CN214942442U - Super high-rise horizontal structure construction is with hanging mould platform device - Google Patents

Super high-rise horizontal structure construction is with hanging mould platform device Download PDF

Info

Publication number
CN214942442U
CN214942442U CN202120801525.0U CN202120801525U CN214942442U CN 214942442 U CN214942442 U CN 214942442U CN 202120801525 U CN202120801525 U CN 202120801525U CN 214942442 U CN214942442 U CN 214942442U
Authority
CN
China
Prior art keywords
super high
horizontal structure
platform device
belt
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120801525.0U
Other languages
Chinese (zh)
Inventor
康维
张业
李玉龙
王敉鹏
晁自如
孟磊
刘王奇
冯泽权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120801525.0U priority Critical patent/CN214942442U/en
Application granted granted Critical
Publication of CN214942442U publication Critical patent/CN214942442U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种超高层水平结构施工用吊模平台装置,包括主桁架和提升机构,所述主桁架的外部一侧焊接有固定块,且固定块的上端外部设置有升降机,所述升降机的下端外部两侧设置有支撑斜杆,且支撑斜杆的中部外侧连接有转轴,所述升降机的上端外部设置有升降架,且升降架的上端外部设置有承载机构。该超高层水平结构施工用吊模平台装置设置有卷扬机,卷扬机通过带轮与皮带构成传动结构,首先当通过提升机构上的防坠舌进行提升物料时,卷扬机工作通过带轮带动皮带另一端的缠绕锟进行收放,实现对物料的提升,卷扬机作为轻小型其中设备,可以垂直提升、水平或倾斜拽引重物,其操作简单、绕绳量大、移至方便被广泛应用。

Figure 202120801525

The utility model discloses a formwork lifting platform device for super high-rise horizontal structure construction, which comprises a main truss and a lifting mechanism. A fixing block is welded on the outer side of the main truss, and a lift is arranged outside the upper end of the fixing block. The lower end of the elevator is provided with support inclined rods on both sides, and the middle outer side of the support inclined rod is connected with a rotating shaft. The lifting formwork platform device for the construction of the super high-rise horizontal structure is provided with a hoist. The hoist forms a transmission structure through a pulley and a belt. First, when the material is lifted through the anti-fall tongue on the lifting mechanism, the hoist works through the pulley to drive the other end of the belt. The winding coil is retracted and released to realize the lifting of materials. As a light and small medium-sized equipment, the hoist can vertically lift, horizontally or obliquely pull heavy objects.

Figure 202120801525

Description

Super high-rise horizontal structure construction is with hanging mould platform device
Technical Field
The utility model relates to a superelevation layer horizontal structure construction technical field specifically is a superelevation layer horizontal structure construction is with hanging mould platform device.
Background
The suspended formwork for the super high-rise horizontal structure construction is a construction formwork which is suspended in the air without lower support and can be fixed in various modes, for example, a water stop pull rod is used as a main support, the suspended formwork construction is widely applied to various civil engineering, such as large equipment foundations, valve well pouring and the like, the suspended formwork platform device for the super high-rise horizontal structure construction is a suspended formwork platform for reverse construction, a horizontal structure is constructed from top to bottom, the suspended formwork platform provides an operation surface for the horizontal structure construction and is also used as a bottom formwork of the horizontal structure, and the suspended formwork platform bears the dead weight and construction load of the horizontal structure concrete, so that potential safety hazards caused by an adjacent opening are reduced.
When the formwork lifting platform device in the market is used, the construction is carried out upwards in the sequence of erecting scaffolds, formwork supporting plates, reinforcing steel bars and concrete pouring layer by layer from the first layer according to the traditional method, the construction method has the difficulties of slow construction progress, difficult material organization, more potential safety hazards at the edge opening and the like, and the formwork lifting platform device for the construction of the super-high-rise horizontal structure is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a superelevation layer horizontal structure construction is with hanging mould platform device to it begins from the first layer according to traditional approach that proposes in solving above-mentioned background art, the successive layer sets up scaffold frame, formwork, ties up the reinforcing bar, the order of concreting is upwards under construction, and this construction method has the construction progress slow, the material is organized the difficulty, face the problem that the limit entrance to a cave has difficult points such as potential safety hazard more.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a superelevation layer horizontal structure construction is with hanging mould platform device, includes main truss and hoist mechanism, the outside one side welding of main truss has the fixed block, and the upper end outside of fixed block is provided with the lift, the outside both sides of lower extreme of lift are provided with the support down tube, and the middle part outside of supporting the down tube is connected with the pivot, the upper end outside of lift is provided with the crane, and the upper end outside of crane is provided with bears the mechanism, the upper end external fixation who bears the mechanism hangs the mould platform, and the upper end external connection who hangs the mould platform has the rail guard, hoist mechanism sets up in the outside both sides in upper end that hangs the mould platform, the outside both sides of lower extreme that bear the mechanism are provided with the bolt.
Preferably, the main truss and the fixing block form a welded integral structure, and the main truss and the fixing block are perpendicular to each other.
Preferably, the lifter and the lifting frame are fixedly connected, and the lifter and the lifting frame are parallel to each other.
Preferably, the bearing mechanism comprises an upper chord, a square steel pipe, an inclined web member and a lower chord, the square steel pipe is fixed outside the lower end of the upper chord, the inclined web member is arranged on one side of the outside of the square steel pipe, and the lower chord is arranged outside the other end of the inclined web member.
Preferably, the square steel pipes are distributed on one side of the outer part of the lower end of the upper chord at equal intervals, and the square steel pipes and the upper chord are vertically distributed.
Preferably, the lifting mechanism comprises a winch, a belt wheel, a belt, a winding roller, a steel cable and an anti-falling tongue, the belt wheel is arranged on one side of the outside of the winch, the belt is arranged on the outer wall of the belt wheel, the winding roller is arranged on the outside of the other end of the belt, the steel cable is arranged on the outside of the lower end of the winding roller, and the anti-falling tongue is connected to the outside of the other end of the steel cable.
Preferably, the winch forms a transmission structure through the belt wheel and the belt, and the belt wheel and the belt are attached to each other.
Compared with the prior art, the beneficial effects of the utility model are that: this super high-rise horizontal structure construction is with hanging mould platform device is provided with the hoist engine, and the hoist engine passes through the band pulley and constitutes transmission structure with the belt, at first when promoting the material through preventing weighing down the tongue on the hoist mechanism, and the work of hoist engine drives the winding kun of the belt other end through the band pulley and receive and releases, realizes the promotion to the material, and the hoist engine is light small-size wherein equipment, can lift perpendicularly, level or slope drag and draw the heavy object, and its easy operation, wiring volume are big, move to convenient quilt wide application.
The main truss constitutes welding body structure with the fixed block, the main truss bears the position with the fixed block as the fixed of whole device, because make it have extremely strong bearing capacity and stability for welded connection between the two, the safety of construction has been guaranteed, hang the mould platform during construction and place and hang fixedly on the fixed block, operation platform and die block when constructing as horizontal structure, need not set up the full hall support of floor form again, every construction one deck, will hang the mould platform and transfer the one deck, can divide 5 layers or 10 layers into a construction section, after the construction of all horizontal floors of this construction section is accomplished, will hang the mould platform week and transfer next construction section, continue to carry out the construction of next construction section.
The elevator and the lifting frame are fixedly connected, firstly, a user can transport construction raw materials through the lifting frame, two supporting inclined rods arranged outside the lower end of the elevator play an auxiliary supporting role for the elevator, the deformation of the elevator caused by the large bearing capacity is avoided, and the service life of the elevator is effectively prolonged.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic structural view of the carrying mechanism of the present invention;
fig. 3 is a schematic view of the overhead structure of the mold hanging platform of the present invention.
In the figure: 1. a main truss; 2. a fixed block; 3. an elevator; 4. supporting the diagonal rods; 5. a rotating shaft; 6. a lifting frame; 7. a carrying mechanism; 701. an upper chord; 702. a square steel pipe; 703. a diagonal web member; 704. a lower chord; 8. lifting a mould platform; 9. a lifting mechanism; 901. a winch; 902. a pulley; 903. a belt; 904. a winding roller; 905. a steel cord; 906. the anti-falling tongue; 10. protecting the fence; 11. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a mould hanging platform device for super high-rise horizontal structure construction comprises a main truss 1, a fixed block 2, a lifter 3, a support diagonal rod 4, a rotating shaft 5, a lifting frame 6, a bearing mechanism 7, an upper chord 701, a square steel pipe 702, a diagonal web member 703, a lower chord 704, a mould hanging platform 8, a lifting mechanism 9, a winch 901, a belt wheel 902, a belt 903, a winding roller 904, a steel cable 905, an anti-falling tongue 906, a protective guard 10 and a bolt 11, wherein the fixed block 2 is welded on one side of the outer part of the main truss 1, the lifter 3 is arranged on the outer part of the upper end of the fixed block 2, the support diagonal rods 4 are arranged on the two outer sides of the lower end of the lifter 3, the rotating shaft 5 is connected on the outer side of the middle part of the support diagonal rods 4, the lifting frame 6 is arranged on the outer part of the upper end of the lifting frame 3, the bearing mechanism 7 is arranged on the outer part of the upper end of the bearing mechanism 7, the mould hanging platform 8 is fixed on the outer part of the upper end of the bearing mechanism 7, the protective guard 10 is connected with the outer part of the protective guard 10, the lifting mechanisms 9 are arranged on two sides of the outer portion of the upper end of the mould hanging platform 8, and bolts 11 are arranged on two sides of the outer portion of the lower end of the bearing mechanism 7.
The main truss 1 and the fixed block 2 form a welding integrated structure, the main truss 1 and the fixed block 2 are perpendicular to each other, the main truss 1 and the fixed block 2 are used as fixed bearing parts of the whole device, and the main truss 1 and the fixed block 2 are in welding connection to have strong bearing capacity and stability, so that the construction safety is guaranteed, the formwork lifting platform 8 is placed on the fixed block 2 to be suspended and fixed during construction and used as an operation platform and a bottom die during horizontal structure construction, a floor slab formwork full-space support does not need to be erected, one layer of the formwork lifting platform 8 is placed below each layer during construction, 5 or 10 layers of the formwork lifting platform can be divided into one construction section, and after all horizontal floor slabs of the construction section are constructed, the formwork lifting platform 8 is turned to the next construction section, and construction of the next construction section is continued;
the lifter 3 is fixedly connected with the lifting frame 6, and the lifter 3 and the lifting frame 6 are parallel to each other, so that a user can transport construction raw materials through the lifting frame 6, the two supporting inclined rods 4 arranged outside the lower end of the lifter 3 play an auxiliary supporting role on the lifter, the deformation caused by large bearing capacity of the lifter is avoided, and the service life of the lifter is effectively prolonged;
the bearing mechanism 7 comprises an upper chord 701, a square steel pipe 702, an oblique web member 703 and a lower chord 704, the square steel pipe 702 is fixed outside the lower end of the upper chord 701, the oblique web member 703 is arranged on one side outside the square steel pipe 702, the lower chord 704 is arranged outside the other end of the oblique web member 703, the square steel pipes 702 are distributed on one side outside the lower end of the upper chord 701 at equal intervals, the square steel pipes 702 and the upper chord 701 are vertically distributed, and the bearing mechanism 7 is assembled into a primary truss and a secondary truss by mutually fixing the square steel pipes 702, the oblique web members 703 and the chord members, so that the overall stability of the bearing mechanism is improved, raw materials are saved, and the bearing mechanism is more favorable for dismounting and carrying;
the hoisting mechanism 9 comprises a hoisting machine 901, a belt pulley 902, a belt 903, a winding roller 904, a steel cable 905 and an anti-falling tongue 906, wherein one side of the outside of the hoisting machine 901 is provided with the belt pulley 902, the outer wall of the belt pulley 902 is provided with the belt 903, the other end of the belt 903 is provided with the winding roller 904, the outer part of the lower end of the winding roller 904 is provided with the steel cable 905, the other end of the steel cable 905 is connected with the anti-falling tongue 906, the hoisting machine 901 forms a transmission structure through the belt pulley 902 and the belt 903, the belt 902 and the belt 903 are jointed, firstly, when materials are hoisted through the anti-falling tongue 906 on the hoisting mechanism 9, the hoisting machine 901 works to drive the winding roller 904 at the other end of the belt 903 to be wound and unwound through the belt 902, so as to hoist the materials, the hoisting machine 901 is used as a light and small medium-sized device, can be hoisted vertically, dragged horizontally or obliquely, and heavy, the operation is simple, and the hoisting machine has large rope winding amount, Is widely applied by moving to convenience.
The working principle is as follows: for the hoisting mould platform device for the construction of the super high-rise horizontal structure, firstly, a hoisting mould platform 8 is lifted to the position of a horizontal floor slab to be constructed, the horizontal floor slab is fixed by a fixing block 2 and a bolt 11, then reverse construction is carried out by the hoisting mould platform 8, the hoisting mould platform 8 is used as an operation platform and a bottom mould during the construction of the horizontal structure, a full-hall support of a floor slab template is not required to be erected, one layer of the hoisting mould platform 8 is placed one layer after each construction, 5 or 10 layers of the hoisting mould platform can be divided into a construction section, after the construction of all the horizontal floor slabs in the construction section is finished, the hoisting mould platform 8 is turned to the next construction section, construction of the next construction section is continued, finally, when materials are lifted by a falling prevention tongue 906 on a lifting mechanism 9, a winch 901 works to drive a winding roller 904 at the other end of a belt 903 to be wound and unwound by a belt wheel 902, lifting of the materials is realized, the winch 901 is used as a light and small-sized device, the mould lifting platform device can vertically lift and horizontally or obliquely drag a heavy object, is simple to operate, has large rope winding amount, is convenient to move and widely applied, and can complete the use process of the whole mould lifting platform device for the construction of the super high-rise horizontal structure.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1.一种超高层水平结构施工用吊模平台装置,包括主桁架(1)和提升机构(9),其特征在于:所述主桁架(1)的外部一侧焊接有固定块(2),且固定块(2)的上端外部设置有升降机(3),所述升降机(3)的下端外部两侧设置有支撑斜杆(4),且支撑斜杆(4)的中部外侧连接有转轴(5),所述升降机(3)的上端外部设置有升降架(6),且升降架(6)的上端外部设置有承载机构(7),所述承载机构(7)的上端外部固定有吊模平台(8),且吊模平台(8)的上端外部连接有防护栏(10),所述提升机构(9)设置于吊模平台(8)的上端外部两侧,所述承载机构(7)的下端外部两侧设置有螺栓(11)。1. A formwork lifting platform device for construction of a super high-rise horizontal structure, comprising a main truss (1) and a lifting mechanism (9), characterized in that: a fixing block (2) is welded on the outer side of the main truss (1) , and a lift (3) is provided outside the upper end of the fixed block (2), a support inclined rod (4) is provided on both sides of the lower end of the lift (3), and the middle outer side of the support inclined rod (4) is connected with a rotating shaft (5), a lifting frame (6) is provided outside the upper end of the elevator (3), and a bearing mechanism (7) is arranged outside the upper end of the lifting frame (6), and a bearing mechanism (7) is fixed outside the upper end of the bearing mechanism (7). A mold hanging platform (8), and the upper end of the hanging mold platform (8) is externally connected with a guardrail (10), the lifting mechanism (9) is arranged on both sides of the upper end of the hanging mold platform (8), and the carrying mechanism Bolts (11) are provided on both outer sides of the lower end of (7). 2.根据权利要求1所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述主桁架(1)与固定块(2)构成焊接一体结构,且主桁架(1)与固定块(2)两者之间相互垂直。2. A formwork lifting platform device for super high-rise horizontal structure construction according to claim 1, characterized in that: the main truss (1) and the fixing block (2) form a welded integrated structure, and the main truss (1) and the fixed block (2) are perpendicular to each other. 3.根据权利要求1所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述升降机(3)与升降架(6)为固定连接,且升降机(3)与升降架(6)两者之间相互平行。3. A formwork lifting platform device for super high-rise horizontal structure construction according to claim 1, characterized in that: the lift (3) and the lift frame (6) are fixedly connected, and the lift (3) is connected to the lift frame (6) The two are parallel to each other. 4.根据权利要求1所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述承载机构(7)包括有上弦杆(701)、方钢管(702)、斜腹杆(703)和下弦杆(704),且上弦杆(701)的下端外部固定有方钢管(702),所述方钢管(702)的外部一侧设置有斜腹杆(703),且斜腹杆(703)的另一端外部设置有下弦杆(704)。4. A formwork lifting platform device for super high-rise horizontal structure construction according to claim 1, characterized in that: the bearing mechanism (7) comprises an upper chord (701), a square steel pipe (702), a diagonal web (703) and the lower chord (704), and a square steel pipe (702) is fixed outside the lower end of the upper chord (701), and the outer side of the square steel pipe (702) is provided with an oblique web bar (703), and the oblique belly A lower chord (704) is provided outside the other end of the rod (703). 5.根据权利要求4所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述方钢管(702)等间距分布在上弦杆(701)的下端外部一侧,且方钢管(702)与上弦杆(701)两者之间呈垂直状分布。5. A kind of hanging formwork platform device for super high-rise horizontal structure construction according to claim 4, characterized in that: the square steel pipes (702) are equally spaced on the outer side of the lower end of the upper chord (701), and the square The steel pipe (702) and the upper chord (701) are vertically distributed. 6.根据权利要求1所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述提升机构(9)包括有卷扬机(901)、带轮(902)、皮带(903)、缠绕锟(904)、钢索(905)和防坠舌(906),且卷扬机(901)的外部一侧设置有带轮(902),所述带轮(902)的外壁设置有皮带(903),且皮带(903)的另一端外部设置有缠绕锟(904),所述缠绕锟(904)的下端外部设置有钢索(905),且钢索(905)的另一端外部连接有防坠舌(906)。6. A formwork lifting platform device for super high-rise horizontal structure construction according to claim 1, characterized in that: the lifting mechanism (9) comprises a hoist (901), a pulley (902), a belt (903) , winding rollers (904), steel cables (905) and anti-falling tongues (906), and a pulley (902) is provided on the outer side of the hoist (901), and a belt (902) is provided on the outer wall of the pulley (902). 903), and the other end of the belt (903) is provided with a winding roller (904), the lower end of the winding roller (904) is provided with a steel cable (905), and the other end of the steel cable (905) is externally connected with a Anti-drop tongue (906). 7.根据权利要求6所述的一种超高层水平结构施工用吊模平台装置,其特征在于:所述卷扬机(901)通过带轮(902)与皮带(903)构成传动结构,且带轮(902)与皮带(903)两者之间相贴合。7 . The formwork lifting platform device for super high-rise horizontal structure construction according to claim 6 , wherein the hoist ( 901 ) constitutes a transmission structure through a pulley ( 902 ) and a belt ( 903 ), and the pulley ( 901 ) forms a transmission structure. 8 . (902) and the belt (903) fit together.
CN202120801525.0U 2021-04-20 2021-04-20 Super high-rise horizontal structure construction is with hanging mould platform device Expired - Fee Related CN214942442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120801525.0U CN214942442U (en) 2021-04-20 2021-04-20 Super high-rise horizontal structure construction is with hanging mould platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120801525.0U CN214942442U (en) 2021-04-20 2021-04-20 Super high-rise horizontal structure construction is with hanging mould platform device

Publications (1)

Publication Number Publication Date
CN214942442U true CN214942442U (en) 2021-11-30

Family

ID=79042882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120801525.0U Expired - Fee Related CN214942442U (en) 2021-04-20 2021-04-20 Super high-rise horizontal structure construction is with hanging mould platform device

Country Status (1)

Country Link
CN (1) CN214942442U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20250083928A1 (en) * 2023-09-11 2025-03-13 Otis Elevator Company Construction lifting device and leaping methods for construction lifting devices

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20250083928A1 (en) * 2023-09-11 2025-03-13 Otis Elevator Company Construction lifting device and leaping methods for construction lifting devices
US12565404B2 (en) * 2023-09-11 2026-03-03 Otis Elevator Company Construction lifting device and leaping methods for construction lifting devices

Similar Documents

Publication Publication Date Title
CN103635643B (en) Construction Method of Reinforced Concrete Cylinder in High-rise Steel Structure Building
CN108560927A (en) A kind of Lift-on/Lift-off System and its application method of reinforced concrete column
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN214653269U (en) Simple ALC wallboard hoisting equipment
CN212773376U (en) An overhanging protection platform
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN103255838A (en) Construction method with adoption of large-tonnage long-stroke oil cylinder jacking mold frame
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN113090019A (en) Construction method and construction device for high-rise structure
CN116462106A (en) A turn-free beam tower crane with an adjustable horizontal support system and its construction method
CN115231450A (en) Integral hoisting equipment for steel bar framework and using method
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN115522473B (en) Bridge high pier making machine and construction method thereof
CN206581141U (en) Bridge maintenance system
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN111392589A (en) An attached lifting and transporting device for dismantling a concrete support beam and using method
CN115030038A (en) Turning mold construction method for wet joint of bridge deck system at sea beach section
CN105863280B (en) A kind of discharging platform that can be voluntarily lifted
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN219327296U (en) Attached lifting scaffold mounting structure
CN221116788U (en) Elevator well material transportation equipment
CN217299872U (en) Shaft hydraulic comprehensive distribution platform
CN114250975A (en) A wellbore hydraulic integrated distribution platform for building construction
CN117127503A (en) A method for moving box girder beams and reducing the friction coefficient of traverse beam track

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130