CN210239082U - Temporary hydropower integrated bracket for construction site - Google Patents

Temporary hydropower integrated bracket for construction site Download PDF

Info

Publication number
CN210239082U
CN210239082U CN201920856378.XU CN201920856378U CN210239082U CN 210239082 U CN210239082 U CN 210239082U CN 201920856378 U CN201920856378 U CN 201920856378U CN 210239082 U CN210239082 U CN 210239082U
Authority
CN
China
Prior art keywords
bottom plate
support
threaded rod
temporary
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920856378.XU
Other languages
Chinese (zh)
Inventor
Chunlai Li
李春来
Guangfeng Xu
许光锋
Jianyong Cao
曹建永
Yongjie Li
李勇杰
Tao Chen
陈涛
Honggang Tian
田洪刚
Peng Liu
刘鹏
Zengguang Tian
田增广
Yueming Zhao
赵曰明
Kaichao Zhang
张开超
Hao Niu
牛皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Shandong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201920856378.XU priority Critical patent/CN210239082U/en
Application granted granted Critical
Publication of CN210239082U publication Critical patent/CN210239082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a support is synthesized to interim water and electricity of job site, comprising a base plate, the lower extreme of bottom plate is equipped with running gear, the last lateral wall of bottom plate is equipped with the fluting, it is connected with two threaded rods, two to rotate on the grooved left side wall the right-hand member of threaded rod runs through grooved right side wall setting, two connect through the drive mechanism transmission between the threaded rod, the upside of bottom plate is equipped with the backup pad, be connected through elevating system between backup pad and the bottom plate. The utility model can realize the height adjustment of the supporting plate by arranging the lifting mechanism, thereby achieving the proper working height and achieving the convenient effect; the cooperation drive mechanism adopts many dwangs to support, guarantees that the user has sufficient holding power when standing, prevents to take place the accident.

Description

Temporary hydropower integrated bracket for construction site
Technical Field
The utility model relates to an interim support technical field especially relates to a support is synthesized to interim water and electricity of job site.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
In the prior art, scaffolds are mostly used as construction platforms, but the scaffolds need to be installed and disassembled when the scaffolds are used, time is greatly delayed when the scaffolds are installed and disassembled, and loading is laborious when the scaffolds are evacuated from a site.
Therefore, a temporary hydropower integrated bracket for a construction site is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a temporary hydropower integrated support for a construction site.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a support is synthesized to interim water and electricity of job site, includes the bottom plate, the lower extreme of bottom plate is equipped with running gear, the last lateral wall of bottom plate is equipped with the fluting, it is connected with two threaded rods to rotate on the grooved left side wall, two the right-hand member of threaded rod runs through grooved right side wall setting, two connect through the drive mechanism transmission between the threaded rod, the upside of bottom plate is equipped with the backup pad, be connected through elevating system between backup pad and the bottom plate.
Preferably, running gear includes the support column with the equal fixed connection in lower extreme four corners of bottom plate, two of the left and right sides rotate between the support column and be connected with the axis of rotation, two equal coaxial fixedly connected with a plurality of gyro wheels in the axis of rotation, two the both ends of axis of rotation rotate through rolling bearing between respectively and the many support columns and be connected.
Preferably, the transmission mechanism comprises belt pulleys which are respectively and coaxially and fixedly connected with one ends of the two threaded rods, which are positioned outside the bottom plate, and the two belt pulleys are in transmission connection through a belt.
Preferably, elevating system include with fluting bottom sliding connection's four movable blocks, four the movable block respectively with two threaded rod threaded connection, four the upper end of movable block all rotates and is connected with the dwang, four the dwang is alternately and the swivelling joint between two liang, four the upper end of dwang all with the lower lateral wall sliding connection of backup pad.
Preferably, the lower side wall of the supporting plate is provided with two sliding grooves, two sliding blocks matched with the sliding grooves are arranged in the two sliding grooves respectively, and the four sliding blocks are rotatably connected with the upper ends of the four rotating rods respectively.
Preferably, the threaded rod is a fine thread threaded rod.
Compared with the prior art, the beneficial effects of the utility model are that: the lifting mechanism is arranged, so that the height of the supporting plate can be adjusted, the proper working height is achieved, and the convenient effect is achieved; the cooperation drive mechanism adopts many dwangs to support, guarantees that the user has sufficient holding power when standing, prevents to take place the accident.
Drawings
FIG. 1 is a perspective view of a temporary integrated hydro-power support for construction site according to the present invention;
FIG. 2 is a schematic side view of the temporary hydropower integrated bracket in the construction site according to the present invention;
fig. 3 is the utility model provides an external structure schematic diagram of support is synthesized to interim water and electricity of job site.
In the figure: 1 bottom plate, 2 running gear, 3 threaded rods, 4 transmission mechanisms, 5 supporting plates, 6 lifting mechanisms, 7 supporting columns, 8 rotating shafts, 9 belt pulleys, 10 movable blocks and 11 rotating rods.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a support is synthesized to interim water and electricity in job site, includes bottom plate 1, and the lower extreme of bottom plate 1 is equipped with running gear 2, and is concrete, and running gear 2 includes the support column 7 with the equal fixed connection in lower extreme four corners of bottom plate 1, rotates between two support columns 7 of the left and right sides to be connected with axis of rotation 8, and equal coaxial fixedly connected with a plurality of gyro wheels on two axis of rotation 8, and running gear 2 is convenient for shift after the work, and is more convenient than traditional scaffold frame.
The utility model discloses in, the both ends of two axis of rotation 8 respectively with many support columns 7 between rotate through rolling bearing and be connected, the side wall is equipped with the fluting on bottom plate 1, it is connected with two threaded rods 3 to rotate on the grooved left side wall, it needs to notice, threaded rod 3 is the microgroove threaded rod, and the coaxial fixedly connected with handle of the right-hand member of one of them threaded rod 3, the right-hand member of two threaded rods 3 runs through grooved right side wall setting, connect through 4 transmissions of drive mechanism between two threaded rods 3, it needs to explain, drive mechanism 4 includes the belt pulley 9 that is located the equal coaxial fixed connection of the outer one end of bottom plate 1 with two threaded rods 3 respectively, connect through belt transmission between two belt pulleys 9.
The utility model discloses in, bottom plate 1's upside is equipped with backup pad 5, be connected through elevating system 6 between backup pad 5 and the bottom plate 1, it is worth mentioning that, elevating system 6 includes four movable blocks 10 with fluting bottom sliding connection, four movable blocks 10 respectively with 3 threaded connection of two threaded rods, four upper ends of movable block 10 are all rotated and are connected with dwang 11, four dwang 11 are alternately and rotate the connection between two liang, four dwang 11's upper end all with backup pad 5's lower side wall sliding connection, it needs to notice, backup pad 5's lower side wall is equipped with two spouts, be equipped with two assorted sliders with it in two spouts respectively, four sliders rotate with four dwang 11's upper end respectively and are connected.
The utility model discloses when using, rotate the handle, the handle drives one of them threaded rod 3 and rotates, drives one of them belt pulley 9 and rotates after that, drives another belt pulley 9 through the belt and rotates, connects and drives another threaded rod 3 and rotate, and two threaded rods 3 drive four movable blocks 10 and remove, and four movable blocks 10 drive four dwang 11 and rotate, and four dwang 11 drive backup pad 5 and go up and down to reach required height.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a support is synthesized to interim water and electricity of job site, includes bottom plate (1), its characterized in that, the lower extreme of bottom plate (1) is equipped with running gear (2), the last lateral wall of bottom plate (1) is equipped with the fluting, it is connected with two threaded rod (3), two to rotate on the grooved left side wall the right-hand member of threaded rod (3) runs through grooved right side wall setting, two connect through drive mechanism (4) transmission between threaded rod (3), the upside of bottom plate (1) is equipped with backup pad (5), be connected through elevating system (6) between backup pad (5) and bottom plate (1).
2. The temporary hydropower integrated support for the construction site as claimed in claim 1, wherein the walking mechanism (2) comprises support columns (7) fixedly connected with four corners of the lower end of the bottom plate (1), two support columns (7) on the left side and two support columns on the right side are rotatably connected with a rotation shaft (8) therebetween, the rotation shaft (8) is provided with a plurality of rollers which are coaxially and fixedly connected with each other, and the two ends of the rotation shaft (8) are rotatably connected with the support columns (7) through rotating bearings respectively.
3. The temporary hydropower integrated support for the construction site as claimed in claim 1, wherein the transmission mechanism (4) comprises belt pulleys (9) which are coaxially and fixedly connected with one ends of the two threaded rods (3) which are positioned outside the bottom plate (1) respectively, and the two belt pulleys (9) are in transmission connection through a belt.
4. The temporary water and electricity comprehensive support for the construction site as claimed in claim 1, wherein the lifting mechanism (6) comprises four movable blocks (10) connected with the bottom of the groove in a sliding manner, four movable blocks (10) are respectively connected with two threaded rods (3) in a threaded manner, four movable blocks (10) are connected with a rotating rod (11) and four rotating rods (11) in a crossed manner and in a rotating manner, four rotating rods (11) are connected with a supporting plate (5) in a sliding manner, and the upper ends of the rotating rods (11) are connected with the lower side wall of the supporting plate (5) in a sliding manner.
5. The temporary hydropower integrated support for the construction site as claimed in claim 1, wherein the lower side wall of the support plate (5) is provided with two sliding grooves, two sliding blocks matched with the two sliding grooves are respectively arranged in the two sliding grooves, and the four sliding blocks are respectively and rotatably connected with the upper ends of the four rotating rods (11).
6. A temporary hydropower integrated support for a construction site according to claim 1, wherein the threaded rod (3) is a fine threaded rod.
CN201920856378.XU 2019-06-10 2019-06-10 Temporary hydropower integrated bracket for construction site Expired - Fee Related CN210239082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920856378.XU CN210239082U (en) 2019-06-10 2019-06-10 Temporary hydropower integrated bracket for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920856378.XU CN210239082U (en) 2019-06-10 2019-06-10 Temporary hydropower integrated bracket for construction site

Publications (1)

Publication Number Publication Date
CN210239082U true CN210239082U (en) 2020-04-03

Family

ID=69974003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920856378.XU Expired - Fee Related CN210239082U (en) 2019-06-10 2019-06-10 Temporary hydropower integrated bracket for construction site

Country Status (1)

Country Link
CN (1) CN210239082U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727038A (en) * 2021-01-15 2021-04-30 河南工业和信息化职业学院 Civil engineering construction is with stable form scaffold frame of dismouting of being convenient for

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727038A (en) * 2021-01-15 2021-04-30 河南工业和信息化职业学院 Civil engineering construction is with stable form scaffold frame of dismouting of being convenient for

Similar Documents

Publication Publication Date Title
CN208137383U (en) A kind of liftable architectural engineering scaffold
CN109095278B (en) Building site uses abandonment cable coiling mechanism
CN207245135U (en) A kind of power equipment maintaining scaffold easy to use
CN108502744A (en) A kind of metallurgical casting crane convenient for adjusting
CN212743302U (en) Scaffold for building construction
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN109057296A (en) A kind of construction hoistable platform that can store building waste
CN205955155U (en) Auxiliary stand of portable scaffold frame
CN111305540B (en) Splicing device for building scaffold building
CN207633732U (en) A kind of scaffold of architectural engineering
CN207499372U (en) A kind of Architectural Equipment scaffold
CN216740610U (en) Command desk for building construction site management
CN215926629U (en) Scaffold frame that building engineering used
CN213623178U (en) Hanging basket type transportation system
CN213509479U (en) Construction platform convenient to remove
CN212984717U (en) Slant construction equipment for construction
CN213234386U (en) Supporting structure is strengthened to assembled building
CN211369463U (en) Building scaffold with convenient height adjustment
CN113353811A (en) Lifting type engineering machinery transfer device
CN216042514U (en) Dual self-lifting type external climbing frame for high-rise building
CN217205197U (en) Adjustable scaffold is used in building engineering construction
CN214275392U (en) A lighting device for construction
CN217756806U (en) Lifting device for building site water and electricity construction
CN214739713U (en) Adjustable supporting vehicle for construction engineering construction
CN211873757U (en) Lifting multifunctional scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403

CF01 Termination of patent right due to non-payment of annual fee