CN215588960U - Steel construction fixing device for construction - Google Patents

Steel construction fixing device for construction Download PDF

Info

Publication number
CN215588960U
CN215588960U CN202122230458.4U CN202122230458U CN215588960U CN 215588960 U CN215588960 U CN 215588960U CN 202122230458 U CN202122230458 U CN 202122230458U CN 215588960 U CN215588960 U CN 215588960U
Authority
CN
China
Prior art keywords
frame
fixedly connected
fixing device
rotation
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122230458.4U
Other languages
Chinese (zh)
Inventor
孟帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122230458.4U priority Critical patent/CN215588960U/en
Application granted granted Critical
Publication of CN215588960U publication Critical patent/CN215588960U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel structure fixing device for building construction, which comprises a fixing frame, wherein a lifting device is arranged in the fixing frame and connected with an installation frame, a clamping device is arranged above the installation frame, a traction device is arranged in the installation frame and connected with the clamping device, and a lug is connected to the bottom of the fixing frame. This steel construction fixing device for construction has reached the inside elevating gear that sets up of fixed frame, and the staff of being convenient for adjusts the height of installing frame, utilizes the installing frame to be convenient for support the steel construction, makes things convenient for the staff to install, sets up clamping device, is convenient for carry out the centre gripping to the steel construction fixedly, improves steel construction fixed stability, makes things convenient for the staff to install, sets up draw gear, and the staff of being convenient for adjusts clamping device, improves work efficiency, satisfies user demand's purpose.

Description

Steel construction fixing device for construction
Technical Field
The utility model relates to the field of building construction, in particular to a steel structure fixing device for building construction.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer. When the steel construction is installing, need the staff to use fixing device, support the steel construction fixedly, make things convenient for the staff to install, improve work efficiency. At present, current steel construction fixing device for construction, the single structure, high relatively fixed is not convenient for the staff and is adjusted, and is not convenient for carry out the centre gripping to the steel construction and fix, and installation stability is poor, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems that the prior steel structure fixing device for building construction has single structure, relatively fixed height, inconvenient adjustment by workers, inconvenient clamping and fixing of a steel structure and poor mounting stability and cannot meet the use requirement, the utility model aims to provide the steel structure fixing device for building construction, which can realize the integration of a fixing frame, a lifting device, a mounting frame, a clamping device, a traction device, a lug and a balancing weight, the lifting device is arranged in the fixing frame, the height of the mounting frame can be conveniently adjusted by the workers, the steel structure can be conveniently supported by the mounting frame, the installation of the workers is convenient, the clamping device is arranged, the steel structure can be conveniently clamped and fixed, the fixing stability of the steel structure is improved, the installation by the workers is convenient, the traction device is arranged, and the workers can conveniently adjust the clamping device, the working efficiency is improved, and the use requirement is met.
2. Technical scheme
In order to solve the above problems, the present invention adopts the following technical solutions.
The utility model provides a steel construction fixing device for construction, includes fixed frame, the inside of fixed frame is provided with elevating gear, elevating gear is connected with the installing frame, the top of installing frame is provided with clamping device, the inside of installing frame is provided with draw gear, draw gear is connected with clamping device, the bottom of fixed frame is connected with the lug, the inside both sides fixedly connected with balancing weight of fixed frame.
Preferably, elevating gear includes the motor frame, the inner wall fixed connection of motor frame and fixed frame, the top fixedly connected with motor of motor frame.
Preferably, the output shaft fixedly connected with master gear of motor, the master gear meshing transmission has the pinion, the axle center department fixedly connected with first rotation lead screw of pinion, first rotation lead screw rotates with fixed frame and is connected, first rotation lead screw threaded connection has the motion piece, motion piece and installing frame fixed connection.
Preferably, the lifting device further comprises a sliding rod, the sliding rod is fixedly connected with the inner wall of the fixing frame, the sliding rod is slidably connected with a sliding block, and the sliding block is fixedly connected with the side wall of the mounting frame.
Preferably, the clamping device comprises a second rotating screw rod, the second rotating screw rod is connected with the inner wall of the mounting frame in a rotating mode, a first belt pulley is fixedly connected to the middle of the second rotating screw rod, and the screw directions of the threads on the two sides, located on the first belt pulley, of the second rotating screw rod are opposite.
Preferably, the second rotating screw rod is in threaded connection with a screw rod sliding block, a moving rod is fixedly connected to the side wall of the screw rod sliding block, the moving rod is in sliding connection with the mounting frame, a connecting frame is fixedly connected to the end of the moving rod, a clamping block is connected to the end of the connecting frame, and a rubber pad is arranged on the surface of the clamping block.
Preferably, draw gear includes the axis of rotation, the axis of rotation is connected with the inner wall rotation of installing frame, the fixed surface of axis of rotation is connected with the rolling disc, the middle part fixedly connected with second belt pulley of axis of rotation, the surface of second belt pulley is provided with the belt, the second belt pulley passes through the belt and is connected with first belt pulley transmission.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that: the lifting device is arranged in the fixing frame, workers can adjust the height of the mounting frame conveniently, the mounting frame is used for supporting a steel structure conveniently, workers can install the steel structure conveniently, the clamping device is arranged for clamping and fixing the steel structure conveniently, the fixing stability of the steel structure is improved, the workers can install the steel structure conveniently, the traction device is arranged for workers to adjust the clamping device conveniently, the working efficiency is improved, the lifting device is arranged, the motor frame is fixedly connected with the inner wall of the fixing frame and used for installing a motor, the motor works to drive the main gear to rotate, the auxiliary gear is driven to rotate, the first rotating screw rod is driven to rotate, the moving block is in threaded connection with the first rotating screw rod, the first rotating screw rod rotates to drive the moving block to move, and the mounting frame is driven to move, the height of the installation frame can be adjusted, the inner wall of the fixing frame is provided with a sliding rod, the side wall of the installation frame is provided with a sliding block, the sliding block slides with the sliding rod, the motion stability of the installation frame is improved, the clamping device is arranged, a second rotating lead screw is rotationally connected with the inner wall of the installation frame, the two side thread directions of the second rotating lead screw are opposite, the middle part of the second rotating lead screw is provided with a first belt pulley, the lead screw sliding block is in threaded connection with the second rotating lead screw, the first belt pulley is rotated to drive the second rotating lead screw to rotate, the lead screw sliding block is driven to move, the motion rod is driven to move, the connecting frame is driven to move, the clamping block is driven to move, the steel structure is conveniently clamped and fixed, the fixation stability of the steel structure is improved, the traction device is arranged, the rotating shaft is rotationally connected with the inner wall of the installation frame, the rotating disc is rotated to drive the rotating shaft to rotate, the second belt pulley is driven to rotate by the belt, can adjust the position of grip block, it is fixed to carry out the centre gripping to the steel construction, make things convenient for the staff to operate, reached fixed frame, elevating gear, the installing frame, clamping device, draw gear, a whole is constituteed with the balancing weight to the lug, fixed frame inside sets up elevating gear, the staff of being convenient for adjusts the height of installing frame, utilize the installing frame to be convenient for support the steel construction, make things convenient for the staff to install, set up clamping device, it is fixed to be convenient for carry out the centre gripping to the steel construction, improve the fixed stability of steel construction, make things convenient for the staff to install, set up draw gear, the staff of being convenient for adjusts clamping device, the work efficiency is improved, the purpose of user demand is satisfied.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the connection structure of the clamping device and the traction device of the present invention;
FIG. 3 is a schematic structural diagram of a clamping device according to the present invention.
The reference numbers in the figures illustrate:
1. a fixing frame; 2. a lifting device; 21. a motor frame; 22. a motor; 23. a main gear; 24. a pinion gear; 25. a first rotating screw rod; 26. a motion block; 27. a slider; 28. a slide bar; 3. installing a frame; 4. a clamping device; 41. a second rotating screw rod; 42. a first pulley; 43. a lead screw slider; 44. a motion bar; 45. a connecting frame; 46. a clamping block; 47. a rubber pad; 5. a traction device; 51. a rotating shaft; 52. rotating the disc; 53. a second pulley; 54. a belt; 6. a bump; 7. and a balancing weight.
Detailed Description
The drawings in the embodiments of the utility model will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the utility model; rather than all embodiments. Based on the embodiments of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all fall within the scope of protection of the present invention.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a steel construction fixing device for construction, includes fixed frame 1, and the inside of fixed frame 1 is provided with elevating gear 2, and elevating gear 2 is connected with installing frame 3, and the top of installing frame 3 is provided with clamping device 4, and the inside of installing frame 3 is provided with draw gear 5, and draw gear 5 is connected with clamping device 4, and the bottom of fixed frame 1 is connected with lug 6, the inside both sides fixedly connected with balancing weight 7 of fixed frame 1. Fixed frame 1, elevating gear 2, the installing frame 3, clamping device 4, draw gear 5, lug 6 constitutes a whole with balancing weight 7, fixed frame 1 is inside to set up elevating gear 2, the staff of being convenient for adjusts the height of installing frame 3, utilize installing frame 3 to be convenient for support the steel construction, make things convenient for the staff to install, set up clamping device 4, be convenient for carry out the centre gripping to the steel construction and fix, improve steel construction fixed stability, make things convenient for the staff to install, set up draw gear 5, the staff of being convenient for adjusts clamping device 4, and the work efficiency is improved.
Example 2:
referring to fig. 1, a steel structure fixing device for building construction, further, a lifting device 2 includes a motor frame 21, the motor frame 21 is fixedly connected with an inner wall of a fixing frame 1, and a motor 22 is fixedly connected to a top of the motor frame 21. The lifting device 2 is arranged, and the motor frame 21 is fixedly connected with the inner wall of the fixed frame 1 and used for installing the motor 22.
Example 3:
referring to fig. 1, in a steel structure fixing device for building construction, further, a main gear 23 is fixedly connected to an output shaft of a motor 22, a pinion 24 is engaged with the main gear 23, a first rotating screw 25 is fixedly connected to an axial center of the pinion 24, the first rotating screw 25 is rotatably connected to a fixing frame 1, a moving block 26 is threadedly connected to the first rotating screw 25, and the moving block 26 is fixedly connected to a mounting frame 3. The motor 22 works to drive the main gear 23 to rotate, drive the pinion 24 to rotate, drive the first rotating screw 25 to rotate, the moving block 26 is in threaded connection with the first rotating screw 25, the first rotating screw 25 rotates to drive the moving block 26 to move, and drive the mounting frame 3 to move, so that the height of the mounting frame 3 can be adjusted.
Example 4:
referring to fig. 1, a steel structure fixing device for building construction, further, the lifting device 2 further includes a sliding rod 28, the sliding rod 28 is fixedly connected with the inner wall of the fixing frame 1, the sliding rod 28 is slidably connected with a sliding block 27, and the sliding block 27 is fixedly connected with the side wall of the mounting frame 3. The inner wall of the fixed frame 1 is provided with a sliding rod 28, the side wall of the mounting frame 3 is provided with a sliding block 27, and the sliding block 27 slides with the sliding rod 28, so that the motion stability of the mounting frame 3 is improved.
Example 5:
referring to fig. 3, a steel structure fixing device for building construction, further, a clamping device 4 includes a second rotating screw 41, the second rotating screw 41 is rotatably connected to an inner wall of the mounting frame 3, a first belt pulley 42 is fixedly connected to a middle portion of the second rotating screw 41, and threads of the second rotating screw 41 located at two sides of the first belt pulley 42 are opposite in screw direction. The clamping device 4 is arranged, the second rotating screw rod 41 is rotatably connected with the inner wall of the mounting frame 3, the thread directions of two sides of the second rotating screw rod 41 are opposite, and the middle part of the second rotating screw rod 41 is provided with a first belt pulley 42.
Example 6:
referring to fig. 3, in a steel structure fixing device for building construction, a screw slider 43 is threadedly connected to a second rotating screw 41, a moving rod 44 is fixedly connected to a side wall of the screw slider 43, the moving rod 44 is slidably connected to a mounting frame 3, a connecting frame 45 is fixedly connected to an end of the moving rod 44, a clamping block 46 is connected to an end of the connecting frame 45, and a rubber pad 47 is disposed on a surface of the clamping block 46. The screw rod sliding block 43 is in threaded connection with the second rotating screw rod 41, the first belt pulley 42 is rotated to drive the second rotating screw rod 41 to rotate, the screw rod sliding block 43 is driven to move, the moving rod 44 is driven to move, the connecting frame 45 is driven to move, the clamping block 46 is driven to move, the steel structure can be clamped and fixed conveniently, and the fixing stability of the steel structure is improved.
Example 7:
referring to fig. 2, in a steel structure fixing device for building construction, further, a traction device 5 includes a rotating shaft 51, the rotating shaft 51 is rotatably connected to an inner wall of the mounting frame 3, a rotating disc 52 is fixedly connected to a surface of the rotating shaft 51, a second pulley 53 is fixedly connected to a middle portion of the rotating shaft 51, a belt 54 is disposed on a surface of the second pulley 53, and the second pulley 53 is in transmission connection with the first pulley 42 through the belt 54. Set up draw gear 5, axis of rotation 51 rotates with the 3 inner walls of installing frame to be connected, rotates rolling disc 52, drives axis of rotation 51 and rotates, drives second belt pulley 53 and rotates, drives first belt pulley 42 through belt 54 and rotates, can adjust the position of grip block 46, carries out the centre gripping to the steel construction and fixes, makes things convenient for the staff to operate.
The above; but are merely preferred embodiments of the utility model; the scope of the utility model is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; the technical scheme and the improved concept of the utility model are equally replaced or changed; are intended to be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a steel construction fixing device for construction, includes fixed frame (1), its characterized in that: the inside of fixed frame (1) is provided with elevating gear (2), elevating gear (2) are connected with installing frame (3), the top of installing frame (3) is provided with clamping device (4), the inside of installing frame (3) is provided with draw gear (5), draw gear (5) are connected with clamping device (4), the bottom of fixed frame (1) is connected with lug (6), the inside both sides fixedly connected with balancing weight (7) of fixed frame (1).
2. The steel structure fixing device for building construction according to claim 1, wherein: elevating gear (2) are including motor frame (21), the inner wall fixed connection of motor frame (21) and fixed frame (1), the top fixedly connected with motor (22) of motor frame (21).
3. The steel structure fixing device for building construction according to claim 2, characterized in that: the output shaft fixedly connected with master gear (23) of motor (22), master gear (23) meshing transmission has pinion (24), the first rotation lead screw (25) of axle center department fixedly connected with of pinion (24), first rotation lead screw (25) rotate with fixed frame (1) and be connected, first rotation lead screw (25) threaded connection has motion piece (26), motion piece (26) and installing frame (3) fixed connection.
4. The steel structure fixing device for building construction according to claim 3, wherein: elevating gear (2) still include slide bar (28), slide bar (28) and the inner wall fixed connection of fixed frame (1), slide bar (28) sliding connection has slider (27), slider (27) and the lateral wall fixed connection of installing frame (3).
5. The steel structure fixing device for building construction according to claim 1, wherein: clamping device (4) include that the second rotates lead screw (41), the inner wall that the second rotated lead screw (41) and installing frame (3) rotates to be connected, the second rotates the first belt pulley (42) of middle part fixedly connected with of lead screw (41), the second rotates the both sides screw thread spiral shell that lead screw (41) is located first belt pulley (42) to opposite.
6. The steel structure fixing device for building construction according to claim 5, wherein: the screw rod sliding block (43) is connected to the second rotary screw rod (41) in a threaded mode, a moving rod (44) is fixedly connected to the side wall of the screw rod sliding block (43), the moving rod (44) is connected with the installation frame (3) in a sliding mode, a connecting frame (45) is fixedly connected to the end portion of the moving rod (44), a clamping block (46) is connected to the end portion of the connecting frame (45), and a rubber pad (47) is arranged on the surface of the clamping block (46).
7. The steel structure fixing device for building construction according to claim 6, wherein: draw gear (5) are including axis of rotation (51), axis of rotation (51) are connected with the inner wall rotation of installing frame (3), the fixed surface of axis of rotation (51) is connected with rolling disc (52), the middle part fixedly connected with second belt pulley (53) of axis of rotation (51), the surface of second belt pulley (53) is provided with belt (54), second belt pulley (53) are connected with first belt pulley (42) transmission through belt (54).
CN202122230458.4U 2021-09-15 2021-09-15 Steel construction fixing device for construction Expired - Fee Related CN215588960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122230458.4U CN215588960U (en) 2021-09-15 2021-09-15 Steel construction fixing device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122230458.4U CN215588960U (en) 2021-09-15 2021-09-15 Steel construction fixing device for construction

Publications (1)

Publication Number Publication Date
CN215588960U true CN215588960U (en) 2022-01-21

Family

ID=79885952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122230458.4U Expired - Fee Related CN215588960U (en) 2021-09-15 2021-09-15 Steel construction fixing device for construction

Country Status (1)

Country Link
CN (1) CN215588960U (en)

Similar Documents

Publication Publication Date Title
CN111424994B (en) Steel construction interfacing apparatus for construction
CN110303341B (en) Multifunctional steel structure cutting and drilling device
CN211541002U (en) Assembly jig is used in processing of large-scale steel construction
CN215588960U (en) Steel construction fixing device for construction
CN215919587U (en) Steel construction welding clamping device
CN218320396U (en) Hoisting device for steel structure section bar
CN216541572U (en) A hyoplastron assembly line equipment for $ integrateing shaped steel
CN216512517U (en) Multifunctional construction crane
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN218061535U (en) Steel construction lift angle adjusting device for management integrates based on building site
CN112453547A (en) Channel steel cutting device for steel structure machining
CN218195016U (en) Assembled steel construction processing operation panel convenient to adjust
CN220022723U (en) But angle regulation's solar cell panel
CN212836780U (en) Steel member fixing device
CN214834529U (en) Building electromechanical engineering assembled installation device
CN218815082U (en) Scaffold convenient to split installation
CN218968717U (en) Tower crane attaches wall structure
CN217413990U (en) Ultra-thin type hoisting robot walking track
CN208344758U (en) A kind of support frame of multi-functional air-entrained concrete building block
CN218560926U (en) Lifting device for pipeline installation convenient to fix for electromechanical engineering
CN219261354U (en) Anti-seismic buffer base for constructional engineering
CN213560270U (en) Steel structure suspension cable
CN220921107U (en) Steel structure suspension cable
CN217376843U (en) Pay-off is used in water conservancy water and electricity construction
CN215254699U (en) Whole displacement device of building steel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220121