CN215717138U - Building engineering is with pouring mould structure - Google Patents

Building engineering is with pouring mould structure Download PDF

Info

Publication number
CN215717138U
CN215717138U CN202122037268.0U CN202122037268U CN215717138U CN 215717138 U CN215717138 U CN 215717138U CN 202122037268 U CN202122037268 U CN 202122037268U CN 215717138 U CN215717138 U CN 215717138U
Authority
CN
China
Prior art keywords
connecting plate
threaded
clamping
groove
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122037268.0U
Other languages
Chinese (zh)
Inventor
王美成
王春晖
李白雪
林宗卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122037268.0U priority Critical patent/CN215717138U/en
Application granted granted Critical
Publication of CN215717138U publication Critical patent/CN215717138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pouring die structure for construction engineering, which comprises a first connecting plate and a second connecting plate, wherein the upper end and the lower end of the first connecting plate are fixedly connected with clamping blocks, the two sides of one end surface of the second connecting plate are provided with clamping grooves, one side of each clamping groove is connected with a threaded hole in a penetrating manner, a threaded rod is connected in each threaded hole in a threaded manner, one side of each clamping block is provided with a threaded groove, the middle positions of the surfaces of the first connecting plate and the second connecting plate are fixedly connected with water adding ports, and sealing plugs are sleeved in the water adding ports. The first connecting plate and the second connecting plate can be better spliced through the arranged clamping blocks and the clamping grooves, so that the first connecting plate and the second connecting plate are spliced into a complete pouring mold, then the first connecting plate and the second connecting plate are fixed through threaded rods through the threaded holes formed in the clamping grooves and the clamping grooves formed in the clamping blocks, the mold is fastened more, and pouring is facilitated better.

Description

Building engineering is with pouring mould structure
Technical Field
The utility model belongs to the technical field of constructional engineering, and particularly relates to a pouring mold structure for constructional engineering.
Background
When the existing building engineering pouring mold is used, the mold is only limited to pouring of modules with the same size due to the limitation of the shape of the mold, and the humidity of concrete is guaranteed after pouring, so that the concrete is continuously watered, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model provides a pouring mold structure for construction engineering, which can better splice a first connecting plate and a second connecting plate through the arranged clamping blocks and clamping grooves so as to splice the first connecting plate and the second connecting plate into a complete pouring mold, and then fix the first connecting plate and the second connecting plate through threaded rods through threaded holes arranged on the clamping grooves and clamping grooves arranged on the clamping blocks, so that the mold is more fastened, and the pouring treatment is better and convenient.
The water storage device is characterized by comprising a first connecting plate and a second connecting plate, wherein the upper end and the lower end of the first connecting plate are fixedly connected with a clamping block, clamping grooves are formed in two sides of one end face of the second connecting plate, one side of each clamping groove is connected with a threaded hole in a penetrating mode, a threaded rod is connected in the threaded hole in a threaded mode, a threaded groove is formed in one side of each clamping block, a water adding port is fixedly connected to the middle position of the surfaces of the first connecting plate and the second connecting plate, a sealing plug is sleeved in the water adding port, and a water storage groove is formed in the first connecting plate and the second connecting plate.
Preferably, the first connecting plate and the second connecting plate are spliced through the clamping blocks and the clamping grooves, and then are fixed through the threaded holes, the threaded grooves and the threaded rods.
Preferably, one end of the inner side of the water storage tank is fixedly connected with a water leakage net.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the first connecting plate and the second connecting plate can be better spliced through the clamping blocks and the clamping grooves, so that the first connecting plate and the second connecting plate are spliced into a complete casting mold, and then the first connecting plate and the second connecting plate are fixed through the threaded holes formed in the clamping grooves and the clamping grooves formed in the clamping blocks through the threaded rods, so that the mold is more fastened, and the casting treatment is better and convenient.
2. According to the utility model, through the arrangement of the first connecting plate and the second connecting plate, the first connecting plate and the second connecting plate are spliced through the clamping block and the clamping groove and then are fixed through the threaded hole, the threaded groove and the threaded rod, so that the first connecting plate and the second connecting plate can be spliced more conveniently and can be spliced more firmly.
3. The water leakage net is fixedly connected with one end of the inner side of the water storage tank through the arranged water leakage net, so that added water can be better seeped out through the water leakage net, and poured concrete is moisturized, and is better condensed.
Drawings
FIG. 1 is a schematic diagram of a structure provided by an embodiment of the present invention;
fig. 2 is an enlarged view of a portion a in fig. 1 according to an embodiment of the present invention.
In the figure: 1. a first connecting plate; 2. a second connecting plate; 3. a clamping block; 4. a clamping groove; 5. a water adding port; 6. a sealing plug; 7. a water storage tank; 8. a water leakage net; 9. a threaded hole; 10. a thread groove; 11. a threaded rod.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1 to 2, a pouring mold structure for construction engineering provided in an embodiment of the present invention includes a first connecting plate 1 and a second connecting plate 2, where the upper and lower ends of the first connecting plate 1 are fixedly connected with clamping blocks 3, two sides of one end surface of the second connecting plate 2 are provided with clamping grooves 4, one side of each clamping groove 4 is connected with a threaded hole 9 in a penetrating manner, a threaded rod 11 is connected with the threaded hole 9 in a threaded manner, one side of each clamping block 3 is provided with a threaded groove 10, the surface middle positions of the first connecting plate 1 and the second connecting plate 2 are fixedly connected with a water filling port 5, a sealing plug 6 is sleeved in the water filling port 5, and a water storage groove 7 is provided inside the first connecting plate 1 and the second connecting plate 2.
Referring to fig. 1, a first connecting plate 1 and a second connecting plate 2 are spliced by a clamping block 3 and a clamping groove 4, and then fixed by a threaded hole 9, a threaded groove 10 and a threaded rod 11.
Adopt above-mentioned scheme: through the first connecting plate 1 and the second connecting plate 2 that set up, splice through joint piece 3 and joint groove 4 with first connecting plate 1 and second connecting plate 2, then fix through screw hole 9, thread groove 10 and threaded rod 11 and make the fastening more of concatenation simultaneously in order to better make first connecting plate 1 and second connecting plate 2 splice convenience more.
Referring to fig. 1, a water leakage net 8 is fixedly connected to one end of the inner side of the water storage tank 7.
Adopt above-mentioned scheme: through the water leakage net 8 that sets up, the water that will add through water leakage net 8 that leaks through the inboard one end fixed connection water leakage net 8 at aqua storage tank 7 is for can be better oozes through water leakage net 8 to keep wet the concrete of pouring, thereby make the better condensation of concrete.
The working principle of the utility model is as follows:
when using, at first the size of deciding first connecting plate 1 and the concatenation of second connecting plate 2 through the size of the concrete that will pour, thereby make the concrete form that can pour not unidimensional, then screw hole 9 through setting up, thread groove 10 and threaded rod 11 make the concatenation between first connecting plate 1 and the second connecting plate firm more and inseparable, then water to the template after pouring that can be better through aqua storage tank 7 that sets up and water leakage net 8, thereby make the convenience that can add of the condensation of concrete, the intensity of concrete has been improved simultaneously.
In summary, the following steps: this building engineering is with pouring mould structure, first connecting plate 1 through setting up, second connecting plate 2, joint piece 3, joint groove 4, add the mouth of a river 5, sealing plug 6, the aqua storage tank 7, the net 8 that leaks, screw hole 9, the cooperation of thread groove 10 and threaded rod 11 is used, current building engineering pouring mould has been solved because the limitation of mould shape makes the mould only be limited to pouring of same kind of big or small module when using, thereby it will be continuous to water on the concrete still to guarantee the humidity of concrete after pouring, thereby the problem that wastes time and energy.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The utility model provides a building engineering is with pouring mould structure, includes first connecting plate (1) and second connecting plate (2), its characterized in that: the utility model discloses a joint structure, including first connecting plate (1), joint groove (4), one side through connection has screw hole (9) in joint groove (4), threaded connection has threaded rod (11) in screw hole (9), threaded groove (10) have been seted up to one side of joint piece (3), position fixedly connected with adds mouth of a river (5) in the middle of the surface of first connecting plate (1) and second connecting plate (2), it has sealing plug (6) to cup joint in mouth of a river (5) to add, aqua storage tank (7) have been seted up to the inside of first connecting plate (1) and second connecting plate (2).
2. The casting mold structure for construction engineering according to claim 1, wherein: first connecting plate (1) and second connecting plate (2) splice through joint piece (3) and joint groove (4) that set up, then fix through screw hole (9), thread groove (10) and threaded rod (11).
3. The casting mold structure for construction engineering according to claim 1, wherein: one end of the inner side of the water storage tank (7) is fixedly connected with a water leakage net (8).
CN202122037268.0U 2021-08-27 2021-08-27 Building engineering is with pouring mould structure Expired - Fee Related CN215717138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122037268.0U CN215717138U (en) 2021-08-27 2021-08-27 Building engineering is with pouring mould structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122037268.0U CN215717138U (en) 2021-08-27 2021-08-27 Building engineering is with pouring mould structure

Publications (1)

Publication Number Publication Date
CN215717138U true CN215717138U (en) 2022-02-01

Family

ID=80007938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122037268.0U Expired - Fee Related CN215717138U (en) 2021-08-27 2021-08-27 Building engineering is with pouring mould structure

Country Status (1)

Country Link
CN (1) CN215717138U (en)

Similar Documents

Publication Publication Date Title
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN215717138U (en) Building engineering is with pouring mould structure
CN207130962U (en) A kind of assembled architecture panel structure
CN209408833U (en) The structure of transvers plate of multiple building wire box precast concrete blocks can be made simultaneously
CN206501223U (en) A kind of mold heating device
CN214423685U (en) Building movement joint concrete double-wall synchronizer
CN206625557U (en) Constructional column die head activity horn mouth
CN209556080U (en) One kind can have enough to meet the need precast concrete gutter
CN211572616U (en) Pouring device for constructional column
CN208918032U (en) Building concrete shear wall reserved opening plugging structure
CN206722197U (en) A kind of self locking type thermal insulation type concrete hollow block
CN209350489U (en) A kind of wire box precast concrete block structure of transvers plate for building
CN108839212B (en) A mould structure for precast concrete post
CN209755580U (en) PC component mould for assembly type building
CN107724673B (en) Convex die plate assembly and concave die plate assembly of arc-shaped building and template system formed by convex die plate assembly and concave die plate assembly
CN207156081U (en) A kind of prefabricated box -beam internal model anti-floating system
CN206667751U (en) A kind of arc cornices reversed beam mould
CN209760813U (en) Novel construction template is fixed device
CN216109675U (en) Assembled plastic formwork
CN216475701U (en) Assembly type wallboard seam filling clamp
CN219157414U (en) Large tongue-and-groove steel mould of anti-seepage steel structure
CN207989052U (en) Buried water stop fixing device in a kind of tunnel
CN109629696A (en) A kind of connecting node and bamboo building structure of assembled raw bamboo assembled wall board and floor
CN200970836Y (en) Plate tile mould
CN214993643U (en) Assembled irrigation and water conservancy culvert gate structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220201