CN211572616U - Pouring device for constructional column - Google Patents

Pouring device for constructional column Download PDF

Info

Publication number
CN211572616U
CN211572616U CN201921911521.7U CN201921911521U CN211572616U CN 211572616 U CN211572616 U CN 211572616U CN 201921911521 U CN201921911521 U CN 201921911521U CN 211572616 U CN211572616 U CN 211572616U
Authority
CN
China
Prior art keywords
plate
grouting
opening
plates
sealing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921911521.7U
Other languages
Chinese (zh)
Inventor
江敬健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201921911521.7U priority Critical patent/CN211572616U/en
Application granted granted Critical
Publication of CN211572616U publication Critical patent/CN211572616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a device of pouring of constructional column, its characterized in that: grouting plates, joggle plates and three-section type pull rod bolts; the grouting plates and the joggling plates are respectively fixed on two sides of the wall surface, the pull rod bolt penetrates through the two sides of the wall surface, the grouting plates and the joggling plates, and steel pipes are tightly arranged between the grouting plates and the joggling plates and rotating handles of the pull rod bolts; the top end of the grouting plate is provided with an opening, the opening is provided with a sealing plate, the sealing plate is hinged to the bottom end of the opening through a hinge, and the sealing plate and the opening are completely sealed when the sealing plate is sealed; be provided with the rotation type switch on the open-ended top, can buckle the shrouding when closed shrouding, avoid the shrouding to open. The utility model discloses can reduce the construction extravagant, promote production efficiency.

Description

Pouring device for constructional column
Technical Field
The utility model relates to a device of pouring of constructional column belongs to building technical field.
Background
The application of the constructional column is mainly to improve the stability and reliability of a concrete structure and improve the strength and the shearing resistance of an integral part. The application of the constructional column structure in the building engineering has been extensive for many years, and the result is remarkable. Plays an important role in preventing the cracking and leakage of the building structure. The constructional column forms a "small frame" together with the ring beam in a brick-concrete structure. The integrity of the house is enhanced, and the shock resistance of the house is enhanced. The earthquake-proof building is absolutely indispensable in earthquake-proof areas, otherwise, the earthquake-proof performance of the building is seriously influenced. In contrast, the so-called "construction columns" in frame structures are much less effective than the construction columns in brick and concrete structures.
When the constructional column is constructed, a pouring opening is reserved at the top of a constructional column template in the traditional pouring method. After the concrete is poured, an excessive wedge-shaped concrete is usually left on the top. The concrete needs to be chiseled off after it has reached age. Since a large number of construction columns are required in a construction work, a part of the concrete is wasted and labor costs are lost.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a device of pouring of constructional column, the device of pouring of this constructional column can reduce the construction extravagant, has promoted production efficiency.
The technical scheme of the utility model as follows:
the utility model provides a device of pouring of constructional column which characterized in that: grouting plates, joggle plates and three-section type pull rod bolts;
the grouting plates and the joggling plates are respectively fixed on two sides of the wall surface, the pull rod bolt penetrates through the two sides of the wall surface, the grouting plates and the joggling plates, and steel pipes are tightly arranged between the grouting plates and the joggling plates and rotating handles of the pull rod bolts;
the top end of the grouting plate is provided with an opening, the opening is provided with a sealing plate, the sealing plate is hinged to the bottom end of the opening through a hinge, and the sealing plate and the opening are completely sealed when the sealing plate is sealed; be provided with the rotation type switch on the open-ended top, can buckle the shrouding when closed shrouding, avoid the shrouding to open.
Furthermore, the closing plate is provided with a through hole for extruding the redundant concrete.
Furthermore, a rubber cover is arranged between the sealing plate and the side edge of the opening.
Furthermore, the two ends of the tenon plate are respectively provided with a tenon and a mortise, so that a plurality of tenon plates can be spliced into a whole; the bottom of grout board is provided with tenon or fourth of twelve earthly branches groove, still includes the extension plate, the extension plate set up in the below of grout board, the both ends of extension plate are equipped with tenon and fourth of twelve earthly branches groove respectively for grout board can with the extension plate joggle.
The utility model discloses following beneficial effect has: through the setting of shrouding, changed and to have left the defect of a unnecessary wedge concrete at the top of constructional column among the traditional handicraft, reduced the construction extravagant, also need not the manual work with the process of wedge shovel, greatly reduced manufacturing cost, promoted production efficiency.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is an enlarged view of a portion of FIG. 1 at B;
the reference numbers in the figures denote:
1. grouting plates; 11. an opening; 111. a switch; 12. closing the plate; 121. a through hole; 13. a rubber cover; 14. an extension plate;
2. a joggle plate; 21. a tenon; 22. mortise slot making;
3. a draw bar bolt; 31. and (5) steel pipes.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 and 2, a constructional column pouring device is characterized in that: grouting plates 1, a joggle plate 2 and a three-section type pull rod bolt 3;
the grouting plate 1 and the tenon plate 2 are respectively fixed on two sides of a wall surface, the pull rod bolt 3 penetrates through the two sides of the wall surface, the grouting plate 1 and the tenon plate 2, and a steel pipe 31 is tightly arranged between the grouting plate 1 and the tenon plate 2 and a rotating handle of the pull rod bolt 3;
an opening 11 is formed in the top end of the grouting plate 1, a sealing plate 12 is arranged at the opening 11, the sealing plate 12 is hinged to the bottom end of the opening 11 through a hinge, and when the sealing plate is closed, the sealing plate and the opening 11 are completely closed; the top end of the opening 11 is provided with a rotary switch 111 which can be used for clamping the sealing plate 12 when the sealing plate 12 is closed, so that the sealing plate 12 is prevented from being opened.
The utility model discloses a working process does: mounting grouting plates 1 and joggling plates 2 on two sides of a wall surface where the constructional column is located respectively, and tensioning through pull rod bolts 3; then opening the sealing plate 12 for pouring, closing the sealing plate 12 after pouring is finished, flattening and compacting the top of the constructional column, and taking down the sealing plate 12 after cement is solidified; the stay bolt 3 may use a stay bolt 3 manufactured by Chongqing iron source fastener manufacturing Co.
The utility model has the advantages that: through the setting of shrouding 12, changed and to have left the defect of a unnecessary wedge concrete at the top of constructional column among the traditional handicraft, reduced the construction extravagant, also need not the manual work with the process of wedge shovel, greatly reduced manufacturing cost, promoted production efficiency.
Further, the closing plate 12 is provided with a through hole 121 for extruding the excess concrete.
As can be seen from the above description, the arrangement of the through holes 121 can extrude the excess concrete for recycling, thereby saving production materials, and being more energy-saving and environment-friendly; when the pouring is finished, the open hole can be plugged by a cork or an adhesive tape, so that the slurry leakage is avoided.
Further, a rubber cover 13 is disposed between the closing plate 12 and the side of the opening 11.
Can know from the above-mentioned description, through rubber envelope 13's setting can avoid appearing the phenomenon that the concrete was revealed, and rubber envelope 13 also can form the structure of a similar funnel with shrouding 12 when pouring simultaneously, has also avoided the process of pouring to appear leaking the thick liquid when conveniently pouring.
Furthermore, two ends of the tenon plate 2 are respectively provided with a tenon 21 and a mortise 22, so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate 1 is provided with tenon 21 or mortise 22, still includes extension plate 14, extension plate 14 set up in grouting plate 1's below, the both ends of extension plate 14 are equipped with tenon 21 and mortise 22 respectively for grouting plate 1 can with extension plate 14 joggle.
As can be seen from the above description, through the design of tenon 21 and mortise 22, can all use this device when being under construction to the wall of co-altitude not, greatly increased application scope.
Example one
A constructional column pouring device as shown in fig. 1-3, characterized in that: grouting plates 1, a joggle plate 2 and a three-section type pull rod bolt 3; the grouting plate 1 and the tenon plate 2 are respectively fixed on two sides of a wall surface, the pull rod bolt 3 penetrates through the two sides of the wall surface, the grouting plate 1 and the tenon plate 2, and a steel pipe 31 is tightly arranged between the grouting plate 1 and the tenon plate 2 and a rotating handle of the pull rod bolt 3; an opening 11 is formed in the top end of the grouting plate 1, a sealing plate 12 is arranged at the opening 11, the sealing plate 12 is hinged to the bottom end of the opening 11 through a hinge, and when the sealing plate is closed, the sealing plate and the opening 11 are completely closed; a rotary switch 111 is arranged at the top end of the opening 11, and when the closing plate 12 is closed, the closing plate 12 can be clamped, so that the closing plate 12 is prevented from being opened; the sealing plate 12 is provided with a through hole 121 for extruding redundant concrete; a rubber cover 13 is arranged between the sealing plate 12 and the side edge of the opening 11; two ends of the tenon plate 2 are respectively provided with a tenon 21 and a mortise 22, so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate 1 is provided with tenon 21 or mortise 22, still includes extension plate 14, extension plate 14 set up in grouting plate 1's below, the both ends of extension plate 14 are equipped with tenon 21 and mortise 22 respectively for grouting plate 1 can with extension plate 14 joggle.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (4)

1. The utility model provides a device of pouring of constructional column which characterized in that: the grouting plate (1), the joggle joint plate (2) and the three-section type draw bar bolt (3);
the grouting plate (1) and the joggle plate (2) are respectively fixed on two sides of a wall surface, the draw bar bolt (3) penetrates through the two sides of the wall surface and the grouting plate (1) and the joggle plate (2), and a steel pipe (31) is tightly arranged between the grouting plate (1) and the joggle plate (2) and a rotating handle of the draw bar bolt (3);
an opening (11) is formed in the top end of the grouting plate (1), a sealing plate (12) is arranged at the position of the opening (11), the sealing plate (12) is hinged to the bottom end of the opening (11) through a hinge, and the sealing plate and the opening (11) are completely sealed when the sealing plate is sealed; a rotary switch (111) is arranged on the top end of the opening (11), and the sealing plate (12) can be clamped when the sealing plate (12) is closed, so that the sealing plate (12) is prevented from being opened.
2. The constructional column casting apparatus as defined in claim 1, wherein: the sealing plate (12) is provided with a through hole (121) for extruding redundant concrete.
3. The constructional column casting apparatus as defined in claim 1, wherein: a rubber cover (13) is arranged between the closing plate (12) and the side edge of the opening (11).
4. The constructional column casting apparatus as defined in claim 1, wherein: two ends of the tenon plate (2) are respectively provided with a tenon (21) and a mortise (22), so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate (1) is provided with tenon (21) or mortise (22), still includes extension plate (14), extension plate (14) set up in the below of grouting plate (1), the both ends of extension plate (14) are equipped with tenon (21) and mortise (22) respectively for grouting plate (1) can with extension plate (14) joggle.
CN201921911521.7U 2019-11-07 2019-11-07 Pouring device for constructional column Active CN211572616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921911521.7U CN211572616U (en) 2019-11-07 2019-11-07 Pouring device for constructional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921911521.7U CN211572616U (en) 2019-11-07 2019-11-07 Pouring device for constructional column

Publications (1)

Publication Number Publication Date
CN211572616U true CN211572616U (en) 2020-09-25

Family

ID=72532042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921911521.7U Active CN211572616U (en) 2019-11-07 2019-11-07 Pouring device for constructional column

Country Status (1)

Country Link
CN (1) CN211572616U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293931A (en) * 2021-06-04 2021-08-24 中冶建工集团有限公司 Masonry wall constructional column construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293931A (en) * 2021-06-04 2021-08-24 中冶建工集团有限公司 Masonry wall constructional column construction method

Similar Documents

Publication Publication Date Title
CN202441391U (en) End template device for mounting waterstop in tunnel secondary lining concrete
CN209228042U (en) A kind of corner constructional column erecting device
CN201050190Y (en) Formwork clamp for building construction
CN211572616U (en) Pouring device for constructional column
CN208380099U (en) Concrete casting device
CN212358742U (en) Assembly welding type steel bar template integrated T-shaped component
CN207813019U (en) A kind of UHPC non-dismantling formworks of casting concrete column
CN208152107U (en) A kind of rubber watertight strip mounting device
CN106337530A (en) Construction method for plugging construction joint of frame beam
CN111005562A (en) Method for sealing and processing opening of window of assembled laminated plate wall
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN212984630U (en) Template device is sealed in advance to vertical post-cast strip
CN211691450U (en) Slurry leakage prevention device for prefabricated side embedded steel bars of laminated slab beam
CN201321721Y (en) Constructional column no-putlog-hole template fixing device in brick and concrete structure construction
CN207485013U (en) Building cylinder reparation template framework
CN206220057U (en) Open drain one-time-shaped mould
CN108331333B (en) Aluminum alloy formwork inner wall column root plug seam optimization device and construction method thereof
CN209779949U (en) Prefabricated assembled profiled steel sheet concrete shear force wall
CN106808564B (en) Three-word buckle type box girder end sealing template and box girder end sealing method
CN219033593U (en) Post-cast strip waterproof construction
CN220848736U (en) Be applied to pre-buried construction's of outer wall tubular product seepage prevention structure
CN212096814U (en) Prefabricated mould of hole concrete is reserved to block terminal
CN217326441U (en) Can have enough to meet need, anti-bank concrete form reinforcing tool of fast ann quick detach
CN215670999U (en) Aluminum alloy template slurry leakage prevention device
CN220318857U (en) Building block wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant