CN211572616U - Pouring device for constructional column - Google Patents
Pouring device for constructional column Download PDFInfo
- Publication number
- CN211572616U CN211572616U CN201921911521.7U CN201921911521U CN211572616U CN 211572616 U CN211572616 U CN 211572616U CN 201921911521 U CN201921911521 U CN 201921911521U CN 211572616 U CN211572616 U CN 211572616U
- Authority
- CN
- China
- Prior art keywords
- plate
- grouting
- opening
- plates
- sealing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a device of pouring of constructional column, its characterized in that: grouting plates, joggle plates and three-section type pull rod bolts; the grouting plates and the joggling plates are respectively fixed on two sides of the wall surface, the pull rod bolt penetrates through the two sides of the wall surface, the grouting plates and the joggling plates, and steel pipes are tightly arranged between the grouting plates and the joggling plates and rotating handles of the pull rod bolts; the top end of the grouting plate is provided with an opening, the opening is provided with a sealing plate, the sealing plate is hinged to the bottom end of the opening through a hinge, and the sealing plate and the opening are completely sealed when the sealing plate is sealed; be provided with the rotation type switch on the open-ended top, can buckle the shrouding when closed shrouding, avoid the shrouding to open. The utility model discloses can reduce the construction extravagant, promote production efficiency.
Description
Technical Field
The utility model relates to a device of pouring of constructional column belongs to building technical field.
Background
The application of the constructional column is mainly to improve the stability and reliability of a concrete structure and improve the strength and the shearing resistance of an integral part. The application of the constructional column structure in the building engineering has been extensive for many years, and the result is remarkable. Plays an important role in preventing the cracking and leakage of the building structure. The constructional column forms a "small frame" together with the ring beam in a brick-concrete structure. The integrity of the house is enhanced, and the shock resistance of the house is enhanced. The earthquake-proof building is absolutely indispensable in earthquake-proof areas, otherwise, the earthquake-proof performance of the building is seriously influenced. In contrast, the so-called "construction columns" in frame structures are much less effective than the construction columns in brick and concrete structures.
When the constructional column is constructed, a pouring opening is reserved at the top of a constructional column template in the traditional pouring method. After the concrete is poured, an excessive wedge-shaped concrete is usually left on the top. The concrete needs to be chiseled off after it has reached age. Since a large number of construction columns are required in a construction work, a part of the concrete is wasted and labor costs are lost.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a device of pouring of constructional column, the device of pouring of this constructional column can reduce the construction extravagant, has promoted production efficiency.
The technical scheme of the utility model as follows:
the utility model provides a device of pouring of constructional column which characterized in that: grouting plates, joggle plates and three-section type pull rod bolts;
the grouting plates and the joggling plates are respectively fixed on two sides of the wall surface, the pull rod bolt penetrates through the two sides of the wall surface, the grouting plates and the joggling plates, and steel pipes are tightly arranged between the grouting plates and the joggling plates and rotating handles of the pull rod bolts;
the top end of the grouting plate is provided with an opening, the opening is provided with a sealing plate, the sealing plate is hinged to the bottom end of the opening through a hinge, and the sealing plate and the opening are completely sealed when the sealing plate is sealed; be provided with the rotation type switch on the open-ended top, can buckle the shrouding when closed shrouding, avoid the shrouding to open.
Furthermore, the closing plate is provided with a through hole for extruding the redundant concrete.
Furthermore, a rubber cover is arranged between the sealing plate and the side edge of the opening.
Furthermore, the two ends of the tenon plate are respectively provided with a tenon and a mortise, so that a plurality of tenon plates can be spliced into a whole; the bottom of grout board is provided with tenon or fourth of twelve earthly branches groove, still includes the extension plate, the extension plate set up in the below of grout board, the both ends of extension plate are equipped with tenon and fourth of twelve earthly branches groove respectively for grout board can with the extension plate joggle.
The utility model discloses following beneficial effect has: through the setting of shrouding, changed and to have left the defect of a unnecessary wedge concrete at the top of constructional column among the traditional handicraft, reduced the construction extravagant, also need not the manual work with the process of wedge shovel, greatly reduced manufacturing cost, promoted production efficiency.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is an enlarged view of a portion of FIG. 1 at B;
the reference numbers in the figures denote:
1. grouting plates; 11. an opening; 111. a switch; 12. closing the plate; 121. a through hole; 13. a rubber cover; 14. an extension plate;
2. a joggle plate; 21. a tenon; 22. mortise slot making;
3. a draw bar bolt; 31. and (5) steel pipes.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 and 2, a constructional column pouring device is characterized in that: grouting plates 1, a joggle plate 2 and a three-section type pull rod bolt 3;
the grouting plate 1 and the tenon plate 2 are respectively fixed on two sides of a wall surface, the pull rod bolt 3 penetrates through the two sides of the wall surface, the grouting plate 1 and the tenon plate 2, and a steel pipe 31 is tightly arranged between the grouting plate 1 and the tenon plate 2 and a rotating handle of the pull rod bolt 3;
an opening 11 is formed in the top end of the grouting plate 1, a sealing plate 12 is arranged at the opening 11, the sealing plate 12 is hinged to the bottom end of the opening 11 through a hinge, and when the sealing plate is closed, the sealing plate and the opening 11 are completely closed; the top end of the opening 11 is provided with a rotary switch 111 which can be used for clamping the sealing plate 12 when the sealing plate 12 is closed, so that the sealing plate 12 is prevented from being opened.
The utility model discloses a working process does: mounting grouting plates 1 and joggling plates 2 on two sides of a wall surface where the constructional column is located respectively, and tensioning through pull rod bolts 3; then opening the sealing plate 12 for pouring, closing the sealing plate 12 after pouring is finished, flattening and compacting the top of the constructional column, and taking down the sealing plate 12 after cement is solidified; the stay bolt 3 may use a stay bolt 3 manufactured by Chongqing iron source fastener manufacturing Co.
The utility model has the advantages that: through the setting of shrouding 12, changed and to have left the defect of a unnecessary wedge concrete at the top of constructional column among the traditional handicraft, reduced the construction extravagant, also need not the manual work with the process of wedge shovel, greatly reduced manufacturing cost, promoted production efficiency.
Further, the closing plate 12 is provided with a through hole 121 for extruding the excess concrete.
As can be seen from the above description, the arrangement of the through holes 121 can extrude the excess concrete for recycling, thereby saving production materials, and being more energy-saving and environment-friendly; when the pouring is finished, the open hole can be plugged by a cork or an adhesive tape, so that the slurry leakage is avoided.
Further, a rubber cover 13 is disposed between the closing plate 12 and the side of the opening 11.
Can know from the above-mentioned description, through rubber envelope 13's setting can avoid appearing the phenomenon that the concrete was revealed, and rubber envelope 13 also can form the structure of a similar funnel with shrouding 12 when pouring simultaneously, has also avoided the process of pouring to appear leaking the thick liquid when conveniently pouring.
Furthermore, two ends of the tenon plate 2 are respectively provided with a tenon 21 and a mortise 22, so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate 1 is provided with tenon 21 or mortise 22, still includes extension plate 14, extension plate 14 set up in grouting plate 1's below, the both ends of extension plate 14 are equipped with tenon 21 and mortise 22 respectively for grouting plate 1 can with extension plate 14 joggle.
As can be seen from the above description, through the design of tenon 21 and mortise 22, can all use this device when being under construction to the wall of co-altitude not, greatly increased application scope.
Example one
A constructional column pouring device as shown in fig. 1-3, characterized in that: grouting plates 1, a joggle plate 2 and a three-section type pull rod bolt 3; the grouting plate 1 and the tenon plate 2 are respectively fixed on two sides of a wall surface, the pull rod bolt 3 penetrates through the two sides of the wall surface, the grouting plate 1 and the tenon plate 2, and a steel pipe 31 is tightly arranged between the grouting plate 1 and the tenon plate 2 and a rotating handle of the pull rod bolt 3; an opening 11 is formed in the top end of the grouting plate 1, a sealing plate 12 is arranged at the opening 11, the sealing plate 12 is hinged to the bottom end of the opening 11 through a hinge, and when the sealing plate is closed, the sealing plate and the opening 11 are completely closed; a rotary switch 111 is arranged at the top end of the opening 11, and when the closing plate 12 is closed, the closing plate 12 can be clamped, so that the closing plate 12 is prevented from being opened; the sealing plate 12 is provided with a through hole 121 for extruding redundant concrete; a rubber cover 13 is arranged between the sealing plate 12 and the side edge of the opening 11; two ends of the tenon plate 2 are respectively provided with a tenon 21 and a mortise 22, so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate 1 is provided with tenon 21 or mortise 22, still includes extension plate 14, extension plate 14 set up in grouting plate 1's below, the both ends of extension plate 14 are equipped with tenon 21 and mortise 22 respectively for grouting plate 1 can with extension plate 14 joggle.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.
Claims (4)
1. The utility model provides a device of pouring of constructional column which characterized in that: the grouting plate (1), the joggle joint plate (2) and the three-section type draw bar bolt (3);
the grouting plate (1) and the joggle plate (2) are respectively fixed on two sides of a wall surface, the draw bar bolt (3) penetrates through the two sides of the wall surface and the grouting plate (1) and the joggle plate (2), and a steel pipe (31) is tightly arranged between the grouting plate (1) and the joggle plate (2) and a rotating handle of the draw bar bolt (3);
an opening (11) is formed in the top end of the grouting plate (1), a sealing plate (12) is arranged at the position of the opening (11), the sealing plate (12) is hinged to the bottom end of the opening (11) through a hinge, and the sealing plate and the opening (11) are completely sealed when the sealing plate is sealed; a rotary switch (111) is arranged on the top end of the opening (11), and the sealing plate (12) can be clamped when the sealing plate (12) is closed, so that the sealing plate (12) is prevented from being opened.
2. The constructional column casting apparatus as defined in claim 1, wherein: the sealing plate (12) is provided with a through hole (121) for extruding redundant concrete.
3. The constructional column casting apparatus as defined in claim 1, wherein: a rubber cover (13) is arranged between the closing plate (12) and the side edge of the opening (11).
4. The constructional column casting apparatus as defined in claim 1, wherein: two ends of the tenon plate (2) are respectively provided with a tenon (21) and a mortise (22), so that a plurality of tenon plates can be spliced into a whole; the bottom of grouting plate (1) is provided with tenon (21) or mortise (22), still includes extension plate (14), extension plate (14) set up in the below of grouting plate (1), the both ends of extension plate (14) are equipped with tenon (21) and mortise (22) respectively for grouting plate (1) can with extension plate (14) joggle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921911521.7U CN211572616U (en) | 2019-11-07 | 2019-11-07 | Pouring device for constructional column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921911521.7U CN211572616U (en) | 2019-11-07 | 2019-11-07 | Pouring device for constructional column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211572616U true CN211572616U (en) | 2020-09-25 |
Family
ID=72532042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921911521.7U Active CN211572616U (en) | 2019-11-07 | 2019-11-07 | Pouring device for constructional column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211572616U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113293931A (en) * | 2021-06-04 | 2021-08-24 | 中冶建工集团有限公司 | Masonry wall constructional column construction method |
-
2019
- 2019-11-07 CN CN201921911521.7U patent/CN211572616U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113293931A (en) * | 2021-06-04 | 2021-08-24 | 中冶建工集团有限公司 | Masonry wall constructional column construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202441391U (en) | End template device for mounting waterstop in tunnel secondary lining concrete | |
CN209228042U (en) | A kind of corner constructional column erecting device | |
CN201050190Y (en) | Formwork clamp for building construction | |
CN211572616U (en) | Pouring device for constructional column | |
CN208380099U (en) | Concrete casting device | |
CN212358742U (en) | Assembly welding type steel bar template integrated T-shaped component | |
CN207813019U (en) | A kind of UHPC non-dismantling formworks of casting concrete column | |
CN208152107U (en) | A kind of rubber watertight strip mounting device | |
CN106337530A (en) | Construction method for plugging construction joint of frame beam | |
CN111005562A (en) | Method for sealing and processing opening of window of assembled laminated plate wall | |
CN212224611U (en) | Shear force wall pouring template reinforcing apparatus | |
CN212984630U (en) | Template device is sealed in advance to vertical post-cast strip | |
CN211691450U (en) | Slurry leakage prevention device for prefabricated side embedded steel bars of laminated slab beam | |
CN201321721Y (en) | Constructional column no-putlog-hole template fixing device in brick and concrete structure construction | |
CN207485013U (en) | Building cylinder reparation template framework | |
CN206220057U (en) | Open drain one-time-shaped mould | |
CN108331333B (en) | Aluminum alloy formwork inner wall column root plug seam optimization device and construction method thereof | |
CN209779949U (en) | Prefabricated assembled profiled steel sheet concrete shear force wall | |
CN106808564B (en) | Three-word buckle type box girder end sealing template and box girder end sealing method | |
CN219033593U (en) | Post-cast strip waterproof construction | |
CN220848736U (en) | Be applied to pre-buried construction's of outer wall tubular product seepage prevention structure | |
CN212096814U (en) | Prefabricated mould of hole concrete is reserved to block terminal | |
CN217326441U (en) | Can have enough to meet need, anti-bank concrete form reinforcing tool of fast ann quick detach | |
CN215670999U (en) | Aluminum alloy template slurry leakage prevention device | |
CN220318857U (en) | Building block wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |