CN215629603U - Quick installation device of steel pipe stand parallel connection - Google Patents

Quick installation device of steel pipe stand parallel connection Download PDF

Info

Publication number
CN215629603U
CN215629603U CN202121780290.8U CN202121780290U CN215629603U CN 215629603 U CN215629603 U CN 215629603U CN 202121780290 U CN202121780290 U CN 202121780290U CN 215629603 U CN215629603 U CN 215629603U
Authority
CN
China
Prior art keywords
steel pipe
push rod
hydraulic push
hydraulic
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121780290.8U
Other languages
Chinese (zh)
Inventor
李永峰
李科
曾佳明
柏庆宝
吴定坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communication South Road and Bridge Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communication South Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communication South Road and Bridge Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202121780290.8U priority Critical patent/CN215629603U/en
Application granted granted Critical
Publication of CN215629603U publication Critical patent/CN215629603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a steel pipe upright column parallel connection quick mounting device which comprises a supporting table and a supporting table, wherein a fixing hole is formed in the middle position of the upper end face of the supporting table, first hydraulic push rods are arranged on two sides of the fixing hole, a first clamping block is arranged at the output shaft end of each first hydraulic push rod, supporting columns are arranged on two sides of the lower end face of the supporting table, through holes are formed in two sides of each supporting column, a mounting frame penetrates through the through holes, at least two pushing springs are sleeved on the mounting frame, the other ends of the pushing springs are arranged on the supporting columns, a first handle is arranged on one side of the mounting frame, and a second clamping block is arranged on the other side of the mounting frame. The first handle is loosened, the steel pipe stand column is clamped by the second clamping block on the mounting frame under the action of the pushing spring, the steel pipe stand column is preliminarily fixed, then the hydraulic pump is started, and high-pressure oil in the first hydraulic push rod is discharged into an oil tank of the hydraulic pump through the oil conveying pipe, so that the first hydraulic push rod moves in the opposite direction, the first clamping block is driven to clamp the steel pipe stand column, and the steel pipe stand column is secondarily fixed.

Description

Quick installation device of steel pipe stand parallel connection
Technical Field
The utility model belongs to the technical field of steel pipe stand column devices, and particularly relates to a steel pipe stand column parallel connection rapid installation device.
Background
The steel pipe column is an important accessory of the corrugated beam guardrail plate, the steel pipe column is driven into the foundation to support the corrugated beam plate, and the steel pipe column mainly has two forms: ordinary steel pipe stand and type stand commonly used, the price is cheaper, the flange stand and have available rag bolt in chassis or expansion bolts installation, and it is higher usually for manual welding chassis price, is commonly used for bridge guardrail board, and steel pipe stand main specification has: 140 x 4.5 x height, 114 x 4.5 x height, steel tube column surface treatment can be made into hot galvanizing or zinc plating spraying plastics.
When needs are installed the steel pipe stand, at first land hoisting equipment falls the steel pipe stand, at first steel pipe stand apart from top department along the required rings of axis symmetry welding hoist and mount time, select 25 tons of truck crane to hoist the steel pipe stand, take one's place the back, recheck the steel column axis, constantly adjust to accurate position, the steel column straightness that hangs down adopts wire rope constantly to receive and release the adjustment, adopts mutually perpendicular direction to rectify, the weak point that exists: when installing the steel pipe stand, the unable fixed easy production of stand rocks, and can't carry out continuous installation to the steel pipe stand in succession, fixed relatively poor problem of effect when having the installation of steel pipe stand.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a steel pipe upright parallel connection rapid installation device, which solves the problem of poor fixing effect during installation of a steel pipe upright in the prior art.
In order to achieve the purpose, the utility model provides the following technical scheme: including a supporting bench, brace table up end intermediate position is equipped with the fixed orifices, the fixed orifices both sides are provided with first hydraulic rod, first hydraulic rod output shaft end is provided with first clamp splice, brace table down end both sides are provided with the support column, the support column both sides are equipped with the perforation, it has the mounting bracket to run through in the perforation, the cover is equipped with two at least top and pushes away the spring on the mounting bracket, it sets up on the support column to push away the spring other end, mounting bracket one side is provided with first handle, and the opposite side is provided with the second clamp splice.
Preferably, the lower end face of the supporting column is provided with a roller, the supporting column is provided with a fixed block and a limiting block, the upper end face of the fixed block is provided with a hydraulic pump, the lower end face of the fixed block is provided with a second hydraulic push rod, the output shaft end of the second hydraulic push rod is provided with an annular frame, the roller penetrates out of the annular frame, and the annular frame penetrates out of the fixed block and the limiting block.
Preferably, a first through hole is formed in the upper end face of the fixing block, one end of the annular frame penetrates through the first through hole, a second through hole and a third through hole are formed in the two sides of the limiting block, and the other end of the annular frame penetrates through the second through hole and the third through hole.
Preferably, the hydraulic pump is connected with first hydraulic push rod and second hydraulic push rod through defeated oil pipe, first clamp splice and second clamp splice are soft rubber material.
1. According to the utility model, the first handles on the two sides of the mounting frame are held and pulled out for a certain distance, then the steel pipe upright post is dropped and placed into the fixing hole by using the hoisting equipment, the first handles are loosened, the second clamping block on the mounting frame clamps the steel pipe upright post under the action of the pushing spring to preliminarily fix the steel pipe upright post, then the oil conveying pipe is communicated with the first hydraulic push rod, the hydraulic pump is started, high-pressure oil in the first hydraulic push rod is discharged into an oil tank of the hydraulic pump through the oil conveying pipe, so that the first hydraulic push rods move oppositely to drive the first clamping block to clamp the steel pipe upright post, and the steel pipe upright post is secondarily fixed, thereby ensuring the stability of the steel upright post during installation.
2. According to the utility model, by starting the hydraulic pump, high-pressure oil in the second hydraulic push rod is discharged into the oil tank of the hydraulic pump through the oil delivery pipe, so that the second hydraulic push rod descends, the second hydraulic push rod drives the annular frame to slide on the fixed block and the limiting block, and the annular frame touches the ground until the supporting column is supported, so that the stability of the device is improved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front cross-sectional view of FIG. 1;
fig. 3 is a schematic top view of fig. 1.
In the figure: the oil delivery device comprises a supporting table 1, a fixing hole 2, a first hydraulic push rod 3, a first clamping block 4, a supporting column 5, a through hole 6, a mounting frame 7, a pushing spring 8, a first handle 9, a second clamping block 10, a roller 11, a fixing block 12, a limiting block 13, a hydraulic pump 14, a second hydraulic push rod 15, an annular frame 16, a first through hole 17, a second through hole 18, a third through hole 19 and an oil delivery pipe 20.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in figure 1 of the drawings, in which, as shown in fig. 2 and 3, the embodiment of the utility model provides a steel pipe column parallel connection rapid installation device, which comprises a support table 1 and the support table 1, wherein a fixing hole 2 is formed in the middle position of the upper end surface of the support table 1, first hydraulic push rods 3 are welded on two sides of the fixing hole 2, the type of each first hydraulic push rod 3 is YT1-25ZB, a first clamping block 4 is welded on the output shaft end of each first hydraulic push rod 3, support columns 5 are welded on two sides of the lower end surface of the support table 1, through holes 6 are formed in two sides of each support column 5, an installation frame 7 penetrates through the through holes 6, two pushing springs 8 are sleeved on the installation frame 7, the pushing springs 8 are in an initial state of a stretching state, the initial force is 20N, the other ends of the pushing springs 8 are welded on the support columns 5, a first handle 9 is welded on one side of the installation frame 7, a second clamping block 10 is welded on the other side of the installation frame 7, and the first clamping block 4 and the second clamping block 10 are made of soft rubber.
As shown in figure 1 of the drawings, in which, fig. 2 and fig. 3, the lower end face of the support column 5 is welded with a roller 11, the support column 5 is welded with a fixed block 12 and a limit block 13, the upper end face of the fixed block 12 is welded with a hydraulic pump 14, the model of the hydraulic pump 14 is PSVD2-21E, the hydraulic pump 14 is connected with a first hydraulic push rod 3 and a second hydraulic push rod 15 through an oil delivery pipe 20, the lower end face of the fixed block 12 is welded with a second hydraulic push rod 15, the model of the second hydraulic push rod 15 is YT1-25ZB, the output shaft end of the second hydraulic push rod 15 is welded with an annular frame 16, the roller 11 penetrates through the annular frame 16, the annular frame 16 penetrates through the fixed block 12 and the limit block 13, the upper end face of the fixed block 12 is provided with a first through hole 17, one end of the annular frame 16 penetrates through the first through hole 17, the two sides of the limit block 13 are provided with a second through hole 18 and a third through hole 19, and the other end of the annular frame 16 penetrates through the second through hole 18 and the third through hole 19.
The working principle of the embodiment is as follows: when the steel pipe upright is installed, firstly, the device is pushed to a working place, then the hydraulic pump 14 is started, high-pressure oil in the second hydraulic push rod 15 is discharged into an oil tank of the hydraulic pump 14 through the oil delivery pipe 20, so that the second hydraulic push rod 15 descends, the second hydraulic push rod 15 drives the annular frame 16 to slide on the fixed block 12 and the limiting block 13, the annular frame 16 touches the ground until the supporting column 5 is supported, then the first grips 9 on two sides of the mounting frame 7 are held and are pulled out for a certain distance, then the steel pipe upright is dropped and placed into the fixed hole 2 by using hoisting equipment, the first grips 9 are released, the second clamp blocks 10 on the mounting frame 7 clamp the steel pipe upright under the action of the pushing springs 8, the steel pipe upright is preliminarily fixed, then the oil delivery pipe 20 is communicated with the first hydraulic push rod 3, the hydraulic pump 14 is started, the high-pressure oil in the first hydraulic push rod 3 is discharged into the oil tank of the hydraulic pump 14 through the oil delivery pipe 20, thereby make first hydraulic push rod 3 move in opposite directions, drive first clamp splice 4 and press from both sides the steel pipe stand, carry out the secondary to the steel pipe stand and fix, stability when having guaranteed the installation of steel stand.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (4)

1. The utility model provides a quick installation device of steel pipe stand parallel connection which characterized in that: including brace table (1), the up end intermediate position of brace table (1) is equipped with fixed orifices (2), fixed orifices (2) both sides are provided with first hydraulic rod (3), first hydraulic rod (3) output shaft end is provided with first clamp splice (4), the terminal surface both sides are provided with support column (5) under brace table (1), support column (5) both sides are equipped with perforation (6), it has mounting bracket (7) to run through in perforation (6), the cover is equipped with two at least top and pushes away spring (8) on mounting bracket (7), top pushes away spring (8) other end setting on support column (5), mounting bracket (7) one side is provided with first handle (9), and the opposite side is provided with second clamp splice (10).
2. The steel tube column parallel connection quick installation device of claim 1, wherein: the hydraulic support is characterized in that rollers (11) are arranged on the lower end face of the support column (5), a fixed block (12) and a limiting block (13) are arranged on the support column (5), a hydraulic pump (14) is arranged on the upper end face of the fixed block (12), a second hydraulic push rod (15) is arranged on the lower end face of the fixed block (12), an output shaft end of the second hydraulic push rod (15) is provided with an annular frame (16), the rollers (11) penetrate through the annular frame (16), and the annular frame (16) penetrates through the fixed block (12) and the limiting block (13).
3. The steel tube column parallel connection quick installation device of claim 2, wherein: the upper end face of the fixed block (12) is provided with a first through hole (17), one end of the annular frame (16) penetrates through the first through hole (17), two sides of the limiting block (13) are provided with a second through hole (18) and a third through hole (19), and the other end of the annular frame (16) penetrates through the second through hole (18) and the third through hole (19).
4. The steel tube column parallel connection quick installation device of claim 2, wherein: the hydraulic pump (14) is connected with the first hydraulic push rod (3) and the second hydraulic push rod (15) through an oil conveying pipe (20), and the first clamping block (4) and the second clamping block (10) are made of soft rubber.
CN202121780290.8U 2021-08-02 2021-08-02 Quick installation device of steel pipe stand parallel connection Active CN215629603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121780290.8U CN215629603U (en) 2021-08-02 2021-08-02 Quick installation device of steel pipe stand parallel connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121780290.8U CN215629603U (en) 2021-08-02 2021-08-02 Quick installation device of steel pipe stand parallel connection

Publications (1)

Publication Number Publication Date
CN215629603U true CN215629603U (en) 2022-01-25

Family

ID=79894172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121780290.8U Active CN215629603U (en) 2021-08-02 2021-08-02 Quick installation device of steel pipe stand parallel connection

Country Status (1)

Country Link
CN (1) CN215629603U (en)

Similar Documents

Publication Publication Date Title
CN111472789B (en) Pipe jacking construction process
CN107268669A (en) Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards
CN215629603U (en) Quick installation device of steel pipe stand parallel connection
CN205329738U (en) Novel umbelliform ground bearing capacity detecting device
CN207160049U (en) Piling jacket construction component, jacket of driving piles afterwards afterwards
CN211472177U (en) Single tensioning device of steel strand inhaul cable system with suspension locking structure
CN210828282U (en) High-strength foot blocking plate
CN220807187U (en) Controllable focus clamp plate dismounting device
CN213572907U (en) Special simple and easy support frame of construction machinery
CN214302941U (en) Supporting-free and elevation-adjustable precast beam supporting tool
CN216239362U (en) Lattice formula steel column
CN220952909U (en) Trestle with steel-pipe pile support column
CN215164746U (en) Auxiliary device for lower guide type bridge girder erection machine
CN210288120U (en) Cable saddle operation platform
CN208432415U (en) A kind of building iron detection electric welding sampling fixing device
CN215316728U (en) Pipeline welding and pipe aligning device
CN211541661U (en) Concrete internal mold supporting device
CN215798095U (en) Easy dismouting type tower crane standard festival
CN216711349U (en) Hoisting beam for penetrating steel grating floor
CN213978620U (en) Supporting device for prestress tensioning jack at continuous bridge end
CN216587615U (en) Installation operation support of wall body top decorative cover layer
CN217299769U (en) Vertical rod positioning device for overhanging scaffold
CN217205195U (en) Anti-shaking structure of building scaffold
CN209923732U (en) Water stable paving elevation control device
CN214570577U (en) Hexagonal block installation and transportation integrated machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant