CN201511127U - Double-station type pouring structure - Google Patents

Double-station type pouring structure Download PDF

Info

Publication number
CN201511127U
CN201511127U CN 200920048190 CN200920048190U CN201511127U CN 201511127 U CN201511127 U CN 201511127U CN 200920048190 CN200920048190 CN 200920048190 CN 200920048190 U CN200920048190 U CN 200920048190U CN 201511127 U CN201511127 U CN 201511127U
Authority
CN
China
Prior art keywords
mould
platform
operating platform
guide rod
circular port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200920048190
Other languages
Chinese (zh)
Inventor
蒋俊
王宝珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI LUHU CORPORATION LIMITED
Original Assignee
Wuxi Lihu Wheel Manufacture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Lihu Wheel Manufacture Co Ltd filed Critical Wuxi Lihu Wheel Manufacture Co Ltd
Priority to CN 200920048190 priority Critical patent/CN201511127U/en
Application granted granted Critical
Publication of CN201511127U publication Critical patent/CN201511127U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Invalid Beds And Related Equipment (AREA)

Abstract

The utility model relates to a double-station type pouring structure, which is characterized in that a first mould and a second mould are respectively arranged on two working platforms, a hydraulic oil cylinder controls an operating platform to combine an upper die and a lower die of the first mould and the second mould, a circular port and a parting line are respectively arranged between the first mould and the second mould, the circular port is communicated with the inner cavity of the mould, the operating platform is a platform connected with the lower die, the operating platform is arranged between an upper platform and a lower platform, the upper platform, the operating platform and the lower platform are connected via shafts, a shaft sleeve is sleeved on the shaft, a guide rod and a hydraulic pipeline are arranged between the operating platform and the lower platform, the guide rod is fixed on the lower platform, a mandril is arranged in the middle of a cushion block and then is arranged on the operating platform, and the guide rod is obliquely arranged on the mandril. The utility model has simple, compact and reasonable structure, can utilize effective area to reduce the process that operators walk back and forth, reduces the labor intensity, and can increase the production efficiency.

Description

A kind of double formula cast structure
Technical field
The utility model relates to a kind of double formula cast structure, specifically original casting machine is put side by side by the position of two stations, belongs to the gravity casting technical field.
Background technology
At present, the operative employee operates two casting equipments, and two equipment are at same parallel position, the operative employee must before and after the operation of walking about, and the floor space of every casting machine is 2 square metres, adds the operating space, floor space is very big.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, will utilize effective area thereby provide a kind of, reduces operative employee's the process of walking up and down, and reduces labor strength, and the double formula that can enhance productivity cast structure.
The technical scheme that provides according to the utility model, a kind of double formula cast structure comprises first, second secondary mould, described first, second secondary mould is formed by the upper and lower mould merging respectively, feature is: described first, second mould is installed in respectively on two workbenches, merge first, second secondary mould upper and lower mould with hydraulic jack control operation platform, be respectively equipped with circular port and parting line in the middle of first, second secondary mould, circular port feeds the mould inside die cavity; Described operating platform is the platform that counterdie connects, operating platform is between upper mounting plate and lower platform, upper mounting plate, operating platform and lower platform connect by axle, axle sleeve is enclosed within on the axle, be provided with guide rod and conduit under fluid pressure between described operating platform and the lower platform, described guide rod is fixed on the lower platform, and described push rod is placed in the middle of the cushion block, be placed on again on the operating platform, with being placed on the push rod of guide pillar tilted direction.The placement gradient of described all guide pillars and push rod is 10 degree.
Compared with the prior art the utility model has the following advantages:
The utility model is simple, compact and reasonable for structure; Can utilize effective area, reduce operative employee's the process of walking up and down, reduce labor strength, and can enhance productivity.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Embodiment during following the utility model is incited somebody to action in conjunction with the accompanying drawings is further described:
As shown in Figure 1, comprise workbench 1, first, second secondary mould 2, operating platform 3, cushion block 4, upper mounting plate 5, screw 6, guide pillar 7, axle 8, axle sleeve 9, guide rod 10, mould circular port 11, die joint 12, conduit under fluid pressure 13, lower platform 14, push rod 15 and contour cushion block 16 etc.
The utility model will comprise first, second secondary mould 2, described first, second secondary mould 2 is formed by the upper and lower mould merging respectively, described first, second mould 2 is installed in respectively on two workbenches 1, merge first, second secondary mould 2 upper and lower moulds with hydraulic jack control operation platform 3, be respectively equipped with circular port 11 and parting line 12 in the middle of first, second secondary mould 2, circular port 11 feeds the mould inside die cavity; The parting line 12 of mould and mould circular port 11 shapes differ.Described operating platform 3 is platforms that bed die connects, and operating platform 3 is between upper mounting plate 5 and lower platform 14, and upper mounting plate 5, operating platform 3 and lower platform 14 connect by axle 8, and axle sleeve 9 is enclosed within on the axle, is used for fixing axle 8.Be provided with guide rod 10 and conduit under fluid pressure 13 between described operating platform 3 and lower platform 14, guide rod 10 is fixed on this position, uses guide rod 10 when the position that operating platform 3 drops to guide rod 10 and withstands push rod 15, ejects pressure shell.Described guide rod 10 is fixed on the lower platform 14, on the described lower platform 14 conduit under fluid pressure 13 is set, and described push rod 15 is placed in the middle of the cushion block 4, is placed on the operating platform 3, at last being placed on the push rod 15 with guide pillar 7 tilted directions again.
Described all guide pillars 7 are 10 degree with the placement gradient of push rod 15.Described upper mounting plate 5 is fastenedly connected with screw 6 with mould.
In use, energising is controlled operating platform 3, and bed die and push rod 15, contour cushion block 16, guide pillar 7 are on operating platform 3, drive moving up and down of they, realize the matched moulds of mould 2, when pressure shell has been poured into a mould, utilization is to the control of operating platform 3, die sinking, bed die is down to guide rod 10 positions, and guide rod 10 withstands push rod 15, push rod 15 ejects pressure shell, take out by the operative employee again, get togather mould 2 then, carry out the cast of next pressure shell.

Claims (2)

1. a double formula is poured into a mould structure, it is characterized in that comprising first, second secondary mould (2), described first, second secondary mould (2) is formed by the upper and lower mould merging respectively, it is characterized in that: described first, second mould (2) is installed in respectively on two workbenches (1), merge first, second secondary mould (2) upper and lower mould with hydraulic jack control operation platform (3), be respectively equipped with circular port (11) and parting line (12) in the middle of first, second secondary mould (2), circular port (11) feeds the mould inside die cavity; Described operating platform (3) is positioned between upper mounting plate (5) and the lower platform (14), upper mounting plate (5), operating platform (3) and lower platform (14) connect by axle (8), axle sleeve (9) is enclosed within on the axle (8), be provided with guide rod (10) and conduit under fluid pressure (13) between described operating platform (3) and the lower platform (14), described guide rod (10) is fixed on the lower platform (14), described push rod (15) is placed in the middle of the cushion block (4), and be placed on the operating platform (3) being placed on the push rod (15) of guide pillar (7) tilted direction.
2. a kind of double formula cast structure according to claim 1 is characterized in that the described guide pillar (7) and the placement gradient of push rod (15) are 10 degree.
CN 200920048190 2009-08-31 2009-08-31 Double-station type pouring structure Expired - Fee Related CN201511127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200920048190 CN201511127U (en) 2009-08-31 2009-08-31 Double-station type pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200920048190 CN201511127U (en) 2009-08-31 2009-08-31 Double-station type pouring structure

Publications (1)

Publication Number Publication Date
CN201511127U true CN201511127U (en) 2010-06-23

Family

ID=42482525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200920048190 Expired - Fee Related CN201511127U (en) 2009-08-31 2009-08-31 Double-station type pouring structure

Country Status (1)

Country Link
CN (1) CN201511127U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378441A (en) * 2016-11-29 2017-02-08 山东杰创机械有限公司 Double-station automatic pouring machine
CN110405151A (en) * 2019-07-26 2019-11-05 黑龙江兰德超声科技股份有限公司 One kind is based on the homogenized composite material casting device of coupling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378441A (en) * 2016-11-29 2017-02-08 山东杰创机械有限公司 Double-station automatic pouring machine
CN106378441B (en) * 2016-11-29 2018-01-02 山东杰创机械有限公司 A kind of double automatic pouring machine
CN110405151A (en) * 2019-07-26 2019-11-05 黑龙江兰德超声科技股份有限公司 One kind is based on the homogenized composite material casting device of coupling

Similar Documents

Publication Publication Date Title
CN201865054U (en) Hydraulic climbing formwork device for high bridge pier
CN202079671U (en) Integrated hydraulic brick making machine
CN102587918B (en) High-strength reducing template for construction of coal mine freezing vertical shaft
CN203725731U (en) Multi-station heated-mold-method centrifuge production system
CN205042989U (en) Drawing die of car reinforcing plate
CN202877378U (en) Automatic ejection flanging die
CN103878337B (en) Multistation thermodyn process centrifuge production system
CN201511127U (en) Double-station type pouring structure
CN206109994U (en) Pier pier shaft prefabricated mould
KR101876864B1 (en) manufacturing device for T type pipe
CN202804005U (en) Necking bucket integrated machine
CN202639240U (en) Automatic leaky model compaction and molding machine
CN205895266U (en) Subway secretly digs station integral platform truck station room layer bracket template system of two linings
CN2467217Y (en) Three-way forming drawing branch pipe apparatus
CN107695201B (en) With long-armed spindle bending mould
CN202088515U (en) Push-out cylinder structure for petroleum drill pipe joint forming hydraulic machine
CN202483579U (en) High-strength reducing template for shaft construction of coal mile freezing vertical shaft
CN2542355Y (en) Frame-type oil tube thickening machine
CN201816126U (en) Hydraulic internal model for combined box beam
CN201086419Y (en) High-accuracy oil cylinder driven double-station moveable platform
CN201140429Y (en) Die body apparatus of anode carbon block shaping apparatus
CN201313407Y (en) One-station and multi-cylinder hydraulic punching machine
CN103991131A (en) Pipeline mould and working method thereof
CN202894258U (en) Automatic stripper machine in centrifugal casting
CN210587319U (en) Drilling die

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 214124 Jiangsu, Wuxi, Binhu District, Binhu Economic Development Zone Huayi Road, No. 2

Patentee after: WUXI LUHU CORPORATION LIMITED

Address before: 214124 Jiangsu, Wuxi, Binhu District, Binhu Economic Development Zone Huayi Road, No. 2

Patentee before: Wuxi Lihu Impeller Manufacturing Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100623

Termination date: 20170831

CF01 Termination of patent right due to non-payment of annual fee