CN215592329U - Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude - Google Patents

Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude Download PDF

Info

Publication number
CN215592329U
CN215592329U CN202121734283.4U CN202121734283U CN215592329U CN 215592329 U CN215592329 U CN 215592329U CN 202121734283 U CN202121734283 U CN 202121734283U CN 215592329 U CN215592329 U CN 215592329U
Authority
CN
China
Prior art keywords
baffle
external wall
wall brick
climbing frame
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121734283.4U
Other languages
Chinese (zh)
Inventor
白轩
王赞东
晁红涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202121734283.4U priority Critical patent/CN215592329U/en
Application granted granted Critical
Publication of CN215592329U publication Critical patent/CN215592329U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of concrete pouring, and discloses lifting equipment for high-rise external wall brick masonry inserted along with a climbing frame, which comprises: dolly base and shallow handrail dolly frame and trilateral baffle of dismantling as an organic whole step on brake by dolly return pulley and foot and constitute braking system, and decorative pattern steel sheet bottom plate and bottom plate angle steel fossil fragments and steel reinforcement fossil fragments welding reinforcement form dolly bottom plate and carry thing frame, lie in decorative pattern steel sheet bottom plate both sides and be fixed with first bolt fixed orifices and handling pull ring, the inner wall that can dismantle the baffle is equipped with the baffle fossil fragments, the both sides of dismantling the baffle are equipped with the assembly pulley of symmetry, and bottom and front side are equipped with the baffle bolt. The climbing frame is inserted into high-rise external wall brick masonry lifting equipment, and lifting rings on two sides are added to be integrated with a top keel to form a lifting environment; all the other trilateral baffle bolt, second bolt fixed orifices and can dismantle the baffle and constitute, prevent that the handling material from having the risk that drops, improve the security performance.

Description

Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude
Technical Field
The utility model relates to the technical field of concrete pouring, in particular to lifting equipment for high-rise external wall brick masonry, which is inserted along with a climbing frame.
Background
More and more high-rise group residential districts are developed and constructed, and residential buildings have various shapes; in part of the design, most of the wall body on the outer side is designed into a cast-in-place structure, but a large amount of masonry structures exist, and the investment of later-stage labor and safety measures is needed; with the development and popularization of the integral lifting scaffold, the safe and efficient protection equipment is used in various high-rise buildings and is also matched with a lifting unloading platform; for project management and decision makers, in order to complete the outer wall construction at one time earlier and reduce the safety risk of later construction and the cost investment increased by safety measures, the safety protection device of the integral lifting scaffold is better utilized, and good construction period cost benefit can be brought to projects; therefore, the external wall building work must be inserted in advance, and the material transportation and safety are necessarily the direction that managers need to think; the present design of operational equipment addresses this need well.
A small flat cart is available in the market, and is designed and improved in order to meet the requirements of field practical problems; the bottom keel is reinforced, so that the bearing capacity of the bottom keel can be enhanced; the hoisting rings on two sides are added to be integrated with the top keel to form a hoisting environment; the other three sides are provided with clamping grooves and detachable baffles, so that the lifting materials are prevented from falling off, and the safety performance is improved; adopt this device, in the main part construction, build work by laying bricks or stones with the outer wall and alternate in advance, the protective properties that can bigger degree utilize the promotion formula to climb the frame transports the brickwork to the floor through the platform of unloading, builds work by laying bricks or stones with the outer wall and accomplishes in advance, need not to wait outdoor elevator and hanging flower basket installation back construction, has improved security performance and engineering time limit for a project node greatly, convenient and fast, safe high efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems that in the prior art, when a worker is matched with a concrete wall to pour, the operation space is small, tools are inconvenient to use for matching, the safety is low, the working procedure cannot be completely operated, the pouring quality of the wall is affected, and the adjustment cannot be carried out according to the field condition, so that the lifting equipment for the high-rise external wall brick masonry can be inserted along with a climbing frame.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a be used for high-rise external tile brickwork handling equipment along with climbing frame interlude, includes:
the trolley frame is integrated with the trolley base and the trolley handrail, and the three-side detachable baffle plate is integrated with the trolley base and the trolley handrail;
a braking system is formed by a trolley bottom wheel and a foot-operated brake;
the patterned steel plate bottom plate, the bottom plate angle steel keels and the steel bar keels are welded and reinforced to form a trolley bottom plate carrying frame;
first bolt fixing holes and lifting pull rings are fixed on two sides of the patterned steel plate base plate;
the inner wall of the detachable baffle is provided with a baffle keel;
symmetrical pulley blocks are arranged on two sides of the detachable baffle;
the bottom and the front side are provided with baffle bolts.
Preferably, the cart handrail, the fixed baffle and the front end bottom plate angle steel keel are welded into a whole.
Preferably, the bottom and the front end of the detachable baffle on the two sides are baffle bolts, and the rear end of the detachable baffle is a chain bolt and a perforation fixing angle plate.
Preferably, the baffle bolt of the baffle can be dismantled to the rear side and fixed with first bolt fixed orifices, and both sides adopt perforation fixed scute and chain bolt fixed.
Preferably, the angle steel keel two sides are fixed with the trolley base through first bolt fixing holes, and one side of the trolley handrail is provided with a second bolt fixing hole and is fixed with the detachable baffle through the second bolt fixing hole.
Preferably, the bottom of the angle steel keel is a steel bar keel, and the steel bar keel and the lifting pull ring are welded into a whole.
Preferably, the pulley block is composed of two pulleys.
Compared with the prior art, the utility model provides lifting equipment for high-rise external wall brick masonry inserted along with a climbing frame, which has the following beneficial effects:
the climbing frame is inserted into high-rise external wall brick masonry lifting equipment to reinforce the bottom keel, so that the bearing capacity of the climbing frame is enhanced; the hoisting rings on two sides are added to be integrated with the top keel to form a hoisting environment; all the other trilateral baffle bolt that pass through, second bolt fixed orifices and can dismantle the baffle and constitute, prevent that the handling material from having the risk that drops, the security performance is improved, when using, adopt the rope to be fixed in two handling pull rings of one side through the lifting hook respectively, and cross two pulleys respectively, form isosceles triangle, can keep splendid stability in the handling like this, and it is more laborsaving, adopt this device, in the main part construction, build work with outer wall and alternate in advance, can be bigger degree utilize the promotion formula to climb the barrier propterty, transport the brickwork to the floor through the platform of unloading, build work with outer wall and accomplish in advance, need not to wait outdoor elevator and hanging flower basket installation back construction, the security performance and engineering time limit for a project node have been improved greatly, and is convenient and fast, safety and high efficiency.
Drawings
FIG. 1 is a schematic diagram of a plurality of groups of splicing devices inserted with a climbing frame and used for high-rise external wall brick masonry hoisting equipment;
FIG. 2 is a first schematic diagram of single-unit splicing of hoisting equipment for high-rise external wall brick masonry inserted along with a climbing frame, provided by the utility model;
FIG. 3 is a schematic diagram II of single-group splicing of hoisting equipment for high-rise external wall brick masonry inserted along with a climbing frame, which is provided by the utility model;
FIG. 4 is a schematic structural diagram of a connection framework of hoisting equipment for high-rise external wall brick masonry inserted along with a climbing frame, which is provided by the utility model;
fig. 5 is a schematic structural diagram of the pulley block connection of the hoisting equipment for the high-rise external wall brick masonry inserted along with the climbing frame.
In the figure: 1. a trolley bottom wheel; 2. braking by stepping on a brake; 3. angle steel keel; 4. a patterned steel plate base plate; 5. A steel bar keel; 6. a baffle plate bolt; 7. a first bolt fixing hole; 8. hoisting a pull ring; 9. a detachable baffle plate; 10. a cart armrest; 11. a baffle keel; 12. a chain bolt; 13. punching and fixing angle plates; 14. fixing a baffle plate; 15. a pulley block; 16. the second bolt fixed orifices.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Example (b):
referring to fig. 1-5, an apparatus for lifting high-rise exterior wall brick masonry with the climbing frame inserted comprises:
a trolley frame with a trolley base and a trolley handrail 10 integrated and a three-surface detachable baffle 9; brake 2 constitutes braking system by dolly return pulley 1 and foot pedal, decorative pattern steel sheet bottom plate 4 and bottom plate angle steel fossil fragments 3 and steel joist 5 welding reinforcement form dolly bottom plate year thing frame, it is fixed with first bolt fixed orifices 7 and handling pull ring 8 to be located decorative pattern steel sheet bottom plate 4 both sides, the inner wall that can dismantle baffle 9 is equipped with baffle fossil fragments 11, the both sides that can dismantle baffle 9 are equipped with the assembly pulley 15 of symmetry, bottom and front side are equipped with baffle bolt 6, shallow handrail 10 and fixed stop 14 and front end bottom plate angle steel fossil fragments 3 welding form wholly.
Specifically, baffle 9 bottom and front end can be dismantled to both sides are baffle bolt 6, the rear end is chain bolt 12 and perforation fixed angle board 13, baffle bolt 6 that baffle 9 can be dismantled to the rear side is fixed with first bolt fixed orifices 7, both sides adopt perforation fixed angle board 13 fixed with chain bolt 12, angle steel fossil fragments 3 both sides are fixed with the dolly base through first bolt fixed orifices 7, one side of shallow handrail 10 is equipped with second bolt fixed orifices 16, and it is fixed with dismantling baffle 9 through second bolt fixed orifices 16, when the dismouting, correspond respectively through a plurality of baffle bolts 6 and insert first bolt fixed orifices 7 and second bolt fixed orifices 16, the fixing of diagonal angle steel fossil fragments 3 with can dismantle baffle 9 bottom has been accomplished, and shallow handrail 10 and the fixing of dismantling baffle 9 side, and convenient the dismantlement.
Specifically, 3 bottoms of angle steel fossil fragments are steel joist 5, and steel joist 5 welds as a whole with handling pull ring 8, with handling pull ring 8 welding, can make handling pull ring 8 more firm.
Specifically, as shown in fig. 5, the pulley block 15 is composed of two pulleys, two pulleys in the pulley block 15 are arranged in parallel and are arranged between two lifting pull rings 8 on one side, and in the middle position, the pulley block 15 is connected with the detachable baffle 9 through a fixed shaft, two ropes are fixed to the two lifting pull rings 8 on one side through lifting hooks respectively and cross the two pulleys respectively to form an isosceles triangle, so that excellent stability can be kept during lifting, and labor is saved.
When the utility model is used, the trolley is placed in a material stacking area to be transported, the rear side chain type bolt 12 is taken out firstly, then the rear side baffle and the two side detachable baffles 9 are taken down, the transport material is transported to the trolley, the edge of the stacked material does not exceed the outer contour of the base plate of the trolley, the height of the stacked material does not exceed the highest position of the baffles, the two side baffles are installed after the material is transported, the bottom baffle pin 6 and the front baffle pin 6 are inserted into the second pin fixing hole 16, and finally the rear side baffle is installed, and the chain type bolts 12 at two sides are fixed with the fixed angle plate 13 perforated on the rear side baffle plate, the trolley bottom wheel 1 is ensured to be in a locking state before hoisting, a tower crane signal worker is matched with constructors to fix the hoisting pull ring 8 of a tower crane hook, ropes respectively cross two pulleys of the pulley block 15 to form an isosceles triangle shape, the firmness and stability during hoisting are increased, the process can be inserted in advance, and the problem that a large amount of materials cannot be transported to a construction part is solved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude which characterized in that includes:
a trolley frame and three-side detachable baffles (9) which are formed by integrating a trolley base and a trolley handrail (10); a braking system is formed by a trolley bottom wheel (1) and a foot-operated brake (2);
the patterned steel plate bottom plate (4), the bottom plate angle steel keels (3) and the steel bar keels (5) are welded and reinforced to form a trolley bottom plate carrying frame;
a first bolt fixing hole (7) and a lifting pull ring (8) are fixed on two sides of the patterned steel plate bottom plate (4);
the inner wall of the detachable baffle (9) is provided with a baffle keel (11);
symmetrical pulley blocks (15) are arranged on two sides of the detachable baffle (9);
the bottom and the front side are provided with baffle bolts (6).
2. The equipment for hoisting and inserting the high-rise external wall brick masonry along with the climbing frame as claimed in claim 1, wherein the cart handrail (10) and the fixed baffle (14) are welded with the front-end bottom plate angle steel keel (3) to form a whole.
3. The equipment for hoisting and transporting the high-rise external wall brick masonry with the climbing frame interpenetration according to claim 1, characterized in that the bottom and the front end of the detachable baffles (9) at two sides are provided with baffle bolts (6), and the rear end is provided with chain bolts (12) and perforated fixed angle plates (13).
4. The equipment for hoisting and transporting the high-rise external wall brick masonry with the climbing frame interpenetration according to claim 3, characterized in that the baffle bolt (6) of the detachable baffle (9) at the rear side is fixed with the first bolt fixing hole (7), and the perforated fixing angle plate (13) and the chain bolt (12) are adopted at the two sides for fixing.
5. The equipment for hoisting and transporting the high-rise external wall brick masonry with the climbing frame interpenetration according to claim 1, characterized in that two sides of the angle steel keel (3) are fixed with a trolley base through first bolt fixing holes (7), and one side of the trolley handrail (10) is provided with second bolt fixing holes (16) and is fixed with a detachable baffle plate (9) through the second bolt fixing holes (16).
6. The equipment for hoisting and transporting the high-rise external wall brick masonry with the climbing frame interpenetration according to claim 1, characterized in that a steel bar keel (5) is arranged at the bottom of the angle steel keel (3), and the steel bar keel (5) and the hoisting pull ring (8) are welded into a whole.
7. The equipment for hoisting and transporting high-rise external wall brick masonry with the climbing frame interpenetrated according to claim 1, characterized in that the pulley block (15) is composed of two pulleys.
CN202121734283.4U 2021-07-28 2021-07-28 Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude Active CN215592329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121734283.4U CN215592329U (en) 2021-07-28 2021-07-28 Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121734283.4U CN215592329U (en) 2021-07-28 2021-07-28 Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude

Publications (1)

Publication Number Publication Date
CN215592329U true CN215592329U (en) 2022-01-21

Family

ID=79879668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121734283.4U Active CN215592329U (en) 2021-07-28 2021-07-28 Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude

Country Status (1)

Country Link
CN (1) CN215592329U (en)

Similar Documents

Publication Publication Date Title
CN210439705U (en) Precast concrete superimposed sheet hoist device
CN215592329U (en) Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN206844621U (en) It is elevated from steady support job platform in a kind of elevator hoistways of shear wall structure
CN211257761U (en) Lifting type elevator shaft operating platform
CN214733728U (en) Hoisting device
CN215167862U (en) Be used in no counter weight hanging flower basket of parapet
CN210825192U (en) Overhead hoist that house construction was used
CN210764005U (en) Walking type small electric elevator suitable for transferring materials between floors by reverse construction method
CN209855192U (en) Automatic lifting frame for shaped elevator shaft way
CN210853369U (en) Protection device for vertical transportation building blocks of tower crane
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN211396549U (en) Telescopic folding elevator shaft construction operation platform
CN215368804U (en) Material pouring platform for elevator shaft
CN217581313U (en) Detachable lifting unloading platform
CN217808268U (en) Integrated multi-functional hoist of building of timber structure
CN220663339U (en) Air entrainment piece transportation base device
CN214942442U (en) Super high-rise horizontal structure construction is with hanging mould platform device
CN215631419U (en) Steel construction building scaffold
CN219824920U (en) Temporary support structure for flange plates of reinforced concrete superposed beams
CN215407350U (en) Tool type steel springboard
CN215326417U (en) Adjustable lifting appliance for lifting laminated plate bracket
CN219429514U (en) Climbing frame dismantling support
CN220148981U (en) Aluminum film turnover lifting device
CN214785838U (en) Multifunctional elevator shaft operating platform device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant