CN215717819U - Prefabricated stand installation adjusting device - Google Patents

Prefabricated stand installation adjusting device Download PDF

Info

Publication number
CN215717819U
CN215717819U CN202120033413.5U CN202120033413U CN215717819U CN 215717819 U CN215717819 U CN 215717819U CN 202120033413 U CN202120033413 U CN 202120033413U CN 215717819 U CN215717819 U CN 215717819U
Authority
CN
China
Prior art keywords
prefabricated
installation
mounting
fixedly connected
adjusting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120033413.5U
Other languages
Chinese (zh)
Inventor
甘东情
候魏华
郑键
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN202120033413.5U priority Critical patent/CN215717819U/en
Application granted granted Critical
Publication of CN215717819U publication Critical patent/CN215717819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)

Abstract

The utility model discloses a prefabricated upright post installation adjusting device, which comprises a prefabricated upright post, wherein support brackets are fixedly arranged on the periphery of the outer surface of the prefabricated upright post, each support bracket comprises an installation base plate, one side of each installation base plate is fixedly connected with a ribbed plate, the bottom of each ribbed plate is provided with a jack, the top of each ribbed plate is provided with an installation groove, the top of each installation groove is clamped with an installation strip, one side of each installation strip is fixedly connected with a connecting piece, the bottom of each connecting piece is fixedly connected with a horizontal detector, detection liquid is arranged in each horizontal detector, and scales are arranged on the surface of each horizontal detector. The labor intensity of workers is reduced.

Description

Prefabricated stand installation adjusting device
Technical Field
The utility model relates to the technical field of prefabricated stand columns, in particular to a prefabricated stand column installation adjusting device.
Background
The prefabricated enclosing wall is formed by splicing cement enclosing wall plates. The prefabricated member combined enclosing wall is a temporary engineering enclosing wall made up by using new-type wall material magnesium chloride, pearlite, sand and cement through a special production process according to a scientific mixing ratio. The building brick is attractive in appearance, green and environment-friendly, convenient and quick to construct and low in cost, becomes an ideal substitute for clay bricks and concrete enclosing walls, and can be widely applied to various construction engineering fields such as building sites, urban construction, environment beautification, industrial technology transformation and the like.
The vertical angle of the prefabricated upright post plays a critical role, the vertical angle of the prefabricated upright post is particularly important to be adjusted, the horizontal angle of the prefabricated upright post is generally continuously adjusted through the support brackets on the periphery, in the adjusting process, the horizontal position of the prefabricated upright post needs to be detected, but the existing detection device is too complex, and the detection result is not accurate, so that the prefabricated upright post installation adjusting device is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a prefabricated stand column installation adjusting device to solve the problems in the background technology.
In order to solve the technical problems, the utility model provides the following technical scheme:
the utility model provides a prefabricated stand column installation adjusting device which comprises a prefabricated stand column, wherein supporting brackets are fixedly installed on the periphery of the outer surface of the prefabricated stand column, each supporting bracket comprises an installation base plate, a ribbed plate is fixedly connected to one side of each installation base plate, a jack is installed at the bottom of each ribbed plate, an installation groove is formed in the top of each ribbed plate, an installation strip is clamped to the top of each installation groove, a connecting piece is fixedly connected to one side of each installation strip, and a horizontal detector is fixedly connected to the bottom of each connecting piece.
As a preferred technical scheme of the utility model: the inside of horizontal detector is provided with detects liquid, the surface of horizontal detector is provided with the scale.
As a preferred technical scheme of the utility model: the upper end and the lower end of the mounting substrate are respectively provided with a screw hole and a bolt matched with the screw hole.
As a preferred technical scheme of the utility model: the thickness of the mounting substrate is 15 mm, and the diameter of the bolt is 18 mm.
The utility model has the following beneficial effects: the horizontal detector can be arranged at the top of the rib plate through the matching of the mounting strip and the mounting groove, so that the horizontal position of the rib plate can be visually detected, the detection efficiency is improved, the detection cost is reduced, and the labor intensity of workers is reduced.
Drawings
Fig. 1 is a schematic structural diagram of a prefabricated upright post installation adjusting device.
FIG. 2 is a side view of a support bracket in a prefabricated column installation adjustment device.
FIG. 3 is a front view of a support bracket of a prefabricated column mounted adjustment assembly.
Fig. 4 is a schematic structural view of the inside of a level detector in a prefabricated column installation adjusting device.
Fig. 5 is an enlarged view of a portion of a prefabricated pillar mounting adjustment device at a in fig. 2.
In the figure: 1. prefabricating a stand column; 2. supporting the bracket; 3. a mounting substrate; 4. a rib plate; 5. a jack; 6. mounting grooves; 7. mounting a bar; 8. a connecting member; 9. a horizontal detector; 10. detecting the liquid; 11. calibration; 12. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example (b): as shown in fig. 1-5, the utility model provides a prefabricated upright post installation adjusting device, which comprises a prefabricated upright post 1, wherein supporting brackets 2 are fixedly installed on the periphery of the outer surface of the prefabricated upright post 1, each supporting bracket 2 comprises an installation base plate 3, one side of each installation base plate 3 is fixedly connected with a rib plate 4, a jack 5 is installed at the bottom of each rib plate 4, an installation groove 6 is formed in the top of each rib plate 4, an installation strip 7 is clamped at the top of each installation groove 6, a connecting piece 8 is fixedly connected to one side of each installation strip 7, a horizontal detector 9 is fixedly connected to the bottom of each connecting piece 8, and the horizontal detector 9 can be installed at the top of each rib plate 4 through the matching of the installation strips 7 and the installation grooves 6, so that the horizontal position of the rib plate 4 can be visually detected, the detection efficiency is improved, the detection cost is reduced, and the labor intensity of workers is reduced.
The level detector 9 is provided with a detection liquid 10 therein, and the level detector 9 is provided with a scale 11 on the surface thereof.
Wherein, the upper and lower both ends of the mounting substrate 3 are respectively provided with a screw hole and a bolt 12 matched with the screw hole.
The thickness of the mounting substrate 3 is 15 mm, and the diameter of the bolt 12 is 18 mm.
Specifically, when the utility model is used: before the prefabricated stand column 1 is lifted by crane, four supporting brackets 2 are arranged around the lower end of the prefabricated stand column 1, the mounting base plate 3 is mounted on the surface of the prefabricated stand column 1 through bolts 12, the horizontal detector 9 is mounted at the top of the rib plate 4, the perpendicularity of the prefabricated stand column 1 is adjusted through the four jacks 5, and the scale reached by the internal detection liquid 10 of the horizontal detector 9 is observed all around, so that the perpendicularity can be judged, and the next-step adjustment is convenient.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (4)

1. The utility model provides a prefabricated column mouting adjusting device, is including prefabricated stand (1), its characterized in that, equal fixed mounting all around of prefabricated stand (1) surface has support bracket (2), support bracket (2) including mounting substrate (3), one side fixedly connected with floor (4) of mounting substrate (3), jack (5) are installed to the bottom of floor (4), mounting groove (6) have been seted up at the top of floor (4), the top joint of mounting groove (6) has mounting bar (7), one side fixedly connected with connecting piece (8) of mounting bar (7), the bottom fixedly connected with level detector (9) of connecting piece (8).
2. Prefabricated column installation adjustment device according to claim 1, characterized in that the level detector (9) is provided with a detection liquid (10) inside and the surface of the level detector (9) is provided with a scale (11).
3. Prefabricated column installation adjustment device according to claim 1, characterized in that the upper and lower ends of the installation base plate (3) are respectively provided with a screw hole and a bolt (12) matched with the screw hole.
4. A prefabricated pillar mounting adjustment device according to claim 3, characterised in that the thickness of said mounting base plate (3) is 15 mm and the diameter of said bolt (12) is 18 mm.
CN202120033413.5U 2021-01-07 2021-01-07 Prefabricated stand installation adjusting device Active CN215717819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120033413.5U CN215717819U (en) 2021-01-07 2021-01-07 Prefabricated stand installation adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120033413.5U CN215717819U (en) 2021-01-07 2021-01-07 Prefabricated stand installation adjusting device

Publications (1)

Publication Number Publication Date
CN215717819U true CN215717819U (en) 2022-02-01

Family

ID=79985659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120033413.5U Active CN215717819U (en) 2021-01-07 2021-01-07 Prefabricated stand installation adjusting device

Country Status (1)

Country Link
CN (1) CN215717819U (en)

Similar Documents

Publication Publication Date Title
CN101575889B (en) Multi-curved surface overhung copper plate curtain wall and construction method thereof
JPH075129Y2 (en) Pillar / floor panel connection structure
CN108222270B (en) Assembling construction building method of prefabricated building
CN210177511U (en) Foundation ditch steel sheet pile supporting construction
CN108005254A (en) A kind of assembled architecture heat preserving exterior wall and its installation method
CN215717819U (en) Prefabricated stand installation adjusting device
CN210369345U (en) Novel light outer wall bracket based on steel construction
CN112282500A (en) Built-in reinforcement foundation structure's fire-proof assembled wallboard
CN211548570U (en) Ground mounting structure is maked somebody a mere figurehead to assembled concrete
CN204920196U (en) Grout wallboard formwork
CN111910793A (en) Anti-cracking anti-seepage building wallboard convenient to install quickly and installation method
CN112302316A (en) Novel leveling device
CN112983121A (en) Assembly type building construction method
CN217353856U (en) Assembled precast concrete encloses fender
CN221004327U (en) Roof equipment supporting device
CN217130835U (en) Measuring device for house building engineering supervision
CN213709839U (en) PC corridor suitable for steel construction building
CN214302399U (en) Multifunctional steel structure assembled wallboard
CN211782760U (en) Modular arch tire for glass kiln masonry
CN218952605U (en) Adjustable cushion block
CN219825762U (en) Novel mounting structure of ceramic tile curtain wall string hanging system
CN218815137U (en) Building construction elevator attaches wall
CN217299769U (en) Vertical rod positioning device for overhanging scaffold
CN220133667U (en) Integrative general fender base that encloses
CN219386839U (en) Multi-angle adjustable device suitable for horizontal roof suspender of sloping roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant