CN214834713U - Die carrier that side wall and bottom plate were pour simultaneously - Google Patents

Die carrier that side wall and bottom plate were pour simultaneously Download PDF

Info

Publication number
CN214834713U
CN214834713U CN202121073817.3U CN202121073817U CN214834713U CN 214834713 U CN214834713 U CN 214834713U CN 202121073817 U CN202121073817 U CN 202121073817U CN 214834713 U CN214834713 U CN 214834713U
Authority
CN
China
Prior art keywords
bottom plate
side wall
die carrier
frame
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121073817.3U
Other languages
Chinese (zh)
Inventor
任永银
阎继勇
常平
李士良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Yellow River Bridge Constrution Group Co Ltd
Original Assignee
Jinan Yellow River Bridge Constrution Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Yellow River Bridge Constrution Group Co Ltd filed Critical Jinan Yellow River Bridge Constrution Group Co Ltd
Priority to CN202121073817.3U priority Critical patent/CN214834713U/en
Application granted granted Critical
Publication of CN214834713U publication Critical patent/CN214834713U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model relates to a construction technical field discloses a die carrier that side wall and bottom plate were pour simultaneously, including the A-frame, the left side of A-frame is equipped with the side wall die carrier, and the bottom side of A-frame is equipped with the bottom plate die carrier through adjustable bolted connection bottom plate reinforcing bar between A-frame and the bottom plate reinforcing bar, the bottom plate die carrier includes the die block board, the utility model discloses bottom plate and side wall are pour simultaneously, do not need wait that the bottom plate concrete possesses to pour the side wall after certain intensity again, have optimized work flow, have improved the efficiency of construction.

Description

Die carrier that side wall and bottom plate were pour simultaneously
Technical Field
The utility model relates to a construction technical field specifically is a die carrier that side wall and bottom plate were pour simultaneously.
Background
In municipal works work progress, the concrete passageway is more common structure, generally adopts the mode of setting up the die carrier among the prior art to pour and construct, but current die carrier can only satisfy and pour the completion one end time back at the bottom plate, sets up the die carrier again and pours the curb plate, can not pour bottom plate and die carrier simultaneously, can not satisfy the requirement of high efficiency construction.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a formwork for simultaneous casting of side walls and bottom plates to solve the above-mentioned problems of the prior art.
In order to realize the above-mentioned purpose, the utility model provides a die carrier that side wall and bottom plate were pour simultaneously, including the A-frame, the left side of A-frame is equipped with the side wall die carrier, and the bottom side of A-frame is equipped with the bottom plate die carrier through adjustable bolted connection bottom plate reinforcing bar between A-frame and the bottom plate reinforcing bar, the bottom plate die carrier includes the die block board.
Further, the side wall template comprises an outer support, the outer support is connected with the triangular support through a clamp, the side wall template is arranged between the outer support and the triangular support, and the side wall template is connected with the triangular support and the outer support through split bolts.
Furthermore, the bottom surface and the left side surface of the triangular support and one surface of the outer support close to the triangular support are fixedly connected with the back ridge.
Furthermore, the bottom surface of the triangular support is fixedly connected with a lifting wheel.
Furthermore, the bottom surface of the triangular support and the bottom template are provided with vibrating holes which correspond to each other.
Furthermore, the top of the triangular support is fixedly connected with the operating platform.
The utility model has the advantages that:
1. the bottom plate and the side walls are poured simultaneously, and the side walls are not poured after the bottom plate concrete has certain strength, so that the working process is optimized, and the construction efficiency is improved;
2. through setting up the hole of vibrating, put into the concrete of bottom plate with the vibrting spear and vibrate, improved pouring speed and quality.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 shows a schematic structural diagram according to an embodiment of the present invention;
wherein the figures include the following reference numerals:
1. a triangular bracket; 2. a bottom plate steel bar; 3. an adjustable bolt; 4. a bottom template; 5. an outer support; 6. a clamp; 7. back corrugation; 8. a liftable wheel; 9. an operating platform; 10. oppositely pulling the bolts; 11. a side wall template; 12. and vibrating the holes.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1, according to the embodiment 1 of the present invention, a formwork for simultaneously pouring a side wall and a bottom plate is provided.
Specifically, including A-frame 1, the left side of A-frame 1 is equipped with the side wall die carrier, and the bottom side of A-frame 1 passes through adjustable bolt 3 and connects bottom plate reinforcing bar 2, is equipped with the bottom plate die carrier between A-frame 1 and bottom plate reinforcing bar 2, and the bottom plate die carrier includes die block board 4. The bottom surface, the left side surface and one surface of the outer bracket close to the triangular bracket 1 are fixedly connected with a back ridge 7.
The side wall template comprises an outer support 5, the outer support 5 is connected with the triangular support 1 through a clamp 6, a side wall template 11 is arranged between the outer support 5 and the triangular support 1, the side wall template 11 is divided into an inner template and an outer template, the inner template and the outer template are respectively abutted against a back ridge 7, and the side wall template 11 is connected with the triangular support 1 and the outer support 5 through split bolts 10.
The bottom surface fixedly connected with of A-frame 1 can promote wheel 8, can promote the setting of wheel 8 and be convenient for the removal of A-frame 1.
The bottom surface of the triangular support 1 and the bottom template 4 are provided with the vibrating holes 12 which correspond to each other, so that the vibrating rods can be conveniently placed into the concrete of the bottom plate through the vibrating holes 12 for vibrating, and the pouring speed and the pouring quality are improved.
The top of the triangular support 1 is fixedly connected with an operation platform 9, and people stand on the operation platform 9 to pour the side wall.
The utility model discloses a theory of operation is: the side wall casting method comprises the steps of sequentially installing the triangular support 1, the side wall formwork and the bottom plate formwork, pouring the bottom plate and the side wall at the same time, pouring the side wall after the bottom plate concrete has certain strength, transmitting pressure generated by side wall pouring to the triangular support 1, transmitting the pressure to the bottom plate steel bars 2 through the adjustable bolts 3, and offsetting the pressure through the bottom plate steel bars, so that the stability of the side wall formwork and the triangular support 1 is kept.
According to the utility model discloses an embodiment 2, when two relative side walls that set up are pour to needs, then the symmetry sets up two A-frame supports 1, side wall die carrier and bottom plate die carrier, and two bottom plate die carriers link to each other together, set up like this and can pour out a concrete passageway simultaneously, improve work efficiency.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a die carrier that side wall and bottom plate were pour simultaneously, includes A-frame (1), its characterized in that, the left side of A-frame (1) is equipped with the side wall die carrier, and adjustable bolt (3) connection bottom plate reinforcing bar (2) are passed through to the bottom side of A-frame (1), are equipped with the bottom plate die carrier between A-frame (1) and bottom plate reinforcing bar (2), the bottom plate die carrier includes die block board (4).
2. The formwork for simultaneously pouring the side wall and the bottom plate according to claim 1 is characterized by comprising an outer support (5), wherein the outer support (5) is connected with the triangular support (1) through a clamp (6), a side wall formwork (11) is arranged between the outer support (5) and the triangular support (1), and the side wall formwork (11) is connected with the triangular support (1) and the outer support (5) through split bolts (10).
3. The formwork for simultaneously pouring the side wall and the bottom plate according to claim 2 is characterized in that the bottom surface, the left side surface and the surface of the outer support close to the triangular support (1) are fixedly connected with the back ridge (7).
4. The formwork for simultaneous casting of side walls and bottom plates according to claim 1, wherein the bottom surface of the triangular support (1) is fixedly connected with a liftable wheel (8).
5. The formwork for simultaneous casting of side walls and bottom panels according to claim 1, wherein the bottom surface of the triangular support (1) and the bottom panel (4) are provided with vibrating holes (12) corresponding to each other.
6. Formwork for simultaneous casting of side walls and bottom panels according to any of claims 1-5, wherein the top of the triangular frame (1) is fixedly connected to an operating platform (9).
CN202121073817.3U 2021-05-19 2021-05-19 Die carrier that side wall and bottom plate were pour simultaneously Active CN214834713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121073817.3U CN214834713U (en) 2021-05-19 2021-05-19 Die carrier that side wall and bottom plate were pour simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121073817.3U CN214834713U (en) 2021-05-19 2021-05-19 Die carrier that side wall and bottom plate were pour simultaneously

Publications (1)

Publication Number Publication Date
CN214834713U true CN214834713U (en) 2021-11-23

Family

ID=78773630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121073817.3U Active CN214834713U (en) 2021-05-19 2021-05-19 Die carrier that side wall and bottom plate were pour simultaneously

Country Status (1)

Country Link
CN (1) CN214834713U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115125996A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Underground house construction technology based on assembled combined die
CN115162710A (en) * 2022-06-30 2022-10-11 陕西帕源路桥建设有限公司 Assembled combined module for underground parking lot construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115125996A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Underground house construction technology based on assembled combined die
CN115162710A (en) * 2022-06-30 2022-10-11 陕西帕源路桥建设有限公司 Assembled combined module for underground parking lot construction

Similar Documents

Publication Publication Date Title
CN214834713U (en) Die carrier that side wall and bottom plate were pour simultaneously
CN201666157U (en) Inverted arch integral type moving die carrier
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN108582426A (en) A kind of producing device and production method of stiffened column
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN209832088U (en) Combined curing kiln for concrete product production line
CN210482530U (en) Novel water recovery well wellhead reinforced concrete assembling template
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN211250599U (en) Take pouring mould of window frame wallboard
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN207363256U (en) A kind of type quick detaching beam bottom mother plate supporting rack
CN215549558U (en) Track beam formwork based on concrete loss reduction
CN211421732U (en) A exempt from to tear open steel mould device for ventilation shaft construction
CN214272109U (en) Ground beam formwork device
CN110919825A (en) Large die table die for plate type prefabricated part assembly line construction
CN210061516U (en) Building stair mould
CN111074800A (en) Drainage box culvert pouring supporting structure
CN218145284U (en) Panel structure is with exempting from rings of cutting
CN218467104U (en) High-rise outer frame-free unilateral masonry formwork
CN210508036U (en) Cast-in-place concrete form removal-free steel mesh reinforced high-strength fiber cement pressure template structure
CN218893964U (en) Quick installing and detaching baffle device for bridge deck anti-collision guardrail fracture
CN216741551U (en) Special secondary lining tunnel trolley for expanding section
CN217144292U (en) Precast concrete is with installing fast and tearing open template
CN219826107U (en) Quick easy-to-install and-remove elevator shaft operation frame and template
CN218813881U (en) Self-hanging concrete module brick hole filling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant