CN215405588U - Bridge floor guardrail outside construction work platform - Google Patents

Bridge floor guardrail outside construction work platform Download PDF

Info

Publication number
CN215405588U
CN215405588U CN202121736709.XU CN202121736709U CN215405588U CN 215405588 U CN215405588 U CN 215405588U CN 202121736709 U CN202121736709 U CN 202121736709U CN 215405588 U CN215405588 U CN 215405588U
Authority
CN
China
Prior art keywords
platform
construction work
work platform
outer side
slope plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121736709.XU
Other languages
Chinese (zh)
Inventor
方庆林
郑蓉
朱敦辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoushan Wanlihang Transportation Facilities Co ltd
Original Assignee
Zhoushan Wanlihang Transportation Facilities Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Wanlihang Transportation Facilities Co ltd filed Critical Zhoushan Wanlihang Transportation Facilities Co ltd
Priority to CN202121736709.XU priority Critical patent/CN215405588U/en
Application granted granted Critical
Publication of CN215405588U publication Critical patent/CN215405588U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

Bridge floor guardrail outside construction work platform. The hanging flower basket that mainly solves present bridge floor guardrail outside construction work platform is most integrative setting, uses inconvenient problem. The method is characterized in that: the support body includes bottom platform (3) and top platform (4), be equipped with a plurality of balancing weights (31) on the platform of bottom, top platform one end is connected with stair (5), top platform other end bottom is equipped with hanging flower basket (6) that can dismantle the connection. The utility model provides a construction operation platform for the outer side of a bridge floor guardrail, wherein hanging baskets can be detached and are adaptive to installation of different hanging baskets, so that the platform is suitable for different occasions.

Description

Bridge floor guardrail outside construction work platform
Technical Field
The utility model relates to the field of electrical switches, in particular to a bridge floor guardrail outer side construction operation platform.
Background
In the bridge construction or maintenance process, for example, the drain pipe is installed, the defects of wing plates are repaired or rain drops are installed outside the bridge eave, the construction working face is often required to be in close contact with the aid of construction auxiliary equipment, sometimes the construction support cannot be built under the bridge due to the limitation of the environmental conditions of the bridge, or the construction support cannot be conveniently constructed even if the construction support is built.
The hanging baskets of the construction operation platform outside the existing bridge floor guardrail are mostly integrally arranged and cannot use different hanging baskets.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the background art, the utility model provides a bridge deck guardrail outer side construction operation platform, which mainly solves the problem that hanging baskets of the existing bridge deck guardrail outer side construction operation platform are mostly arranged integrally and are inconvenient to use.
The technical scheme of the utility model is as follows:
bridge floor guardrail outside construction work platform, comprising a frame body, the support body bottom is equipped with the gyro wheel, the support body includes bottom platform and top platform, be equipped with a plurality of balancing weights on the platform of bottom, top platform one end is connected with stair, top platform other end bottom is equipped with the hanging flower basket that can dismantle the connection.
The support body includes the mobile jib, the mobile jib top is equipped with a plurality of branches, branch with the platform is connected.
The frame body is relatively provided with a stair handrail.
The hanging basket comprises a connecting rod, a connecting plate is arranged on the connecting rod, a first connecting hole is formed in the connecting plate, a second connecting hole is formed in the top platform, and the first connecting hole and the second connecting hole are connected through screws.
The bottom platform is provided with a slope plate movably arranged, and the slope plate comprises a first position and a second position, wherein one end of the first position is in contact with the ground, and the second position is away from the ground.
The bottom platform is provided with a sliding groove, rotating shafts are arranged on two sides of the slope plate and are in sliding fit with the sliding groove.
And a rubber pad is arranged on the end surface of the bottom of the slope plate.
The bottom platform is provided with an open slot communicated with the sliding groove, the slope plate is provided with a handle, and the handle penetrates through the open slot.
The utility model has the beneficial effects that: the utility model provides a construction operation platform for the outer side of a bridge floor guardrail, wherein hanging baskets can be detached and are adaptive to installation of different hanging baskets, so that the platform is suitable for different occasions.
Drawings
FIG. 1 is a side view of one embodiment of the present invention.
Fig. 2 is a partial structural diagram of an embodiment of the present invention.
FIG. 3 is a schematic partial cross-sectional view of one embodiment of the present invention.
Fig. 4 is a partial structural diagram of an embodiment of the present invention.
Detailed Description
The utility model will be further described with reference to the accompanying drawings in which: as shown in the figure, bridge floor guardrail outside construction work platform, including support body 1, the support body bottom is equipped with gyro wheel 2, the support body includes bottom platform 3 and top platform 4, be equipped with a plurality of balancing weights 31 on the platform of bottom, top platform one end is connected with stair 5, top platform other end bottom is equipped with hanging flower basket 6 that can dismantle the connection. The utility model provides a construction operation platform for the outer side of a bridge floor guardrail, wherein hanging baskets can be detached and are adaptive to installation of different hanging baskets, so that the platform is suitable for different occasions. The disassembly and assembly can be realized through screws and the like. The balancing weight can prevent overturning.
In the present invention, as shown in the figure, the frame body includes a main rod 11, the top end of the main rod is provided with a plurality of support rods 12, and the support rods are connected with the platform. The strength is increased.
In the present invention, as shown in the figures, handrails 51 are provided on the frame body opposite to the stairs. The use is safer.
In the utility model, as shown in the figure, the hanging basket comprises a connecting rod 61, a connecting plate 62 is arranged on the connecting rod, a first connecting hole is arranged on the connecting plate, a second connecting hole is arranged on the top platform, and the first connecting hole and the second connecting hole are connected through a screw 9. The connection can be facilitated by screws.
In the present invention, as shown in the figures, the bottom platform is provided with a movably arranged slope plate 7, and the slope plate comprises a first position with one end contacting with the ground and a second position away from the ground. The slope plate can be used for facilitating the assembly and disassembly of the balancing weight and can be folded and unfolded.
In the present invention, as shown in the figure, the bottom platform is provided with a sliding groove 32, and two sides of the slope plate are provided with rotating shafts 71, and the rotating shafts are in sliding fit with the sliding groove.
In the present invention, as shown in the figure, a rubber pad 72 is disposed on the bottom end surface of the slope plate.
In the utility model, as shown in the figure, the bottom platform is provided with an open slot 33 communicated with the chute, the slope plate is provided with a handle 73, and the handle penetrates through the open slot. The handle can be pulled to drag the slope plate, and the slope plate can be rotationally placed on the ground through the rotating shaft after being in place.
The embodiments described with reference to the drawings are illustrative and are intended to be illustrative of the utility model and should not be construed as limiting the utility model. The examples should not be construed as limiting the present invention, but any modifications made based on the spirit of the present invention should be within the scope of protection of the present invention.

Claims (8)

1. Bridge floor guardrail outside construction work platform, including support body (1), the support body bottom is equipped with gyro wheel (2), its characterized in that: the support body includes bottom platform (3) and top platform (4), be equipped with a plurality of balancing weights (31) on the platform of bottom, top platform one end is connected with stair (5), top platform other end bottom is equipped with hanging flower basket (6) that can dismantle the connection.
2. The deck guardrail outer side construction work platform of claim 1, characterized in that: the support body includes mobile jib (11), the mobile jib top is equipped with a plurality of branches (12), branch with the platform is connected.
3. The deck guardrail lateral construction work platform of claim 2, characterized in that: the frame body is relatively provided with a stair handrail (51).
4. The deck guardrail outer side construction work platform of claim 3, wherein: the hanging flower basket includes connecting rod (61), be equipped with connecting plate (62) on the connecting rod, the connecting plate is equipped with first connecting hole, be equipped with the second connecting hole on the top platform, first connecting hole and second connecting hole pass through screw (9) and connect.
5. The deck guardrail lateral construction work platform of claim 4, wherein: the bottom platform is provided with a slope plate (7) which is movably arranged, and the slope plate comprises a first position and a second position, wherein one end of the first position is in contact with the ground, and the second position is away from the ground.
6. The deck guardrail outer side construction work platform of claim 5, wherein: the bottom platform is provided with a sliding groove (32), two sides of the slope plate are provided with rotating shafts (71), and the rotating shafts are in sliding fit with the sliding groove.
7. The deck guardrail outer side construction work platform of claim 6, wherein: and a rubber pad (72) is arranged on the end surface of the bottom of the slope plate.
8. The deck guardrail outer side construction work platform of claim 7, wherein: an open slot (33) communicated with the sliding groove is formed in the bottom platform, a handle (73) is arranged on the slope plate, and the handle penetrates through the open slot.
CN202121736709.XU 2021-07-29 2021-07-29 Bridge floor guardrail outside construction work platform Active CN215405588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121736709.XU CN215405588U (en) 2021-07-29 2021-07-29 Bridge floor guardrail outside construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121736709.XU CN215405588U (en) 2021-07-29 2021-07-29 Bridge floor guardrail outside construction work platform

Publications (1)

Publication Number Publication Date
CN215405588U true CN215405588U (en) 2022-01-04

Family

ID=79653858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121736709.XU Active CN215405588U (en) 2021-07-29 2021-07-29 Bridge floor guardrail outside construction work platform

Country Status (1)

Country Link
CN (1) CN215405588U (en)

Similar Documents

Publication Publication Date Title
CN201843324U (en) Shaping lifting operation platform
CN215405588U (en) Bridge floor guardrail outside construction work platform
CN204435922U (en) Protection device of elevator shaft
CN204355903U (en) A kind of climbing frame of building hoist
CN211114956U (en) Anti-seismic stability-increasing reinforcing structure for concrete stairs
CN211548713U (en) A suspension type scaffold frame for square chimney
CN205347999U (en) Bridge construction bracket constructional device
CN216429076U (en) Platform of unloading that construction engineering used
CN113700215A (en) Steel beam connecting fitting and using method thereof
CN209210243U (en) The hanging apparatus of curtain wall lighting roof
CN113047595A (en) External hanging basket installation structure of building wall and construction method thereof
CN206571430U (en) Support derrick is prized with Multifunctional winch
CN111017799A (en) Hydraulic lifting type insulating platform for live working
CN205277282U (en) Novel power maintenance device
CN220909072U (en) Large-span mobile platform device suitable for high-altitude operation of factory building
CN213692922U (en) Support is used in supplementary installation of electric power engineering circuit
CN211347671U (en) Corner curtain wall building interlayer deformation performance detection system
CN110212854B (en) Environment-friendly solar photovoltaic module frame
CN204824006U (en) Cut fork lifter
CN210289090U (en) Attached type cantilever plate conversion device for climbing frame
CN219389182U (en) Raise dust monitoring device for building monitoring
CN219825903U (en) Supporting structure and spliced prefabricated stair installation assembly
CN114541791A (en) Fast-assembling high-rise horizontal protection shed and installation method
CN208618780U (en) A kind of building scaffold safety device
CN202648784U (en) Lifting and descending device of electronic ground scale body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant