CN215290884U - Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate - Google Patents

Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate Download PDF

Info

Publication number
CN215290884U
CN215290884U CN202120765138.6U CN202120765138U CN215290884U CN 215290884 U CN215290884 U CN 215290884U CN 202120765138 U CN202120765138 U CN 202120765138U CN 215290884 U CN215290884 U CN 215290884U
Authority
CN
China
Prior art keywords
main
uhpc board
uhpc
pendant
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120765138.6U
Other languages
Chinese (zh)
Inventor
张敬民
张培炜
孟京京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Full Arts Curtain Wall Engineering Co ltd
Original Assignee
Shanghai Full Arts Curtain Wall Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Full Arts Curtain Wall Engineering Co ltd filed Critical Shanghai Full Arts Curtain Wall Engineering Co ltd
Priority to CN202120765138.6U priority Critical patent/CN215290884U/en
Application granted granted Critical
Publication of CN215290884U publication Critical patent/CN215290884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a building curtain field discloses a can realize mounting structure of quick installation of UHPC board. The utility model discloses a can realize mounting structure of UHPC board installation fast, include: main joist, main pendant, bottom assistant pendant, pendant base and UHPC board, main joist are fixed on building wall, and a plurality of main pendants are laid on the top of UHPC board, and a plurality of bottom assistant pendants are laid in the bottom of UHPC board, and a plurality of pendant bases are laid on main joist, and main pendant and bottom assistant pendant all are equipped with the breach groove, with the breach groove of pendant base adaptation. The utility model discloses a can realize mounting structure of quick installation of UHPC board, UHPC board when the installation, insert the pendant base with the breach groove of main pendant and the vice pendant in bottom on, the UHPC board articulates on the main joist, accomplishes articulating of UHPC board and installs, and convenient and fast has improved the installation effectiveness of UHPC board.

Description

Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate
Technical Field
The embodiment of the utility model provides a relate to building curtain field, concretely relates to can realize mounting structure of quick installation of UHPC board.
Background
With the development of society and economy, various buildings have been pulled out. The method drives the vigorous development of the decoration industry and also puts higher requirements on the building decoration industry.
UHPC (Ultra-High Performance Concrete) is the most innovative cement-based engineering material, has ultrahigh durability, ultrahigh mechanical property, excellent wear resistance, excellent anti-explosion Performance and the like, and is widely applied as one kind of building curtain walls.
However, the existing UHPC board is inconvenient to install and low in installation efficiency because the modes of the upper end pressure plate and the lower end supporting plate are adopted independently during installation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can realize mounting structure of UHPC board quick installation to solve the problem among the above-mentioned background art.
The embodiment of the utility model provides a can realize mounting structure of UHPC board installation fast, include: the device comprises a main keel, a main pendant, a bottom auxiliary pendant, a pendant base and a UHPC board;
the main keel is fixed on the building wall;
the number of the main hanging pieces and the number of the bottom auxiliary hanging pieces are multiple, the main hanging pieces are arranged at the top end of the UHPC board, and the bottom auxiliary hanging pieces are arranged at the bottom end of the UHPC board;
the pendant bases are arranged on the main keel and correspond to the main pendants and the auxiliary pendants at the bottom;
and the main hanging piece and the bottom auxiliary hanging piece are both provided with notch grooves, and the notch grooves are used for inserting the hanging piece bases, so that the UHPC board is hung on the main keel.
According to the above scheme, the utility model discloses a can realize mounting structure of UHPC board quick installation, through setting up main joist, main pendant, bottom assistant's pendant, pendant base and UHPC board, the main joist is fixed on building wall's facade, and is a plurality of main pendant lays on the top of UHPC board, and a plurality of bottom assistant's pendant lays in the bottom of UHPC board, and a plurality of pendant bases lay on the main joist, and main pendant and bottom assistant's pendant all are equipped with and supply to articulate base male breach groove. The utility model discloses a can realize mounting structure of quick installation of UHPC board, UHPC board when the installation, insert the pendant base with the breach groove of main pendant and the vice pendant in bottom on, the UHPC board articulates on the main joist, accomplishes articulating of UHPC board and installs, and convenient and fast has improved the installation effectiveness of UHPC board.
In one possible embodiment, the method further comprises: a middle auxiliary hanging part;
the middle auxiliary hanging piece is arranged in the middle of the UHPC board;
the auxiliary middle hanging piece is provided with a notch groove for inserting the hanging piece base.
In one possible solution, the hanger base is L-shaped, including: a first transverse plate and a first vertical plate;
the first transverse plate is connected with the main keel, and the first vertical plate is used for being inserted into the notch groove.
In one possible embodiment, the bottom end of the notch groove is flared.
In a feasible scheme, the main hanging piece is provided with a threaded hole at the notch groove, an adjusting bolt is engaged in the threaded hole, and the adjusting bolt is used for abutting against the first vertical plate.
In a possible solution, the first cross plate is provided with a long hole, so that the first cross plate is connected with the main keel in an adjustable position.
In a feasible scheme, a plurality of square steel pipes are arranged on the back surface of the UHPC plate;
the square steel pipes are arranged in a staggered mode in a shape like a Chinese character jing, and the main hanging piece, the bottom auxiliary hanging piece and the middle auxiliary hanging piece are arranged on the square steel pipes.
In one possible embodiment, the method further comprises: an adapter;
the adapter is fixed on the UHPC plate through bolts, and the square steel pipe is fixed on the adapter.
In one possible embodiment, the method further comprises: a steel adaptor;
the steel adaptor is preset in the building wall body, the main keel is arranged on the steel adaptor.
In a feasible scheme, the main hanging piece is provided with a hoisting through hole.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor.
Fig. 1 is a schematic view of a vertical mounting node of a mounting structure in an embodiment of the present invention;
fig. 2 is an enlarged view of a point a in fig. 1 in an embodiment of the present invention;
fig. 3 is an enlarged view of a portion B in fig. 1 according to an embodiment of the present invention;
fig. 4 is a schematic view of a transverse mounting node of the mounting structure in an embodiment of the present invention;
fig. 5 is an enlarged view of a point C in fig. 4 according to an embodiment of the present invention.
Reference numbers in the figures:
1. a main keel; 11. a steel adaptor; 201. a notch groove; 21. a main hanging part; 211. hoisting the through hole; 22. a bottom auxiliary hanger; 23. a middle auxiliary hanging part; 24. adjusting the bolt; 3. a pendant base; 31. a first transverse plate; 32. a first vertical plate; 4. a UHPC board; 41. a square steel pipe; 42. an adapter.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "axial," "radial," "circumferential," and the like are used in the orientation or positional relationship indicated in the drawings for convenience in describing the present invention and for simplicity in description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and are not to be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly, e.g., as a fixed connection, a detachable connection, or an integral part; the connection can be mechanical connection, electrical connection or communication connection; either directly or indirectly through intervening media, either internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The technical solution of the present invention will be described in detail with specific examples. The following several specific embodiments may be combined with each other, and details of the same or similar concepts or processes may not be repeated in some embodiments.
As described in the background art of the present application, UHPC (Ultra-High Performance Concrete) is the most innovative cement-based engineering material, and has the properties of Ultra-High durability, Ultra-High mechanical properties, excellent wear resistance and explosion resistance, and the UHPC board is increasingly widely used as one of building curtain walls.
The inventor of the application finds that the existing UHPC board is independent from the upright post and the cross beam in a mode of generally adopting an upper end pressure plate and a lower end supporting plate during installation, cannot be installed quickly during installation, and is low in installation efficiency; and aiming at the UHPC plate with a more peculiar shape, more pressing plates and supporting plates are needed for fixing, and the installation cost is increased.
In order to solve the above problems, the inventor of the present application proposes a technical solution of the present application, and specific embodiments are as follows:
fig. 1 is the utility model discloses mounting structure's in the embodiment vertical installation node schematic diagram, fig. 2 is the utility model discloses in the embodiment the enlargements of a department in fig. 1, fig. 3 is the utility model discloses in the embodiment the enlargements of B department in fig. 1, fig. 4 is the utility model discloses in the embodiment transverse installation node schematic diagram of mounting structure, fig. 5 is the utility model provides an in the embodiment enlargements of C department in fig. 4. As shown in fig. 1 to 5, the installation structure capable of implementing quick installation of a UHPC board of this embodiment includes: the main keel comprises a main keel 1, a main hanger 21, a bottom auxiliary hanger 22, a hanger base 3 and a UHPC board 4.
The main keel 1 is fixed on a building wall through a connecting piece, and the main keel 1 encloses a keel frame on the vertical surface of the building wall.
The main pendant 21 is equipped with a plurality ofly, and a plurality of main pendants 21 are spaced, the side by side cloth is established on the top of UHPC board 4, and the vice pendant 22 in bottom also is equipped with a plurality ofly, and the vice pendant 22 in a plurality of bottoms is spaced, the side by side cloth is established in the bottom of UHPC board 4.
The pendant base 3 is equipped with a plurality ofly, and a plurality of pendant bases 3 are laid on main joist 1. And the number of the pendant bases 3 corresponds to the total number of the main pendants 21 and the bottom auxiliary pendants 22, and the arrangement positions of the pendant bases 3 correspond to the positions of the main pendant 21 and the bottom auxiliary pendant 22 on the UHPC board 4.
The bottom ends of the main hanger 21 and the bottom auxiliary hanger 22 are both provided with a notch 201, and the notch 201 on the main hanger 21 and the bottom auxiliary hanger 22 corresponds to the hanger base 3. When the UHPC board is installed, the notch grooves of the main hanging piece 21 and the bottom auxiliary hanging piece 22 are inserted into the hanging piece base 3, so that the UHPC board 4 is hung on the main keel 1, and the UHPC board is quickly installed.
Through the above, it is not difficult to find that the installation structure capable of realizing the rapid installation of the UHPC board of the embodiment is characterized in that the main keel is fixed on the vertical face of the building wall body, the main hangers are arranged on the top end of the UHPC board, the plurality of bottom auxiliary hangers are arranged at the bottom end of the UHPC board, the plurality of hanger bases are arranged on the main keel, and the main hangers and the bottom auxiliary hangers are provided with notch grooves for hooking the base to insert. The installation structure capable of achieving quick installation of the UHPC board is characterized in that when the UHPC board is installed, the notch grooves of the main hanging piece and the auxiliary hanging piece at the bottom are inserted into the hanging piece base, the UHPC board is hung on the main keel, hanging installation of the UHPC board is completed, convenience and rapidness are achieved, and installation efficiency of the UHPC board is improved.
Optionally, the mounting structure capable of implementing quick mounting of the UHPC board in this embodiment further includes: and a middle sub hanger 23.
The middle auxiliary hanging piece 23 is consistent with the bottom auxiliary hanging piece 22 in shape and is also provided with a plurality of auxiliary hanging pieces. The plurality of middle auxiliary hangers 23 are arranged in the middle of the UHPC board 4 side by side at intervals, and the bottom ends of the middle auxiliary hangers 23 are also provided with notch grooves 201 for inserting the hanger bases 3.
The main keel 1 is provided with a pendant base 3 corresponding to the middle auxiliary pendant 23, when the UHPC board is installed, the notch groove of the middle auxiliary pendant 23 is inserted into the pendant base 3, and the UHPC board is installed more stably. Of course, according to the size of the UHPC plate, the number of the hanging pieces and the hanging piece bases can be adjusted, and the installation requirement of the UHPC plate is met. In this embodiment, the vice pendant in middle part and the vice pendant in bottom not only play limiting displacement (the displacement of UHPC board in perpendicular to face direction that the restriction installation was accomplished promptly), still play the effect that the prevention UHPC board drops: when the main pendant at the top end is damaged and fails, the middle auxiliary pendant and the bottom auxiliary pendant can be stressed to be firmly hung on the pendant base at once so as to prevent danger caused by falling of the UHPC board.
Further, as shown in fig. 2 and fig. 3, in the installation structure capable of implementing quick installation of the UHPC board in this embodiment, the suspension member base 3 is L-shaped, and the suspension member base 3 includes: a first cross plate 31 and a first riser 32.
The first transverse plate 31 of the pendant base 3 is horizontally arranged, the first transverse plate 31 is fixed on the main keel 1 through connecting pieces such as connecting bolts, and the first vertical plate 32 of the pendant base 3 is vertically arranged upwards. When the UHPC board is installed, the first vertical plate 32 of the suspension member base is inserted into the gap groove of each suspension member to complete the suspension installation of the UHPC board.
Further, in the installation structure capable of realizing rapid installation of the UHPC board in this embodiment, the bottom ends of the notch grooves 201 on the main suspension member 21, the bottom auxiliary suspension member 22 and the middle auxiliary suspension member 23 are in a horn shape, so that the first vertical plate of the suspension member base can be conveniently inserted into the notch grooves of the suspension members.
Further, in the installation structure capable of realizing rapid installation of the UHPC board in this embodiment, the main hanger 21 is provided with a threaded hole above the notch groove 201, and the threaded hole of the main hanger 21 is internally engaged with the adjusting bolt 24 of the stainless steel hexagon socket. When the UHPC board is installed, the bottom of the adjusting bolt 24 is propped against the first vertical plate 32 of the pendant base 3, and the adjusting bolt is rotated to adjust the installation height of the UHPC board and ensure the vertical surface effect of a building.
Further, the mounting structure that can realize the quick installation of UHPC board in this embodiment, first diaphragm 31 of pendant base 3 is equipped with rectangular hole for first diaphragm 31 passes through connecting bolt position adjustable connection on the main joist, adjusts the fore-and-aft position of first diaphragm 31, and fore-and-aft position when can adjusting the installation of UHPC board guarantees the level and smooth of UHPC board lateral surface.
Further, in the installation structure for realizing quick installation of the UHPC board in this embodiment, the back surface of the UHPC board 4 is provided with a plurality of square steel pipes 41.
A plurality of square steel pipes 41 are arranged on the back surface of the UHPC plate 4 in a staggered mode in a shape of Chinese character jing so as to enhance the strength of the UHPC plate, and the main hanging piece 21, the bottom auxiliary hanging piece 22 and the middle auxiliary hanging piece 23 are respectively arranged on the square steel pipes 41.
Further, the installation structure capable of implementing quick installation of the UHPC board in this embodiment further includes: an adapter 42.
The adapter 42 is fixed on the back of the UHPC plate 4 through a connecting back bolt, and the square steel pipe 41 is fixed on the adapter 42 through connecting pieces such as bolts, so that the square steel pipe can be conveniently connected and fixed.
Optionally, the mounting structure capable of implementing quick mounting of the UHPC board in this embodiment further includes: a steel adaptor 11.
Steel adaptor 11 can be predetermine in building the wall body, and main joist 1 is connected on steel adaptor 11, makes things convenient for main joist 1 to be fixed in the connection on building the wall body.
Further, in the installation structure capable of realizing rapid installation of the UHPC board in this embodiment, a hoisting through hole 211 is formed in the top end of the main hanger 21. The main hanging piece 21 is fixed on the UHPC board, and the UHPC board can be conveniently hoisted by external equipment through the hoisting through holes 211 on the main hanging piece 21.
In the present application, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may be directly contacting the first feature or the second feature or indirectly contacting the first feature or the second feature through an intermediate.
Also, a first feature "on," "above," and "over" a second feature may mean that the first feature is directly above or obliquely above the second feature, or that only the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lower level than the second feature.
In the description herein, reference to the description of the term "one embodiment," "some embodiments," "an example," "a specific example" or "some examples," or the like, means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (10)

1. A mounting structure for realizing rapid mounting of a UHPC board, comprising: the device comprises a main keel, a main pendant, a bottom auxiliary pendant, a pendant base and a UHPC board;
the main keel is fixed on the building wall;
the number of the main hanging pieces and the number of the bottom auxiliary hanging pieces are multiple, the main hanging pieces are arranged at the top end of the UHPC board, and the bottom auxiliary hanging pieces are arranged at the bottom end of the UHPC board;
the pendant bases are arranged on the main keel and correspond to the main pendants and the auxiliary pendants at the bottom;
and the main hanging piece and the bottom auxiliary hanging piece are both provided with notch grooves, and the notch grooves are used for inserting the hanging piece bases, so that the UHPC board is hung on the main keel.
2. The mounting structure capable of achieving rapid installation of a UHPC board according to claim 1, further comprising: a middle auxiliary hanging part;
the middle auxiliary hanging piece is arranged in the middle of the UHPC board;
the auxiliary middle hanging piece is provided with a notch groove for inserting the hanging piece base.
3. The installation structure capable of realizing rapid installation of the UHPC board according to claim 2, wherein the suspension member base is L-shaped and comprises: a first transverse plate and a first vertical plate;
the first transverse plate is connected with the main keel, and the first vertical plate is used for being inserted into the notch groove.
4. The UHPC board quick mount enabled mounting structure of claim 3, wherein the bottom end of the cutaway groove is flared.
5. The installation structure capable of realizing rapid installation of the UHPC board as recited in claim 3, wherein the main suspension member is provided with a threaded hole at the notch groove, and an adjusting bolt is engaged in the threaded hole and is used for abutting against the first vertical plate.
6. The installation structure capable of realizing rapid installation of the UHPC board as recited in claim 3, wherein the first cross plate is provided with a long hole, so that the first cross plate can be connected with the main keel in an adjustable position.
7. The installation structure capable of realizing rapid installation of the UHPC board as recited in claim 2, wherein a plurality of square steel pipes are arranged on the back surface of the UHPC board;
the square steel pipes are arranged in a staggered mode in a shape like a Chinese character jing, and the main hanging piece, the bottom auxiliary hanging piece and the middle auxiliary hanging piece are arranged on the square steel pipes.
8. The UHPC board quick mount enabled mounting structure of claim 7 further comprising: an adapter;
the adapter is fixed on the UHPC plate through bolts, and the square steel pipe is fixed on the adapter.
9. The mounting structure capable of achieving rapid installation of a UHPC board according to claim 1, further comprising: a steel adaptor;
the steel adaptor is preset in the building wall body, the main keel is arranged on the steel adaptor.
10. The installation structure capable of realizing rapid installation of the UHPC board according to any one of claims 1 to 9, wherein the main hanging piece is provided with a hoisting through hole.
CN202120765138.6U 2021-04-15 2021-04-15 Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate Active CN215290884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120765138.6U CN215290884U (en) 2021-04-15 2021-04-15 Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120765138.6U CN215290884U (en) 2021-04-15 2021-04-15 Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate

Publications (1)

Publication Number Publication Date
CN215290884U true CN215290884U (en) 2021-12-24

Family

ID=79536573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120765138.6U Active CN215290884U (en) 2021-04-15 2021-04-15 Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate

Country Status (1)

Country Link
CN (1) CN215290884U (en)

Similar Documents

Publication Publication Date Title
CN215290884U (en) Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate
CN220317073U (en) TRD shaped steel hoist and mount stability fixture and hoist thereof
CN217000827U (en) Connecting assembly for mounting and fixing scaffold steel plate net
US6513847B2 (en) Simple multiple concrete block lifting device
CN218809912U (en) Hoisting device
CN215368190U (en) Energy-saving integrated anti-drop suspended ceiling structure
CN115504364A (en) Split type frock of curtain unit hoist and mount
CN210217000U (en) Building stone fixing structure
CN210176292U (en) Adjustable universal hanging bracket applied to prefabricated building
CN208920568U (en) A kind of fan coil hanger
CN218294758U (en) Pipeline hanger and pipeline hanger system
CN219411790U (en) Scaffold for outer wall construction
CN217680754U (en) Interim strutting arrangement
CN221609199U (en) Stone curtain wall system connecting assembly capable of independently disassembling stone plate
CN218161712U (en) Novel hoist is laid in hoist and mount of loss prevention cable
CN220816787U (en) Pre-buried base water supply pipe hanger
CN216713763U (en) Scaffold
CN217003406U (en) Socket pipe line that can establish ties suspends protection in midair and uses staple bolt
CN109774885B (en) A fast loading and unloading scaffold device for FSRU
CN210739033U (en) Square pipe connecting piece
CN220505050U (en) Steel truss structure for tunnel support
CN215594411U (en) Plate-groove type embedded part and heat-insulation curtain wall system adopting same
KR200275103Y1 (en) fixing structure of slab support pipe for building
CN216430705U (en) Air pipe convenient to install
CN210179150U (en) A gallows is used in installation of mill's exhaust pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An installation structure that enables quick installation of UHPC boards

Granted publication date: 20211224

Pledgee: Shanghai Rural Commercial Bank Co.,Ltd. Songjiang sub branch

Pledgor: SHANGHAI FULL ARTS CURTAIN WALL ENGINEERING Co.,Ltd.

Registration number: Y2024310000298