CN215291826U - A novel railing for utility tunnel - Google Patents

A novel railing for utility tunnel Download PDF

Info

Publication number
CN215291826U
CN215291826U CN202121719316.8U CN202121719316U CN215291826U CN 215291826 U CN215291826 U CN 215291826U CN 202121719316 U CN202121719316 U CN 202121719316U CN 215291826 U CN215291826 U CN 215291826U
Authority
CN
China
Prior art keywords
base
novel
railing
clamping portion
utility tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121719316.8U
Other languages
Chinese (zh)
Inventor
刘晓飞
于印冲
葛庆贺
张林萌
徐会恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202121719316.8U priority Critical patent/CN215291826U/en
Application granted granted Critical
Publication of CN215291826U publication Critical patent/CN215291826U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel railing for a comprehensive pipe gallery, which comprises a railing main body and a movable base; the guardrail comprises a guardrail body and a guardrail body, wherein the guardrail body comprises upright posts, cross rods and a bottom plate, the upright posts and the cross rods are arranged in a staggered mode, and the bottom plate is welded at the bottoms of the upright posts; the movable base comprises a base and a clamping portion, the clamping portion is arranged on the top surface of the base, a clamping groove is arranged on one side of the clamping portion, a fixing hole with a single end opened is arranged on the top surface of the clamping portion, and the bottom plate of the railing body is detachably arranged in the clamping groove of the movable base. The utility model provides a pair of a novel railing for utility tunnel, its is rational in infrastructure, and convenient to use can swiftly install and dismantle, has effectively improved the efficiency of construction, has guaranteed the security of utility tunnel hoist and mount operation, has good spreading value.

Description

A novel railing for utility tunnel
Technical Field
The utility model belongs to the technical field of building engineering, a novel railing for utility tunnel is related to.
Background
All pipelines and equipment facilities in the underground pipe gallery are vertically transported from a pipe gallery lifting port, particularly in the process of lifting large-diameter pipelines, the protective railings at the periphery of the lifting port obstruct the lifting transportation of the pipelines, and the pipelines cannot enter the gallery to be installed. In the prior art, the tunnel portal protection guardrail needs to be dismantled and then hoisted. So the railing needs to be repeatedly disassembled and assembled to meet the requirement of hoisting pipeline equipment in the corridor.
The existing protective handrail is fixed by adopting a pre-buried sleeve mode, and the manufactured handrail is directly inserted into the sleeve so as to achieve the purpose of moving the handrail. However, in the process of reserving the casing pipes, the deviation of the reserved casing pipes is caused when concrete is poured and vibrated, and the installation efficiency of the protective railings is influenced.
If the mode of later stage water drilling and making a hole is adopted, the structural steel bar can be cut off, unsafe factors are left for the building structure, and the method is not economical. Moreover, if the protective railing is not installed in time after the pipeline equipment is hoisted, the edge opening is not protected, and potential safety hazards of personnel falling exist.
Therefore, a need exists to design a novel railing for utility tunnel, solve the technical problem that exists among the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the partial technical problem that exists among the prior art to a certain extent at least, the novel railing for utility tunnel that provides, its is rational in infrastructure, and convenient to use can swiftly install and dismantle, has effectively improved the efficiency of construction, has guaranteed the security of utility tunnel hoist and mount operation, has good spreading value.
In order to solve the technical problem, the utility model provides a novel railing for a comprehensive pipe gallery, which comprises a railing main body and a movable base; the guardrail comprises a guardrail body and a guardrail body, wherein the guardrail body comprises upright posts, cross rods and a bottom plate, the upright posts and the cross rods are arranged in a staggered mode, and the bottom plate is welded at the bottoms of the upright posts; the movable base comprises a base and a clamping portion, the clamping portion is arranged on the top surface of the base, a clamping groove is arranged on one side of the clamping portion, a fixing hole with a single end opened is arranged on the top surface of the clamping portion, and the bottom plate of the railing body is detachably arranged in the clamping groove of the movable base.
As a preferred embodiment, the number of the movable bases is multiple, and the openings of the clamping grooves are in consistent orientation and are arranged at intervals along the linear direction.
As a preferred embodiment, the number of the bottom plates of the railing body is matched with the number of the movable bases.
In a preferred embodiment, the fixing hole is an elongated hole, and an opening width of the elongated hole is gradually reduced along a length direction of the clamping portion.
In a preferred embodiment, the opening width of the fixing hole is larger than the diameter of the upright rod.
In a preferred embodiment, the locking groove is a wedge-shaped groove, and the longitudinal height of the outer end of the locking groove is greater than that of the inner end of the locking groove.
In a preferred embodiment, the vertical height of the card slot matches the height of the bottom plate.
As a preferred embodiment, the movable base is configured with mounting holes, and the mounting holes are distributed at four corners of the base.
In a preferred embodiment, the mounting hole is a long hole, and the long hole is arranged along the length or width direction of the base.
As a preferred embodiment, the clamping portion and the base are integrally formed, and the clamping groove is arranged in a penetrating manner along the length direction of the clamping portion.
The utility model discloses beneficial effect:
the utility model provides a pair of a novel railing for utility tunnel, its is rational in infrastructure, and convenient to use can swiftly install and dismantle, has effectively improved the efficiency of construction, has guaranteed the security of utility tunnel hoist and mount operation, has good spreading value.
Drawings
The above advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and do not limit the present invention, and in which:
fig. 1 is a schematic structural view of a novel rail for a utility tunnel according to the present invention;
fig. 2 is a schematic structural view of the balustrade body of the present invention;
fig. 3 is a schematic structural view of the movable base of the present invention;
fig. 4 is a top view of the movable base of the present invention;
fig. 5 is a schematic view of the bottom plate of the present invention disposed in the slot;
fig. 6 is a schematic view of the movable base of the present invention.
In the drawings, the reference numerals denote the following components:
10. a balustrade main body; 11. erecting a rod; 12. a cross bar; 13. a base plate;
20. a movable base; 21. a base; 22. a clamping part; 22a, a card slot; 22b, a fixing hole; 23. and (7) installing holes.
Detailed Description
Fig. 1 to 6 are related schematic views of a novel balustrade for a utility tunnel according to the present application, and the present invention will be described in detail with reference to the following embodiments and accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
A structure schematic diagram for utility tunnel's novel railing, as shown in figure 1. The novel railing for the utility tunnel comprises a railing body 10 and a movable base 20. The rail main body 10 comprises upright posts 11, cross bars 12 and a bottom plate 13, as shown in fig. 2, the upright posts 11 and the cross bars 12 are arranged in a staggered manner, and the bottom plate 13 is welded at the bottom of the upright posts 11; the movable base 20 includes a base 21 and a clamping portion 22, as shown in fig. 3, the clamping portion 22 is disposed on the top surface of the base 21, a clamping groove 22a is disposed on one side of the clamping portion 22, a fixing hole 22b with a single end open is disposed on the top surface of the clamping portion 22, and the bottom plate 13 of the handrail main body 10 is detachably disposed in the clamping groove 22a of the movable base 20, as shown in fig. 5.
As an embodiment of the present invention, the number of the movable bases 20 is plural, and as shown in fig. 1, the openings of the locking grooves 22a are oriented in the same direction and are arranged at intervals along the linear direction. Further, the number of the bottom plates 13 of the railing body 10 matches with the number of the movable bases 20.
The utility model discloses in, fixed orifices 22b is the rectangular hole, as shown in fig. 4, and its opening width is followed joint portion 22's length direction diminishes gradually to the bottom plate 13 of railing main part 10 smooth and easy card plug-in joint portion 22. Preferably, the opening width of the fixing hole 22b is larger than the diameter of the upright 11.
As an embodiment of the present invention, the locking groove 22a is a wedge-shaped groove, as shown in fig. 6, the longitudinal height of the outer end is greater than the longitudinal height of the inner end. Specifically, the longitudinal height of the clamping groove 22a is matched with the height of the bottom plate 13 to ensure smooth clamping and fixing of the bottom plate 13
Fig. 4 is a top view of the movable base of the present invention, wherein the movable base 20 is configured with mounting holes 23, and the mounting holes 23 are distributed at four corners of the base 21.
Further, the mounting hole 23 is a long hole, and the long hole is disposed along the length and/or width direction of the base 21.
The clamping portion 22 and the base 21 are integrally formed, and the clamping groove 22a is arranged along the length direction of the clamping portion 22 in a penetrating mode, so that the position of the movable base 20 can be accurately adjusted.
Novel the whole weight of railing is light and handy, and single can light and handy removal railing, activity base 20 is fixed in piping lane structure top surface by expansion bolts, need not to reserve in advance pre-buried, and the railing main part is installed on the base, realizes the purpose of activity railing. And simultaneously, the utility model provides a hoist and mount mouth face the problem that limit entrance to a cave's protection railing activity was installed and is torn open, reliably fixed through expansion bolts and structure, it is pre-buried to need not to reserve among the preceding stage concrete placement process, need not later stage water and bores the opening and destroy the structural reinforcement, convenient and fast, the edge hole protection safety problem that faces when having guaranteed the pipeline hoist and mount transportation, guarantee operation personnel safety.
After the construction of piping lane structure is accomplished, consider that there is personnel to come in and go out in the intermediate layer, the hoist and mount mouth faces the limit and has the risk that personnel fall, can install movable railing according to the construction drawing earlier, when treating the installation of the interior pipe of corridor, demolish railing main part 10 before the pipeline hoist and mount transportation, only leave movable base 20, because of movable base 20 is only higher than ground not much, do not influence pipeline hoist and mount completely, the pipeline all hoists to the corridor in insert movable base with railing main part 10 once more.
Meanwhile, in the pipe gallery operation stage, if the pipeline equipment in the pipe gallery needs to be changed, hoist and mount the transportation from this hoist and mount mouth, hoist after the railing has hindered that the pipeline transportation also can be demolishd the railing temporarily to realize the purpose of activity railing.
The present invention is not limited to the above embodiments, and any person can obtain other products in various forms without departing from the scope of the present invention, but any change in shape or structure is included in the technical solution that is the same as or similar to the present invention.

Claims (10)

1. A novel railing for a comprehensive pipe gallery is characterized by comprising a railing main body and a movable base; the guardrail comprises a guardrail body and a guardrail body, wherein the guardrail body comprises upright posts, cross rods and a bottom plate, the upright posts and the cross rods are arranged in a staggered mode, and the bottom plate is welded at the bottoms of the upright posts; the movable base comprises a base and a clamping portion, the clamping portion is arranged on the top surface of the base, a clamping groove is arranged on one side of the clamping portion, a fixing hole with a single end opened is arranged on the top surface of the clamping portion, and the bottom plate of the railing body is detachably arranged in the clamping groove of the movable base.
2. The novel railing for utility tunnel according to claim 1, characterized in that the number of the movable bases is plural, and the openings of the locking grooves are oriented in the same direction and arranged at intervals along the linear direction.
3. The novel balustrade for a utility tunnel according to claim 2, wherein the number of base plates of the balustrade body matches the number of movable bases.
4. The novel rail for the utility tunnel according to claim 1, wherein the fixing hole is a long hole, and the opening width of the fixing hole is gradually reduced along the length direction of the clamping portion.
5. The novel balustrade for a utility tunnel according to claim 4, wherein the fixing holes have an opening width greater than the diameter of the vertical rods.
6. The novel rail for the utility tunnel according to claim 1, wherein the locking groove is a wedge-shaped groove, and the longitudinal height of the outer end of the locking groove is greater than the longitudinal height of the inner end of the locking groove.
7. The novel balustrade for a utility tunnel according to claim 6, wherein the longitudinal height of the slot matches the height of the base plate.
8. The novel balustrade for a utility tunnel according to claim 1, wherein the movable base is configured with mounting holes distributed at the four corners of the base.
9. The novel balustrade for a utility tunnel of claim 8, wherein the mounting holes are elongated holes disposed along the length or width of the base.
10. The novel rail for the comprehensive pipe rack as claimed in claim 1, wherein the clamping portion is integrally formed with the base, and the clamping groove is arranged to penetrate along a length direction of the clamping portion.
CN202121719316.8U 2021-07-27 2021-07-27 A novel railing for utility tunnel Active CN215291826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121719316.8U CN215291826U (en) 2021-07-27 2021-07-27 A novel railing for utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121719316.8U CN215291826U (en) 2021-07-27 2021-07-27 A novel railing for utility tunnel

Publications (1)

Publication Number Publication Date
CN215291826U true CN215291826U (en) 2021-12-24

Family

ID=79524715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121719316.8U Active CN215291826U (en) 2021-07-27 2021-07-27 A novel railing for utility tunnel

Country Status (1)

Country Link
CN (1) CN215291826U (en)

Similar Documents

Publication Publication Date Title
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN105908960A (en) Construction rack for construction of high and large space
CN215717163U (en) Steel form suitable for super high-rise core tube inclined shear wall
CN110952995A (en) Construction method for external tunnel door post-cast ring beam
CN215291826U (en) A novel railing for utility tunnel
CN112554208B (en) Cantilever support platform, supporting and retaining wall and construction method
CN107217831A (en) High-rise building Core Walls Structure horizontal structure construction method
CN115095118A (en) Method for constructing coke quenching tower by suspended integrally-installed support
CN212773587U (en) Novel detachable horizontal entrance to a cave protection instrument
CN113186854B (en) Concrete guardrail prefabricated thin plate structure and recycling construction method thereof
CN104533106A (en) Single-layer three-dimensional prefabricated sunken construction ladder stand assembled along with excavation of foundation pit and construction method
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
KR200395096Y1 (en) Length-adjustable guardrail
CN210563531U (en) Steel structure support for building protection
CN210264813U (en) Walkway plate support in subway tunnel
CN209686454U (en) A kind of high roadbed open cut tunnel inspection shaft construction
CN210117921U (en) Shear wall structure tunnel formwork
CN114215335A (en) Movable construction platform for rock anchor beam of underground factory building
CN102677680A (en) Dismantling method for concrete waist beam
CN215164543U (en) Fabricated foundation pit crossing channel
CN213038820U (en) Stereotype elevator shaft way construction operation platform
CN109208936A (en) A kind of existing building elevator shaft structure, which adds, builds structure and its construction method
CN211143691U (en) Super-large span cast-in-situ cantilever beam multilayer section steel-stay cable three-dimensional supporting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant