CN215809451U - Air energy heat pump unit capable of quickly defrosting - Google Patents

Air energy heat pump unit capable of quickly defrosting Download PDF

Info

Publication number
CN215809451U
CN215809451U CN202121552406.2U CN202121552406U CN215809451U CN 215809451 U CN215809451 U CN 215809451U CN 202121552406 U CN202121552406 U CN 202121552406U CN 215809451 U CN215809451 U CN 215809451U
Authority
CN
China
Prior art keywords
heat pump
pump unit
air energy
energy heat
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121552406.2U
Other languages
Chinese (zh)
Inventor
阮彩仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xuanke Energy Saving Technology Co ltd
Original Assignee
Guangdong Xuanke Energy Saving Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xuanke Energy Saving Technology Co ltd filed Critical Guangdong Xuanke Energy Saving Technology Co ltd
Priority to CN202121552406.2U priority Critical patent/CN215809451U/en
Application granted granted Critical
Publication of CN215809451U publication Critical patent/CN215809451U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Defrosting Systems (AREA)

Abstract

The utility model discloses an air energy heat pump unit capable of quickly defrosting, which belongs to the technical field of air energy heat pump equipment and comprises a base, wherein the upper surface of the base is provided with an installation groove, an installation block is inserted in the installation groove, the air energy heat pump unit capable of quickly defrosting is provided with an evaporator, an evaporator absorbs air, the air is compressed into a refrigerant through a conveying pipe and the compressor, the temperature is increased after the air is compressed, the air energy heat pump unit is heated or cooled through the condenser, and the heating efficiency or the cooling efficiency of the equipment can be effectively improved by matching the heating box, the defrosting effect of the heat pump unit is enhanced, and the damage of frozen ice of equipment is prevented.

Description

Air energy heat pump unit capable of quickly defrosting
Technical Field
The utility model belongs to the technical field of air-source heat pump equipment, and particularly relates to an air-source heat pump unit capable of quickly defrosting.
Background
The air energy heat pump device is more and more favored by people as a novel energy heating device, but for areas with low temperature or even ultra-low temperature, the limited constraint is very large, the ultra-low temperature air energy heat pump unit is appeared, and the problems are well solved; when the evaporation temperature is lower than 0 ℃, the surface of the first heat exchanger begins to frost, the increase of a frost layer can aggravate the reduction of the evaporation temperature, the enthalpy value and the heating capacity of a system, further, the first heat exchanger is frozen, and the situation is serious, so that the compressor can be damaged due to liquid impact.
However, the traditional air energy heat pump unit is complex in structure and not easy to install and detach, great troubles are brought to users, the working temperature environment of the equipment can not be adjusted according to environmental requirements, the equipment can be frozen and frosted to influence the use, the operation efficiency of the heat pump unit is low, the equipment is not fully protected, and the equipment buffering protection performance, the flexibility and the practicability are poor.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model aims to: the utility model provides an air energy heat pump unit capable of quickly defrosting, and aims to solve the problems that the structure of the air energy heat pump unit is complex, the air energy heat pump unit is not easy to install and disassemble, great troubles are brought to users, the working temperature and environment of equipment cannot be adjusted according to environment requirements, the equipment can be frozen and frosted to influence the use, the operation efficiency of the heat pump unit is low, the equipment is not fully protected, and the buffering protection performance, flexibility and practicability of the equipment are poor.
(II) technical scheme
The utility model specifically adopts the following technical scheme for realizing the purpose:
the utility model provides an air can heat pump set of ability defrosting fast, the on-line screen storage device comprises a base, the mounting groove has been seted up to the upper surface of base, the inside of mounting groove is pegged graft and is had the installation piece, one side fixedly connected with air can heat pump set case of installation piece, the inner wall of air can heat pump set case is provided with the fixed block, the last fixed surface of fixed block is connected with the backup pad, the last fixed surface of backup pad is connected with the evaporimeter, the middle part of evaporimeter is provided with the heating cabinet, the lower fixed surface of evaporimeter is connected with the conveyer pipe, one side fixedly connected with compressor of conveyer pipe, one side fixedly connected with condenser of compressor, the front of air can heat pump set case is provided with the chamber door, the front of chamber door has set gradually control panel, handle and trick lock from a left side to the right side.
Further, the inner wall fixedly connected with motor of heating cabinet, the output fixedly connected with flabellum of motor, the middle part of heating cabinet is provided with the heat-conducting layer.
Furthermore, the back of the air energy heat pump unit box is fixedly connected with a fan box, a support frame is arranged on the inner wall of the fan box, and a fan is arranged in the middle of the support frame.
Furthermore, ventilation grooves are formed in the left side and the right side of the air energy heat pump unit box, and dust screens are arranged inside the ventilation grooves.
Further, the inner wall of the mounting block is fixedly connected with a metal spring, and an elastic element is arranged on the inner wall of the metal spring.
Furthermore, the inner wall of the base is provided with a groove, the inner wall of the groove is fixedly connected with a clamping spring, and one side of the clamping spring is fixedly connected with a clamping plate.
Further, the lower surface fixed connection of base has the universal wheel, one side of universal wheel is provided with the locking piece.
Further, all be provided with the screw rod seat around the base upper surface, the inside threaded connection of screw rod seat has the screw rod, the lower fixed surface of screw rod is connected with the fixed plate.
(III) advantageous effects
The utility model has the following beneficial effects:
1. the air energy heat pump unit capable of quickly defrosting is characterized in that the air energy heat pump unit box, the box door, the control panel, the handle and the coded lock are arranged in a matched mode, the air energy heat pump unit box can be quickly and safely arranged in the base through the matched arrangement of the mounting groove and the mounting block when in use, the fixed block and the supporting plate can conveniently support and disassemble internal equipment, the evaporator, the heating box, the conveying pipe, the compressor and the condenser are arranged, the evaporator absorbs air and is compressed into a refrigerant through the conveying pipe and the compressor, the temperature is increased after the compression, then the refrigerant is heated or cooled through the condenser, the equipment heating or cooling efficiency can be effectively improved through the matched heating box, the defrosting effect of the heat pump unit is enhanced, the equipment is prevented from being damaged by freezing ice, the control panel, the handle and the coded lock are arranged, the pressure gauge and the display screen which are arranged on the front surface of the control panel can monitor the working state of the equipment, the cooperation handle and trick lock can conveniently overhaul equipment internals, avoid irrelevant personnel to destroy equipment, guarantee its safe in utilization, the setting of motor and flabellum, the motor drives the flabellum and rotates, the cooperation heat-conducting layer can be quick for equipment heating or cooling, for equipment provides good operating condition, the setting of fan and ventilation groove can ensure the timely inhaled air of evaporimeter, in time with the work area of heat transfer or discharge compressor, thereby guarantee equipment safety, improve equipment life.
2. This air energy heat pump set that can change frost fast, through metal spring, chucking spring, the cardboard, the universal wheel, the screw rod seat, the cooperation setting of screw rod and fixed plate, the elasticity of using metal spring during the use, cooperation elastic element can provide certain buffering shock-absorbing capacity for equipment fixing, setting through chucking spring and cardboard, can ensure that equipment is fixed safe firm, make things convenient for its installation to dismantle, the universal wheel, the screw rod seat, the setting of screw rod and fixed plate, can conveniently fix or mobile device, improve equipment flexibility and security.
Drawings
FIG. 1 is a schematic view of an axial structure of the present invention;
FIG. 2 is a schematic diagram of an axial structure of an air energy heat pump unit case according to the present invention;
FIG. 3 is a schematic view of an axial structure of the heating chamber of the present invention;
FIG. 4 is a schematic axial view of a fan according to the present invention;
FIG. 5 is a schematic view of an axial structure of the base of the present invention.
Reference numerals: 1. a base; 2. mounting grooves; 3. mounting blocks; 4. an air energy heat pump unit box; 5. a fixed block; 6. a support plate; 7. an evaporator; 8. a heating box; 9. a delivery pipe; 10. a compressor; 11. a condenser; 12. a box door; 13. a control panel; 14. a handle; 15. a coded lock; 16. a motor; 17. a fan blade; 18. a heat conductive layer; 19. a fan box; 20. a support frame; 21. a fan; 22. a ventilation slot; 23. a metal spring; 24. a groove; 25. a chucking spring; 26. clamping a plate; 27. a universal wheel; 28. a screw seat; 29. a screw; 30. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1-5, an air energy heat pump unit capable of quickly defrosting comprises a base 1, a mounting groove 2 is formed in the upper surface of the base 1, a mounting block 3 is inserted into the mounting groove 2, one side of the mounting block 3 is fixedly connected with an air energy heat pump unit box 4, a fixing block 5 is arranged on the inner wall of the air energy heat pump unit box 4, a supporting plate 6 is fixedly connected to the upper surface of the fixing block 5, an evaporator 7 is fixedly connected to the upper surface of the supporting plate 6, a heating box 8 is arranged in the middle of the evaporator 7, a conveying pipe 9 is fixedly connected to the lower surface of the evaporator 7, a compressor 10 is fixedly connected to one side of the conveying pipe 9, a condenser 11 is fixedly connected to one side of the compressor 10, a box door 12 is arranged on the front side of the air energy heat pump unit box 4, and a control board 13, a handle 14 and a password lock 15 are sequentially arranged from the front side to the right side of the box 12.
In the embodiment, the air energy heat pump unit box 4, the box door 12, the control panel 13, the handle 14 and the coded lock 15 are arranged in a matched manner, when in use, the installation groove 2 and the installation block 3 are arranged in a matched manner, the air energy heat pump unit box 4 can be quickly and safely installed in the base 1, the fixed block 5 and the support plate 6 are arranged, internal equipment can be conveniently supported and disassembled, the evaporator 7, the heating box 8, the delivery pipe 9, the compressor 10 and the condenser 11 are arranged, the evaporator 7 absorbs air, the air is compressed into a refrigerant through the delivery pipe 9 and the compressor 10, the temperature is increased after the refrigerant is compressed, then the refrigerant is heated or cooled through the condenser 11, the equipment heating or cooling efficiency can be effectively improved by matching with the heating box 8, the defrosting effect of the heat pump unit is enhanced, the equipment is prevented from being damaged by freezing ice, the control panel 13, the handle 14 and the coded lock 15 are arranged, the pressure meter, the display screen and the like arranged on the front side of the control panel 13 can monitor the working state of the equipment, the cooperation handle 14 and trick lock 15 can conveniently overhaul equipment internals, avoid irrelevant personnel to destroy equipment, ensure its safety in utilization.
Example 2
Referring to fig. 1-4, the present embodiment is further optimized based on embodiment 1, specifically, a motor 16 is fixedly connected to an inner wall of the heating box 8, fan blades 17 are fixedly connected to an output end of the motor 16, and a heat conduction layer 18 is disposed in the middle of the heating box 8.
Specifically, the back of the air energy heat pump unit box 4 is fixedly connected with a fan box 19, the inner wall of the fan box 19 is provided with a support frame 20, and the middle of the support frame 20 is provided with a fan 21.
Specifically, ventilation groove 22 has all been seted up to the left and right sides of air energy heat pump unit case 4, and ventilation groove 22's inside is provided with the dust screen.
In this embodiment, through motor 16, flabellum 17, heat-conducting layer 18, fan 21 and ventilation slot 22's cooperation setting, motor 16 and flabellum 17's setting during the use, motor 16 drives flabellum 17 and rotates, cooperation heat-conducting layer 18 can be quick for equipment heating or cooling, for equipment provides good operating condition, fan 21 and ventilation slot 22's setting, can ensure the timely inhaled air of evaporimeter 7, in time with heat transfer or discharge compressor 10's work area, thereby guarantee equipment safety, improve equipment life.
Example 3
Referring to fig. 1, fig. 2 and fig. 5, the present embodiment is optimized based on the embodiment 1 or 2, specifically, a metal spring 23 is fixedly connected to an inner wall of the mounting block 3, and an elastic element is disposed on the inner wall of the metal spring 23.
Specifically, the inner wall of the base 1 is provided with a groove 24, the inner wall of the groove 24 is fixedly connected with a clamping spring 25, and one side of the clamping spring 25 is fixedly connected with a clamping plate 26.
Specifically, the lower surface of the base 1 is fixedly connected with a universal wheel 27, and one side of the universal wheel 27 is provided with a locking block.
Specifically, the periphery of the upper surface of the base 1 is provided with a screw seat 28, the screw 29 is connected to the screw seat 28 in a threaded manner, and the lower surface of the screw 29 is fixedly connected with a fixing plate 30.
In this embodiment, through metal spring 23, chucking spring 25, cardboard 26, universal wheel 27, screw seat 28, the cooperation setting of screw rod 29 and fixed plate 30, the elasticity of using metal spring 23 during the use, cooperation elastic element can provide certain buffering shock-absorbing capacity for equipment fixing, setting through chucking spring 25 and cardboard 26, can ensure that equipment is fixed safe firm, make things convenient for its installation to dismantle, universal wheel 27, screw seat 28, the setting of screw rod 29 and fixed plate 30, can conveniently fix or mobile device, improve equipment flexibility and security.
To sum up: the utility model, the mounting groove 2 and the mounting block 3 are matched when using, the air energy heat pump unit box 4 can be quickly and safely mounted in the base 1, the fixing block 5 and the supporting plate 6 are arranged, the internal equipment can be conveniently supported and disassembled, the evaporator 7, the heating box 8, the conveying pipe 9, the compressor 10 and the condenser 11 are arranged, the evaporator 7 absorbs air, the air is compressed into a refrigerant through the conveying pipe 9 and the compressor 10, the temperature is increased after the compression, then the refrigerant is heated or refrigerated through the condenser 11, the equipment heating or refrigerating efficiency can be effectively improved by matching with the heating box 8, the defrosting effect of the heat pump unit is enhanced, the equipment is prevented from being damaged by freezing ice, the control panel 13, the handle 14 and the coded lock 15 are arranged, the pressure gauge and the display screen which are arranged on the front surface of the control panel 13 can monitor the working state of the equipment, and the internal parts of the equipment can be conveniently overhauled by matching with the handle 14 and the coded lock 15, the arrangement of the motor 16 and the fan blades 17 can ensure that the evaporator 7 can suck air in time and heat can be transferred or discharged out of a working area of the compressor 10 in time, so that the safety of the equipment is ensured, and the service life of the equipment is prolonged; the elasticity of application metal spring 23, cooperation elastic element can provide certain buffering shock-absorbing capacity for equipment fixing, and through chucking spring 25 and cardboard 26's setting, it is safe firm that can ensure equipment is fixed, makes things convenient for its installation to dismantle, and universal wheel 27, screw rod seat 28, screw rod 29 and fixed plate 30's setting can conveniently be fixed or mobile device, improve equipment flexibility and security.
The above description is only a preferred embodiment of the present invention, and not intended to limit the present invention, and the scope of the present invention is defined by the appended claims, and all structural changes that can be made by using the contents of the description and the drawings of the present invention are intended to be covered by the scope of the present invention.

Claims (8)

1. The utility model provides an air energy heat pump set that can defrost fast, includes base (1), its characterized in that: the air energy heat pump unit comprises a base (1), wherein a mounting groove (2) is formed in the upper surface of the base (1), a mounting block (3) is inserted into the mounting groove (2), an air energy heat pump unit box (4) is fixedly connected to one side of the mounting block (3), a fixing block (5) is arranged on the inner wall of the air energy heat pump unit box (4), a supporting plate (6) is fixedly connected to the upper surface of the fixing block (5), an evaporator (7) is fixedly connected to the upper surface of the supporting plate (6), a heating box (8) is arranged in the middle of the evaporator (7), a conveying pipe (9) is fixedly connected to the lower surface of the evaporator (7), a compressor (10) is fixedly connected to one side of the conveying pipe (9), a condenser (11) is fixedly connected to one side of the compressor (10), and a box door (12) is arranged on the front side of the air energy heat pump unit box (4), the front side of the box door (12) is sequentially provided with a control panel (13), a handle (14) and a coded lock (15) from left to right.
2. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: the inner wall fixedly connected with motor (16) of heating cabinet (8), the output fixedly connected with flabellum (17) of motor (16), the middle part of heating cabinet (8) is provided with heat-conducting layer (18).
3. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: the back of the air energy heat pump unit box (4) is fixedly connected with a fan box (19), a support frame (20) is arranged on the inner wall of the fan box (19), and a fan (21) is arranged in the middle of the support frame (20).
4. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: ventilating grooves (22) are formed in the left side and the right side of the air energy heat pump unit box (4), and dust screens are arranged in the ventilating grooves (22).
5. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: the inner wall of the mounting block (3) is fixedly connected with a metal spring (23), and the inner wall of the metal spring (23) is provided with an elastic element.
6. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: a groove (24) is formed in the inner wall of the base (1), a clamping spring (25) is fixedly connected to the inner wall of the groove (24), and a clamping plate (26) is fixedly connected to one side of the clamping spring (25).
7. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: the lower surface fixed connection of base (1) has universal wheel (27), one side of universal wheel (27) is provided with the locking piece.
8. The air energy heat pump unit capable of defrosting rapidly according to claim 1, characterized in that: all be provided with screw rod seat (28) around base (1) upper surface, the inside threaded connection of screw rod seat (28) has screw rod (29), the lower fixed surface of screw rod (29) is connected with fixed plate (30).
CN202121552406.2U 2021-07-07 2021-07-07 Air energy heat pump unit capable of quickly defrosting Expired - Fee Related CN215809451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121552406.2U CN215809451U (en) 2021-07-07 2021-07-07 Air energy heat pump unit capable of quickly defrosting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121552406.2U CN215809451U (en) 2021-07-07 2021-07-07 Air energy heat pump unit capable of quickly defrosting

Publications (1)

Publication Number Publication Date
CN215809451U true CN215809451U (en) 2022-02-11

Family

ID=80181130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121552406.2U Expired - Fee Related CN215809451U (en) 2021-07-07 2021-07-07 Air energy heat pump unit capable of quickly defrosting

Country Status (1)

Country Link
CN (1) CN215809451U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114963629A (en) * 2022-05-27 2022-08-30 合肥荣事达太阳能有限公司 Ultra-low temperature air energy heat pump unit defrosting system
CN117870142A (en) * 2023-04-11 2024-04-12 枝江市岱热科技有限公司 Air source heat pump unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114963629A (en) * 2022-05-27 2022-08-30 合肥荣事达太阳能有限公司 Ultra-low temperature air energy heat pump unit defrosting system
CN117870142A (en) * 2023-04-11 2024-04-12 枝江市岱热科技有限公司 Air source heat pump unit

Similar Documents

Publication Publication Date Title
CN215809451U (en) Air energy heat pump unit capable of quickly defrosting
CN102573420B (en) Embedded cabinet air-conditioning refrigeration system
CN102914192A (en) Heat tube heat exchanger with auxiliary cooling function
CN202697138U (en) Air cooling water system for integrated cabinet
CN102650465A (en) Refrigerating system of air conditioner
CN106705308B (en) Mechanical flash evaporation type air conditioner refrigeration system and working method thereof
CN201233076Y (en) Cooling machine cabinet of energy-conserving server
CN206439954U (en) A kind of cooling double loop water cooling heat-pipe air-cooling air conditioner integrated machine of computer room
CN204739716U (en) From heat extraction rack air conditioning system
CN101178225A (en) Double systems machine cabinet air-conditioner
CN216347192U (en) Energy-saving water chilling unit of refrigeration equipment
CN215864113U (en) Intelligent refrigerating unit waste heat recovery utilizes equipment
CN206683135U (en) A kind of ice-chilling air conditioning system
CN202195733U (en) Heat pipe exchanger having auxiliary cooling function
CN201145358Y (en) Double-system energy-saving air conditioner
CN103542477A (en) Automatic switchover integrated type outer-door-free air conditioner having double-cold-source refrigeration function
CN101382326A (en) Split type semiconductor air conditioner
CN203533766U (en) Automatic switchover integrated type outer-door-free air conditioner having double-cold-source refrigeration function
CN219328202U (en) CO2 air source heat pump easy to operate
CN213071780U (en) Safe low-voltage power distribution cabinet
CN202813581U (en) Improved household central air-conditioner anti-freeze heat pump unit system
CN211204253U (en) Integrated machine room refrigeration energy-saving device
CN205957531U (en) Refrigerating system of supplementary water -cooling unit in area
CN220669738U (en) Heat recovery device for air conditioner water system backwater
CN204717923U (en) For the thermostat of Cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220211

CF01 Termination of patent right due to non-payment of annual fee