CN215926076U - Tunnel bituminous pavement auxiliary construction steel plate - Google Patents
Tunnel bituminous pavement auxiliary construction steel plate Download PDFInfo
- Publication number
- CN215926076U CN215926076U CN202122446272.2U CN202122446272U CN215926076U CN 215926076 U CN215926076 U CN 215926076U CN 202122446272 U CN202122446272 U CN 202122446272U CN 215926076 U CN215926076 U CN 215926076U
- Authority
- CN
- China
- Prior art keywords
- steel frame
- inspection well
- plate
- tunnel
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 52
- 239000010959 steel Substances 0.000 title claims abstract description 52
- 238000010276 construction Methods 0.000 title claims abstract description 31
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 50
- 238000007689 inspection Methods 0.000 claims abstract description 32
- 229910052742 iron Inorganic materials 0.000 claims abstract description 25
- 239000010426 asphalt Substances 0.000 claims abstract description 19
- 238000009434 installation Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005096 rolling process Methods 0.000 description 7
- 239000002344 surface layer Substances 0.000 description 6
- 238000004140 cleaning Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000011384 asphalt concrete Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a tunnel asphalt pavement auxiliary construction steel plate, which comprises a steel frame arranged on an inspection well in a tunnel hole, and an iron cover plate which is embedded into the inner side of the steel frame and covers the inspection well. The steel frame is larger than or equal to the wellhead of the inspection well; the area of the iron cover plate corresponds to the area of the inner side of the steel frame. Fixing plates extending outwards are respectively arranged on two sides of the steel frame; the fixing plate is provided with a fixing hole. The fixing hole is provided with a screw which passes through the fixing hole to fix the fixing plate on the inspection well. The utility model has the effects of facilitating the construction and the modularized installation of the road surface and saving the labor cost.
Description
Technical Field
The utility model relates to the field of tunnel construction materials, in particular to a tunnel asphalt pavement auxiliary construction steel plate.
Background
With the rapid development of asphalt pavement construction technology, more and more tunnel pavements are constructed by adopting asphalt concrete, however, two inspection wells are respectively arranged in the tunnel every 50 meters. At present, the well lid on the inspection shaft mainly adopts precast concrete apron, covers the well lid again after bituminous paving construction accomplishes. The existing construction method is that when the tunnel asphalt is constructed, a wooden template is used for covering an inspection wellhead, the asphalt around the wellhead is chiseled after the asphalt pavement construction is finished, and then a cover plate is installed. However, the adopted wood template has poor stability, and the construction process is easy to push and damage, so that a large amount of asphalt mixture falls off from the inspection well; in addition, before the inspection well cover is installed, a large amount of manpower and material resources are consumed for cleaning, and asphalt edges around the well mouth are crushed due to rolling of the rubber-tyred roller to form an inclined plane; in addition, during installation, the cover plates are different in size and have height difference, and great hidden danger is caused to driving safety after installation is completed.
SUMMERY OF THE UTILITY MODEL
In view of the above problems, the present invention aims to provide an auxiliary construction steel plate for tunnel asphalt pavement, which facilitates the construction and modular installation of the pavement and saves labor cost.
In order to achieve the purpose, the utility model provides an auxiliary construction steel plate for a tunnel asphalt pavement, which comprises a steel frame arranged on an inspection well in a tunnel hole, and an iron cover plate which is embedded into the inner side of the steel frame and covers the inspection well, wherein the steel frame is arranged on the inspection well. The steel frame is greater than or equal to the well mouth of the inspection well, and the area of the iron cover plate corresponds to the area of the inner side of the steel frame. Fixing plates extending outwards are respectively arranged on two sides of the steel frame; the fixed plate is provided with a fixed hole, and the fixed hole is provided with a screw which penetrates through the fixed hole to fix the fixed plate on the inspection well.
In some embodiments, the steel frame is a box iron frame.
In some embodiments, a supporting block for supporting the iron cover plate is arranged on the inner side of the steel frame.
In some embodiments, the steel frame has a dimension of 70cm x 40cm or 70cm x 65 cm.
In some embodiments, the iron cover plate is provided with a handle hole.
The utility model has the advantages of convenient construction and modular installation of the road surface and labor cost saving. During specific application, before the construction of a middle surface layer (5.5cm) of tunnel asphalt, the steel frame is fixedly installed at an inspection well mouth, an iron cover plate is placed on the steel frame during construction, and the iron plate is taken out after the rolling of the middle surface layer is completed. Before the construction of the upper surface layer (4.5cm), the iron cover plate is installed in the steel frame, the iron cover plate is taken out after the rolling is finished, and finally the uniform prefabricated cement cover plate for the inspection well is installed. So not only can guarantee that the pitch work progress can not drop to cause the later stage to produce a large amount of cleaning work in the inspection shaft, also avoided the well head all around pitch limit portion simultaneously because of rolling of rubber tyer road roller collapse the limit and form the inclined plane, with the apron formation not of uniform size the difference in height's the condition, ensure the roughness on whole driving road surface. The inspection well is polluted by a large amount of mixtures during tunnel asphalt pavement construction to the greatest extent, the flatness around the inspection well is improved, and the construction problem of smooth running surface is ensured. The construction and the modularization installation of the road surface of being convenient for have been realized, and the effect of saving the cost of labor.
Drawings
FIG. 1 is an exploded view of the present invention;
FIG. 2 is a schematic view of the structure of the assembled state of the present invention;
fig. 3 is a schematic structural view of the steel frame of fig. 1.
Detailed Description
The following describes the present invention in further detail with reference to the accompanying drawings.
As shown in fig. 1-3, an auxiliary construction steel plate for a tunnel asphalt pavement comprises a steel frame 1 arranged on an inspection well in a tunnel, and an iron cover plate 2 embedded into the inner side of the steel frame 1 and covering the inspection well and arranged on the steel frame 1. The steel frame 1 is larger than or equal to the well mouth of the inspection well, and the area of the iron cover plate 2 corresponds to the area of the inner side of the steel frame 1. Fixing plates 3 extending outwards are respectively arranged on two sides of the steel frame 1; the fixing plate 3 is provided with a fixing hole 4, and the fixing hole 4 is provided with a screw which penetrates through the fixing hole 4 and fixes the fixing plate 3 on the inspection well. The steel frame 1 is a square iron frame. The inner side of the steel frame 1 is provided with a supporting block 5 for supporting the iron cover plate 2. The steel frame 1 has dimensions of 70cm x 40cm or 70cm x 65 cm. The iron cover plate 2 is provided with a handle hole 6.
During application, before the construction of a middle surface layer (5.5cm) of tunnel asphalt, the steel frame 1 is fixedly installed at an inspection well mouth, an iron cover plate 2 is placed on the steel frame 1 during construction, and the iron plate is taken out after the rolling of the middle surface layer is completed. Before the construction of an upper surface layer (4.5cm), the iron cover plate 2 is installed in the steel frame 1, the iron cover plate 2 is taken out after the rolling is finished, and finally, the uniform prefabricated inspection well cement cover plate is installed. So not only can guarantee that the pitch work progress can not drop to cause the later stage to produce a large amount of cleaning work in the inspection shaft, also avoided the well head all around pitch limit portion simultaneously because of rolling of rubber tyer road roller collapse the limit and form the inclined plane, with the apron formation not of uniform size the difference in height's the condition, ensure the roughness on whole driving road surface. The inspection well is polluted by a large amount of mixtures during tunnel asphalt pavement construction to the greatest extent, the flatness around the inspection well is improved, and the construction problem of smooth running surface is ensured. The construction and the modularization installation of the road surface of being convenient for have been realized, and the effect of saving the cost of labor.
What has been described above are merely some embodiments of the present invention. It will be apparent to those skilled in the art that various changes and modifications can be made without departing from the inventive concept herein, and it is intended to cover all such modifications and variations as fall within the scope of the utility model.
Claims (5)
1. A tunnel asphalt pavement auxiliary construction steel plate is characterized by comprising a steel frame arranged on an inspection well in a tunnel hole, and an iron cover plate which is embedded into the inner side of the steel frame and covers the inspection well, wherein the steel frame is arranged on the steel frame;
the steel frame is larger than or equal to the wellhead of the inspection well; the area of the iron cover plate corresponds to the area of the inner side of the steel frame;
fixing plates extending outwards are respectively arranged on two sides of the steel frame; the fixing plate is provided with a fixing hole; and the fixing hole is provided with a screw which passes through the fixing hole to fix the fixing plate on the inspection well.
2. The steel plate for assisting construction of the asphalt pavement of the tunnel according to claim 1, wherein the steel frame is a square iron frame.
3. The steel plate as claimed in claim 2, wherein a supporting block for supporting the iron cover plate is provided on the inner side of the steel frame.
4. The steel plate for assisting construction of asphalt pavement of tunnel according to claim 1, 2 or 3, wherein the size of the steel frame is 70cm x 40cm or 70cm x 65 cm.
5. The steel plate for assisting construction of the asphalt pavement of the tunnel according to claim 1, wherein the iron cover plate is provided with a handle hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122446272.2U CN215926076U (en) | 2021-10-11 | 2021-10-11 | Tunnel bituminous pavement auxiliary construction steel plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122446272.2U CN215926076U (en) | 2021-10-11 | 2021-10-11 | Tunnel bituminous pavement auxiliary construction steel plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215926076U true CN215926076U (en) | 2022-03-01 |
Family
ID=80408411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122446272.2U Active CN215926076U (en) | 2021-10-11 | 2021-10-11 | Tunnel bituminous pavement auxiliary construction steel plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215926076U (en) |
-
2021
- 2021-10-11 CN CN202122446272.2U patent/CN215926076U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112031374A (en) | Construction method of basement large-area terrace | |
CN111764216A (en) | Construction method and application of fabricated concrete road plate | |
LU501207B1 (en) | Structure and method for reinforcing manhole cover anchored with existing road surface foundation by means of dowel bars | |
CN112227759B (en) | Repair, reinforcement and migration method for historic building clean water wall | |
CN114150593B (en) | Simple arch bridge dismantling and reconstructing structure and arch bridge dismantling and reconstructing method | |
CN215926076U (en) | Tunnel bituminous pavement auxiliary construction steel plate | |
CN109488037A (en) | A kind of environmental protection construction method that private residence is quickly rebuild | |
CN105507109A (en) | Damaged concrete pavement panel reinforcing structure and method | |
CN103343503A (en) | Bridge type wear-resistant pavement structure system with prefabricated reinforced concrete trough plate and construction method | |
CN108222010A (en) | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method | |
CN209443368U (en) | The overhead anti-ponding structure in bridge floor edge | |
CN111663770A (en) | Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold | |
CN208121776U (en) | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled | |
CN203905331U (en) | Cast-in-place plate-type staircase with seamless steps | |
CN113026473B (en) | Road widening construction method | |
CN214992802U (en) | Asphalt pavement pit repairing structure | |
CN211849540U (en) | Building rubbish breaks room soil and handles weak foundation structure | |
CN212533597U (en) | Novel assembled temporary road structure | |
CN112045840B (en) | Construction method of assembly type beam storage pedestal for prefabricating high-speed railway box beam | |
CN213267374U (en) | Fabricated road for construction site | |
CN203429528U (en) | Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system | |
CN113638443A (en) | Construction process of underground comprehensive pipe gallery | |
CN111979865A (en) | Composite asphalt pavement construction method | |
CN113339003A (en) | Construction method of tunnel integrated arch sheathing trolley | |
CN206666971U (en) | A kind of assembled road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |