CN215583428U - Budget processing device for engineering cost - Google Patents

Budget processing device for engineering cost Download PDF

Info

Publication number
CN215583428U
CN215583428U CN202122119265.1U CN202122119265U CN215583428U CN 215583428 U CN215583428 U CN 215583428U CN 202122119265 U CN202122119265 U CN 202122119265U CN 215583428 U CN215583428 U CN 215583428U
Authority
CN
China
Prior art keywords
budget
wall
fixed mounting
supporting box
worm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122119265.1U
Other languages
Chinese (zh)
Inventor
陈珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122119265.1U priority Critical patent/CN215583428U/en
Application granted granted Critical
Publication of CN215583428U publication Critical patent/CN215583428U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model belongs to the technical field of budget treatment equipment, in particular to a budget treatment device for engineering cost, which aims at the problem that the existing budget treatment device is inconvenient to adjust and cannot meet the budget work of users with different heights. The height adjusting device is reasonable in structural design, the height of the workbench is adjusted through the threaded transmission of the screw rod and the lifting plate and the matching of the driving gear and the driven gear, the use by different users is facilitated, and the reliability is high.

Description

Budget processing device for engineering cost
Technical Field
The utility model relates to the technical field of budget processing equipment, in particular to a budget processing device for engineering cost.
Background
The project cost refers to the construction cost of the project, namely the total fixed asset investment cost expected to be paid or actually paid for constructing one project, the cost budget is calculated by overlapping the known project expenditure projects to estimate the approximate cost of the project, and the budget processing device is used for carrying out centralized processing on budget data (including digital data and paper data).
The existing budget processing device is inconvenient to adjust, so that the existing budget processing device cannot meet the defects of budget work of users with different heights, and therefore, a budget processing device for engineering cost is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects that the conventional budget processing device is inconvenient to adjust and cannot meet the budget work of users with different heights, and provides the budget processing device for the construction cost.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a budget processing device for engineering cost comprises a workbench, wherein a support box is movably mounted at the bottom of the workbench, two lead screws are rotatably mounted on the inner wall of the bottom of the support box, the outer side threads of the two lead screws are sleeved with a same lifting plate, a square body is fixedly mounted at the top of the lifting plate, the top of the square body is fixedly mounted at the bottom of the workbench, two guide plates are fixedly mounted on the inner wall of the top of the support box, the outer sides of the guide plates are slidably connected with the inner wall of the lifting plate, a rotating shaft is rotatably mounted on the inner wall of the bottom of the support box, a driving gear is fixedly mounted at the outer side of the rotating shaft, a driven gear is fixedly mounted at the outer sides of the two lead screws, the driving gear is mutually meshed with the driven gear, a worm wheel is fixedly mounted at the outer side of the rotating shaft, a worm is rotatably mounted on the inner wall of the rear side of the support box, and the worm wheel is mutually meshed with the worm wheel, the bracing piece has been placed in the top activity of workstation, and the top of bracing piece is rotated and is installed the display screen, and the outside fixed mounting of bracing piece has electric putter, and same dwang is installed in electric putter's output shaft and the rear side rotation of display screen.
Preferably, a motor is fixedly mounted at the rear side of the support box, and the rear end of the worm extends to the outer side of the support box and is fixedly connected with an output shaft of the motor.
Preferably, a budget processing computer is placed on the top of the workbench, and a mouse and a keyboard are movably installed on the top of the workbench.
Preferably, the rear side of the supporting box is fixedly provided with a mounting plate, and the motor is fixedly arranged at the top of the mounting plate.
Preferably, sliding holes are formed in two sides of the top of the lifting plate, and the outer sides of the two guide plates are respectively slidably mounted on the inner walls of the corresponding sliding holes.
Preferably, a rectangular through hole is formed in the top of the supporting box, and the outer side of the square body is slidably mounted on the inner wall of the rectangular through hole.
According to the budget processing device for the engineering cost, the work of the motor drives the worm to rotate, the worm drives the worm wheel to simultaneously rotate and drives the rotating shaft to rotate, the two screw rods simultaneously rotate through the matching of the driving gear and the driven gear, the lifting plate can be driven to move upwards, the use height of the workbench can be adjusted through the connection of the square bodies, the use requirements of different users are met, and the engineering cost budget can be realized through the budget processing computer and the display screen;
the height adjusting device is reasonable in structural design, the height of the workbench is adjusted through the threaded transmission of the screw rod and the lifting plate and the matching of the driving gear and the driven gear, the use by different users is facilitated, and the reliability is high.
Drawings
FIG. 1 is a schematic perspective view of a budget processing device for construction cost according to the present invention;
FIG. 2 is a schematic perspective view of another perspective view of a budget management device for construction cost according to the present invention;
FIG. 3 is a schematic cross-sectional view of a budget management device for construction cost according to the present invention;
FIG. 4 is a schematic diagram of a portion A of a budget processing device for construction cost according to the present invention;
FIG. 5 is a schematic diagram of a part B of a budget processing device for construction cost according to the present invention.
In the figure: 1. a work table; 2. a support box; 3. a screw rod; 4. a lifting plate; 5. a square body; 6. a guide plate; 7. a rotating shaft; 8. a driving gear; 9. a driven gear; 10. a worm gear; 11. a worm; 12. a motor; 13. a support bar; 14. a display screen; 15. an electric push rod; 16. rotating the rod; 17. a budget processing computer; 18. a keyboard; 19. a mouse.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-5, a budget treatment device for engineering cost comprises a workbench 1, a support box 2 is movably mounted at the bottom of the workbench 1, two lead screws 3 are rotatably mounted on the inner wall of the bottom of the support box 2, the outer side of the two lead screws 3 is sleeved with a same lifting plate 4 through threads, a square body 5 is fixedly mounted at the top of the lifting plate 4, the top of the square body 5 is fixedly mounted at the bottom of the workbench 1, two guide plates 6 are fixedly mounted on the inner wall of the top of the support box 2, the outer sides of the guide plates 6 are slidably connected with the inner wall of the lifting plate 4, a rotating shaft 7 is rotatably mounted on the inner wall of the bottom of the support box 2, a driving gear 8 is fixedly mounted on the outer side of the rotating shaft 7, driven gears 9 are fixedly mounted on the outer sides of the two lead screws 3, the driving gear 8 is meshed with the driven gears 9, and a worm gear 10 is fixedly mounted on the outer side of the rotating shaft 7, rotate on the rear side inner wall of supporting box 2 and install worm 11, worm 11 and worm wheel 10 intermeshing, bracing piece 13 has been placed in the top activity of workstation 1, and the top of bracing piece 13 is rotated and is installed display screen 14, and the outside fixed mounting of bracing piece 13 has electric putter 15, and same dwang 16 is installed in electric putter 15's output shaft and the rear side rotation of display screen 14.
In the utility model, the motor 12 is fixedly arranged at the rear side of the supporting box 2, the rear end of the worm 11 extends to the outer side of the supporting box 2 and is fixedly connected with the output shaft of the motor 12, and the working of the motor 12 can drive the lifting plate 4 to vertically move so as to adjust the use height of the workbench 1.
In the utility model, a budget processing computer 17 is arranged at the top of the workbench 1, and a mouse 19 and a keyboard 18 are movably arranged at the top of the workbench 1, so that a user can conveniently perform project cost budget.
In the utility model, the mounting plate is fixedly arranged at the rear side of the supporting box 2, and the motor 12 is fixedly arranged at the top of the mounting plate to provide a mounting position for the motor 12.
In the utility model, sliding holes are respectively formed in two sides of the top of the lifting plate 4, the outer sides of the two guide plates 6 are respectively slidably mounted on the inner walls of the corresponding sliding holes, and the guide plates 6 are used for providing a guiding function for the lifting plate 4.
According to the utility model, the top of the supporting box 2 is provided with a rectangular through hole, the outer side of the square body 5 is slidably mounted on the inner wall of the rectangular through hole, and a movement range is provided for the square body 5 arranged in the rectangular through hole.
In the utility model, when the workbench is used, the motor 12 is started, the work of the motor 12 drives the worm 11 to rotate, the worm 11 drives the worm wheel 10 to simultaneously rotate and drives the rotating shaft 7 to rotate, the two screw rods 3 simultaneously rotate through the matching of the driving gear 8 and the driven gear 9, the lifting plate 4 can be driven to move upwards, the use height of the workbench 1 can be adjusted through the connection of the square body 5, the use requirements of different users can be met, and the project cost budget can be calculated through the budget processing computer 17 and the display screen 14.

Claims (6)

1. The utility model provides a budget processing apparatus for engineering cost, includes workstation (1), its characterized in that, the bottom movable mounting of workstation (1) has supporting box (2), rotate on the bottom inner wall of supporting box (2) and install two lead screws (3), the outside screw thread cover of two lead screws (3) is equipped with same lifter plate (4), and the top fixed mounting of lifter plate (4) has square body (5), and the top fixed mounting of square body (5) is in the bottom of workstation (1), fixed mounting has two deflector (6) on the top inner wall of supporting box (2), the outside of deflector (6) and the inner wall sliding connection of lifter plate (4), rotate on the bottom inner wall of supporting box (2) and install pivot (7), and the outside fixed mounting of pivot (7) has driving gear (8), and the equal fixed mounting in the outside of two lead screws (3) has driven gear (9), driving gear (8) and driven gear (9) intermeshing, the outside fixed mounting of pivot (7) has worm wheel (10), rotate on the rear side inner wall of supporting box (2) and install worm (11), worm (11) and worm wheel (10) intermeshing, bracing piece (13) have been placed in the top activity of workstation (1), and the top of bracing piece (13) is rotated and is installed display screen (14), and the outside fixed mounting of bracing piece (13) has electric putter (15), and same dwang (16) are installed in the output shaft of electric putter (15) and the rear side rotation of display screen (14).
2. A budget management device for construction costs according to claim 1, characterized in that the rear side of the support box (2) is fixedly mounted with a motor (12), and the rear end of the worm (11) extends to the outside of the support box (2) and is fixedly connected with the output shaft of the motor (12).
3. A budget processing device for construction cost according to claim 1, characterized in that a budget processing computer (17) is placed on the top of the working platform (1), and a mouse (19) and a keyboard (18) are movably mounted on the top of the working platform (1).
4. A cost budget handling device according to claim 1, characterized in that a mounting plate is fixedly mounted on the rear side of said supporting box (2), and the motor (12) is fixedly mounted on the top of the mounting plate.
5. The budget treatment device for construction cost according to claim 1, wherein the two sides of the top of the lifting plate (4) are both provided with sliding holes, and the outer sides of the two guide plates (6) are respectively slidably mounted on the inner walls of the corresponding sliding holes.
6. A budget processing device for construction cost according to claim 1, characterized in that the top of the supporting box (2) is provided with a rectangular through hole, and the outer side of the square body (5) is slidably mounted on the inner wall of the rectangular through hole.
CN202122119265.1U 2021-09-03 2021-09-03 Budget processing device for engineering cost Active CN215583428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122119265.1U CN215583428U (en) 2021-09-03 2021-09-03 Budget processing device for engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122119265.1U CN215583428U (en) 2021-09-03 2021-09-03 Budget processing device for engineering cost

Publications (1)

Publication Number Publication Date
CN215583428U true CN215583428U (en) 2022-01-21

Family

ID=79884189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122119265.1U Active CN215583428U (en) 2021-09-03 2021-09-03 Budget processing device for engineering cost

Country Status (1)

Country Link
CN (1) CN215583428U (en)

Similar Documents

Publication Publication Date Title
CN213423801U (en) Image adjusting device convenient to use
CN215583428U (en) Budget processing device for engineering cost
CN215935306U (en) Over-and-under type electrical control cabinet for fire engineering
CN213656137U (en) Computer display support
CN216990827U (en) Drilling equipment is used in processing of zinc steel guardrail convenient to adjust
CN216433807U (en) Hardness detection device for computer case
CN213765768U (en) Multifunctional tool table for building electrical design
CN215924321U (en) Electric indoor construction auxiliary device of building
CN214275058U (en) Adjusting device of computer multimedia display
CN213215908U (en) Drawing board strutting arrangement for architectural design
CN211946110U (en) Self-propelled crawler elevator
CN211554783U (en) Industrial operating rod structure with multiple gears
CN211059703U (en) Combined solid geometry teaching instrument
CN213849489U (en) Electric control file cabinet
CN215599613U (en) Touch industrial computer with protection function
CN112045644A (en) Multifunctional workbench for industrial design
CN214262875U (en) Computer room is with dust removal maintenance of equipment
CN212776606U (en) Interactive touch-control all-in-one of meeting teaching
CN216854119U (en) Logistics information consultation workbench
CN219526149U (en) Auxiliary device for installing electromechanical equipment
CN218364640U (en) Design workbench convenient to height adjusting
CN214663428U (en) Integrated multi-position computer rotating frame
CN214119547U (en) Teaching device for computer software programming teaching
CN220896152U (en) Multidirectional adjustable guide rail type intelligent electric energy meter
CN212471416U (en) Multifunctional workbench for industrial design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant