CN215715201U - A gabion for ecological remediation of mine side slope - Google Patents

A gabion for ecological remediation of mine side slope Download PDF

Info

Publication number
CN215715201U
CN215715201U CN202122116938.8U CN202122116938U CN215715201U CN 215715201 U CN215715201 U CN 215715201U CN 202122116938 U CN202122116938 U CN 202122116938U CN 215715201 U CN215715201 U CN 215715201U
Authority
CN
China
Prior art keywords
gabion
net
threaded rod
gabion net
mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122116938.8U
Other languages
Chinese (zh)
Inventor
毕泗栋
从相军
欧阳友和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Corps Of China Building Materials Industrial Geological Exploration Center
Original Assignee
Shandong Corps Of China Building Materials Industrial Geological Exploration Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Corps Of China Building Materials Industrial Geological Exploration Center filed Critical Shandong Corps Of China Building Materials Industrial Geological Exploration Center
Priority to CN202122116938.8U priority Critical patent/CN215715201U/en
Application granted granted Critical
Publication of CN215715201U publication Critical patent/CN215715201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a gabion for ecological restoration of a mine side slope, which comprises a lower gabion mesh, a side gabion mesh and an upper gabion mesh, wherein positioning mechanisms are arranged on the peripheries of the lower gabion mesh and the upper gabion mesh, the side gabion mesh is arranged between the lower gabion mesh and the upper gabion mesh, fixing mechanisms are arranged between the lower gabion mesh and the side gabion mesh and between the upper gabion mesh and the side gabion mesh, the number of the fixing mechanisms is eight, when the side gabion mesh is assembled, the side gabion mesh can be preliminarily fixed on the lower gabion mesh, the subsequent assembling work can be carried out without extra manual support of the side gabion mesh through the arranged positioning mechanisms, the labor cost is reduced, the assembling dislocation phenomenon is avoided, the work efficiency is high, the use effect is good, the fixing effect between the gabion meshes can be enhanced through the arranged fixing mechanisms, and the side gabion mesh is prevented from being impacted by stones, the side gabion net is separated from the lower gabion net or the upper gabion net, and the practicability is high.

Description

A gabion for ecological remediation of mine side slope
Technical Field
The utility model belongs to the technical field of gabions, and particularly relates to a gabion for ecological restoration of a mine side slope.
Background
The gabion is a cage filled with stones and arranged for preventing a river bank or a structure from being washed by water flow, in China, an ecological grid structure originates from a bamboo cage and a sheepfold process for many years, and a plum ice father is used for the first time in Dujiang weir engineering, and is the ecological grid structure in the traditional sense; the ecological grid in the modern meaning of China originated in 1998 from an enterprise named Jinlida in the south of the Yangtze river. Nowadays, as a new technology, a new technology and a new material, the novel ecological grid structure is successfully applied to protection engineering of hydraulic engineering, highways, railway engineering and dikes, better realizes the organic combination of the engineering structure and the ecological environment, and has own advantages compared with some traditional rigid structures, so the novel ecological grid structure becomes a preferred structural style for protecting riverbeds, governing landslides, preventing and treating mud-rock flows and preventing rockfall and also protecting the environment worldwide.
The existing gabion is usually supported by two workers in the assembling process, and another worker is used for assembling and fixing the gabion net, so that the labor cost is high, the gabion net is easy to deviate in the assembling process, the working efficiency is influenced, and the gabion for ecological restoration of the mine side slope is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a gabion for ecological restoration of a mine side slope, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a gabion for ecological remediation of mine side slope, includes lower gabion net, kerbstone cage net and goes up the gabion net, all be provided with positioning mechanism around lower gabion net and the last gabion net, the side gabion net sets up under between gabion net and last gabion net, all be provided with fixed establishment down between gabion net and the kerbstone cage net, go up between gabion net and the kerbstone cage net, and fixed establishment is provided with eight.
Preferably, positioning mechanism includes the locating piece, four locating piece fixed mounting is in the four corners department of gabion net down, four locating piece fixed mounting is in the four corners department of last gabion net, the inside fixed mounting of lower extreme of locating piece has expanding spring, expanding spring's outer end fixedly connected with movable plate, the outer end and the kerbstone cage net of movable plate offset, the inside fixed mounting in upper end of locating piece has pressure spring, pressure spring is close to the one end fixedly connected with limiting plate of movable plate, one side that the limiting plate is close to the movable plate offsets with the kerbstone cage net.
Preferably, fixed establishment includes the fixed block, four fixed block fixed mounting is on the gabion net down, four fixed block fixed mounting is on last gabion net, the inside movable mounting of fixed block has first threaded rod and second threaded rod, and first threaded rod is close to the one end and the second threaded rod fixed connection of gabion net down, the equal threaded connection in surface of first threaded rod and second threaded rod has the slider, two the equal fixedly connected with clamp splice of the relative one end of slider, side gabion net adds holds two between the clamp splice.
Preferably, the lower ends of the four side gabion nets are all inserted into the four lower end positioning blocks, and the upper ends of the four side gabion nets are all inserted into the four upper end positioning blocks.
Preferably, the two compression springs and the two limiting plates are symmetrically arranged inside the positioning block, and one end, far away from the compression springs, of the limiting plate is abutted to the limiting plate on the right side on the left side.
Preferably, the outer end of the first threaded rod penetrates through the fixing block and is fixedly connected with the knob, and the surface of the knob is sleeved with the anti-skidding sleeve.
Preferably, the fixed block is internally and fixedly provided with a bearing, and the second threaded rod is rotatably connected with the inside of the fixed block through the bearing.
Compared with the prior art, the utility model has the beneficial effects that:
(1) this a gabion for mine side slope ecological remediation through the positioning mechanism who sets up, can be when offside gabion net assembles, with the side gabion net tentatively fixed on the gabion net down, need not extra manual work and supports the side gabion net, just can carry out subsequent equipment work to reduce the cost of labor, and avoided the equipment dislocation phenomenon, work efficiency is high, excellent in use effect.
(2) This a gabion for mine side slope ecological remediation through the fixed establishment who sets up, can strengthen down the fixed effect between gabion net and the kerbstone cage net, also can strengthen the fixed effect between side gabion net and the last gabion net, has avoided the stone to strike side gabion net, leads to side gabion net to break away from on lower gabion net or the last gabion net, and the practicality is high.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a left side elevation view of the present invention;
FIG. 3 is an enlarged view of the structure of FIG. 2 at A in accordance with the present invention;
fig. 4 is a cross-sectional view of the positioning mechanism of the present invention.
In the figure: 1. a gabion net is arranged; 2. a lateral gabion mesh; 3. putting a gabion net; 4. a positioning mechanism; 401. positioning blocks; 402. a tension spring; 403. moving the plate; 404. a compression spring; 405. a limiting plate; 5. a fixing mechanism; 501. a fixed block; 502. a first threaded rod; 503. a second threaded rod; 504. a slider; 505. a clamping block; 506. a knob.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a gabion for ecological restoration of a mine side slope, which comprises a lower gabion mesh 1, a side gabion mesh 2 and an upper gabion mesh 3, wherein positioning mechanisms 4 are arranged around the lower gabion mesh 1 and the upper gabion mesh 3, the side gabion mesh 2 is arranged between the lower gabion mesh 1 and the upper gabion mesh 3, fixing mechanisms 5 are arranged between the lower gabion mesh 1 and the side gabion mesh 2 and between the upper gabion mesh 3 and the side gabion mesh 2, and eight fixing mechanisms 5 are arranged between the fixing mechanisms 5.
In this embodiment, preferably, the positioning mechanism 4 includes positioning blocks 401, four positioning blocks 401 are fixedly installed at four corners of the lower gabion mesh 1, four positioning blocks 401 are fixedly installed at four corners of the upper gabion mesh 3, an extension spring 402 is fixedly installed inside a lower end of the positioning blocks 401, a moving plate 403 is fixedly connected to an outer end of the extension spring 402, an outer end of the moving plate 403 abuts against the kerbstone gabion mesh 2, a compression spring 404 is fixedly installed inside an upper end of the positioning blocks 401, a limiting plate 405 is fixedly connected to one end of the compression spring 404 close to the moving plate 403, one side of the limiting plate 405 close to the moving plate 403 abuts against the kerbstone gabion mesh 2, and with this structure, when the lower end of the kerbstone gabion mesh 2 is inserted into the positioning block 401 below, the kerbstone gabion mesh 2 presses the moving plate 403 downward, and meanwhile, the two limiting plates 405 are moved out of the positioning blocks 401 by the force of the compression spring 404, so that the two limiting plates 405 abut against each other, at this moment, the extension spring 402 releases an upward ground force, and can jack up the lower ends of the moving plate 403 and the side gabion mesh 2 upwards, so that the lower end of the side gabion mesh 2 is fixed inside the positioning block 401, and therefore preliminary fixing of the side gabion mesh 2 is achieved, and subsequent assembling is facilitated.
In this embodiment, preferably, the fixing mechanism 5 includes a fixing block 501, four fixing blocks 501 are fixedly installed on the lower gabion mesh 1, four fixing blocks 501 are fixedly installed on the upper gabion mesh 3, a first threaded rod 502 and a second threaded rod 503 are movably installed inside the fixing blocks 501, one end of the first threaded rod 502 close to the lower gabion mesh 1 is fixedly connected with the second threaded rod 503, the surfaces of the first threaded rod 502 and the second threaded rod 503 are both connected with a slider 504 through threads, one ends of the two sliders 504 opposite to each other are both fixedly connected with clamping blocks 505, the gabion mesh 2 is clamped between the two clamping blocks 505, a knob 506 is rotated, the knob 506 drives the first threaded rod 502 and the second threaded rod to rotate, so as to drive the two sliders 503 and the two clamping blocks 505 to move in opposite directions, and then the side gabion mesh 2 can be clamped, and the fixing effect of the side gabion mesh 2 is improved.
In this embodiment, it is preferred, the lower extreme of four side gabion nets 2 all pegs graft inside four lower extreme locating pieces 401, the inside at four upper end locating pieces 401 is all pegged graft in the upper end of four side gabion nets 2, the setting of this structure for the four corners department of side gabion net 2 pegs graft inside locating piece 401, thereby preliminary fixed side gabion net 2 need not artifical support side gabion net 2, just can carry out subsequent equipment work, thereby has reduced the cost of labor.
In this embodiment, it is preferred, hold-down spring 404 and limiting plate 405 all are provided with two, two hold-down spring 404 and limiting plate 405 symmetry set up in the inside of locating piece 401, the one end that hold-down spring 404 was kept away from to left side limiting plate 405 offsets with right side limiting plate 405, through two mutual butts of limiting plate 405, can seal the upper end of side gabion net 2, avoided the kerbstone gabion net 2 to break away from locating piece 401, make side gabion net 2 fixed on gabion net 1 down, subsequent work of being convenient for.
In this embodiment, preferably, the outer end of the first threaded rod 502 penetrates through the fixing block 501 and is fixedly connected with the knob 506, and the surface of the knob 506 is sleeved with the anti-slip sleeve, so that the friction force on the surface of the knob 506 is improved, the phenomenon of slipping when the knob 506 is rotated is avoided, and the practicability in use is improved.
In this embodiment, preferably, the inside fixed mounting of fixed block 501 has the bearing, and second threaded rod 503 passes through the bearing and is connected with the inside rotation of fixed block 501, and the setting of bearing can play spacing fixed effect to second threaded rod 503, and because the characteristic of bearing self for second threaded rod 503 rotates more smoothly, avoids second threaded rod 503 to take place the card and pause the influence and use.
The working principle and the using process of the utility model are as follows: when the device is used, the lower gabion mesh 1 is firstly laid flat, then the lower end of the side gabion mesh 2 is inserted into the positioning block 401, when the lower end of the side gabion mesh 2 is inserted into the positioning block 401 below, the side gabion mesh 2 presses the moving plate 403 downwards, meanwhile, the two limiting plates 405 are moved out of the positioning block 401 under the force of the compression spring 404, so that the two limiting plates 405 are mutually abutted, the expansion spring 402 releases an upward force, the moving plate 403 and the lower end of the side gabion mesh 2 can be upwards jacked up, the lower end of the side gabion mesh 2 is fixed inside the positioning block 401, preliminary fixing of the side gabion mesh 2 is achieved, then the knob 506 is rotated, the knob 506 drives the first threaded rod 502 and the second threaded rod 503 to rotate, so that the two sliding blocks 504 and the two clamping blocks 505 are driven to move oppositely, the side gabion mesh 2 can be clamped, and the fixing effect of the side gabion mesh 2 is improved, then put into the stone cage with the stone inside fill up, later with last stone cage net 3 lid in the upper end of side stone cage net 2 for inside the locating piece 401 of stone cage net 3 was inserted to the upper end of side stone cage net 2, fixed mechanism 5 through last stone cage net 3 on will go up stone cage net 3 and side stone cage net 2 is fixed, thereby improved the holistic stability of stone cage, just can use this stone cage this moment.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a gabion for mine side slope ecological remediation, includes lower gabion net (1), curb gabion net (2) and goes up gabion net (3), its characterized in that: all be provided with positioning mechanism (4) around lower gabion net (1) and last gabion net (3), side gabion net (2) set up gabion net (1) and last gabion net (3) down between, all be provided with fixed establishment (5) between lower gabion net (1) and kerbstone cage net (2), go up gabion net (3) and kerbstone cage net (2), and fixed establishment (5) are provided with eight.
2. The gabion for ecological restoration of mine side slopes according to claim 1, wherein: positioning mechanism (4) are including locating piece (401), four locating piece (401) fixed mounting is in the four corners department of lower gabion net (1), four locating piece (401) fixed mounting is in the four corners department of last gabion net (3), the inside fixed mounting of lower extreme of locating piece (401) has expanding spring (402), the outer end fixedly connected with movable plate (403) of expanding spring (402), the outer end and the curb gabion net (2) of movable plate (403) offset, the inside fixed mounting in upper end of locating piece (401) has pressure spring (404), pressure spring (404) are close to the one end fixedly connected with limiting plate (405) of movable plate (403), one side and the curb gabion net (2) counterbalance that limiting plate (405) are close to movable plate (403).
3. The gabion for ecological restoration of mine side slopes according to claim 1, wherein: fixed establishment (5) are including fixed block (501), four fixed block (501) fixed mounting is on lower gabion net (1), four fixed block (501) fixed mounting is on last gabion net (3), the inside movable mounting of fixed block (501) has first threaded rod (502) and second threaded rod (503), and one end and second threaded rod (503) fixed connection that first threaded rod (502) are close to gabion net (1) down, the equal threaded connection in surface of first threaded rod (502) and second threaded rod (503) has slider (504), two the equal fixedly connected with clamp splice (505) of the relative one end of slider (504), side gabion net (2) add and hold two between clamp splice (505).
4. The gabion for ecological restoration of mine side slopes according to claim 2, wherein: the lower ends of the four side gabion nets (2) are all inserted into the four lower end positioning blocks (401), and the upper ends of the four side gabion nets (2) are all inserted into the four upper end positioning blocks (401).
5. The gabion for ecological restoration of mine side slopes according to claim 2, wherein: the pressing spring (404) and the limiting plate (405) are arranged in two, the pressing spring (404) and the limiting plate (405) are symmetrically arranged inside the positioning block (401), the left side is arranged on the left side, one end of the limiting plate (405) far away from the pressing spring (404) is abutted to the right side limiting plate (405).
6. A gabion for mine slope ecological restoration according to claim 3, characterized in that: the outer end of the first threaded rod (502) penetrates through the fixing block (501) and is fixedly connected with a knob (506), and an anti-skidding sleeve is sleeved on the surface of the knob (506).
7. A gabion for mine slope ecological restoration according to claim 3, characterized in that: the bearing is fixedly installed inside the fixed block (501), and the second threaded rod (503) is rotatably connected with the inside of the fixed block (501) through the bearing.
CN202122116938.8U 2021-09-03 2021-09-03 A gabion for ecological remediation of mine side slope Active CN215715201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122116938.8U CN215715201U (en) 2021-09-03 2021-09-03 A gabion for ecological remediation of mine side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122116938.8U CN215715201U (en) 2021-09-03 2021-09-03 A gabion for ecological remediation of mine side slope

Publications (1)

Publication Number Publication Date
CN215715201U true CN215715201U (en) 2022-02-01

Family

ID=80014021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122116938.8U Active CN215715201U (en) 2021-09-03 2021-09-03 A gabion for ecological remediation of mine side slope

Country Status (1)

Country Link
CN (1) CN215715201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116950009A (en) * 2023-09-13 2023-10-27 安平县昊昌丝网制造有限公司 Gabion net ecological slope protection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116950009A (en) * 2023-09-13 2023-10-27 安平县昊昌丝网制造有限公司 Gabion net ecological slope protection
CN116950009B (en) * 2023-09-13 2024-03-15 安平县昊昌丝网制造有限公司 Gabion net ecological slope protection

Similar Documents

Publication Publication Date Title
CN215715201U (en) A gabion for ecological remediation of mine side slope
CN113417252B (en) Revetment reinforcing facility and construction method thereof
CN104234061A (en) Reinforced ecological concrete revetment and construction method thereof
CN112538840A (en) Landscape lake bank protection brick construction equipment
CN202577960U (en) Suspension outer bearing type combination steel formwork applied in roller compacted concrete (RCC) construction
CN209891155U (en) Environmental protection afforestation type bank protection device is used to water
CN117604980A (en) Water conservancy ecological slope protection drainage structure and drainage method thereof
CN108286251A (en) A kind of ground tamping unit for building
CN211621600U (en) Stability foundation ditch safety support structure
CN212896292U (en) Foundation collapse prevention supporting structure
CN206368358U (en) A kind of tamping apparatus of Geotechnical Engineering foundation construction
CN211036873U (en) Bottom reinforced structure that river course was administered synthetically
CN217923704U (en) Sluice pump station basis reinforced structure
CN216713066U (en) Geotechnical engineering rock slope protector
CN214783636U (en) Slide box for laying river channel gabion cage
CN206503044U (en) A kind of compound resistance to compression roadbed
CN220789623U (en) River course slope protection structure
CN216040977U (en) Hydraulic engineering revetment with afforestation function
CN217679168U (en) Ecological restoration structure for damage of mountain slope
CN219772862U (en) Protection device for hydraulic and hydroelectric engineering side slope
CN218911353U (en) Foundation leveling equipment for earthwork
CN211395570U (en) A protective structure for hydraulic and hydroelectric engineering side slope
CN220813685U (en) Ecological bank protection bearing structure of hydraulic and hydroelectric engineering
CN211596765U (en) Hydraulic engineering is with pulling out post device
CN219060088U (en) Ecological restoration of side slope is green firm protective structure again

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant