CN215803260U - Automatic device of demolising of integral hydraulic pressure case roof beam end mould - Google Patents

Automatic device of demolising of integral hydraulic pressure case roof beam end mould Download PDF

Info

Publication number
CN215803260U
CN215803260U CN202023051958.3U CN202023051958U CN215803260U CN 215803260 U CN215803260 U CN 215803260U CN 202023051958 U CN202023051958 U CN 202023051958U CN 215803260 U CN215803260 U CN 215803260U
Authority
CN
China
Prior art keywords
end mould
hydraulic cylinder
hydraulic
mould
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023051958.3U
Other languages
Chinese (zh)
Inventor
崔建峰
郭凯
贾晓娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zibo Huanyu Bridge Template Co ltd
Original Assignee
Shandong Zibo Huanyu Bridge Template Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zibo Huanyu Bridge Template Co ltd filed Critical Shandong Zibo Huanyu Bridge Template Co ltd
Priority to CN202023051958.3U priority Critical patent/CN215803260U/en
Application granted granted Critical
Publication of CN215803260U publication Critical patent/CN215803260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an automatic integral hydraulic box girder end mould dismantling device which comprises an end mould, wherein the end mould comprises an upper end mould beam and a lower end mould beam, a concrete beam is arranged on one side of the end mould, the concrete beam is manufactured by matching the end mould, a plurality of upper hydraulic cylinders are arranged between one side of the upper end mould beam and the concrete beam, and a plurality of lower hydraulic cylinders are arranged between one side of the lower end mould beam and the concrete beam. The utility model overcomes the defects of the prior art, has reasonable structure, high form removal speed, beautiful beam body and labor saving.

Description

Automatic device of demolising of integral hydraulic pressure case roof beam end mould
Technical Field
The utility model relates to the technical field of end mold dismantling, in particular to an automatic dismantling device for an integral hydraulic box girder end mold.
Background
The end mould in present beam yard is demolishd, can only use the sledge hammer to beat, and on-the-spot preparation frock uses the jack toward outer top, uses the portal crane toward outer hoist and mount, just can demolish the template, demolishs the in-process, and the condition that drops can appear in the concrete, needs on-the-spot secondary to seal up to mend, takes a lot of work, wastes the material, still influences the outward appearance, consequently waits urgently to improve.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem of overcoming the defects of the prior art and provides an automatic integral hydraulic box girder end mould dismounting device which is reasonable in structure, high in mould dismounting speed, attractive in girder body and labor-saving.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows: the utility model provides an automatic device of demolising of integral hydraulic pressure case roof beam end mould, includes the end mould, the end mould includes end mould upper beam and end mould underbeam, end mould one side is equipped with the concrete beam, the concrete beam passes through end mould cooperation preparation, be equipped with hydraulic cylinder on a plurality of between end mould upper beam one side and the concrete beam, be equipped with hydraulic cylinder under a plurality of between end mould underbeam one side and the concrete beam.
Furthermore, the upper hydraulic cylinders are three and are uniformly arranged on one side of the upper beam of the end die.
Furthermore, lower hydraulic cylinder is provided with three, and evenly sets up one side on the end mould underbeam.
Furthermore, the upper hydraulic cylinder and the lower hydraulic cylinder are both detachably connected with the end die through bolts.
Furthermore, the upper hydraulic cylinder and the lower hydraulic cylinder are connected and configured with a movable pump station hydraulic system.
Furthermore, the upper hydraulic cylinder and the lower hydraulic cylinder are both connected to the reaction frame.
Compared with the prior art, the utility model has the advantages that: the utility model has the advantages of reasonable structure, high form removal speed, beautiful beam body, labor saving and suitability for wide popularization and application.
Drawings
Fig. 1 is a schematic structural view of the present invention.
FIG. 2 is a side view of the present invention.
As shown in the figure: 1. end mould, 2, end mould upper beam, 3, end mould lower beam, 4, upper hydraulic cylinder, 5, lower hydraulic cylinder, 6, reaction frame.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "lateral", "upper", "lower", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified. Furthermore, the term "comprises" and any variations thereof is intended to cover non-exclusive inclusions.
The present invention will be described in further detail with reference to the accompanying drawings.
When the utility model is implemented specifically, the utility model relates to an automatic dismounting device for an integral hydraulic box girder end mould, which is characterized in that: including end mould 1, end mould 1 includes end mould upper beam 2 and end mould underbeam 3, 1 one side of end mould is equipped with the concrete beam, the concrete beam passes through. End mould 1 cooperation preparation, be equipped with hydraulic cylinder 4 on a plurality of between 2 one sides of end mould upper beam and the concrete beam, be equipped with hydraulic cylinder 5 under a plurality of between 3 one sides of end mould underbeam and the concrete beam, it is provided with threely to go up hydraulic cylinder 4, and evenly sets up one side on end mould upper beam 2, hydraulic cylinder 5 is provided with threely down, and evenly sets up one side on end mould underbeam 3, it all can dismantle connection end mould 1 through the bolt with lower hydraulic cylinder 5 to go up hydraulic cylinder 4, it disposes mobilizable pump station hydraulic system to go up hydraulic cylinder 4 and lower hydraulic cylinder 5 connection, it all connects on reaction frame 6 with lower hydraulic cylinder 5 to go up hydraulic cylinder 4.
The working principle of the utility model is as follows: a set of movable pump station hydraulic system is independently configured, 5 hydraulic cylinders with the diameter of 70 are arranged on one end die, 3 hydraulic cylinders (an upper hydraulic cylinder 4) are arranged on the upper surface, 2 hydraulic cylinders (a lower hydraulic cylinder 5) are arranged on the lower surface, the oil cylinders can be disassembled, and when the strength of concrete reaches a die removing condition, five oil cylinders are used for simultaneously pushing, so that the die plates are automatically pushed open.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (6)

1. The utility model provides an automatic device of demolising of integral hydraulic pressure case roof beam end mould which characterized in that: including end mould (1), end mould (1) is including end mould upper beam (2) and end mould underbeam (3), end mould (1) one side is equipped with the concrete roof beam, the concrete roof beam is through end mould (1) cooperation preparation, be equipped with hydraulic cylinder (4) on a plurality of between end mould upper beam (2) one side and the concrete roof beam, be equipped with hydraulic cylinder (5) down between end mould underbeam (3) one side and the concrete roof beam.
2. The automatic dismantling device for the integral hydraulic box girder end mold according to claim 1, characterized in that: the number of the upper hydraulic cylinders (4) is three, and the three upper hydraulic cylinders are uniformly arranged on one side of the upper beam (2) of the end die.
3. The automatic dismantling device for the integral hydraulic box girder end mold according to claim 1, characterized in that: the lower hydraulic cylinders (5) are three and are uniformly arranged on one side of the lower beam (3) of the end die.
4. The automatic dismantling device for the integral hydraulic box girder end mold according to claim 1, characterized in that: the upper hydraulic cylinder (4) and the lower hydraulic cylinder (5) are detachably connected with the end die (1) through bolts.
5. The automatic dismantling device for the integral hydraulic box girder end mold according to claim 1, characterized in that: the upper hydraulic cylinder (4) and the lower hydraulic cylinder (5) are connected with a movable pump station hydraulic system.
6. The automatic dismantling device for the integral hydraulic box girder end mold according to claim 1, characterized in that: the upper hydraulic cylinder (4) and the lower hydraulic cylinder (5) are both connected to the reaction frame (6).
CN202023051958.3U 2020-12-17 2020-12-17 Automatic device of demolising of integral hydraulic pressure case roof beam end mould Active CN215803260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023051958.3U CN215803260U (en) 2020-12-17 2020-12-17 Automatic device of demolising of integral hydraulic pressure case roof beam end mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023051958.3U CN215803260U (en) 2020-12-17 2020-12-17 Automatic device of demolising of integral hydraulic pressure case roof beam end mould

Publications (1)

Publication Number Publication Date
CN215803260U true CN215803260U (en) 2022-02-11

Family

ID=80124793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023051958.3U Active CN215803260U (en) 2020-12-17 2020-12-17 Automatic device of demolising of integral hydraulic pressure case roof beam end mould

Country Status (1)

Country Link
CN (1) CN215803260U (en)

Similar Documents

Publication Publication Date Title
CN210732212U (en) A anchor clamps that is used for line processing is produced to fork truck gearbox box intelligence
CN215803260U (en) Automatic device of demolising of integral hydraulic pressure case roof beam end mould
CN214834713U (en) Die carrier that side wall and bottom plate were pour simultaneously
CN208628224U (en) A kind of four column oil-pressure trimmers
CN205895266U (en) Subway secretly digs station integral platform truck station room layer bracket template system of two linings
CN213887810U (en) Panel drilling equipment for building engineering
CN213440313U (en) Portable demoulding tool for prefabricated small parts
CN210336359U (en) But prefabricated apron forming die of fast operation
CN214834820U (en) Automatic device of demolising of portable hydraulic pressure case roof beam end mould
CN209255651U (en) Upper die of bending machine quick replacement device
CN220218944U (en) Disassembly-free integrated square pile template
CN217096352U (en) Guide pulley outer lane welding frock
CN206622600U (en) Piston ring knockout falls ring mechanical arm assembly
CN211135180U (en) Profiling tool for surrounding plate of crane
CN201511127U (en) Double-station type pouring structure
CN204602952U (en) Horn basin rack forming machine
CN215237289U (en) Supporting equipment for automobile part mould
CN204503855U (en) A kind of U-shaped beam forming machine with piston flange seat
CN220373531U (en) Demolding device for T-beam end mold
CN217998966U (en) Concrete form dismantles structure
CN109624035A (en) It is a kind of can sharp work preform lid board forming die
CN211444853U (en) Simple steel jacking machine
CN220487095U (en) Automatic template for slope pouring
CN208946073U (en) A kind of collars attaching/detaching apparatus
CN209792340U (en) Device for manufacturing lifting hook for prefabricated part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An automatic dismantling device for the end mold of an integral hydraulic box beam

Granted publication date: 20220211

Pledgee: Huantai County Branch of China Postal Savings Bank Co.,Ltd.

Pledgor: SHANDONG ZIBO HUANYU BRIDGE TEMPLATE CO.,LTD.

Registration number: Y2024980000358

PE01 Entry into force of the registration of the contract for pledge of patent right