the components of the device are moved to a construction site, assembled after reaching the construction site, and assembled after the assembly is completed, four groups of travelling wheels 7 which can move at any time are arranged at the bottoms of the two groups of steel frames 3 to realize the movement of the scaffold, after the scaffold reaches a specified position, the small-sized inflator pump 601 in the box body 6 is taken out, the inflatable air cushion 201 in the air cushion box 2 is drawn out from the air cushion port 202 to realize inflation, the protection effect on the wall body is enhanced, by installing the iron frame plates 5 at intervals between the two steel frames 3, a worker moves up and down from the climbing frame 303 on the steel frame 3, through at the internally mounted steel mesh 501 of iron frame board 5, solve the problem that the master worker of workman produced fragment residue remained in the scaffold when rotating the hole to the top, finally, through the operation end, demolish the scaffold, remove from the job site.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. The utility model provides an installation protection air cushion's double-deck indoor scaffold, includes guardrail A (1), steelframe (3) and iron stand board (5), its characterized in that: connecting block (101) are installed through hinge (102) in one side of guardrail A (1), and connecting block (101) are fixed in one side of steelframe (3), and the opposite side of guardrail A (1) is fixed at the opposite side of steelframe (3) through couple (502), install railing (4) and roll bolt (401) that the cooperation was used on the inboard of steelframe (3), and railing (4) are located the below of guardrail A (1), be fixed with iron frame board (5) between steelframe (3), and iron frame board (5) are located railing (4) under, and install bolt A (304) on steelframe (3), and bolt A (304) and railing (4) and guardrail B (302) cooperation are used, there is walking wheel (7) bottom through bolt B (701) fixed mounting of steelframe (3).
2. The double-deck indoor scaffold installed with protective air cushions as claimed in claim 1, wherein: an air cushion box (2) is installed on one side of the steel frame (3), and the air cushion box (2) releases an inflatable air cushion (201) through an air cushion opening (202).
3. The double-deck indoor scaffold installed with protective air cushions as claimed in claim 1, wherein: a box body (6) is installed on one side of the steel frame (3), and a small-sized inflator pump (601) is installed inside the box body (6).
4. The double-deck indoor scaffold installed with protective air cushions as claimed in claim 1, wherein: and a climbing frame (303) is welded between the inner parts of the steel frames (3).
5. The double-deck indoor scaffold installed with protective air cushions as claimed in claim 1, wherein: the steel mesh (501) is installed to the internally mounted of iron frame board (5), couple (502) are installed at the both ends of iron frame board (5), and couple (502) and install barb mouth (301) cooperation use on steelframe (3).
CN202120983843.3U 2021-05-10 2021-05-10 Double-layer indoor scaffold provided with protective air cushion Expired - Fee Related CN215926643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120983843.3U CN215926643U (en) 2021-05-10 2021-05-10 Double-layer indoor scaffold provided with protective air cushion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120983843.3U CN215926643U (en) 2021-05-10 2021-05-10 Double-layer indoor scaffold provided with protective air cushion

Publications (1)

Publication Number Publication Date
CN215926643U true CN215926643U (en) 2022-03-01

Family

ID=80410416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120983843.3U Expired - Fee Related CN215926643U (en) 2021-05-10 2021-05-10 Double-layer indoor scaffold provided with protective air cushion

Country Status (1)

Country Link
CN (1) CN215926643U (en)

Similar Documents

Publication Publication Date Title
CN215926643U (en) Double-layer indoor scaffold provided with protective air cushion
CN209179643U (en) Guardrail formwork assembling and disassembling dedicated trolley
CN203867583U (en) Tunnel constructing platform
CN210368666U (en) Safe hanging flower basket is used in bridge construction
CN207686260U (en) A kind of overhanging construction system for building the construction of cornice position
CN203034370U (en) Walking car used for maintaining suspended rails
CN211736279U (en) Scaffold for interior decoration
CN113323425B (en) Multi-purpose nondestructive rapid mounting and dismounting edge-facing protective net
CN215167767U (en) Slip stable portable scaffold frame
CN201801812U (en) Multi-functional highway-railway overhead working truck for bridge inspection
CN202896536U (en) Wheel washing machine
CN211648412U (en) Air compressor machine with function of making an uproar falls in giving sound insulation
CN210239201U (en) Cart type elevator wellhead and hoistway protection device
CN206667711U (en) A kind of scaffold that can adjust height
CN217710363U (en) Square column steel formwork component for road and bridge building
CN205918085U (en) External wall construction hydraulic means
CN110528953A (en) A kind of communications tower of anti-climbing solar energy
CN206091254U (en) Whole construction scaffold frame of track formula of climbing
CN219451556U (en) Telescopic discharging platform
CN210699343U (en) Multi-functional maintenance device of environmental protection
CN110206331A (en) A kind of cart type elevator shaft mouth and hoistway protective device and construction method
CN216498294U (en) Interior decoration dust collector
CN212246135U (en) Maintenance hoisting device is transported to externally-hung wallboard for assembly type structure
CN211596451U (en) Hanging flower basket device for bridge construction
CN213234545U (en) Road and bridge construction is with making an uproar protective screen of falling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220301