CN215594014U CN202121369499.5U CN202121369499U CN215594014U CN 215594014 U CN215594014 U CN 215594014U CN 202121369499 U CN202121369499 U CN 202121369499U CN 215594014 U CN215594014 U CN 215594014U
Authority
CN
China
Prior art keywords
steel
equal
positioning device
rectangular
rectangular steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121369499.5U
Other languages
Chinese (zh)
Inventor
杨立
汪明
李文刚
于安文
张志鹏
崔玉峰
任亮
于振江
张元新
李小龙
温季龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN202121369499.5U priority Critical patent/CN215594014U/en
Application granted granted Critical
Publication of CN215594014U publication Critical patent/CN215594014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of bridge construction, and relates to a pile foundation steel reinforcement framework manhole accurate positioning device. The related pile foundation steel reinforcement framework access hole accurate positioning device is provided with two rectangular steel plates which are arranged in parallel; the two rectangular steel plates are connected through equal-edge angle steel perpendicular to the rectangular steel plates; the two equal-edge angle steels are symmetrically arranged; two ends of each equal-edge angle steel are respectively connected with two rectangular steel plates; the rectangular steel plate and the equilateral angle steel are both provided with elongated connecting holes, and the elongated connecting holes form adjusting holes; the two rectangular steel plates and the two equal-side angle steels are connected into a whole to form a rectangular frame structure with adjustable size; the two equilateral angle steels are respectively and fixedly connected with a semicircular clamp; the two semicircular clamps act along with the corresponding equal-edge angle steel to form an adjustable positioning device; a cavity for placing a reinforcement cage is formed between the two semicircular clamps. The utility model realizes accurate positioning adjustment and ensures the requirement of the thickness of the protective layer.

Description

Accurate positioning device for pile foundation steel reinforcement framework inlet hole
Technical Field
The utility model belongs to the technical field of bridge construction, and particularly relates to a pile foundation steel reinforcement framework manhole accurate positioning device.
Background
When the highway bridge pile foundation steel bar framework is erected in the manhole, the eccentricity phenomenon can occur under the influence of factors such as operating level or local deformation of steel pile casing embedding, and the like, and then the steel bar framework protective layer after the manhole is too large or too small; the bridge pile columns are generally connected through the tie beams, the deviation between the center of the column and the center of the pile is required to be within 5cm, and therefore the accuracy of the hole entering of the steel reinforcement framework needs to be strictly controlled, and the thickness of the protective layer can be ensured to meet the requirements.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model aims to provide an accurate positioning device for a pile foundation steel reinforcement framework access hole.
The utility model adopts the following technical scheme for achieving the purpose:
a pile foundation steel reinforcement framework manhole accurate positioning device is provided with two rectangular steel plates which are arranged in parallel; the two rectangular steel plates are connected through equal-edge angle steel perpendicular to the rectangular steel plates; the two equal-edge angle steels are symmetrically arranged; two ends of each equilateral angle steel are respectively connected with the two rectangular steel plates; the rectangular steel plate and the equilateral angle steel are both provided with strip-shaped connecting holes, and the strip-shaped connecting holes form adjusting holes; the two rectangular steel plates and the two equal-side angle steels are connected into a whole to form a rectangular frame structure with adjustable size; the two equal-edge angle steels are respectively and fixedly connected with a semicircular clamp; the two semicircular clamps act along with the corresponding equal-edge angle steel to form an adjustable positioning device; a cavity for placing a reinforcement cage is formed between the two semicircular clamps.
The rectangular steel plate is provided with scale marks.
The equilateral angle steel is provided with scale marks.
According to the accurate positioning device for the pile foundation steel reinforcement framework access hole, the technical scheme is adopted, and accurate positioning adjustment is achieved through movement between the equilateral angle steel and the rectangular steel plate, so that the requirement of the thickness of the protective layer is met.
Drawings
FIG. 1 is a top view of the structure of the present invention.
Fig. 2 is a front view of the structure of the present invention.
In the figure, the steel bar comprises a rectangular steel plate 1, an equilateral angle steel 2, a fixing bolt and a gasket 3, a semicircular fixture 4, a steel chisel 5, a strip-shaped connecting hole 6, a carrying pole beam 7, a steel protective cylinder 8, a steel protective cylinder 9 and a steel reinforcement framework.
Detailed Description
The utility model is described in detail with reference to the accompanying drawings and specific embodiments:
as shown in fig. 1 and 2, the device for accurately positioning the hole into the steel reinforcement cage of the pile foundation is provided with two rectangular steel plates 1 which are arranged in parallel; the two rectangular steel plates 1 are connected through equal-edge angle steel 2 perpendicular to the rectangular steel plates; the two equal-edge angle steels 2 are symmetrically arranged; two ends of each equilateral angle steel 2 are respectively connected with the two rectangular steel plates 1; the rectangular steel plate and the equilateral angle steel are both provided with strip-shaped connecting holes 6, and the strip-shaped connecting holes 6 form adjusting holes; the two rectangular steel plates 1 and the two equilateral angle steels 2 are connected into a whole to form a rectangular frame structure with adjustable size, and the adjusted equilateral angle steels and the rectangular steel plates are fixedly connected and positioned through fixing bolts and gaskets 3; the two equal-edge angle steels are respectively and fixedly connected with a semicircular clamp 4; the two semicircular clamps 4 act along with the corresponding equal-edge angle steel 2 to form an adjustable positioning device; a cavity for placing a reinforcement cage is formed between the two semicircular clamps.
The rectangular steel plate is provided with scale marks.
The equilateral angle steel is provided with scale marks.
When the positioning device works, the cross line is pulled to find out the center point of a pile foundation, and steel brazes 5 are arranged around the center point for fixing the whole positioning device; the steel reinforcement cage is properly pulled open in 4 directions, namely, the front direction, the rear direction, the left direction and the right direction, the steel reinforcement cage is installed into the hole by a crane, and the top of the steel reinforcement cage is temporarily fixed at the top of the steel casing through the carrying pole beam 7 to wait for being connected with a lower section of the steel reinforcement cage. According to the radius scales of the surfaces of the rectangular steel plate and the equal-edge angle steel, the accurate positioning is realized by moving the adjusting hole by using the 3 fixing bolt and the gasket according to the radius scales.

Claims (3)

1. The utility model provides a pile foundation framework of steel reinforcement hand-hole accurate positioning device which characterized in that: the positioning device is provided with two rectangular steel plates which are arranged in parallel; the two rectangular steel plates are connected through equal-edge angle steel perpendicular to the rectangular steel plates; the two equal-edge angle steels are symmetrically arranged; two ends of each equilateral angle steel are respectively connected with the two rectangular steel plates; the rectangular steel plate and the equilateral angle steel are both provided with strip-shaped connecting holes, and the strip-shaped connecting holes form adjusting holes; the two rectangular steel plates and the two equal-side angle steels are connected into a whole to form a rectangular frame structure with adjustable size; the two equal-edge angle steels are respectively and fixedly connected with a semicircular clamp; the two semicircular clamps act along with the corresponding equal-edge angle steel to form an adjustable positioning device; a cavity for placing a reinforcement cage is formed between the two semicircular clamps.
2. The accurate positioning device for the pile foundation steel reinforcement framework manhole in claim 1, wherein: the rectangular steel plate is provided with scale marks.
3. The accurate positioning device for the pile foundation steel reinforcement framework manhole in claim 1, wherein: the equilateral angle steel is provided with scale marks.
CN202121369499.5U 2021-06-21 2021-06-21 Accurate positioning device for pile foundation steel reinforcement framework inlet hole Active CN215594014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121369499.5U CN215594014U (en) 2021-06-21 2021-06-21 Accurate positioning device for pile foundation steel reinforcement framework inlet hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121369499.5U CN215594014U (en) 2021-06-21 2021-06-21 Accurate positioning device for pile foundation steel reinforcement framework inlet hole

Publications (1)

Publication Number Publication Date
CN215594014U true CN215594014U (en) 2022-01-21

Family

ID=79875642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121369499.5U Active CN215594014U (en) 2021-06-21 2021-06-21 Accurate positioning device for pile foundation steel reinforcement framework inlet hole

Country Status (1)

Country Link
CN (1) CN215594014U (en)

Similar Documents

Publication Publication Date Title
CN215594014U (en) Accurate positioning device for pile foundation steel reinforcement framework inlet hole
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN103031861B (en) Test device for simulating six-direction load action on raft of raft base
CN210669327U (en) Electric pipeline positioner of assembled building
CN110185074B (en) Inclined pile model test device and test method
CN102418329B (en) Rapid installation method for large-scale hydraulic radial gate
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN211621261U (en) Pier column reinforcing apparatus is used in road and bridge construction
CN217175830U (en) Accurate installation device for horizontal embedded bolt of equipment foundation
CN113775207B (en) Temporary door type passage design and construction method for building
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN110499762A (en) A kind of overlength steel pile casting positioning device and mounting process
CN210421190U (en) Batter pile model test device
CN211735427U (en) Adjustable forming lattice column jig frame
CN212224667U (en) Roof steel truss assembling jig frame
CN114232983A (en) Construction method and system of pool wall template
CN220246681U (en) Cantilever casting box girder web steel bar positioning device
CN210597281U (en) Bridge pile foundation in-situ binding reinforcement cage deviation control die carrier
CN213326416U (en) Positioning device for improving installation precision of river-crossing gantry crane foundation pile
CN216586182U (en) Bridge steel part positioner with adjustable
CN215859067U (en) Right-angle ruler-shaped template fixing device
CN214883653U (en) Positioning device for prestressed reinforced concrete pipe pile
CN207079486U (en) Cast-in-situ Beam prestress pipe is accurately positioned with total cross-section entirety alignment system
CN219951666U (en) Vertical prestressing force anchor box positioner of suspension casting case roof beam
CN219060956U (en) Be used for pre-buried accurate positioning fixture of railway mound top contact net

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant