CN215511576U - Portable concrete test block maintenance frame - Google Patents
Portable concrete test block maintenance frame Download PDFInfo
- Publication number
- CN215511576U CN215511576U CN202120620691.0U CN202120620691U CN215511576U CN 215511576 U CN215511576 U CN 215511576U CN 202120620691 U CN202120620691 U CN 202120620691U CN 215511576 U CN215511576 U CN 215511576U
- Authority
- CN
- China
- Prior art keywords
- concrete test
- frame
- welded
- test block
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 61
- 239000010959 steel Substances 0.000 claims abstract description 61
- 238000003466 welding Methods 0.000 claims abstract description 7
- 239000002699 waste material Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses a movable concrete test block maintenance frame which comprises vertical steel frames, steel plates, transverse steel frames, a bottom frame and universal wheels, wherein the vertical steel frames are welded and installed on the upper surface of the bottom frame, screw holes are formed in the bottom of the bottom frame, the universal wheels are installed on the lower surface of the bottom frame, the vertical steel frames are connected through the steel plates, the transverse steel frames are welded and installed in the middle of the vertical steel frames, the other ends of the transverse steel frames are welded and installed on the other vertical steel frame, and adjusting holes are formed in the outer surfaces of the transverse steel frames and the bottom frame. According to the concrete test block placing device, the steel plates are arranged between the vertical steel frames, the steel wire meshes are embedded and arranged in the steel plates, so that matching places are provided for some small concrete test blocks, the carving teeth are uniformly arranged on one side of the vertical steel frames through the welding machine, and the hooks are arranged at two ends of the transverse steel frame, so that a space for placing some large concrete test blocks is provided.
Description
Technical Field
The utility model relates to the technical field of concrete test block curing devices, in particular to a movable concrete test block curing frame.
Background
The concrete standard curing room usually has definite regulations on indoor environment temperature, humidity and distance between test blocks, a detection mechanism is provided with a multi-layer frame type steel structure concrete test block curing frame in order to fully utilize the space in the concrete standard curing room, thereby increasing the storage number of concrete test blocks, the test blocks participating in concrete strength evaluation are divided into standard curing test blocks and co-curing test blocks, the standard curing test blocks refer to the test blocks cured in the standard curing room, the standard curing test blocks are specified to be cured at the temperature of 20 +/-2 ℃, the humidity is more than 95%, and the curing is carried out for 28 days; the co-curing test block is a test block made by randomly drawing concrete on a casting site, the co-curing test block is a test block which is randomly drawn on a construction site and accumulated to 600 ℃ on the site according to the daily average temperature of on-site curing conditions, meanwhile, the specification also specifies that the equivalent curing period is not smaller than 14d, under the condition of high-rise building construction, a form removal test block is usually kept, and a concrete test block curing frame is used on the premise of no curing room for curing concrete.
The existing concrete test block curing frame has the defects that:
1. the existing concrete test block maintenance frame is mostly of a fixed laminate structure, is not suitable for a larger concrete test block, and has certain limitation;
2. most of the existing concrete test block curing frames are fixed frames, the occupied area is large, and the existing concrete test block curing frames cannot be disassembled, so that the movable concrete test block curing frames are provided for solving the existing problems;
3. the existing concrete test block maintenance frame cannot be moved, time and labor are wasted when the concrete test block maintenance frame is carried, and therefore the existing problem is solved by the mobile concrete test block maintenance frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a movable concrete test block curing frame to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a portable concrete test block maintenance frame, includes vertical steelframe, steel sheet, horizontal steelframe, chassis and universal wheel, vertical steelframe is installed to the last surface welding of chassis, and the even welded mounting in one side of vertical steelframe has the tooth carving, the lower surface mounting of chassis has the universal wheel, connect through the steel sheet between the vertical steelframe, horizontal steelframe is installed to the intermediate position welded mounting of vertical steelframe, and the even welded mounting in top of horizontal steelframe has the dog, and welded mounting has the track between the dog, be equipped with the slider on the track, and the slider distributes and install between the dog, vertical cardboard is installed to one side of slider, the couple is installed in the both sides welded mounting of horizontal steelframe, the other end welded mounting of horizontal steelframe is on another vertical steelframe, and the surface of horizontal steelframe and chassis all is equipped with the regulation hole.
Preferably, the top of the steel plate is embedded with a steel wire mesh.
Preferably, a transverse clamping plate is arranged between the adjusting holes, and cylindrical handles are welded at two ends of the transverse clamping plate.
Preferably, the bottom of the bottom frame is provided with a screw hole.
Preferably, the top of the universal wheel is welded with a bolt.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the adjusting holes are formed in the shell of the transverse steel frame, the transverse clamping plates penetrate through the adjusting holes, the control on the length of the concrete test block is realized through the limitation of the adjusting holes, a plurality of groups of stop blocks are welded and installed at the top of the transverse steel frame, the stop blocks are connected through the rail, the rail is provided with the sliding block, the sliding block is positioned in the middle of the stop block, and the vertical clamping plates are installed on one side of the concrete test block, so that the control on the width of the concrete test block is realized.
2. According to the utility model, the carving teeth are uniformly arranged on one side of the vertical steel frame by the welding machine, and the hooks are arranged at two ends of the transverse steel frame, so that a space for placing some large concrete test blocks is provided, and the practicability of the device is enhanced.
3. According to the utility model, the screw holes are formed in the bottoms of the two groups of vertical steel frames, and the universal wheels are arranged in the screw holes, so that the capability of the integral maintenance frame for convenient movement is improved, and the problems of time and labor waste of workers are reduced.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic top view of the transverse steel frame of the present invention;
fig. 4 is a schematic top view of the transverse steel frame according to the present invention.
In the figure: 1. a vertical steel frame; 101. tooth engraving; 2. a steel plate; 201. steel wire mesh; 3. a transverse steel frame; 301. a cylindrical handle; 302. an adjustment hole; 303. a stopper; 304. a track; 305. a slider; 306. a transverse clamping plate; 307. hooking; 308. a vertical clamping plate; 4. a chassis; 401. a screw hole; 5. a universal wheel; 501. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, an embodiment of the present invention is shown: a movable concrete test block maintenance frame comprises a vertical steel frame 1, a steel plate 2, a transverse steel frame 3, a bottom frame 4 and universal wheels 5, wherein the vertical steel frame 1 is welded and installed on the upper surface of the bottom frame 4, engraving teeth 101 are evenly welded and installed on one side of the vertical steel frame 1, the universal wheels 5 are installed on the lower surface of the bottom frame 4, the universal wheels 5 are installed inside screw holes 401, the capability of the whole maintenance frame convenient to move is improved, the problems of time and labor waste of workers are reduced, the vertical steel frames 1 are connected through the steel plate 2, the transverse steel frame 3 is welded and installed at the middle position of the vertical steel frame 1, stoppers 303 are evenly welded and installed at the top of the transverse steel frame 3, a rail 304 is welded and installed between the stoppers 303, a sliding block 305 is arranged on the rail 304, the sliding block 305 is distributed and installed between the stoppers 303, a vertical clamping plate 308 is installed on one side of the sliding block 305, hooks 307 are welded and installed on two sides of the transverse steel frame 3, couple 307 is installed through the both ends at horizontal steelframe 3, the space of placing some relatively large-scale concrete test blocks is provided, the device's practicality has been strengthened, the other end welded mounting of horizontal steelframe 3 is on another vertical steelframe 1, and the surface of horizontal steelframe 3 and chassis 4 all is equipped with adjustment hole 302, restriction through adjustment hole 302, the accuse of the length of concrete test block has been realized, install multiunit dog 303 through the top welded mounting at horizontal steelframe 3, and connect through track 304 between the dog 303, and be equipped with slider 305 on track 304, slider 305 is located the intermediate position of dog 303, through installing vertical cardboard 308 in one side of concrete test block, the accuse of concrete test block width has been realized.
Further, the steel wire net 201 is installed in the top embedding of steel sheet 2, provides the place of adaptation for some less concrete test blocks.
Further, install horizontal cardboard 306 between the regulation hole 302, and the both ends welding of horizontal cardboard 306 installs cylindrical handle 301, has made things convenient for handheld cylindrical handle 301 of operation personnel to operate, further laminating ergonomics.
Further, the bottom of chassis 4 is equipped with screw 401, and the top welding of universal wheel 5 installs bolt 501, and through artificial rotation bolt 501, the installation to screw 401 has been made things convenient for the equipment and the dismantlement of universal wheel 5, and indirect improvement the practical ability of device.
The working principle is as follows: before using this device, the user detects the device earlier, confirm and use after not having the problem, through installing steel sheet 2 between vertical steelframe 1, install couple 307 through the both ends welding at horizontal steelframe 3, and couple 307 carries out the joint to vertical steelframe 1 inboard tooth 101, through be equipped with regulation hole 302 on horizontal steelframe 3, through artificial debugging horizontal cardboard 306, match the regulation and control to the length of concrete test block, through adjusting vertical cardboard 308 at artificial, and the both ends of vertical cardboard 308 are connected with slider 305, through the removal of slider 305 at track 304, the control of the matching of width has been carried out for the concrete test block, and finally, put the concrete test block to each position of curing frame, through artificial promotion curing frame, will cure the frame and push away to the curing room, carry out standard curing.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (5)
1. The utility model provides a portable concrete test block maintenance frame, includes vertical steelframe (1), steel sheet (2), horizontal steelframe (3), chassis (4) and universal wheel (5), its characterized in that: the upper surface of the chassis (4) is welded with vertical steel frames (1), one side of each vertical steel frame (1) is uniformly welded with the corresponding notch (101), the lower surface of each chassis (4) is provided with universal wheels (5), the vertical steel frames (1) are connected through steel plates (2), the middle position of each vertical steel frame (1) is welded with the corresponding transverse steel frame (3), the tops of the transverse steel frames (3) are uniformly welded with the corresponding stop blocks (303), the corresponding stop blocks (303) are welded between the corresponding stop blocks (303) and provided with the corresponding tracks (304), the corresponding tracks (304) are provided with the corresponding sliding blocks (305), the sliding blocks (305) are distributed and arranged between the corresponding stop blocks (303), one side of each sliding block (305) is provided with the corresponding vertical clamping plate (308), the two sides of each transverse steel frame (3) are welded with the corresponding hooks (307), and the other ends of the corresponding transverse steel frames (3) are welded and arranged on the other vertical steel frames (1), and the outer surfaces of the transverse steel frame (3) and the bottom frame (4) are provided with adjusting holes (302).
2. The mobile concrete test block curing rack of claim 1, wherein: and a steel wire mesh (201) is embedded in the top of the steel plate (2).
3. The mobile concrete test block curing rack of claim 1, wherein: install horizontal cardboard (306) between regulation hole (302), and the both ends welding of horizontal cardboard (306) is installed cylinder handle (301).
4. The mobile concrete test block curing rack of claim 1, wherein: and a screw hole (401) is formed in the bottom of the bottom frame (4).
5. The mobile concrete test block curing rack of claim 1, wherein: and bolts (501) are welded and installed at the tops of the universal wheels (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120620691.0U CN215511576U (en) | 2021-03-26 | 2021-03-26 | Portable concrete test block maintenance frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120620691.0U CN215511576U (en) | 2021-03-26 | 2021-03-26 | Portable concrete test block maintenance frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215511576U true CN215511576U (en) | 2022-01-14 |
Family
ID=79800996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120620691.0U Expired - Fee Related CN215511576U (en) | 2021-03-26 | 2021-03-26 | Portable concrete test block maintenance frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215511576U (en) |
-
2021
- 2021-03-26 CN CN202120620691.0U patent/CN215511576U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215511576U (en) | Portable concrete test block maintenance frame | |
CN108252513A (en) | A kind of sizing connection component, aluminium frame wooden model and template construction engineering method | |
CN217144257U (en) | Wood formwork bending device | |
CN214136615U (en) | Thickened type outer wall evaporates presses aerated concrete wallboard positioner | |
CN215100550U (en) | Component clamping device is stacked in steel construction preparation | |
CN213226735U (en) | Material distribution vibrating and scraping equipment for light inner wall plate vertical mold production line | |
CN205127618U (en) | Circulation sprays grid tray formula dust device | |
CN214090818U (en) | Home decoration leveling device | |
CN218061312U (en) | Formwork laying scaffold | |
CN218029148U (en) | Building protection net | |
CN214941124U (en) | Thickened type outer wall evaporates presses aerated concrete wallboard connecting device | |
CN218934043U (en) | Enclose fender structure convenient to fixed mounting | |
CN110725523A (en) | Scaffold for building construction | |
CN218779956U (en) | Concrete form bearing structure for building engineering | |
CN114837449B (en) | Window expansion supporting device for old community transformation and installation method | |
CN210364793U (en) | Pipe fitting storage rack for house construction engineering | |
CN210309606U (en) | Novel digital printing controller | |
CN215702690U (en) | Building is marked for room test block maintenance frame of supporting | |
CN204425828U (en) | Rack | |
CN218670150U (en) | Flat-plate type foundation screw | |
CN215909565U (en) | Building gravel and sand drying device | |
CN214939361U (en) | Adjustable cantilever operation platform | |
CN218375172U (en) | Building engineering template fixing device | |
CN217581245U (en) | Template fixing device for building engineering | |
CN214656650U (en) | Municipal administration highway engineering is with portable guardrail of preventing wearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220114 |