CN215520151U - Movable processing shed - Google Patents

Movable processing shed Download PDF

Info

Publication number
CN215520151U
CN215520151U CN202120172097.XU CN202120172097U CN215520151U CN 215520151 U CN215520151 U CN 215520151U CN 202120172097 U CN202120172097 U CN 202120172097U CN 215520151 U CN215520151 U CN 215520151U
Authority
CN
China
Prior art keywords
upright
multiplied
movable processing
processing shed
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120172097.XU
Other languages
Chinese (zh)
Inventor
黄大伟
曹永军
蒋浩
张德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202120172097.XU priority Critical patent/CN215520151U/en
Application granted granted Critical
Publication of CN215520151U publication Critical patent/CN215520151U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a movable processing shed which comprises two rows of symmetrically arranged upright posts, wherein a plurality of upright posts are uniformly arranged in each row; the top and the lower part of two adjacent upright columns in each row are respectively provided with a tie bar in the horizontal direction, and an intercolumnar supporting rod is arranged in a crossed manner; and a tie bar is arranged between each upright column and the upper part of the other row of symmetrical upright columns, a truss girder is arranged between the tops of the upright columns, and roof tiles are arranged at the tops of the truss girders. The method can effectively solve the problems of manufacturing and construction schemes of the processing shed during municipal project construction, improve the production efficiency, save the manufacturing time and reduce the project investment cost.

Description

Movable processing shed
Technical Field
The utility model belongs to the technical field of building construction equipment, and relates to a movable processing shed which is suitable for municipal engineering projects.
Background
Because municipal works project construction span is great to construction cycle is short in the limited district, sometimes still can receive the restriction of condition such as place narrowness. Therefore, the traditional fixed processing shed is not favorable for the project cost saving type construction idea. Municipal projects are different from building projects, and fixed processing sheds cannot be used continuously until the projects are finished, but the processing sheds are continuously transferred along with the progress of the projects or are dynamically adjusted along with the change of the overall plane arrangement. If the processing shed is built in sections, cost saving is not facilitated, the building period is long, and cost waste is serious.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model provides a movable processing shed which can effectively solve the manufacturing and construction scheme of the processing shed during municipal project construction, improve the production efficiency, save the manufacturing time and reduce the project input cost.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model relates to a movable processing shed which comprises two rows of symmetrically arranged upright posts, wherein a plurality of upright posts are uniformly arranged in each row; the top and the lower part of each row of upright columns are respectively provided with a tie bar in the horizontal direction, and an intercolumnar supporting rod is arranged between every two adjacent upright columns in each row in a crossed manner; and a tie bar is arranged between each upright column and the upper part of the other row of symmetrical upright columns, a truss girder is arranged between the tops of the upright columns, and roof tiles are arranged at the tops of the truss girders.
Furthermore, the upright columns, the tie rods, the inter-column supporting rods, the truss girders and the universal wheels are fixedly connected through bolts; the truss girder and the roof tile are fixedly connected through rivets.
Furthermore, the upright columns are made of phi 120 multiplied by 3.0 steel pipes made of Q235B, the truss girders are made of phi 100 multiplied by 2.0 steel pipes made of Q235B, the tie bars are made of phi 63 multiplied by 2.0 steel pipes made of Q235B, the inter-column support rods are made of L50 multiplied by 3 angle steel made of Q235B, and the roof tiles are made of 0.5 thick color steel plates.
The other technical scheme of the utility model is as follows:
the utility model relates to a movable processing shed which is formed by splicing a plurality of movable processing shed units through connecting and fastening devices; the movable processing shed unit comprises four rectangular upright columns which are vertically arranged, the bottom of each upright column is provided with a universal wheel, and a parking brake device is arranged on each universal wheel; the tie bars are horizontally arranged along the top and the lower part of the adjacent upright columns in the length direction of the movable processing shed unit respectively, the support bars between the upright columns are arranged in a crossed mode, the tie bars are arranged between the upper parts of the adjacent upright columns in the width direction of the movable processing shed unit, a truss girder is further arranged between the tops of the adjacent upright columns, and roof tiles are arranged at the tops of the truss girders.
Furthermore, the connecting and fastening device comprises two fastening plates and two fastening bolts which are arranged in parallel at intervals; two U-shaped hoops are welded between the two fastening plates, the two U-shaped hoops are symmetrically arranged with outward openings, and the inner sides of the two U-shaped hoops are respectively matched with and tightly attached to the upright columns corresponding to the two spliced movable processing shed units; the two fastening bolts respectively pass through the two fastening plates and the outer end of the U-shaped hoop and are fixedly connected with the U-shaped hoop.
Furthermore, an anti-skid cushion pad is arranged between the U-shaped hoop and the upright post.
Furthermore, the upright columns are made of phi 120 multiplied by 3.0 steel pipes made of Q235B, the truss girders are made of phi 100 multiplied by 2.0 steel pipes made of Q235B, the tie bars are made of phi 63 multiplied by 2.0 steel pipes made of Q235B, the inter-column support rods are made of L50 multiplied by 3 angle steel made of Q235B, and the roof tiles are made of 0.5 thick color steel plates.
Compared with the prior art, the movable processing shed can effectively solve the turnover utilization rate of the steel bars and the woodworking processing shed in municipal projects or projects with more single buildings and can be constructed in stages, saves time, reduces the construction cost, and is simple and quick to operate and convenient to transport; in addition, the movable processing shed can be integrated or made into a unit type, can be freely moved and then assembled according to construction requirements, and is more convenient and practical.
Drawings
FIG. 1 is a schematic view of an integrated portable processing booth of the present invention;
FIG. 2 is a schematic front view of the integrated portable processing shelter of the present invention;
FIG. 3 is a schematic side view of the portable processing shelter of the present invention;
FIG. 4 is a schematic view of the construction of the portable processing shelter unit of the present invention;
FIG. 5 is a schematic view of the connection fastening device of the present invention in connection with the vertical column;
in the figure: 1. a universal wheel; 2. parking braking; 3. supporting among the columns; 4. a truss beam; 5. a column; 6. a tie bar; 7. roofing tiles; 8. a movable processing shed unit; 9. connecting and fastening devices; 91. a rigid plate; 92. Fastening a bolt; 93. a U-shaped clamp.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
as shown in fig. 1 to 4, the movable processing shed comprises two rows of symmetrically arranged upright posts 5, wherein a plurality of upright posts 5 are uniformly arranged in each row, the bottom of each upright post 5 is provided with a universal wheel 1, and the universal wheel 1 is provided with a parking brake device 2; the top and the lower part of each row of upright columns 5 are respectively provided with a tie bar 6 in the horizontal direction, and an intercolumnar supporting rod 3 is arranged between every two adjacent upright columns 5 in each row in a crossed manner; and a tie bar 6 is arranged between each upright 5 and the upper part of the other row of symmetrical uprights 5, a truss girder 4 is arranged between the tops of the uprights, and roof tiles 7 are arranged on the tops of the truss girders 4.
In this embodiment, the upright 5, the tie bar 6, the intercolumnar support rod 3, the truss girder 4 and the universal wheel 1 are all fixedly connected by bolts; the truss girder 4 and the roof tile 7 are fixedly connected through rivets.
In this embodiment, the columns 5 are made of steel pipes with a diameter of 120 × 3.0 and Q235B, the truss girders 4 are made of steel pipes with a diameter of 100 × 2.0 and Q235B, the tie bars 6 are made of steel pipes with a diameter of 63 × 2.0 and Q235B, the intercolumn support bars 3 are made of angle steel with a diameter of L50 × 3 and Q235B, and the roof tiles 7 are made of 0.5 thick color steel plates.
When the movable processing shed is applied to municipal engineering project construction, the operation is carried out according to the following steps:
in the first step, the columns 5 (made of steel pipe with phi 120 × 3.0 material Q235B) and the truss girders 4 (made of steel pipe with phi 100 × 2.0 material Q235B) are bolted.
And secondly, connecting the tie bars 6 (made of steel pipes with the material of phi 63 multiplied by 2.0 and Q235B) with the upright posts through bolts, wherein one upright post is arranged in each row, and one upright post is arranged between two corresponding upright posts in each two rows of upright posts.
Thirdly, manufacturing enough quantity of support rods 3 among the columns (manufactured by using L50 multiplied by 3 angle steel of Q235B) according to the span of the movable processing shed, and obliquely and crossly connecting the front side and the back side of the processing shed by using bolts respectively.
Fourthly, roof tiles 7 are installed on the top of the truss girder 4 and are connected through rivets.
Fifthly, mounting universal wheels 1 and parking brakes 2 at the bottom ends of the upright posts 5, and connecting the universal wheels and the parking brakes through bolts.
Example 2:
in order to facilitate the assembly and transportation of the movable processing shed, the integral movable processing shed in the embodiment 1 is made into a plurality of movable processing shed units 8, and then the movable processing shed units are assembled according to the requirements.
The utility model relates to a movable processing shed which is formed by splicing a plurality of movable processing shed units 8 through connecting and fastening devices 9; the movable processing shed unit 8 comprises four rectangular upright posts 5 which are vertically arranged, the bottom of each upright post 5 is provided with a universal wheel 1, and the universal wheels 1 are provided with parking brake devices 2; tie bars 6 horizontally arranged along the top and the lower part of adjacent columns 5 in the length direction of the movable processing shed unit 8 are respectively provided with a support rod 3 between columns in a crossed manner, the tie bars 6 are arranged between the upper parts of the adjacent columns 5 in the width direction of the movable processing shed unit 8, a truss girder 4 is further arranged between the tops, and a roof tile 7 is arranged at the top of the truss girder 4. When assembling, the upright posts corresponding to the two adjacent movable processing shed units 8 are fixedly connected through a plurality of connecting and fastening devices 9.
As shown in fig. 5, in the present embodiment, the connecting and fastening device 9 includes two fastening plates 91 and two fastening bolts 92 arranged in parallel and at intervals; two U-shaped hoops 93 are welded between the two fastening plates 91, the two U-shaped hoops 93 are symmetrically arranged with the openings facing outwards, and the inner sides of the two U-shaped hoops 93 are respectively matched with and tightly attached to the upright columns corresponding to the two spliced movable processing shed units 8; two fastening bolts 92 respectively penetrate through the two fastening plates 91 and the outer end of a U-shaped hoop 93 and are connected and fixed. Through the structure, two adjacent movable processing shed units 8 can be firmly connected together to meet the requirement of construction.
Furthermore, an anti-slip cushion 94 is arranged between the U-shaped hoop 93 and the upright post 5, so that the buffering between the upright post and the U-shaped hoop is effectively increased, the friction force between the upright post and the U-shaped hoop is increased, and the connection is firmer.
In this embodiment, the columns 5 are made of steel pipes with a diameter of 120 × 3.0 and Q235B, the truss girders 4 are made of steel pipes with a diameter of 100 × 2.0 and Q235B, the tie bars 6 are made of steel pipes with a diameter of 63 × 2.0 and Q235B, the intercolumn support bars 3 are made of angle steel with a diameter of L50 × 3 and Q235B, and the roof tiles 7 are made of 0.5 thick color steel plates.
In this embodiment, the upright 5, the tie bar 6, the intercolumnar support rod 3, the truss girder 4 and the universal wheel 1 are all fixedly connected by bolts; the truss girder 4 and the roof tile 7 are fixedly connected through rivets.

Claims (7)

1. The utility model provides a movable processing canopy which characterized in that: the parking brake device comprises two rows of symmetrically arranged upright posts (5), wherein a plurality of upright posts (5) are uniformly arranged in each row, the bottom of each upright post (5) is provided with a universal wheel (1), and a parking brake device (2) is arranged on each universal wheel (1); the top and the lower part of each row of upright columns (5) are respectively provided with a tie bar (6) in the horizontal direction, and an intercolumnar supporting rod (3) is arranged between two adjacent upright columns (5) in each row in a crossed manner; and a tie bar (6) is arranged between each upright post (5) and the upper part of the other row of symmetrical upright posts (5), a truss girder (4) is arranged between the tops of the upright posts, and roof tiles (7) are arranged at the tops of the truss girders (4).
2. A portable processing shelter as claimed in claim 1, wherein: the upright columns (5), the tie rods (6), the inter-column support rods (3), the truss girders (4) and the universal wheels (1) are fixedly connected through bolts; the truss girder (4) and the roof tile (7) are fixedly connected through rivets.
3. A portable processing shelter as claimed in claim 1 or 2, in which: the upright posts (5) are made of phi 120 multiplied by 3.0 steel pipes made of Q235B, the truss girders (4) are made of phi 100 multiplied by 2.0 steel pipes made of Q235B, the tie bars (6) are made of phi 63 multiplied by 2.0 steel pipes made of Q235B, the inter-post support rods (3) are made of L50 multiplied by 3 angle steel made of Q235B, and the roof tiles (7) are made of 0.5 thick color steel plates.
4. The utility model provides a movable processing canopy which characterized in that: the movable processing shed is formed by splicing a plurality of movable processing shed units (8) through connecting and fastening devices (9); the movable processing shed unit (8) comprises four rectangular upright posts (5) which are vertically arranged, the bottom of each upright post (5) is provided with a universal wheel (1), and the universal wheel (1) is provided with a parking brake device (2); the tie bars (6) are horizontally arranged along the top and the lower part of the adjacent upright columns (5) in the length direction of the movable processing shed unit (8) respectively, the inter-column support bars (3) are arranged in a crossed mode, the tie bars (6) are arranged between the upper parts of the adjacent upright columns (5) in the width direction of the movable processing shed unit (8), truss girders (4) are further arranged between the tops, and roof tiles (7) are arranged at the tops of the truss girders (4).
5. A portable processing shelter as claimed in claim 4, in which: the connecting and fastening device (9) comprises two fastening plates (91) and two fastening bolts (92) which are arranged in parallel at intervals; two U-shaped hoops (93) are welded between the two fastening plates (91), the two U-shaped hoops (93) are symmetrically arranged with outward openings, and the inner sides of the two U-shaped hoops are respectively matched with and tightly attached to the upright columns corresponding to the two spliced movable processing shed units (8); two fastening bolts (92) respectively penetrate through the outer ends of the two fastening plates (91) and a U-shaped hoop (93) and are connected and fixed.
6. A portable processing shelter as claimed in claim 5, in which: an anti-skid buffer pad (94) is also arranged between the U-shaped hoop (93) and the upright post (5).
7. A portable processing shelter as claimed in any one of claims 4 to 6 in which: the upright posts (5) are made of phi 120 multiplied by 3.0 steel pipes made of Q235B, the truss girders (4) are made of phi 100 multiplied by 2.0 steel pipes made of Q235B, the tie bars (6) are made of phi 63 multiplied by 2.0 steel pipes made of Q235B, the inter-post support rods (3) are made of L50 multiplied by 3 angle steel made of Q235B, and the roof tiles (7) are made of 0.5 thick color steel plates.
CN202120172097.XU 2021-01-21 2021-01-21 Movable processing shed Active CN215520151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120172097.XU CN215520151U (en) 2021-01-21 2021-01-21 Movable processing shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120172097.XU CN215520151U (en) 2021-01-21 2021-01-21 Movable processing shed

Publications (1)

Publication Number Publication Date
CN215520151U true CN215520151U (en) 2022-01-14

Family

ID=79787133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120172097.XU Active CN215520151U (en) 2021-01-21 2021-01-21 Movable processing shed

Country Status (1)

Country Link
CN (1) CN215520151U (en)

Similar Documents

Publication Publication Date Title
WO2019237823A1 (en) Wide-angle sloping roof steel structure and construction method therefor
CN107816223B (en) Safe and stable type station canopy station house and installation method thereof
CN201953070U (en) Repeatedly usable assembly type processing shed on building construction sites
CN202090433U (en) Rectangular structure using prestress metal plate roof
CN204676881U (en) Large span intersection truss steel structure supporting system
CN111441622A (en) Assembled greenhouse and construction method thereof
CN215520151U (en) Movable processing shed
CN106351429A (en) Heavy support system and construction method thereof
CN201835413U (en) Arched corrugated steel roof with enhanced bearing capacity through stay cables
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN213418558U (en) Reinforcing device for improving wood structure building column
CN213233106U (en) Arch ring support
CN212715990U (en) Adjustable vertical type assembling jig frame for assembling plane truss
KR102294174B1 (en) Temporary structure and construction method for formwork
CN210370010U (en) Truss-like boot foot for lattice support
JP3072214B2 (en) Temporary shed
CN211646721U (en) Steel construction dysmorphism post frame bearing structure
CN108365798B (en) Cable truss type flexible photovoltaic support unit and photovoltaic support
CN218060948U (en) Steel construction factory building roofing suspended structure platform
CN217782350U (en) Steel frame supporting structure adopting assembly construction
CN213297245U (en) Prestressed steel cable reinforced crossbeam
CN104234189A (en) Four-pipe truss structure of prefabricated house
CN219760545U (en) Unilateral photovoltaic crane span structure support of encorbelmenting of no bracing
CN215717089U (en) Lattice column capable of assembling and restraining front supporting column of hanging basket
CN219175613U (en) Reinforcing steel bar processing shed convenient for material lifting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant