CN215445353U - Embedded pipeline installation base - Google Patents

Embedded pipeline installation base Download PDF

Info

Publication number
CN215445353U
CN215445353U CN202121843451.3U CN202121843451U CN215445353U CN 215445353 U CN215445353 U CN 215445353U CN 202121843451 U CN202121843451 U CN 202121843451U CN 215445353 U CN215445353 U CN 215445353U
Authority
CN
China
Prior art keywords
mounting plate
sleeve
embedded
drain pipe
mounting panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121843451.3U
Other languages
Chinese (zh)
Inventor
王玉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruiteng Building Materials Group Co ltd
Original Assignee
Henan Ruiteng Plastic Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Ruiteng Plastic Group Co ltd filed Critical Henan Ruiteng Plastic Group Co ltd
Priority to CN202121843451.3U priority Critical patent/CN215445353U/en
Application granted granted Critical
Publication of CN215445353U publication Critical patent/CN215445353U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The pre-buried pipeline mounting base effectively solves the problem that an elevator is easy to drop when a pipeline is hoisted, and the normal use of a drain pipe is influenced; the embedded type pipe joint comprises a mounting plate, wherein a pre-embedded head is arranged on one side of the mounting plate, the size of the end, far away from the mounting plate, of the pre-embedded head is larger than that of the end, close to the mounting plate, of the pre-embedded head, and a sleeve is arranged on the other side of the mounting plate; the fixing device is simple in structure and convenient to use, and the mounting base is fixed inside the wall in a pre-buried mode, so that the drain pipe is quickly fixed.

Description

Embedded pipeline installation base
Technical Field
The utility model relates to the technical field of drainage pipe fittings, in particular to an embedded pipeline mounting base.
Background
When the PVC drain pipe is fixed, generally use the elevator to carry out fixed connection, the elevator is as shown in figure 1, uses the screw to fix seat card 1 at the house top, then uses connecting pipe 2 to be connected pipe card 3 with seat card 1, and the screw drops easily among this connected mode, causes the pipeline to break away from fixedly, influences the drain pipe normal use.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model provides the embedded pipeline mounting base, which effectively solves the problem that the normal use of a drain pipe is influenced because an elevator is easy to drop when a pipeline is hoisted.
The technical scheme for solving the technical problem is as follows: the utility model provides a buried pipeline installation base, includes the mounting panel, and mounting panel one side is equipped with the embedded head, and the embedded head is kept away from mounting panel one end size and is greater than being close to mounting panel one end size, and the mounting panel opposite side is equipped with the sleeve pipe.
Preferably, the mounting plate, the embedded head and the sleeve are integrally formed by PVC materials.
Preferably, the mounting plate is externally provided with a positioning hole.
Preferably, the outer side of the bottom of the sleeve is provided with a plurality of positioning holes.
The fixing device is simple in structure and convenient to use, and the mounting base is fixed inside the wall in a pre-buried mode, so that the drain pipe is quickly fixed.
Drawings
Fig. 1 is a schematic view of a prior art mounting structure.
Fig. 2 is a schematic view of an installation structure of the first embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a first embodiment of the present invention.
Fig. 4 is a schematic view of an installation structure of the second embodiment of the present invention.
Fig. 5 is a schematic structural diagram of a second embodiment of the present invention.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
The first embodiment is as follows:
as shown in fig. 2 and 3, the embedded pipeline mounting base comprises a mounting plate 4, a pre-embedding head 5 is arranged on one side of the mounting plate 4, the size of one end, away from the mounting plate 4, of the pre-embedding head 5 is larger than that of the end, close to the mounting plate 4, of the pre-embedding head, a positioning hole 7 is formed in the outer portion of the mounting plate 4, a sleeve 6 is arranged on the other side of the mounting plate 4, and the mounting plate 4, the pre-embedding head 5 and the sleeve 6 are integrally formed by PVC materials.
In the particular use of the present invention,
when a building is poured, holes are formed in the template, the sleeve 6 penetrates through the template, then screws penetrate through the fixing holes 7 to fix the mounting plate 4 on the template, the embedded head 5 is located on one pouring side, then pouring is conducted, the embedded head 5 is poured into the building, the sleeve 6 is located outside the building, the template is detached after the building is solidified and formed, then the drain pipe is installed, the drain pipe is fixed through the pipe clamp 3 and then connected to the sleeve 6 through the connecting pipe 2, and therefore the drain pipe is fixed on the wall, and the drain pipe is fixed.
The utility model adopts PVC material for integral forming, adopts a pre-buried mode for installation, can provide enough tension for hoisting the drain pipe, avoids the drain pipe from loosening caused by the falling of the pipe fitting, can save working procedures during installation and improves the construction efficiency.
Example two:
as shown in fig. 4 and 5, an embedded pipeline installation base comprises an installation plate 4, a pre-embedding head 5 is arranged on one side of the installation plate 4, the size of one end, away from the installation plate 4, of the pre-embedding head 5 is larger than that of the end, close to the installation plate 4, of the pre-embedding head, a sleeve 6 is arranged on the other side of the installation plate 4, a plurality of positioning holes 7 are formed in the outer side of the bottom of the sleeve 6, and the installation plate 4, the pre-embedding head 5 and the sleeve 6 are integrally formed by PVC materials.
In the particular use of the present invention,
when a building is poured, the mounting plate 4 is fixed on the template by using screws to penetrate through the fixing holes 7, then pouring is carried out, the embedded head 5 and the sleeve 6 are both poured into the building, when the building is solidified and formed, the template is detached, the sleeve 6 is hidden in the building, when a drain pipe is installed, the drain pipe is fixed through the pipe clamp 3 and then is connected to the sleeve 6 through the connecting pipe 2, and therefore the drain pipe is fixed on the wall, and the drain pipe is fixed.
Compared with the first embodiment, the second embodiment is different in the position change of the positioning hole 7, when the positioning hole 7 is located on the mounting plate 4, a hole needs to be formed in the template for fixed mounting, after pouring is completed, the sleeve 6 extends out of the building and is convenient to connect with the connecting pipe 2, when the positioning hole 7 is located on the sleeve 6, the hole does not need to be formed in the template, and after pouring is completed, the sleeve 6 is hidden in the building, at the moment, when the drain pipe is installed, the drain pipe can be closer to the wall, and the stability of the drain pipe is improved.
Compared with the prior art, the utility model has the following beneficial effects: the installation process is simple and quick, and the construction efficiency can be improved; the installation back is difficult for droing, can provide stable fixed power lastingly, guarantees the normal use of drain pipe.

Claims (4)

1. The utility model provides a buried pipeline installation base which characterized in that, includes mounting panel (4), and mounting panel (4) one side is equipped with embedded head (5), and the one end size of keeping away from mounting panel (4) of embedded head (5) is greater than and is close to mounting panel (4) one end size, and mounting panel (4) opposite side is equipped with sleeve pipe (6).
2. The embedded pipeline installation base of claim 1, wherein the installation plate (4), the embedded head (5) and the sleeve (6) are integrally formed by PVC.
3. A pre-buried pipeline installing base as claimed in claim 1, wherein the installing plate (4) is externally provided with a locating hole (7).
4. A pre-buried pipe installation base as claimed in claim 1, wherein the outer side of the bottom of the sleeve (6) is provided with a plurality of positioning holes (7).
CN202121843451.3U 2021-08-09 2021-08-09 Embedded pipeline installation base Active CN215445353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121843451.3U CN215445353U (en) 2021-08-09 2021-08-09 Embedded pipeline installation base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121843451.3U CN215445353U (en) 2021-08-09 2021-08-09 Embedded pipeline installation base

Publications (1)

Publication Number Publication Date
CN215445353U true CN215445353U (en) 2022-01-07

Family

ID=79692459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121843451.3U Active CN215445353U (en) 2021-08-09 2021-08-09 Embedded pipeline installation base

Country Status (1)

Country Link
CN (1) CN215445353U (en)

Similar Documents

Publication Publication Date Title
CN208364136U (en) A kind of combination fastener of embedded sleeve barrel and rear-mounted conduit
CN110318532B (en) Scaffold fixing device of prefabricated shear wall and mounting method
CN215445353U (en) Embedded pipeline installation base
CN208010361U (en) A kind of half hiding support node of the plug-in conduit of shield tunnel
CN207749850U (en) A kind of level(l)ing device of elevator steel structure frame
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN213598720U (en) Pipeline fixing device
CN211499784U (en) Pouring module device after secondary hole opening of floor slab
CN203794496U (en) Firefighting pipe lifting device
CN209837688U (en) Plate penetrating sleeve piece capable of being circulated and recycled
CN211523528U (en) Pre-buried screw thread switching device of assembled
CN220848062U (en) Hoisting screw rod embedded component
CN207879388U (en) A kind of hiding support node of the plug-in conduit of shield tunnel
CN201296953Y (en) Shower pipe mounting fixing device
CN217925185U (en) Concrete pole fixed knot constructs
CN206135776U (en) Unsettled tile structure roof family is with photovoltaic support fixing device and mounting system
CN218668073U (en) Connecting structure of wall body and steel member
CN218504437U (en) Air pipe spring clamp mounting tool
CN115030391A (en) PVC suspender fixing module and construction method thereof
CN215330524U (en) Separate waterproof lifting hook mounted on concrete member
CN217439322U (en) PVC suspender fixing module
CN218619761U (en) Wall-attached embedded part of construction elevator
CN218780083U (en) Communication tower
CN220133507U (en) Secondary structure concrete picking-free chisel device
CN213711552U (en) L-shaped bolt for bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450000 150 meters to the east of Zhengxin highway, South Street, Guodian Town, Xinzheng City, Zhengzhou City, Henan Province

Patentee after: Ruiteng Building Materials Group Co.,Ltd.

Address before: 450000 150 meters to the east of Zhengxin highway, South Street, Guodian Town, Xinzheng City, Zhengzhou City, Henan Province

Patentee before: HENAN RUITENG PLASTIC GROUP CO.,LTD.

CP01 Change in the name or title of a patent holder