CN215714669U - Hanging basket for bridge section construction operation - Google Patents

Hanging basket for bridge section construction operation Download PDF

Info

Publication number
CN215714669U
CN215714669U CN202121908561.3U CN202121908561U CN215714669U CN 215714669 U CN215714669 U CN 215714669U CN 202121908561 U CN202121908561 U CN 202121908561U CN 215714669 U CN215714669 U CN 215714669U
Authority
CN
China
Prior art keywords
construction
fixed
fixedly installed
basket
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121908561.3U
Other languages
Chinese (zh)
Inventor
李孟元
汪涛
文联友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Xinyuyang Steel Mould Manufacturing Co ltd
Original Assignee
Chongqing Xinyuyang Steel Mould Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Xinyuyang Steel Mould Manufacturing Co ltd filed Critical Chongqing Xinyuyang Steel Mould Manufacturing Co ltd
Priority to CN202121908561.3U priority Critical patent/CN215714669U/en
Application granted granted Critical
Publication of CN215714669U publication Critical patent/CN215714669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hanging basket for bridge segment construction operation, and relates to the technical field of bridge construction. This a hang basket for bridge segment construction operation, including the bridge subject, the top fixed mounting of bridge subject has fixed girder steel, and the top fixed mounting of fixed girder steel has fixed steel sheet, and the front side fixed mounting of fixed steel sheet has supporting platform, is provided with construction mechanism and hangs basket mechanism on the supporting platform. This a hang basket for bridge segment construction operation, be convenient for go up and down the constructor at the in-process of bridge construction and be under construction to the bridge, not only can reduce constructor's the loaded down with trivial details degree of construction, can also reduce the danger that constructor produced at the in-process of construction simultaneously, can guarantee when going up and down the constructor that constructor can not receive the influence of reasons such as weather, thereby can increase the security of constructor when the construction, the protection constructor's of very big degree health safety.

Description

Hanging basket for bridge section construction operation
Technical Field
The utility model relates to the technical field of bridge construction, in particular to a hanging basket for bridge section construction operation.
Background
The bridge need use to hang the basket at the in-process of construction usually and operates, can increase the length of bridge in the bridge main part like this, but the structure of basket is more single to the part of present market, can not carry out the back-and-forth movement to hanging the basket, just need measuring many times when will hanging basket and bridge body are fixed like this, not only need extremely accurate data, still reduce the work efficiency of bridge construction simultaneously, simultaneously after hanging the basket is fixed, because the inside of part string basket does not have the workman that can supply to carry out the construction when carrying out the reinforcing bar landfill to hanging the basket, so use comparatively inconvenient, not only influence the progress of construction, still can threaten constructor health.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a hanging basket for bridge section construction operation, which solves the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a hang basket for bridge segment construction operation, includes the bridge subject, the top fixed mounting of bridge subject has fixed girder steel, and the top fixed mounting of fixed girder steel has fixed steel sheet, and the front side fixed mounting of fixed steel sheet has supporting platform, is provided with construction mechanism and hangs basket mechanism on the supporting platform.
Preferably, the construction mechanism comprises a rotary motor box, a rotary motor, a rotary gear, a support steel beam, an L-shaped support steel beam, a rotary sleeve, a fixed gear, a screw rod, a fixed rod and a construction hanging basket, the rotary motor box is fixedly installed at the bottom of the support platform, the rotary motor is fixedly installed at the bottom of the inner side of the rotary motor box, a rotary shaft is rotatably installed at the top of the support platform, an output shaft of the rotary motor is fixedly installed at one end of the rotary shaft through a coupler, the L-shaped support steel beam is fixedly installed at both ends of the support steel beam, an electric slide rail is arranged in the support platform, an electric sliding table is slidably installed in the electric slide rail, the top of the electric sliding table is fixedly installed at one end of the L-shaped support steel beam, the rotary sleeve is rotatably installed at the top of the support steel beam, the fixed gear is fixedly installed at the outer wall of the rotary sleeve, the screw rod is installed in the rotary sleeve by screw thread, the one end of screw rod extends to the below of supporting platform and rotates and install the dead lever, and the bottom fixed mounting of dead lever has the construction hanging flower basket, and the one end of pivot extends to the top and the outer wall fixed plate that support the girder steel and installs rotating gear, and epaxial rotating gear meshes with the fixed gear on the rotating sleeve pipe mutually, sets up the health safety that can protect the constructor like this.
Preferably, the supporting platform is provided with an opening inside, the inner wall of the opening is not in contact with the outer wall of the rotating shaft, and the top of the supporting platform is provided with an opening for the L-shaped supporting steel beam to move back and forth.
Preferably, the inside of the rotating sleeve is longitudinally provided with a thread groove matched with the screw rod.
Preferably, the hanging basket mechanism comprises a construction U-shaped box, a rotating rod, pulleys, a motor supporting plate, a traction motor, a first traction steel cable, a second traction steel cable, a fixed block, a construction hanging basket and a fixed base, wherein one side of the construction U-shaped box is fixedly installed with one side of the electric sliding table, the other side of the construction U-shaped box is fixedly installed with the motor supporting plate, the top of the motor supporting plate is fixedly installed with the traction motor, the rotating rod is rotatably installed on the inner walls of the two sides of the construction U-shaped box, an output shaft of the traction motor is fixedly installed with one end of the rotating rod through a coupler, the outer wall of the rotating rod is fixedly installed with two groups of pulleys, the outer wall of one group of the pulleys is fixedly installed with the first traction steel cable, the outer wall of the other group of the pulleys is fixedly installed with the second traction steel cable, the fixed block is fixedly installed on one side of the construction hanging basket, and the top of the fixed block is fixedly installed with one end of the first traction steel cable, the top of unable adjustment base and the one end fixed mounting of second traction cable, unable adjustment base's top and the bottom fixed mounting of basket are hung in the construction, set up the efficiency that can promote the work of bridge building like this.
Preferably, the supporting platform is internally provided with a hole, the inner wall of the hole is not in contact with the outer wall of the screw rod, and the screw rod is convenient to lift due to the arrangement.
Compared with the prior art, the utility model has the beneficial effects that:
(1) this a hang basket for bridge segment construction operation, through rotating the motor case, rotate the motor, the rotating gear, the cooperation that supports girder steel and L type support girder steel is used, it goes up and down to be under construction to the bridge to set up the in-process that is convenient for on the one hand at the bridge construction like this, not only can reduce constructor's the loaded down with trivial details degree of construction, can also reduce the danger that constructor produced at the in-process of construction simultaneously, on the other hand such setting can guarantee that constructor can not receive the influence of reasons such as weather when going up and down constructor, thereby can increase constructor's security when the construction, the protection constructor's of very big degree health safety.
(2) This a hang basket for bridge segment construction operation, through construction U type case, the bull stick, the pulley, motor support plate and traction motor's cooperation is used, not only can hang the basket with the construction and go up and down to handle, simultaneously can also hang the basket with the construction and carry out the back-and-forth movement, such setting can hang the basket with the construction and remove again after suitable position and fix it with the bridge main part at the in-process of construction, thereby to the inside operations such as landfill reinforcing bar, the time that the basket was used is hung in the required correction construction during reduction construction that can be very big degree like this, can promote the efficiency of the work of bridge building.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is an enlarged view of portion A of the present invention;
FIG. 4 is an enlarged view of the portion B of the present invention.
In the figure: the construction method comprises the following steps of 1 bridge main body, 2 fixed steel beams, 3 fixed steel plates, 4 supporting platforms, 5 construction mechanisms, 501 rotating motor boxes, 502 rotating motors, 503 rotating gears, 504 supporting steel beams, 505L supporting steel beams, 506 rotating sleeves, 507 fixed gears, 508 screw rods, 509 fixed rods, 510 construction baskets, 6 basket mechanisms, 601 construction U-shaped boxes, 602 rotating rods, 603 pulleys, 604 motor supporting plates, 605 traction motors, 606 first traction steel cables, 607 second traction steel cables, 608 fixed blocks, 609 construction baskets and 610 fixed bases.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a hang basket for bridge segment construction operation, includes bridge subject 1, and bridge subject 1's top fixed mounting has fixed girder steel 2, and fixed girder steel 2's top fixed mounting has fixed steel sheet 3, and fixed steel sheet 3's front side fixed mounting has supporting platform 4, is provided with construction mechanism 5 on supporting platform 4 and hangs basket mechanism 6.
Example two:
referring to fig. 1-4, on the basis of the first embodiment, the construction mechanism 5 includes a rotary motor box 501, a rotary motor 502, a rotary gear 503, a support steel beam 504, an L-shaped support steel beam 505, a rotary sleeve 506, a fixed gear 507, a screw 508, a fixed rod 509 and a construction basket 510, the rotary motor box 501 is fixedly installed at the bottom of the support platform 4, the rotary motor 502 is fixedly installed at the bottom of the inner side of the rotary motor box 501, a rotary shaft is rotatably installed at the top of the support platform 4, an output shaft of the rotary motor 502 is fixedly installed at one end of the rotary shaft through a coupling, L-shaped support steel beams 505 are fixedly installed at both ends of the support steel beam 504, an electric slide rail is installed inside the support platform 4, an electric sliding table is slidably installed in the electric slide rail, the top of the electric sliding table is fixedly installed with one end of the L-shaped support steel beam 505, the rotary sleeve 506 is rotatably installed at the top of the support steel beam 504, a fixed gear 507 is fixedly installed on the outer wall of the rotary sleeve 506, a screw 508 is installed on the internal thread of the rotary sleeve 506, one end of the screw 508 extends to the lower part of the supporting platform 4 and is rotatably installed with a fixed rod 509, a construction basket 510 is fixedly installed at the bottom of the fixed rod 509, one end of the rotary shaft extends to the upper part of the supporting steel beam 504 and the outer wall fixed plate is installed with a rotary gear 503, the rotary gear 503 on the rotary shaft is meshed with the fixed gear 507 on the rotary sleeve 506, the rotary motor 502 is controlled to be started, the rotary motor 502 can drive the rotary shaft and the rotary gear 503 to rotate when being started, the rotary gear 503 can drive the fixed gear 507 and the rotary sleeve 506 to rotate, the rotary sleeve 506 can drive the rotary sleeve 506 and the fixed rod 509 to lift, and thus the construction basket 510 can be lifted, on the one hand, constructors can be lifted and lowered to construct a bridge in the bridge construction process, not only can reduce constructor's the loaded down with trivial details degree of construction, can also reduce the danger that constructor produced at the in-process of construction simultaneously, on the other hand can guarantee like this that constructor can not receive the influence of reasons such as weather when going up and down constructor to can increase constructor's security when the construction, the protection constructor's of very big degree health safety.
Further, the basket hanging mechanism 6 comprises a construction U-shaped box 601, a rotating rod 602, pulleys 603, a motor supporting plate 604, a traction motor 605, a first traction steel cable 606, a second traction steel cable 607, a fixed block 608, a construction basket 609 and a fixed base 610, wherein one side of the construction U-shaped box 601 is fixedly installed with one side of the electric sliding table, the other side of the construction U-shaped box 601 is fixedly installed with the motor supporting plate 604, the top of the motor supporting plate 604 is fixedly installed with the traction motor 605, the inner walls of the two sides of the construction U-shaped box 601 are rotatably installed with the rotating rod 602, the output shaft of the traction motor 605 is fixedly installed with one end of the rotating rod 602 through a coupling, the outer wall of the rotating rod 602 is fixedly installed with two groups of pulleys 603, the outer wall of one group of pulleys 603 is fixedly installed with the first traction steel cable 606, the outer wall of the other group of pulleys 603 is fixedly installed with the second traction steel cable 607, one side of the construction basket 609 is fixedly installed with the fixed block 608, the top of a fixed block 608 is fixedly installed with one end of a first traction steel cable 606, the top of a fixed base 610 is fixedly installed with one end of a second traction steel cable 607, the top of the fixed base 610 is fixedly installed with the bottom of a construction hanging basket 609, the traction motor 605 is controlled to start, the traction motor 605 can drive a rotating rod 602 to rotate when rotating, the rotating rod 602 can drive a pulley 603 to rotate when rotating, the pulley 603 can drive the first traction steel cable 606 and the second traction steel cable 607 to contract when rotating, so that the construction hanging basket 609 can be moved to a proper position, the electric sliding table is controlled to move, the construction hanging basket 609 can be driven to move when moving, the construction hanging basket 609 can be fixed with the bridge main body 1 after being moved to the proper position in the construction process, so that operations such as steel bar filling and the like are carried out inside, and the time for correcting the construction hanging basket 609 during construction can be greatly reduced, the efficiency of the work of bridge building can be promoted.
Still further, an opening is formed in the supporting platform 4, the inner wall of the opening is not in contact with the outer wall of the rotating shaft, an opening for the L-shaped supporting steel beam 505 to move back and forth is formed in the top of the supporting platform 4, a thread groove matched with the screw 508 is longitudinally formed in the rotating sleeve 506, an opening is formed in the supporting platform 4, and the inner wall of the opening is not in contact with the outer wall of the screw 508.
The working principle is as follows: when the construction hanging basket is used, the traction motor 605 is controlled to be started, the traction motor 605 can drive the rotating rod 602 to rotate when rotating, the rotating rod 602 can drive the pulley 603 to rotate when rotating, the pulley 603 can drive the first traction steel cable 606 and the second traction steel cable 607 to contract when rotating, so that the construction hanging basket 609 can be moved to a proper position, the electric sliding table can be controlled to move, the construction hanging basket 609 can be driven to move when moving, when the construction hanging basket 609 is in contact with the bridge main body 1, a worker enters the construction hanging basket 510, the rotating motor 502 is controlled to be started, the rotating motor 502 can drive the rotating shaft and the rotating gear 503 to rotate when starting, the rotating gear 503 can drive the fixed gear 507 and the rotating sleeve 506 to rotate, and the rotating sleeve 506 and the 509 fixed rod can be driven to lift when rotating the rotating sleeve 506, so that the construction hanging basket 510 can be lifted, when the worker adjusts the position to a proper position, the fixing rod 509 is fixed to the bridge main body 1, and bridge construction is performed.

Claims (6)

1. The utility model provides a hang basket for bridge segment construction operation, includes bridge main part (1), its characterized in that: the top fixed mounting of bridge main part (1) has fixed girder steel (2), and the top fixed mounting of fixed girder steel (2) has fixed steel sheet (3), and the front side fixed mounting of fixed steel sheet (3) has supporting platform (4), is provided with construction mechanism (5) and hangs basket mechanism (6) on supporting platform (4).
2. The hanging basket for bridge segment construction work of claim 1, wherein: the construction mechanism (5) comprises a rotary motor box (501), a rotary motor (502), a rotary gear (503), a support steel beam (504), an L-shaped support steel beam (505), a rotary sleeve (506), a fixed gear (507), a screw (508), a fixed rod (509) and a construction hanging basket (510), wherein the rotary motor box (501) is fixedly installed at the bottom of the support platform (4), the rotary motor (502) is fixedly installed at the bottom of the inner side of the rotary motor box (501), a rotating shaft is rotatably installed at the top of the support platform (4), an output shaft of the rotary motor (502) is fixedly installed at one end of the rotating shaft through a coupler, the L-shaped support steel beam (505) is fixedly installed at both ends of the support steel beam (504), an electric sliding rail is arranged inside the support platform (4), an electric sliding table is slidably installed in the electric sliding rail, the top of the electric sliding table is fixedly installed with one end of the L-shaped support steel beam (505), support the top of girder steel (504) and rotate and install and rotate sleeve pipe (506), the outer wall fixed mounting who rotates sleeve pipe (506) has fixed gear (507), the internal thread who rotates sleeve pipe (506) installs screw rod (508), the one end of screw rod (508) extends to the below of supporting platform (4) and rotates and installs dead lever (509), the bottom fixed mounting of dead lever (509) has construction hanging flower basket (510), the one end of pivot extends to the top and the outer wall fixed plate of supporting girder steel (504) and installs rotating gear (503), epaxial rotating gear (503) and rotate fixed gear (507) on the sleeve pipe (506) and mesh mutually.
3. The hanging basket for bridge segment construction work of claim 1, wherein: an opening is formed in the supporting platform (4), the inner wall of the opening is not in contact with the outer wall of the rotating shaft, and an opening for the L-shaped supporting steel beam (505) to move back and forth is formed in the top of the supporting platform (4).
4. The hanging basket for bridge segment construction work of claim 2, wherein: the interior of the rotating sleeve (506) is longitudinally provided with a thread groove matched with the screw rod (508).
5. The hanging basket for bridge segment construction work of claim 1, wherein: the basket hanging mechanism (6) comprises a construction U-shaped box (601), a rotating rod (602), pulleys (603), a motor supporting plate (604), a traction motor (605), a first traction steel cable (606), a second traction steel cable (607), a fixing block (608), a construction basket hanging (609) and a fixing base (610), wherein one side of the construction U-shaped box (601) is fixedly installed with one side of an electric sliding table, the other side of the construction U-shaped box (601) is fixedly provided with the motor supporting plate (604), the top of the motor supporting plate (604) is fixedly provided with the traction motor (605), the inner walls of two sides of the construction U-shaped box (601) are rotatably provided with the rotating rod (602), an output shaft of the traction motor (605) is fixedly installed with one end of the rotating rod (602) through a coupler, the outer wall of the rotating rod (602) is fixedly provided with two groups of pulleys (603), and the outer wall of one group of the pulleys (603) is fixedly provided with the first traction steel cable (606), a second traction steel cable (607) is fixedly installed on the outer wall of the other group of pulleys (603), a fixed block (608) is fixedly installed on one side of the construction hanging basket (609), the top of the fixed block (608) is fixedly installed with one end of the first traction steel cable (606), the top of the fixed base (610) is fixedly installed with one end of the second traction steel cable (607), and the top of the fixed base (610) is fixedly installed with the bottom of the construction hanging basket (609).
6. The hanging basket for bridge segment construction work of claim 1, wherein: the supporting platform (4) is internally provided with a hole, and the inner wall of the hole is not contacted with the outer wall of the screw rod (508).
CN202121908561.3U 2021-08-16 2021-08-16 Hanging basket for bridge section construction operation Active CN215714669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121908561.3U CN215714669U (en) 2021-08-16 2021-08-16 Hanging basket for bridge section construction operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121908561.3U CN215714669U (en) 2021-08-16 2021-08-16 Hanging basket for bridge section construction operation

Publications (1)

Publication Number Publication Date
CN215714669U true CN215714669U (en) 2022-02-01

Family

ID=79996742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121908561.3U Active CN215714669U (en) 2021-08-16 2021-08-16 Hanging basket for bridge section construction operation

Country Status (1)

Country Link
CN (1) CN215714669U (en)

Similar Documents

Publication Publication Date Title
CN211074017U (en) Vibrating device with automatic floating function
CN110284703A (en) A kind of light-duty climbing form system of screw rod promotion
CN2157955Y (en) Multi-function machine for plastering walls
CN215714669U (en) Hanging basket for bridge section construction operation
CN219509125U (en) Movable scaffold
CN218561044U (en) A operation platform for installing template
CN111962405A (en) Existing railway pier self-climbing operation platform without support or suspension
CN109467035B (en) Lifting device for cable trough cover plate
CN110748173A (en) Portable autoclaved aerated concrete strip installation device
CN216462577U (en) Welding device for steel box girder tied arch bridge
CN214006474U (en) Outer wall construction structure for building
CN112846996B (en) Building steel surface treatment system
CN107672001A (en) A kind of adjustable perpendicular cut movable cutting machine of cutting wire spacing
CN110984595A (en) Hydraulic power-assisted manipulator for mounting high-altitude curtain wall
CN209275621U (en) A kind of high quick change case equipment
CN220353333U (en) Stable scaffold
CN211114713U (en) Liftable support for construction engineering construction
CN218990837U (en) Scaffold frame
CN220451368U (en) Intelligence auxiliary stay frame convenient to adjust
CN215441486U (en) Concrete placement device is used in road bridge construction
CN218933764U (en) Building construction platform
CN215801101U (en) Device is demolishd to support for bridge construction
CN210316441U (en) Scaffold for building engineering
CN210368650U (en) Scaffold for highway bridge construction
CN220564103U (en) Beam body installation construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant