CN215626108U - Precast concrete component lifting hook sheath - Google Patents

Precast concrete component lifting hook sheath Download PDF

Info

Publication number
CN215626108U
CN215626108U CN202121079323.6U CN202121079323U CN215626108U CN 215626108 U CN215626108 U CN 215626108U CN 202121079323 U CN202121079323 U CN 202121079323U CN 215626108 U CN215626108 U CN 215626108U
Authority
CN
China
Prior art keywords
sheath
main body
sheath main
precast concrete
lifting hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121079323.6U
Other languages
Chinese (zh)
Inventor
张�林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jiegu Construction Technology Co ltd
Original Assignee
Hubei Jiegu Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jiegu Construction Technology Co ltd filed Critical Hubei Jiegu Construction Technology Co ltd
Priority to CN202121079323.6U priority Critical patent/CN215626108U/en
Application granted granted Critical
Publication of CN215626108U publication Critical patent/CN215626108U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a precast concrete member lifting hook sheath which comprises a first sheath main body and a second sheath main body, wherein magnet pieces are arranged on the first sheath main body and the second sheath main body, the first sheath main body and the second sheath main body can be attracted and spliced into a whole through the magnetic force of the magnet pieces, and a positioning hole for positioning a lifting hook is formed between the first sheath main body and the second sheath main body. The lifting hook sheath adopts a split structure, and the magnets capable of attracting each other are arranged in the first sheath main body and the second sheath main body, so that the lifting hook sheath is convenient to mount and dismount, concrete is prevented from entering the lifting hook sheath to influence dismounting, the problem that the lifting hook sheath is easy to deform after long-term use is solved, and the service life of the lifting hook sheath is prolonged.

Description

Precast concrete component lifting hook sheath
Technical Field
The utility model relates to the technical field of building materials, in particular to a hook sheath for a precast concrete member.
Background
The existing precast concrete member comprises a precast concrete pile, and a lifting hook needs to be arranged in the manufacturing process so as to facilitate lifting. The application of the lifting hook in the precast concrete square pile is particularly wide. The existing part of lifting hooks adopts a form of pre-embedding of deformed steel bars or pier head reinforcing steel bars, and the lifting hook main body is located outside the surface of a concrete member and is not beneficial to transportation and placement. Although some lifting hooks can be arranged inside the outer surface of the concrete member, the structure for forming the hanging space is a plastic pipe or a breakable cushion block structure, the plastic pipe is embedded inside the member and cannot be taken out, the material cost is high, and the breakable cushion block structure needs to be broken and taken out after the member is manufactured, and is only used once, high in material cost and not beneficial to environmental protection. And present lifting hook sheath formula structure as an organic whole usually, at the in-process to lifting hook sheath reuse, inside different lifting hooks need pass the lifting hook sheath many times, cause the lifting hook sheath to warp easily in the past this long, reduced the life of lifting hook sheath, increase cost.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problems and researches and designs a hook sheath of a precast concrete component. The technical means adopted by the utility model are as follows:
the utility model provides a precast concrete member lifting hook sheath, includes first sheath main part and second sheath main part, be equipped with magnet spare in first sheath main part and the second sheath main part, first sheath main part and second sheath main part can attract the concatenation as an organic whole through the magnetic force of magnet spare to form the locating hole that is used for fixing a position the lifting hook between first sheath main part and second sheath main part.
Preferably, the magnet piece includes mutually supporting fixed arch and recess, fixed arch is the iron insert, be equipped with the magnet insert in the recess.
Preferably, one side of the first sheath main body spliced with the second sheath main body is provided with a fixing protrusion and a groove, the second sheath main body and the first sheath main body have the same structure, the fixing protrusion is a hemispherical protrusion, and the groove is a hemispherical groove.
Preferably, the magnet piece includes at least two magnet pieces that attract each other, and the two magnet pieces are respectively disposed in the first sheath main body and the second sheath main body.
Preferably, the first sheath main body and the second sheath main body are provided with mounting holes for mounting the magnet blocks.
Preferably, the magnet block is fixed in the first and second sheath bodies by bolts.
Preferably, the first sheath main body is provided with a transverse positioning strip and a longitudinal positioning strip which are perpendicular to each other, the transverse positioning strip and the longitudinal positioning strip are semicircular in cross section, and the second sheath main body is provided with a positioning groove matched with the transverse positioning strip and the longitudinal positioning strip.
Preferably, the first sheath body and the second sheath body are provided with a lifting part which can be used for lifting.
Preferably, the lifting part is a lifting through hole, and the first sheath main body and the second sheath main body are respectively provided with one lifting through hole.
Preferably, the precast concrete member hook sheath is made of rubber.
Compared with the prior art, the hook sheath for the precast concrete component is of a split structure, so that the hook sheath is convenient to mount and dismount, the magnets capable of attracting each other are arranged in the first sheath main body and the second sheath main body, the first sheath main body and the second sheath main body are tightly connected by using magnetic force, the concrete is prevented from entering the hook sheath to affect dismounting, the problem that the hook sheath is easy to deform after long-term use is solved, the service life of the hook sheath is prolonged, the cost is low, and the hook sheath is environment-friendly.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a schematic view of the overall structure of the first sheath body.
Fig. 3 is a side view of fig. 2.
Fig. 4a is a cross-sectional view a-a of fig. 3.
Fig. 4B is a sectional view B-B of fig. 3.
Fig. 5 is a schematic diagram of an implementation state of an embodiment of the utility model.
Fig. 6 is a side view (inner perspective view) of fig. 5.
Fig. 7 is a schematic structural diagram of another embodiment of the present invention.
Fig. 8 is a top view of fig. 7.
Fig. 9 is a schematic view of the plane C-C of fig. 7.
Fig. 10 is a schematic view of the embodiment of fig. 7.
Fig. 11 is a schematic structural diagram of another embodiment of the present invention.
In the figures, 1, a first sheath body; 2. a second sheath body; 3. a hook; 4. positioning holes; 5. a fixed protrusion; 6. a groove; 7. a magnet block; 8. mounting holes; 9. a bolt; 10. a transverse positioning bar; 11. a longitudinal positioning strip; 12. positioning a groove; 13. a pulling section; 14. and (5) hooping.
Detailed Description
As shown in fig. 1 to 4, a precast concrete member hook sheath includes a first sheath body 1 and a second sheath body 2, wherein the first sheath body 1 and the second sheath body 2 are respectively provided with a magnet piece capable of attracting each other, and the magnet pieces are precast into the first sheath body 1 and the second sheath body 2 in advance. The first sheath body 1 and the second sheath body 2 can be spliced into a whole by magnetic attraction of the magnet pieces, and a positioning hole 4 for positioning the hook 3 is formed between the first sheath body 1 and the second sheath body 2. Under the effect of magnet piece, can connect into whole the use with first sheath main part 1 and second sheath main part 2, still be convenient for simultaneously establish first sheath main part 1 and second sheath main part 2 cover on lifting hook 3 and dismantle first sheath main part 1 and second sheath main part 2 after concrete placement is accomplished.
The magnet piece includes fixed protrusion 5 and recess 6, and fixed protrusion 5 is the iron mold insert or other materials that can be attracted by magnet, is equipped with the magnet mold insert in the recess 6, and fixed protrusion 5 and recess 6 are through the magnetic force zonulae occludens of attracting each other, connect first sheath main part 1 and second sheath main part 2 as an organic whole from this.
Preferably, the fixing protrusion 5 is a hemispherical protrusion, and the groove 6 is a hemispherical groove 6 matched with the fixing protrusion, so that the fixing protrusion and the groove can slide with each other conveniently, and the first sheath body 1 and the second sheath body 2 can be taken out after pouring. And one side of first sheath main part 1 and the concatenation of second sheath main part 2 is equipped with fixed arch 5 and recess 6 simultaneously, and second sheath main part 2 is the same with the structure of first sheath main part 1, and both are as the form shown in fig. 2 in this embodiment, when splicing, only need with both be provided with fixed arch 5 and recess 6 the side butt joint can be connected closely, convenient operation has also saved the cost of preparation sheath main part simultaneously.
The first sheath body 1 and the second sheath body 2 are provided with a pulling portion 13 that can be pulled. In a preferred embodiment, the pulling portion 13 is a pulling through hole, one pulling through hole is respectively arranged on the first sheath body 1 and the second sheath body 2, and after concrete pouring is completed, the first sheath body 1 and the second sheath body 2 are respectively taken out from two directions through the two pulling through holes, so that the detachment is facilitated.
The traditional lifting hook sheath is of an integrated structure and is not provided with a magnet piece. At the in-process to lifting hook sheath reuse, can pass the lifting hook sheath many times when different lifting hooks 3 business turn over locating hole 4 inside, this just makes the lifting hook sheath frequently receive the outside power on the width direction, causes the lifting hook sheath to warp easily in the past this long time to lead to can get into too much concrete in the lifting hook sheath in precast concrete member manufacture process, influence 3 inside formation of hanging the space of lifting hook, need the manual work to knock off the concrete in the lifting hook sheath moreover, waste time and energy. This embodiment is through setting up the magnet piece of inter attraction in first sheath main part 1 and second sheath main part 2, and the lifting hook sheath concatenation is a whole when can guaranteeing concreting, prevents that the concrete from getting into the lifting hook sheath and influencing 3 shapes of lifting hook, can correct the lifting hook sheath to the state of being close initial shape, has avoided the production of above-mentioned problem, has prolonged the life of lifting hook sheath.
In another embodiment, as shown in fig. 7 to 9, the magnet member includes at least two magnet blocks 7 that are attracted to each other, the two magnet blocks 7 are respectively disposed in the first sheath body 1 and the second sheath body 2, and the first sheath body 1 and the second sheath body 2 can be attracted and fixed by the magnet blocks 7. Be equipped with the mounting hole 8 that is used for installing magnet piece 7 in first sheath main part 1 and the second sheath main part 2, the inside of first sheath main part 1 and second sheath main part 2 is put into through mounting hole 8 to magnet piece 7, and the installation of magnet piece 7 is fixed to the completion to the shutoff of reuse rubber piece outside mounting hole 8. The first sheath main body 1 is provided with a transverse positioning strip 10 and a longitudinal positioning strip 11 which are perpendicular to each other, the cross sections of the transverse positioning strip 10 and the longitudinal positioning strip 11 are semicircular, and the second sheath main body 2 is provided with a positioning groove 12 matched with the transverse positioning strip 10 and the longitudinal positioning strip 11. Through the positioning of the transverse positioning strip 10 and the longitudinal positioning strip 11 and the positioning groove 12, the accurate positioning of the first sheath main body 1 and the second sheath main body 2 in the transverse direction and the longitudinal direction can be ensured, the sheath main bodies can be quickly combined into a whole, and the relative movement of the first sheath main body 1 and the second sheath main body 2 in the transverse direction and the longitudinal direction is avoided.
As shown in fig. 11, the magnet block 7 is preferably fixed in the first and second sheathing bodies 1 and 2 by bolts 9 for easy attachment and detachment. Note that the mounting method of the magnet block 7 is not limited to the above-described method, and any other method that can ensure stable mounting of the magnet block 7 can be applied.
Precast concrete member lifting hook sheath is made by rubber in this embodiment, in the actual production process, all can do the fillet to each reentrant corner and external corner department as required and handle, takes out the lifting hook sheath after being convenient for pour.
As shown in fig. 5, 6 and 10, in the process of manufacturing the precast concrete member, the arc-shaped portion of the hook 3 is aligned with the positioning hole 4, so that the first sheath body 1 and the second sheath body 2 can be spliced into a whole, the first sheath body 1 and the second sheath body 2 are positioned between adjacent steel bars, for a precast concrete pile, especially a precast concrete solid square pile, the precast concrete pile can be positioned between adjacent stirrups 14, and the first sheath body 1 and the second sheath body 2 are not in contact with the main bars, and concrete is poured. After the production is completed, the first sheath body 1 and the second sheath body 2 are pulled out of the concrete by hanging and pulling through holes by pulling tools such as a hook 3. The first sheath body 1 and the second sheath body 2 are respectively provided with a lifting through hole, and in the lifting process, component force to two sides of the lifting hook sheath is generated, so that the lifting hook sheath is more beneficial to being detached.
This embodiment adopts split type structure, is convenient for install and demolish the lifting hook sheath to through set up mated magnet piece 7 in first sheath main part 1 and second sheath main part 2, can make the lifting hook sheath keep the closure state, prevent that the condition of deformation from appearing in the lifting hook sheath. The embodiment can be repeatedly used for many times, has low cost and environmental protection, and is particularly suitable for precast concrete solid square piles.
The above-mentioned embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the scope of the present invention, and various modifications and improvements of the technical solution of the present invention by those skilled in the art should fall within the protection scope defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (10)

1. The utility model provides a precast concrete member lifting hook sheath which characterized in that: including first sheath main part (1) and second sheath main part (2), be equipped with the magnet piece on first sheath main part (1) and the second sheath main part (2), first sheath main part (1) and second sheath main part (2) can attract the concatenation as an organic whole through the magnetic force of magnet piece to form between first sheath main part (1) and second sheath main part (2) and be used for carrying out locating hole (4) fixed a position to lifting hook (3).
2. The precast concrete unit hook sheath according to claim 1, wherein: the magnet piece comprises a fixing bulge (5) and a groove (6) which are matched with each other, the fixing bulge (5) is an iron insert, and the groove (6) is internally provided with a magnet insert.
3. The precast concrete unit hook sheath according to claim 2, wherein: one side of the first sheath main body (1) spliced with the second sheath main body (2) is provided with a fixing protrusion (5) and a groove (6), the second sheath main body (2) and the first sheath main body (1) are identical in structure, the fixing protrusion (5) is a hemispherical protrusion, and the groove (6) is a hemispherical groove.
4. The precast concrete unit hook sheath according to claim 1, wherein: the magnet piece comprises at least two mutually attracted magnet blocks (7), and the two magnet blocks (7) are respectively arranged in the first sheath main body (1) and the second sheath main body (2).
5. The precast concrete unit hook sheath according to claim 4, wherein: and mounting holes (8) for mounting the magnet blocks (7) are formed in the first sheath main body (1) and the second sheath main body (2).
6. The precast concrete unit hook sheath according to claim 4, wherein: the magnet block (7) is fixed in the first sheath main body (1) and the second sheath main body (2) through bolts (9).
7. A precast concrete member hook sheath according to claim 4, 5 or 6, characterized in that: the sheath is characterized in that a transverse positioning strip (10) and a longitudinal positioning strip (11) which are perpendicular to each other are arranged on the first sheath main body (1), the cross sections of the transverse positioning strip (10) and the longitudinal positioning strip (11) are semicircular, and positioning grooves (12) matched with the transverse positioning strip (10) and the longitudinal positioning strip (11) are arranged on the second sheath main body (2).
8. The precast concrete unit hook sheath according to claim 1, wherein: the first sheath main body (1) and the second sheath main body (2) are provided with a lifting part (13) which can be used for lifting.
9. The precast concrete unit hook sheath of claim 8, wherein: the lifting part (13) is a lifting through hole, and the first sheath main body (1) and the second sheath main body (2) are respectively provided with one lifting through hole.
10. The precast concrete unit hook sheath according to claim 1, wherein: it is made of rubber.
CN202121079323.6U 2021-05-19 2021-05-19 Precast concrete component lifting hook sheath Active CN215626108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121079323.6U CN215626108U (en) 2021-05-19 2021-05-19 Precast concrete component lifting hook sheath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121079323.6U CN215626108U (en) 2021-05-19 2021-05-19 Precast concrete component lifting hook sheath

Publications (1)

Publication Number Publication Date
CN215626108U true CN215626108U (en) 2022-01-25

Family

ID=79938711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121079323.6U Active CN215626108U (en) 2021-05-19 2021-05-19 Precast concrete component lifting hook sheath

Country Status (1)

Country Link
CN (1) CN215626108U (en)

Similar Documents

Publication Publication Date Title
KR20100013548A (en) Joint of half pc slab
CN215626108U (en) Precast concrete component lifting hook sheath
JP2013209829A (en) Construction method of wall
KR20190101313A (en) Magnetic type embeded anchor and construction method of facility by using it
CN115653280A (en) Concrete template pulling sheet, concrete pouring mold and construction method
CN216195710U (en) Prefabricated assembled concrete shear force wall
CN215471907U (en) Prefabricated pile wall forming die and die set
CN212642127U (en) Wall bushing
CN213015377U (en) Pressure dismounting-free template for embedded part
CN213174445U (en) Prefabricated hollow component
CN111424828A (en) Prefabricated panel, connecting device, structure and manufacturing method thereof and building manufacturing method
KR20170004923A (en) Assembly structure of Form for working wallconcrete and construction equipment
KR200357642Y1 (en) Reinforcement structure of inconner panel
CN209760505U (en) Tenon welding combined horizontal connection shear wall structure
CN210917856U (en) Linear shear wall module and shear wall
CN111168822B (en) T-shaped beam template for road and bridge construction
CN211473066U (en) Precast beam component
CN113997389B (en) Prefabricated part forming die and prefabricated part processing method
CN212707305U (en) Concrete prefabricated component's preparation template
CN215168113U (en) Shear wall template positioning device
CN211250594U (en) Pouring mold for pre-buried hand hole position wallboard
CN214192200U (en) Precast concrete component lifting hook sheath
CN217870407U (en) Wall is led to concatenation formula
CN219080995U (en) Railway roadbed rectangle side ditch design reinforcing bar fixture device
CN219569332U (en) Hollow slab lifting point embedded part capable of being recycled and prefabricated hollow slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant