CN107268669A - Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards - Google Patents

Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards Download PDF

Info

Publication number
CN107268669A
CN107268669A CN201710694171.2A CN201710694171A CN107268669A CN 107268669 A CN107268669 A CN 107268669A CN 201710694171 A CN201710694171 A CN 201710694171A CN 107268669 A CN107268669 A CN 107268669A
Authority
CN
China
Prior art keywords
jacket
jack
sleeve
piling
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710694171.2A
Other languages
Chinese (zh)
Inventor
朱荣华
田振亚
孙香
张美阳
陈文杰
周晋阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Rich Marine Engineering Technology Service Co Ltd
Original Assignee
Zhejiang Rich Marine Engineering Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Rich Marine Engineering Technology Service Co Ltd filed Critical Zhejiang Rich Marine Engineering Technology Service Co Ltd
Priority to CN201710694171.2A priority Critical patent/CN107268669A/en
Publication of CN107268669A publication Critical patent/CN107268669A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Abstract

The present invention discloses jacket construction method of being driven piles after one kind, rear piling jacket construction component, jacket of driving piles afterwards, be related to offshore wind farm technical field, with solve it is existing after the equipment cost that uses is higher during leveling in piling jacket construction method and the technical problem that can not reuse.Piling jacket construction method, comprises the following steps after of the present invention:Step S00, the supporting leg welding by sleeve and jacket;Step S01, by jack and sleeve weld;Step S1, by technique stake squeeze into sea bed;Step S2, the jacket with jack hung into sea, until the base of jack is seated in the stake top of technique stake;Step S3, the leveling by jack progress jacket;After step S4, leveling are finished, steel-pipe pile is hung to the sleeve of jacket, and steel-pipe pile is squeezed into sea bed;Step S5, jack removed, technique stake is extracted.

Description

Piling jacket construction method, rear piling jacket construction component, rear piling are led afterwards Pipe support
Technical field
The present invention relates to offshore wind farm technical field, piling jacket construction method, rear piling are led more particularly to after one kind Pipe support construction component, jacket of driving piles afterwards.
Background technology
At sea in the construction of wind-powered electricity generation, the cost on Wind turbines basis accounts for the 20%- of marine wind electric field project total cost 30%.Wherein, jacket-type basis is a kind of common base form of offshore wind farm blower foundation.
Specifically, in the prior art, the construction method on rear piling jacket-type basis is that first jacket is hung to sea bed On, steel-pipe pile is then inserted shoe sleeve, finally steel-pipe pile is driven piles to seabed with pile hammer, the tune of jacket is then carried out It is flat.
However, present inventor has found, during the leveling of jacket, it usually needs pile chuck and levelling gear It is high Deng, the clip pile level device cost, and clip pile equipment can not typically reuse, and which adds marine work Cheng Chengben.
The content of the invention
It is an object of the invention to provide the jacket construction method of being driven piles after one kind, rear piling jacket construction component, after Drive piles jacket, with solve it is existing after the equipment cost that uses is higher during leveling in piling jacket construction method and can not weigh The technical problem utilized again.
The present invention provides jacket construction method of being driven piles after one kind, comprises the following steps:Technique stake is squeezed into sea bed;Will The jacket with jack is hung into sea, until the base of the jack is seated in the stake top of the technique stake;It is logical Cross the leveling that the jack carries out the jacket;After leveling is finished, steel-pipe pile is hung to the sleeve of the jacket, And squeeze into the steel-pipe pile in the sea bed;The jack is removed, technique stake is extracted.
Wherein, also comprise the following steps before the step of described " squeezing into technique stake in sea bed ":By the sleeve and institute State the supporting leg welding of jacket;By the jack and the sleeve weld.
Specifically, the step of described " squeezing into the steel-pipe pile in the sea bed " is specially:Will be described by pile hammer Steel-pipe pile is squeezed into the sea bed.
Further, the jack is hydraulic jack.
Further, the supporting leg, the sleeve, the steel-pipe pile, the jack and technique stake difference For four.
Relative to prior art, rear piling jacket construction method of the present invention has the advantage that:
In the rear piling jacket construction method that the present invention is provided, comprise the following steps:Step S1, by technique stake squeeze into sea In bed;Step S2, the jacket with jack hung into sea, until the base of jack is seated in the stake top of technique stake; Step S3, the leveling by jack progress jacket;After step S4, leveling are finished, steel-pipe pile is hung to the set of jacket In cylinder, and steel-pipe pile is squeezed into sea bed;Step S5, jack removed, technique stake is extracted.Thus analysis is understood, this hair In the rear piling jacket construction method of bright offer, without using clip pile level device, so as to effectively reduce cost;And And, leveling is carried out by jack, so that leveling process simple and fast;Meanwhile, technique stake and jack can be reused, from And meet the installation of next jacket.
The present invention also provides jacket construction component of being driven piles after one kind, including:Jacket, the bottom of the jacket is provided with Supporting leg, the supporting leg is connected with sleeve, the sleeve and is equipped with steel-pipe pile;The sleeve connection has jack, described The base of jack is seated in the stake top of technique stake.
Wherein, the jack is hydraulic jack.
Specifically, the sleeve is connected with the supporting leg by way of welding;The jack leads to the sleeve The mode for crossing welding is connected.
Further, the supporting leg, the sleeve, the steel-pipe pile, the jack and the technique are respectively Four.
Relative to prior art, rear piling jacket construction component of the present invention has the advantage that:
In the rear piling jacket construction component that the present invention is provided, including:Jacket, the bottom of jacket is provided with support Leg, supporting leg is connected with sleeve, sleeve and is equipped with steel-pipe pile;Wherein, sleeve connection has jack, and the base of jack is located In the stake top of technique stake.Thus analysis is understood, the rear piling jacket construction component provided using the present invention carries out jacket During installation, first technique stake can be squeezed into sea bed;The jacket with jack is hung into sea again, until the bottom of jack Seat is seated in the stake top of technique stake;Then the leveling of jacket is carried out by jack;After leveling is finished, by steel-pipe pile hang to In the sleeve of jacket, and steel-pipe pile is squeezed into sea bed;Finally jack is removed, technique stake is extracted.Therefore, it is of the invention The rear piling jacket construction component provided, without using clip pile level device, so as to effectively reduce cost;Also, it is logical Cross jack and carry out leveling, leveling process simple and fast;Meanwhile, technique stake and jack can be reused, so as to meet down The installation of one jacket.
The present invention provides jacket of being driven piles after one kind again, including:Jacket, the bottom of the jacket is provided with supporting leg, The supporting leg is welded with sleeve, the sleeve and is equipped with steel-pipe pile.
Wherein, the supporting leg, the sleeve and the steel-pipe pile are respectively four.
Piling jacket is relative with above-mentioned rear piling jacket construction method and rear piling jacket construction component after described Have the advantage that identical, will not be repeated here in prior art.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of schematic flow sheet of rear piling jacket construction method provided in an embodiment of the present invention;
Fig. 2 is the schematic flow sheet of another rear piling jacket construction method provided in an embodiment of the present invention;
Fig. 3 is the structural representation of rear piling jacket construction component provided in an embodiment of the present invention;
Fig. 4 is the structural representation of rear piling jacket provided in an embodiment of the present invention.
In figure:1- jackets;2- supporting legs;3- sleeves;4- jack;The stake of 5- techniques;6- steel-pipe piles.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify description, rather than indicate or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, can be with It is the connection of two element internals.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition Concrete meaning in the present invention.
Fig. 1 is a kind of schematic flow sheet of rear piling jacket construction method provided in an embodiment of the present invention;Fig. 3 is this hair The structural representation for the rear piling jacket construction component that bright embodiment is provided.
As shown in Fig. 1 combinations Fig. 3, the embodiment of the present invention provides jacket construction method of being driven piles after one kind, including following step Suddenly:Step S1, technique stake 5 squeezed into sea bed;Step S2, the jacket 1 with jack 4 hung into sea, until very heavy The base on top 4 is seated in the stake top of technique stake 5;Step S3, the leveling by the progress jacket 1 of jack 4;Step S4, leveling After finishing, steel-pipe pile 6 is hung to the sleeve 3 of jacket 1, and steel-pipe pile 6 is squeezed into sea bed;Step S5, by jack 4 Remove, technique stake 5 is extracted.
Relative to prior art, the rear piling jacket construction method described in the embodiment of the present invention has the advantage that:
After provided in an embodiment of the present invention in piling jacket construction method, as shown in Fig. 1 combinations Fig. 3, including following step Suddenly:Step S1, technique stake 5 squeezed into sea bed;Step S2, the jacket 1 with jack 4 hung into sea, until very heavy The base on top 4 is seated in the stake top of technique stake 5;Step S3, the leveling by the progress jacket 1 of jack 4;Step S4, leveling After finishing, steel-pipe pile 6 is hung to the sleeve 3 of jacket 1, and steel-pipe pile 6 is squeezed into sea bed;Step S5, by jack 4 Remove, technique stake 5 is extracted.Thus analysis is understood, in rear piling jacket construction method provided in an embodiment of the present invention, without Using clip pile level device, so as to effectively reduce cost;Also, leveling is carried out by jack 4, so that leveling process is simple It is single quick;Meanwhile, technique stake 5 and jack 4 can be reused, so as to meet the installation of next jacket 1.
Fig. 2 is the schematic flow sheet of another rear piling jacket construction method provided in an embodiment of the present invention.
Wherein, it is above-mentioned in rear piling jacket construction method provided in an embodiment of the present invention as shown in Fig. 2 combinations Fig. 3 It can also comprise the following steps before the step of " squeezing into technique stake 5 in sea bed ":Step S00, by sleeve 3 and jacket 1 Supporting leg 2 is welded;Step S01, jack 4 welded with sleeve 3.
Specifically, it is above-mentioned " steel-pipe pile 6 to be squeezed into sea in rear piling jacket construction method provided in an embodiment of the present invention Bed in " the step of be specifically as follows:Steel-pipe pile 6 is squeezed into sea bed by pile hammer.
Further, in order that to carry out operation during leveling with jack 4 more convenient, it is provided in an embodiment of the present invention after beat In pile leader frame construction method, above-mentioned jack 4 can be preferably hydraulic jack.
Herein it should be added that, hydraulic jack is also known as hydraulic jack, is a kind of to use plunger or hydraulic cylinder It is used as the jack of rigid top lift part.The simple structure of hydraulic jack, it is lightweight, be easy to carry, conveniently moving.
Further, as shown in figure 3, in the construction component of above-mentioned jacket 1, the supporting leg 2, sleeve 3, steel-pipe pile 6th, jack 4 and technique stake 5 can be respectively set to four.
Certainly, during practical application, in the construction component of above-mentioned jacket 1, the supporting leg 2, sleeve 3, steel-pipe pile 6, thousand The particular number of jin top 4 and technique stake 5 is not limited herein, rationally, for example:Can be respectively set to three or three with On.
As shown in figure 3, the embodiment of the present invention also provides piling jacket construction component after one kind, including:Jacket 1, leads The bottom of pipe support 1 is provided with supporting leg 2, and supporting leg 2 is connected with sleeve 3, sleeve 3 and is equipped with steel-pipe pile 6;Sleeve 3 is connected with thousand Jin top 4, the base of jack 4 is seated in the stake top of technique stake 5.
Relative to prior art, the rear piling jacket construction component described in the embodiment of the present invention has the advantage that:
After provided in an embodiment of the present invention in piling jacket construction component, as shown in figure 3, including:Jacket 1, conduit The bottom of frame 1 is provided with supporting leg 2, and supporting leg 2 is connected with sleeve 3, sleeve 3 and is equipped with steel-pipe pile 6;Wherein, sleeve 3 is connected with Jack 4, the base of jack 4 is seated in the stake top of technique stake 5.Thus analysis is understood, using provided in an embodiment of the present invention When piling jacket construction component carries out the installation of jacket 1 afterwards, first technique stake 5 can be squeezed into sea bed;Thousand will be carried again The jacket 1 on jin top 4 is hung into sea, until the base of jack 4 is seated in the stake top of technique stake 5;Then entered by jack 4 The leveling of row jacket 1;After leveling is finished, steel-pipe pile 6 is hung to the sleeve 3 of jacket 1, and steel-pipe pile 6 is squeezed into sea In bed;Finally jack 4 is removed, technique stake 5 is extracted.Therefore, rear piling jacket construction provided in an embodiment of the present invention Component, without using clip pile level device, so as to effectively reduce cost;Also, leveling, leveling are carried out by jack 4 Process simple and fast;Meanwhile, technique stake 5 and jack 4 can be reused, so as to meet the installation of next jacket 1.
Wherein, in order that to carry out operation during leveling with jack 4 more convenient, it is provided in an embodiment of the present invention after piling lead In pipe support construction component, above-mentioned jack 4 can be preferably hydraulic jack.
Herein it should be added that, hydraulic jack is also known as hydraulic jack, is a kind of to use plunger or hydraulic cylinder It is used as the jack of rigid top lift part.The simple structure of hydraulic jack, it is lightweight, be easy to carry, conveniently moving.
Specifically, after provided in an embodiment of the present invention in piling jacket construction component, above-mentioned sleeve 3 and supporting leg 2 it Between can be attached by way of welding;Correspondingly, can also be by the side of welding between above-mentioned jack 4 and sleeve 3 Formula is attached.
Further, as shown in figure 3, it is provided in an embodiment of the present invention after piling jacket construction component in, above-mentioned support Leg 2, sleeve 3, steel-pipe pile 6, jack 4 and technique stake 5 can be respectively set to four.
Certainly, during practical application, in the construction component of above-mentioned jacket 1, the supporting leg 2, sleeve 3, steel-pipe pile 6, thousand The particular number of jin top 4 and technique stake 5 is not limited herein, rationally, for example:Can be respectively set to three or three with On.
Fig. 4 is the structural representation of rear piling jacket provided in an embodiment of the present invention.
As shown in figure 4, the embodiment of the present invention provides jacket of being driven piles after one kind again, including:Jacket 1, the bottom of jacket 1 End is provided with supporting leg 2, and supporting leg 2 is welded with sleeve 3, sleeve 3 and is equipped with steel-pipe pile 6.
Wherein, as shown in figure 4, it is provided in an embodiment of the present invention after piling jacket in, above-mentioned supporting leg 2, sleeve 3 and steel Pile tube 6 can be respectively set to four.
Certainly, during practical application, the particular number of supporting leg 2, sleeve 3 and steel-pipe pile 6 in above-mentioned jacket 1 is herein not It is limited, rationally, for example:Three or more than three can be respectively set to.
Jacket is driven piles after provided in an embodiment of the present invention when mounted, it is necessary to coordinate, leveling is carried out by jack 4, So as to leveling process simple and fast;Meanwhile, technique stake 5 and jack 4 can be reused, so as to meet next jacket 1 Installation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (10)

1. jacket construction method of being driven piles after one kind, it is characterised in that comprise the following steps:
Technique stake is squeezed into sea bed;
The jacket with jack is hung into sea, until the base of the jack is seated in the stake of the technique stake Top;
The leveling of the jacket is carried out by the jack;
After leveling is finished, steel-pipe pile is hung to the sleeve of the jacket, and the steel-pipe pile is squeezed into the sea bed;
The jack is removed, technique stake is extracted.
2. piling jacket construction method after according to claim 1, it is characterised in that described " sea to be squeezed into technique stake Bed in " the step of before also comprise the following steps:
The supporting leg of the sleeve and the jacket is welded;
By the jack and the sleeve weld.
3. piling jacket construction method after according to claim 2, it is characterised in that described " to beat the steel-pipe pile Enter in the sea bed " the step of be specially:
The steel-pipe pile is squeezed into the sea bed by pile hammer.
4. piling jacket construction method after according to claim 3, it is characterised in that the jack is hydraulic jack Top.
5. the rear piling jacket construction method according to any one of claim 2-4, it is characterised in that the support Leg, the sleeve, the steel-pipe pile, the jack and technique stake are respectively four.
6. jacket construction component of being driven piles after one kind, it is characterised in that including:Jacket, the bottom of the jacket is provided with branch Support leg, the supporting leg is connected with sleeve, the sleeve and is equipped with steel-pipe pile;
The sleeve connection has jack, and the base of the jack is seated in the stake top of technique stake.
7. piling jacket construction component after according to claim 6, it is characterised in that the jack is hydraulic jack Top.
8. the rear piling jacket construction component according to claim 6 or 7, it is characterised in that the sleeve and the branch Support leg is connected by way of welding;
The jack is connected with the sleeve by way of welding.
9. it is according to claim 8 after piling jacket construction component, it is characterised in that the supporting leg, the sleeve, The steel-pipe pile, the jack and technique stake are respectively four.
10. jacket of being driven piles after one kind, it is characterised in that including:Jacket, the bottom of the jacket is provided with supporting leg, institute State supporting leg and be welded with sleeve, the sleeve and be equipped with steel-pipe pile.
CN201710694171.2A 2017-08-14 2017-08-14 Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards Pending CN107268669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710694171.2A CN107268669A (en) 2017-08-14 2017-08-14 Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710694171.2A CN107268669A (en) 2017-08-14 2017-08-14 Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards

Publications (1)

Publication Number Publication Date
CN107268669A true CN107268669A (en) 2017-10-20

Family

ID=60080335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710694171.2A Pending CN107268669A (en) 2017-08-14 2017-08-14 Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards

Country Status (1)

Country Link
CN (1) CN107268669A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118697A (en) * 2018-02-28 2018-06-05 浙江华蕴海洋工程技术服务有限公司 The convenient adjusting apparatus of marine guidance piling and method of adjustment
CN110747882A (en) * 2019-10-14 2020-02-04 中国海洋大学 Nail type anti-sinking plate for ocean engineering, jacket and construction method
CN116427375A (en) * 2023-06-02 2023-07-14 天津天易海上工程有限公司 Shallow sea jacket leveling mechanism and use method thereof
CN116791555A (en) * 2023-08-29 2023-09-22 西南石油大学 Drilling platform pile shoe structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4367056A (en) * 1981-01-23 1983-01-04 Varco International, Inc. Marine platform jacket jack
US20100054863A1 (en) * 2008-08-29 2010-03-04 Will Consulting, Inc. Flex-Leg Offshore Structure
CN201649118U (en) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 Foundation structure of jacket-type offshore wind turbine
CN103119222A (en) * 2010-07-05 2013-05-22 船舶通用涡轮有限公司 Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN103556649A (en) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 Jacket leveling mechanism of offshore wind turbine generator system
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN105780806A (en) * 2014-12-24 2016-07-20 广州华申建设工程管理有限公司 Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN105780802A (en) * 2014-12-23 2016-07-20 广州华申建设工程管理有限公司 Jacket offshore wind turbine foundation with brackets and construction method thereof
CN205776423U (en) * 2016-05-22 2016-12-07 中交第一航务工程局有限公司 A kind of levelling device for offshore wind farm catheterostat basis
CN207160049U (en) * 2017-08-14 2018-03-30 浙江华蕴海洋工程技术服务有限公司 Piling jacket construction component, jacket of driving piles afterwards afterwards

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4367056A (en) * 1981-01-23 1983-01-04 Varco International, Inc. Marine platform jacket jack
US20100054863A1 (en) * 2008-08-29 2010-03-04 Will Consulting, Inc. Flex-Leg Offshore Structure
CN201649118U (en) * 2010-04-07 2010-11-24 中国水电顾问集团华东勘测设计研究院 Foundation structure of jacket-type offshore wind turbine
CN103119222A (en) * 2010-07-05 2013-05-22 船舶通用涡轮有限公司 Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN103556649A (en) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 Jacket leveling mechanism of offshore wind turbine generator system
CN105780802A (en) * 2014-12-23 2016-07-20 广州华申建设工程管理有限公司 Jacket offshore wind turbine foundation with brackets and construction method thereof
CN204370469U (en) * 2014-12-24 2015-06-03 广州华申建设工程管理有限公司 A kind of drilled pile long leg jacket offshore wind turbine foundation
CN105780806A (en) * 2014-12-24 2016-07-20 广州华申建设工程管理有限公司 Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN205776423U (en) * 2016-05-22 2016-12-07 中交第一航务工程局有限公司 A kind of levelling device for offshore wind farm catheterostat basis
CN207160049U (en) * 2017-08-14 2018-03-30 浙江华蕴海洋工程技术服务有限公司 Piling jacket construction component, jacket of driving piles afterwards afterwards

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118697A (en) * 2018-02-28 2018-06-05 浙江华蕴海洋工程技术服务有限公司 The convenient adjusting apparatus of marine guidance piling and method of adjustment
CN110747882A (en) * 2019-10-14 2020-02-04 中国海洋大学 Nail type anti-sinking plate for ocean engineering, jacket and construction method
CN116427375A (en) * 2023-06-02 2023-07-14 天津天易海上工程有限公司 Shallow sea jacket leveling mechanism and use method thereof
CN116427375B (en) * 2023-06-02 2023-09-05 天津天易海上工程有限公司 Shallow sea jacket leveling mechanism and use method thereof
CN116791555A (en) * 2023-08-29 2023-09-22 西南石油大学 Drilling platform pile shoe structure
CN116791555B (en) * 2023-08-29 2023-11-17 西南石油大学 Drilling platform pile shoe structure

Similar Documents

Publication Publication Date Title
CN107268669A (en) Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN205382485U (en) Stake mount is embraced to marine wind power single pile
CN210439300U (en) Separable anti-seepage support combined steel sheet pile
CN207160049U (en) Piling jacket construction component, jacket of driving piles afterwards afterwards
CN110004965A (en) A kind of steady stake stage apparatus of piling for the replacement of single-pile foundation flange
CN201045190Y (en) Underwater driving locater
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN107663859A (en) Piling machine
CN211006604U (en) Offshore wind turbine generator system positioning support guide frame
CN207567766U (en) Piling machine
CN111101496A (en) Construction process for installing deepwater jacket based on attached pile stabilizing device
JP2012112181A (en) Pile driver and pile driving method
CN108331007A (en) A kind of foundation structure and installation method for the high-power unit of offshore wind farm
CN213294418U (en) Lifting appliance suitable for concrete pipe pile
CN104452760A (en) Noiseless steel sheet pile pressing equipment and construction method thereof
CN109577323B (en) Tubular pile reinforcing method
CN211948427U (en) Pile mould cofferdam assists and holds up a device
CN211171969U (en) Pile pressing and hammer combined type tubular pile construction equipment
CN106120880A (en) A kind of offshore wind farm single-pile foundation Compressive Bearing Capacity assay device
CN203475433U (en) Noiseless pile pressing device for steel sheet piles
CN102182188A (en) Full hydraulic static pulling machine and method of underground diaphragm wall joint pipe
CN103726505B (en) Offshore wind plant wind turbine foundation
CN202194138U (en) Linkage-type guide rod diesel oil pile hammer
CN204199282U (en) Be applicable to the elevator pile towing device of small engineering machinery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020