CN219411790U - Scaffold for outer wall construction - Google Patents
Scaffold for outer wall construction Download PDFInfo
- Publication number
- CN219411790U CN219411790U CN202320155788.8U CN202320155788U CN219411790U CN 219411790 U CN219411790 U CN 219411790U CN 202320155788 U CN202320155788 U CN 202320155788U CN 219411790 U CN219411790 U CN 219411790U
- Authority
- CN
- China
- Prior art keywords
- pipe
- vertical
- longitudinal
- horizontal
- pipes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides an outer wall construction scaffold which comprises an interface connector assembly, wherein the outer side of the interface connector assembly is respectively connected with a vertical supporting pipe, a horizontal supporting pipe and a longitudinal supporting pipe, the lower part of the vertical supporting pipe is provided with a stable installation base assembly, the interface connector assembly comprises a rectangular connecting block, the upper part and the lower part of the rectangular connecting block are respectively welded with a vertical connecting pipe, the left side and the right side of the rectangular connecting block are respectively welded with a horizontal connecting pipe, and the front end and the rear end of the rectangular connecting block are respectively welded with a longitudinal connecting pipe. The rectangular connecting blocks, the vertical connecting pipes, the horizontal connecting pipes, the longitudinal connecting pipes and the triangular reinforcing plates are arranged, so that the vertical supporting pipes, the horizontal supporting pipes and the longitudinal supporting pipes are connected together, bolts are arranged at the connecting positions, and the safety effect is improved.
Description
Technical Field
The utility model belongs to the technical field of mechanical equipment, and particularly relates to an outer wall construction scaffold.
Background
When building or overhauling an insulation layer on the outer wall of a high-rise building, a scaffold is usually required to be built. The workman carries required instrument and stands on the scaffold frame, operates the outer wall of building, uses support steel pipe and steel pipe checkpost simultaneously to build the scaffold frame, in the build in-process, need install a plurality of steel pipe checkposts on the support steel pipe, stress concentration point is more, and the steel pipe is out of shape after the steel pipe appears pine easily, influences personal safety very easily.
Disclosure of Invention
According to the technical problem, the six connectors are arranged at the connecting positions of the scaffold for outer wall construction, so that stress concentration points can be effectively reduced, and the connecting positions are fixed through bolts and can be loosened after the steel pipes are deformed.
The technical scheme is as follows: the scaffold for the outer wall construction is characterized by comprising an interface connector assembly, wherein the outer side of the interface connector assembly is respectively connected with a vertical supporting tube, a horizontal supporting tube and a longitudinal supporting tube, and a stable installation base assembly is installed at the lower part of the vertical supporting tube.
Preferably, the interface connector assembly comprises a rectangular connecting block, wherein the upper part and the lower part of the rectangular connecting block are respectively welded with a vertical connecting pipe, the left side and the right side of the rectangular connecting block are respectively welded with a horizontal connecting pipe, and the front end and the rear end of the rectangular connecting block are respectively welded with a longitudinal connecting pipe; and triangular reinforcing plates are welded at the joints of the vertical connecting pipes, the horizontal connecting pipes and the longitudinal connecting pipes respectively.
Preferably, the stable installation base component comprises a flange plate with holes, a locking sleeve is welded at the center of the upper part of the flange plate with holes, and an inclined reinforcing sleeve is welded at the joint of the flange plate with holes and the locking sleeve.
Preferably, the vertical connecting pipes, the horizontal connecting pipes and the longitudinal connecting pipes are respectively arranged in a mutually crossing manner, and any two of the vertical connecting pipes and the horizontal connecting pipes are arranged in a mutually perpendicular manner.
Preferably, the end part of the vertical supporting pipe is connected with the inner side bolt of the vertical connecting pipe, the end part of the horizontal connecting pipe is connected with the inner side bolt of the horizontal supporting pipe, and the end part of the longitudinal connecting pipe is connected with the inner side bolt of the longitudinal supporting pipe.
Preferably, the perforated flange plate is arranged at the lower part of the rectangular connecting block, and a smooth through hole is formed in the inner side of the perforated flange plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. in the utility model, the rectangular connecting blocks, the vertical connecting pipes, the horizontal connecting pipes, the longitudinal connecting pipes and the triangular reinforcing plates are arranged, which is beneficial to connecting the vertical supporting pipes, the horizontal supporting pipes and the longitudinal supporting pipes together respectively, and bolts are arranged at the connecting positions, so that the safety effect is improved.
2. In the utility model, the arrangement of the flange plate with holes, the locking sleeve and the inclined reinforcing sleeve is beneficial to increasing the contact area of the bottom of the vertical supporting tube, preventing the ground from sinking, and the stable installation base assembly can be installed at the upper part, the horizontal supporting tube is suspended on the ceiling, and the installation mode is increased.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic structural view of the interface connector assembly of the present utility model.
Fig. 3 is a schematic structural view of the stable mount base assembly of the present utility model.
In the figure:
1. an interface connector assembly; 11. a rectangular connecting block; 12. a vertical connection pipe; 13. a horizontal connecting pipe; 14. a longitudinal connecting pipe; 15. triangular reinforcing plates; 2. a vertical support tube; 3. a horizontal support tube; 4. a longitudinal support tube; 5. stably installing a base assembly; 51. a flange plate with holes; 52. locking the sleeve; 53. and (5) inclining the reinforcing sleeve.
Detailed Description
The utility model is further described below with reference to the accompanying drawings:
examples:
as shown in fig. 1 and 2, an exterior wall construction scaffold comprises an interface connector assembly 1, wherein the outer side of the interface connector assembly 1 is respectively connected with a vertical support tube 2, a horizontal support tube 3 and a longitudinal support tube 4, and a stable installation base assembly 5 is installed at the lower part of the vertical support tube 2.
In the above embodiment, specifically, the lower part of the vertical support tube 2 at the lower part of the rectangular connecting block 11 is inserted into the inner side of the locking sleeve 52, and the connecting part is connected with a locking bolt in a threaded manner.
Principle of operation
According to the utility model, the vertical support pipes 2, the horizontal support pipes 3 and the longitudinal support pipes 4 are respectively inserted into the vertical connection pipes 12, the horizontal connection pipes 13 and the longitudinal connection pipes 14 corresponding to the outer sides of the rectangular connection blocks 11, then the connection positions are connected together through bolts, construction scaffolds with different areas can be built through various combinations, then the lower part of the lowest vertical support pipe 2 is inserted into the locking sleeve 52, the connection positions are still connected through bolts, the perforated flange plate 51 is in contact with the ground, the contact area of the bottom of the construction scaffold can be increased, the perforated flange plate 51 can be installed on the upper part of the uppermost vertical support pipe 2 when the ceiling is used indoors, then the perforated flange plate 51 is hoisted on the ceiling through expansion bolts, the occupied area of the scaffold can be reduced, and the construction space of the bottom is increased.
By using the technical scheme of the utility model or under the inspired by the technical scheme of the utility model, a similar technical scheme is designed by a person skilled in the art, so that the technical effects are achieved, and the technical effects fall into the protection scope of the utility model.
Claims (5)
1. The outer wall construction scaffold is characterized by comprising an interface connector assembly (1), wherein the outer side of the interface connector assembly (1) is respectively connected with a vertical support tube (2), a horizontal support tube (3) and a longitudinal support tube (4), and a stable installation base assembly (5) is installed at the lower part of the vertical support tube (2); the interface connector assembly (1) comprises a rectangular connecting block (11), wherein the upper part and the lower part of the rectangular connecting block (11) are respectively welded with a vertical connecting pipe (12), the left side and the right side of the rectangular connecting block (11) are respectively welded with a horizontal connecting pipe (13), and the front end and the rear end of the rectangular connecting block (11) are respectively welded with a longitudinal connecting pipe (14); the triangular reinforcing plates (15) are welded at the joints of the vertical connecting pipes (12), the horizontal connecting pipes (13) and the longitudinal connecting pipes (14) respectively.
2. The scaffold for outer wall construction according to claim 1, wherein the stable installation base assembly (5) comprises a perforated flange plate (51), a locking sleeve (52) is welded at the upper center position of the perforated flange plate (51), and an inclined reinforcing sleeve (53) is welded at the joint of the perforated flange plate (51) and the locking sleeve (52).
3. The scaffold for outer wall construction according to claim 1, wherein the vertical connection pipe (12), the horizontal connection pipe (13) and the longitudinal connection pipe (14) are respectively arranged to cross each other, and any two are arranged to be perpendicular to each other.
4. The scaffold for outer wall construction according to claim 1, wherein the end of the vertical support pipe (2) is connected to the inner side of the vertical connection pipe (12) by a bolt, the end of the horizontal connection pipe (13) is connected to the inner side of the horizontal support pipe (3) by a bolt, and the end of the longitudinal connection pipe (14) is connected to the inner side of the longitudinal support pipe (4) by a bolt.
5. The scaffold for outer wall construction according to claim 2, wherein the perforated flange plate (51) is arranged at the lower part of the rectangular connecting block (11), and a smooth through hole is formed at the inner side of the perforated flange plate (51).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320155788.8U CN219411790U (en) | 2023-01-31 | 2023-01-31 | Scaffold for outer wall construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320155788.8U CN219411790U (en) | 2023-01-31 | 2023-01-31 | Scaffold for outer wall construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219411790U true CN219411790U (en) | 2023-07-25 |
Family
ID=87238830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320155788.8U Active CN219411790U (en) | 2023-01-31 | 2023-01-31 | Scaffold for outer wall construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219411790U (en) |
-
2023
- 2023-01-31 CN CN202320155788.8U patent/CN219411790U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104389419B (en) | Encorbelment and prop up mould structure for mounting platform and a constructional method | |
CN103993728B (en) | A kind of assembling shaped steel is encorbelmented protection canopy | |
CN110725597A (en) | Construction platform erection structure and method for ring beam at top of concrete silo | |
CN111472530A (en) | Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof | |
CN203891441U (en) | Assembly type section steel overhung protective shed | |
CN210164286U (en) | Support arrangement for high altitude large-span steel structure truss installation usefulness | |
CN102261043A (en) | Assembled steel pipe upright post system | |
CN104179362A (en) | Building site guardrail fast to mount and demount | |
CN212336672U (en) | I-steel overhanging bearing frame of basket pull rod for constructional engineering | |
CN219411790U (en) | Scaffold for outer wall construction | |
CN201506692U (en) | Roofing steel structure simple lifting device and installation structure thereof | |
CN213204913U (en) | Modular prefabricated staircase operation platform | |
CN213837668U (en) | Auxiliary support suitable for hanging flower basket | |
CN210884873U (en) | Installation hanging beam and lifting device of pipeline | |
CN210084690U (en) | Hoistway with elevator | |
CN212836642U (en) | Cantilever beam structure | |
CN211340840U (en) | Tower crane foundation of internal climbing tower crane | |
CN210459181U (en) | New and old ground is wall T joint design node even | |
CN112211384A (en) | Scaffold for building site | |
CN111056460A (en) | Assembled tower crane maintenance platform and installation method | |
CN220014399U (en) | Hanging basket fixing structure | |
CN214995801U (en) | Hanging scaffold capable of being quickly installed and detached | |
CN114000695B (en) | Scaffold for supporting multilayer concrete structure and mounting method thereof | |
CN220504481U (en) | Integral lifting scaffold for steel in core tube well | |
CN220451395U (en) | Structural climbing frame attaching supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||