CN219060088U - Ecological restoration of side slope is green firm protective structure again - Google Patents
Ecological restoration of side slope is green firm protective structure again Download PDFInfo
- Publication number
- CN219060088U CN219060088U CN202223239771.5U CN202223239771U CN219060088U CN 219060088 U CN219060088 U CN 219060088U CN 202223239771 U CN202223239771 U CN 202223239771U CN 219060088 U CN219060088 U CN 219060088U
- Authority
- CN
- China
- Prior art keywords
- slope
- side slope
- retaining wall
- wire rope
- rope net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Abstract
The utility model discloses a slope ecological restoration and greening stable protection structure, which comprises a slope, wherein a retaining wall is arranged on the right side of the bottom of the slope, two groups of stable grooves with the same structure are downwards arranged at the middle of the top of the retaining wall and the middle of the top of the slope, a layer of steel wire rope net is arranged on the slope of the slope, two groups of cement plates with the same structure are arranged at the top of the retaining wall and the top of the slope, an embedded pipe is downwards arranged at the bottom of the stable groove, a limiting base is arranged at the bottom of the inner wall of the embedded pipe, two groups of mounting seats with the same structure are oppositely arranged on the left side and the right side of the middle of the inner wall of the embedded pipe, two groups of return springs with the same structure are inwards arranged on the opposite surfaces of the two groups of return springs, two groups of telescopic clamping pieces with the same structure are oppositely arranged on the surfaces of the two groups of the return springs, and the top of the cement plates is provided with long anchor rods.
Description
Technical Field
The utility model relates to the technical field of slope protection, in particular to a slope ecological restoration greening stable protection structure.
Background
The urban road and highway are two sides often can see the side slope, it is especially important to plant vegetation green branch on the side slope, can effectually prevent side slope gliding, raise dust, soil erosion etc. desertification is very serious in the western region of china, before the side slope is planted green, in order to consolidate the side slope, forestry unit can arrange the workman and carry out firm operation, cover with the non-woven fabrics and be the simplest method, but firm effect is unobvious, the non-woven fabrics is lighter and weaker, the wind and rain is after the side slope top layer still exposes outside, adopt reinforced concrete to build the firm effect of dam bank in the side slope periphery on a large scale, but expense, engineering quantity are huge, obviously impractical, for this reason, we propose a side slope ecological remediation and restore green firm protection architecture.
Disclosure of Invention
The utility model aims to provide a slope ecological restoration greening stable protection structure so as to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a side slope ecological remediation is green firm protective structure again, including the side slope, side slope bottom right side is provided with the retaining wall, retaining wall bottom is provided with the foundation, department is provided with two sets of structurally identical firm grooves downwards in the middle of the retaining wall top department and the side slope top, be provided with one deck wire rope net on the slope of side slope, the equidistance is provided with the rope net buckle that multiunit structure is the same in the middle of the wire rope net, be provided with multiunit structure identical U type rivet on the slope of side slope, retaining wall top and side slope top are provided with two sets of structurally identical cement boards, firm groove bottom is provided with the pre-buried pipe downwards, pre-buried pipe inner wall bottom is provided with spacing base, pre-buried pipe inner wall middle part left and right sides is provided with two sets of structurally identical mount pad relatively, two sets of relatively one side that the mount pad is relative inwards is provided with two sets of structurally identical reset springs, two sets of relatively close sides are provided with two sets of structurally identical expansion joint spare, the cement board top is provided with long stock.
Preferably, the retaining wall is higher than the bottom of the slope, the foundation is pre-buried below the ground soil layer, and the bottom of the retaining wall is connected with the top of the foundation in a pouring mode.
Preferably, the rope net buckle is arranged at the joint of the steel wire ropes on the steel wire rope net, and the tail ends of the upper side and the lower side of the steel wire rope net are respectively paved in the stabilizing grooves at the top of the side slope and the top of the retaining wall.
Preferably, the openings at the bottom of the U-shaped rivets penetrate through the steel wire ropes of the steel wire rope net and are obliquely inserted into the slope.
Preferably, the cement board is cuboid and the middle of the bottom of the cement board is provided with a lug matched with the stabilizing groove downwards.
Preferably, the bottom of the long anchor rod penetrates through the middle of the top of the cement board and is connected with a limiting base at the bottom of the inner wall of the embedded pipe, and grooves matched with the telescopic clamping pieces are formed in the left side and the right side of the outer wall of the middle of the long anchor rod.
Compared with the prior art, the utility model has the beneficial effects that: the retaining wall connected with the foundation has extremely firm blocking and stabilizing effects, the steel wire rope net with the upper end and the lower end fixed is arranged, earth stones on the side slope are firmly locked, the firmness of the surface layer of the side slope is enhanced, the steel wire rope is pressed by the U-shaped rivets, the stability of the steel wire rope net is improved, meanwhile, the two ends of the steel wire rope net are not easily loosened due to the connection of the long anchor rods and the embedded pipes at the pressing positions of the two ends of the steel wire rope net.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of the structure of the wire rope net of the present utility model;
FIG. 3 is a schematic view of the structure of the pre-buried pipe of the present utility model.
In the figure: the device comprises a side slope 1, a retaining wall 2, a foundation 3, a stabilizing groove 4, a steel wire rope net 5, a U-shaped rivet 6, a cement plate 7, an embedded pipe 8, a long anchor rod 9, a rope net buckle 10, a limiting base 11, a mounting seat 12, a return spring 13 and a telescopic clamping piece 14.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a side slope ecological remediation is green firm protective structure again, includes side slope 1, and side slope 1 bottom right side is provided with retaining wall 2, and retaining wall 1 is higher than side slope 1 bottom, and the part that exceeds can block more side slope 1 earth, and the retaining wall bottom is provided with ground 3, and ground 3 pre-buried is in ground soil layer's below, and retaining wall 1 bottom is pour with ground 3 tops and is connected, and retaining wall 2 that pours has very strong stability with ground 3, can bear huge pressure from side slope 1.
The retaining wall 2 top middle department is provided with two sets of steady grooves 4 that the structure is the same downwards with the department in the middle of the side slope 1 top, be provided with one deck wire rope net 5 on the slope of side slope 1, the equidistance is provided with the rope net buckle 10 that the multiunit structure is the same in the middle of the wire rope net 5, the wire rope that the rope net buckle 10 set up on the wire rope net 5's handing-over department, can guarantee like this that wire rope net 5 keeps firm and toughness when laying, the upper and lower both sides end of wire rope net 5 is laid respectively to the steady groove 4 at side slope 1 top and retaining wall 2 top, press the both ends of wire rope net 5 afterwards, be provided with multiunit U type rivet 6 that the structure is the same on the slope of side slope 1, the wire rope slant of U type rivet 6 bottom inserts the inside of side slope 1, U type rivet 6 is at the whole after inserting the slope, the wire rope of wire rope net 5 can be pressed to the top, firm at side slope 1 top from the firm of wire rope net 5.
The retaining wall 2 top is provided with two sets of cement boards 7 that the structure is the same with side slope 1 top, and cement board 7 is the cuboid and the bottom centre department of cement board 7 is provided with downwards with firm groove 4 assorted lug, relies on the weight of cement board 7 like this, can push down the both ends of wire rope net 5, temporarily carries out simple fixed.
The embedded pipe 8 is downwards arranged at the bottom of the stabilizing groove 4, the limiting base 11 is arranged at the bottom of the inner wall of the embedded pipe 8, two groups of installation seats 12 with the same structure are oppositely arranged at the left side and the right side of the middle part of the inner wall of the embedded pipe 8, two groups of reset springs 13 with the same structure are inwards arranged on the opposite surfaces of the two groups of installation seats 12, two groups of telescopic clamping pieces 14 with the same structure are arranged on the opposite surfaces of the two groups of reset springs 13, the reset springs 13 can inwards move when the telescopic clamping pieces 14 are extruded, the long anchor rod 9 is arranged at the top of the cement board 7, the bottom of the long anchor rod 9 penetrates through the middle part of the top of the cement board 7 and is connected with the limiting base 11 at the bottom of the inner wall of the embedded pipe 8, grooves matched with the telescopic clamping pieces 14 are formed in the left side and right side of the middle outer wall of the long anchor rod 9, the bottom of the long anchor rod 9 is inwards moved by the reset springs 13 through the pressure generated when the telescopic clamping pieces 14 when the long anchor rod 9 reaches the bottom of the embedded pipe 8, so that the soil blocks of the side slope 1 are firmly locked, and the soil blocks of the side slope 1 are firmly embedded in the grooves of the middle part of the long anchor rod 9 are greatly reduced, and vegetation water is greatly reduced.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a side slope ecological remediation is green firm protective structure again, includes side slope (1), its characterized in that: the utility model discloses a high-speed cable retaining device for the side slope, including slope (1) bottom right side, the side slope (1) bottom right side is provided with retaining wall (2), retaining wall bottom is provided with ground (3), department downwards is provided with two sets of steady grooves (4) that the structure is the same in the middle of retaining wall (2) top and in the middle of slope (1) top, be provided with one deck wire rope net (5) on the slope of side slope (1), the equidistance is provided with multiunit structure identical rope net buckle (10) in the middle of wire rope net (5), be provided with multiunit structure identical U type rivet (6) on the slope of side slope (1), retaining wall (2) top is provided with two sets of structure identical cement board (7) with side slope (1) top, steady groove (4) bottom is provided with buried pipe (8) downwards, buried pipe (8) inner wall bottom is provided with spacing base (11), buried pipe (8) inner wall middle part left and right sides are provided with two sets of structure identical mount pad (12) relatively, two sets of mount pad (12) are relative one side inwards are provided with two sets of structure identical, reset spring (13) are close to two sets of reset spring (13) are provided with two sets of opposite long anchor rod (9) and are provided with the same anchor rod (14).
2. The slope ecological restoration and greening stable protection structure according to claim 1, wherein: the retaining wall (2) is higher than the bottom of the side slope (1), the foundation (3) is pre-buried below a ground soil layer, and the bottom of the retaining wall (1) is connected with the top of the foundation (3) in a pouring mode.
3. The slope ecological restoration and greening stable protection structure according to claim 1, wherein: the rope net buckle (10) is arranged at the joint of the steel wire ropes on the steel wire rope net (5), and the tail ends of the upper side and the lower side of the steel wire rope net (5) are respectively paved in the stabilizing groove (4) at the top of the side slope (1) and the top of the retaining wall (2).
4. The slope ecological restoration and greening stable protection structure according to claim 1, wherein: the opening at the bottom of the U-shaped rivet (6) penetrates through the steel wire rope of the steel wire rope net (5) and is obliquely inserted into the side slope (1).
5. The slope ecological restoration and greening stable protection structure according to claim 1, wherein: the cement board (7) is cuboid, and the middle of the bottom of the cement board (7) is downwards provided with a lug matched with the stabilizing groove (4).
6. The slope ecological restoration and greening stable protection structure according to claim 1, wherein: the bottom of the long anchor rod (9) penetrates through the middle of the top of the cement board (7) and is connected with a limiting base (11) at the bottom of the inner wall of the embedded pipe (8), and grooves matched with the telescopic clamping pieces (14) are formed in the left side and the right side of the outer wall of the middle of the long anchor rod (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223239771.5U CN219060088U (en) | 2022-12-02 | 2022-12-02 | Ecological restoration of side slope is green firm protective structure again |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223239771.5U CN219060088U (en) | 2022-12-02 | 2022-12-02 | Ecological restoration of side slope is green firm protective structure again |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219060088U true CN219060088U (en) | 2023-05-23 |
Family
ID=86365623
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223239771.5U Active CN219060088U (en) | 2022-12-02 | 2022-12-02 | Ecological restoration of side slope is green firm protective structure again |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219060088U (en) |
-
2022
- 2022-12-02 CN CN202223239771.5U patent/CN219060088U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112392127B (en) | Dendritic embedded type flexible ecological slope drainage ditch and construction method | |
CN103643689B (en) | A kind of pipe type underground water drainage blind ditch and construction technology thereof and application | |
CN219060088U (en) | Ecological restoration of side slope is green firm protective structure again | |
CN214061092U (en) | Highway subgrade settlement-preventing facility | |
CN212670599U (en) | Geotechnical engineering slope seepage prevention water structure | |
CN113622603A (en) | Sponge urban rainwater system | |
CN212477800U (en) | Anchoring gabion retaining wall | |
CN211036873U (en) | Bottom reinforced structure that river course was administered synthetically | |
CN210458817U (en) | Prevent road settlement's foundation structure | |
CN109403356B (en) | Side slope supporting structure | |
CN113047225A (en) | Protection system for side slope of hydraulic and hydroelectric engineering and construction method thereof | |
KR100461664B1 (en) | Structures and system of construction based on the use of plants growing block that protect a shore | |
CN111501788A (en) | Vegetation anchor rod slope fixing structure and method | |
CN217580222U (en) | Landslide prevention building structure | |
CN220953472U (en) | Completely weathered granite side slope structure | |
CN217651862U (en) | Park is reformed transform with synthesizing pipe network slot protector | |
CN213417730U (en) | Wetland revetment slope protection structure | |
CN111042054A (en) | Self-healing type ecological revetment with firewood bundle protection pads | |
CN212129046U (en) | Ecological ladder assembly type river bank protection of stoplog structure | |
CN219195997U (en) | Ecological slope protection structure applied to mud flat | |
CN211922503U (en) | Hydraulic engineering bank protection | |
CN218813512U (en) | Hydraulic engineering slope protection structure | |
CN215329941U (en) | Ecological bank protection of net permeates water | |
CN216156595U (en) | Side slope safety protection processing apparatus | |
CN217231670U (en) | Slope protection for hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |