CN215670920U - High-rise steel structure house tool type overhanging scaffold device - Google Patents

High-rise steel structure house tool type overhanging scaffold device Download PDF

Info

Publication number
CN215670920U
CN215670920U CN202120070037.7U CN202120070037U CN215670920U CN 215670920 U CN215670920 U CN 215670920U CN 202120070037 U CN202120070037 U CN 202120070037U CN 215670920 U CN215670920 U CN 215670920U
Authority
CN
China
Prior art keywords
steel
connecting plate
fixed
clamping plate
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120070037.7U
Other languages
Chinese (zh)
Inventor
李强强
王宝峰
韦艳红
温东涵
王甜
李云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN202120070037.7U priority Critical patent/CN215670920U/en
Application granted granted Critical
Publication of CN215670920U publication Critical patent/CN215670920U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a high-rise steel structure house tool type overhanging scaffold device, which comprises: the steel column, the clamping plate, the stud, the nut, the I-steel, the first connecting plate and the second connecting plate; clamping plates are arranged on the two sides of the upper end and the lower end of the steel column; the double-end stud penetrates through the clamping plate and is fixed through a screw cap; a first connecting plate is arranged on the right side of the clamping plate at the upper end of the steel column, and I-shaped steel is arranged on the right side of the clamping plate at the lower end; a second connecting plate is arranged on the right side of the upper end of the I-shaped steel; the first connecting plate is connected with the second connecting plate through a steel wire rope. The device has the advantages of simple structure, reasonable design, convenient operation, high working efficiency, low manufacturing cost and good safety performance; the I-shaped steel and the clamping plate are fixed by welding, so that the redundant welding time is hardly increased, and the welding quality can be ensured by welding the I-shaped steel by gas shielded welding.

Description

High-rise steel structure house tool type overhanging scaffold device
Technical Field
The utility model relates to the technical field of engineering construction, in particular to a tool type overhanging scaffold device for a high-rise steel structure house.
Background
Aiming at the current cantilever construction of the external scaffold of the high-rise residence, the traditional method is to pre-embed I-steel anchor rings and then cantilever the I-steel out of a building bearing to support the scaffold after the I-steel is installed. The I-steel that lies in the elevator shaft in the later stage construction need wait for and just can carry out the elevator construction after the scaffold frame is demolishd completely, and then leads to the elevator installation lag, and people goods elevator live time extension, the cost increase.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a tool type overhanging scaffold device for a high-rise steel structure house.
In order to achieve the above object, the present invention employs the following:
the utility model provides a high-rise steel construction house instrument formula scaffold device that encorbelments, includes: the steel column, the clamping plate, the stud, the nut, the I-steel, the first connecting plate and the second connecting plate; clamping plates are arranged on the two sides of the upper end and the lower end of the steel column; the double-end stud penetrates through the clamping plate and is fixed through a screw cap; a first connecting plate is arranged on the right side of the clamping plate at the upper end of the steel column, and I-shaped steel is arranged on the right side of the clamping plate at the lower end; a second connecting plate is arranged on the right side of the upper end of the I-shaped steel; the first connecting plate is connected with the second connecting plate through a steel wire rope.
Preferably, the scaffold is further included, and the scaffold is arranged on the I-shaped steel and fixed through bolts.
Preferably, the first connecting plate and the steel column upper end clamping plate are fixed through welding.
Preferably, the I-shaped steel and the clamping plate at the lower end of the steel column are fixed by welding.
Preferably, the I-steel and the second connecting plate are welded and fixed.
Preferably, the rear ends of the first connecting plate and the second connecting plate are both provided with fixing holes; and the steel wire rope penetrates through the fixing hole and is respectively fixed on the first connecting plate and the second connecting plate. The utility model has the following advantages:
the device has the advantages of simple structure, reasonable design, convenient operation, high working efficiency, low manufacturing cost and good safety performance; the I-shaped steel and the clamping plate are fixed by welding, so that the redundant welding time is hardly increased, and the welding quality can be ensured by welding the I-shaped steel by gas shielded welding.
Drawings
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic structural view of a tool type overhanging scaffold device for a high-rise steel structure residential building.
FIG. 2 is a schematic view of the cleat and stud of the present invention.
In the figures, the various reference numbers are:
the steel column fixing structure comprises 1-steel column, 2-clamping plate, 3-stud, 4-nut, 5-I-shaped steel, 6-first connecting plate, 7-second connecting plate, 8-steel wire rope, 9-scaffold and 10-fixing hole.
Detailed Description
In order to more clearly illustrate the utility model, the utility model is further described below in connection with preferred embodiments. It is to be understood by persons skilled in the art that the following detailed description is illustrative and not restrictive, and is not to be taken as limiting the scope of the utility model.
As shown in fig. 1 and 2, a high-rise steel structure residential building tool type overhanging scaffold device includes: the steel column comprises a steel column 1, a clamping plate 2, a stud 3, a nut 4, I-shaped steel 5, a first connecting plate 6 and a second connecting plate 7; clamping plates 2 are arranged on the two sides of the upper end and the lower end of the steel column 1, and a stud 3 penetrates through the clamping plates 2 and is fixed through nuts 4; a first connecting plate 6 is arranged on the right side of the clamping plate 2 at the upper end of the steel column 1, and an I-shaped steel 5 is arranged on the right side of the clamping plate 2 at the lower end of the steel column; a second connecting plate 7 is arranged on the right side of the upper end of the I-shaped steel 5, and the first connecting plate 6 is connected with the second connecting plate 7 through a steel wire rope 8.
Further, the device also comprises a scaffold 9, wherein the scaffold 9 is arranged on the I-shaped steel 5 and is fixed through bolts; the scaffold 9 is arranged to facilitate climbing construction of workers.
Furthermore, the first connecting plate 6 and the clamping plate 2 at the upper end of the steel column are fixed through welding, the I-shaped steel 5 and the clamping plate 2 at the lower end of the steel column are fixed through welding, and meanwhile, the I-shaped steel 5 and the second connecting plate 7 are fixed through welding.
Furthermore, the rear ends of the first connecting plate 6 and the second connecting plate 7 are provided with fixing holes 10, and the steel wire rope 8 penetrates through the fixing holes 10 and is fixed on the first connecting plate 6 and the second connecting plate 7 respectively.
When the device is installed, 1.3M long 18# I-steel 5 is cut in advance, a second connecting plate 7 is welded on the I-steel 5, when an external scaffold of a steel structure house is installed in an overhanging mode, clamping plates 2 are installed and fixed at the upper end and the lower end of a steel column 1, then the I-steel 5 is welded on the clamping plates 2 at the lower end of the steel column and welded in a surrounding mode through gas shielded welding, and finally front bolts 4 and rear bolts 4 on a stud 3 are screwed down to guarantee installation quality.
It should be understood that the above-mentioned embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention, and it will be obvious to those skilled in the art that other variations or modifications may be made on the basis of the above description, and all embodiments may not be exhaustive, and all obvious variations or modifications may be included within the scope of the present invention.

Claims (6)

1. The utility model provides a high-rise steel structure house instrument formula scaffold device that encorbelments which characterized in that includes: the steel column, the clamping plate, the stud, the nut, the I-steel, the first connecting plate and the second connecting plate; clamping plates are arranged on the two sides of the upper end and the lower end of the steel column; the double-end stud penetrates through the clamping plate and is fixed through a screw cap; a first connecting plate is arranged on the right side of the clamping plate at the upper end of the steel column, and I-shaped steel is arranged on the right side of the clamping plate at the lower end; a second connecting plate is arranged on the right side of the upper end of the I-shaped steel; the first connecting plate is connected with the second connecting plate through a steel wire rope.
2. The residential high-rise steel structure tool type overhanging scaffold device as claimed in claim 1, further comprising a scaffold, wherein the scaffold is arranged on the I-steel and fixed by bolts.
3. The tool type overhanging scaffold device for the high-rise steel structure residence according to claim 1, wherein the first connecting plate and the upper end clamping plate of the steel column are fixed by welding.
4. The tool type overhanging scaffold device for the high-rise steel structure residence according to claim 1, wherein the I-shaped steel and the clamping plates at the lower ends of the steel columns are fixed by welding.
5. The tool type overhanging scaffold device for the high-rise steel structure house according to claim 1, wherein the I-steel and the second connecting plate are welded and fixed.
6. The tool type overhanging scaffold device for the high-rise steel structure residence according to claim 1, wherein the rear ends of the first connecting plate and the second connecting plate are respectively provided with a fixing hole; and the steel wire rope penetrates through the fixing hole and is respectively fixed on the first connecting plate and the second connecting plate.
CN202120070037.7U 2021-01-12 2021-01-12 High-rise steel structure house tool type overhanging scaffold device Active CN215670920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120070037.7U CN215670920U (en) 2021-01-12 2021-01-12 High-rise steel structure house tool type overhanging scaffold device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120070037.7U CN215670920U (en) 2021-01-12 2021-01-12 High-rise steel structure house tool type overhanging scaffold device

Publications (1)

Publication Number Publication Date
CN215670920U true CN215670920U (en) 2022-01-28

Family

ID=79950781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120070037.7U Active CN215670920U (en) 2021-01-12 2021-01-12 High-rise steel structure house tool type overhanging scaffold device

Country Status (1)

Country Link
CN (1) CN215670920U (en)

Similar Documents

Publication Publication Date Title
CN215670920U (en) High-rise steel structure house tool type overhanging scaffold device
CN211396543U (en) Telescopic channel steel cantilever beam device
CN108265826B (en) Steel plate reinforced type square steel pipe column and K-shaped steel support connecting node
CN213062869U (en) I-steel scaffold frame of encorbelmenting that pole setting formula is connected
CN212562432U (en) Connecting device of automatic lifting scaffold
CN111321674B (en) Support bracket for bridge engineering and construction method thereof
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN108894111B (en) Integral hoisting device and hoisting method for heavy steel anchor beam and steel corbel
CN112647728A (en) Constructional engineering frame beam reinforcing device and using method thereof
CN111130029A (en) Tower crane main cable fixing device and using method thereof
CN212054472U (en) Steel pipe pole step device
CN213952945U (en) Safety protection device for overhanging layer of external scaffold
CN218668788U (en) Double-cross-arm on electric pole
CN216699890U (en) Counter weight device of photovoltaic board headwind load
CN218323200U (en) Anti-seismic combined beam for house building
CN219987517U (en) Bearing puller
CN219824921U (en) Overhead working platform for welding temporary support structure of flange plate of reinforced concrete composite beam
CN216552969U (en) I-steel wire rope drawknot positioning and fixing device for overhanging scaffold
CN218629993U (en) Lightning protection device monitor and lightning protection testing platform
CN220599141U (en) Novel lower hoisting point component
CN215364378U (en) Lifting equipment direction wire rope is with taking self-locking fixed guider
CN216893144U (en) Anchor assembly
CN215922507U (en) Gap bridge platform pedal structure
CN217173021U (en) Rotor hoisting construction platform
CN218375652U (en) Assembled electric power iron tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant