CN218294758U
CN218294758U CN202222061981.3U CN202222061981U CN218294758U CN 218294758 U CN218294758 U CN 218294758U CN 202222061981 U CN202222061981 U CN 202222061981U CN 218294758 U CN218294758 U CN 218294758U
Authority
CN
China
Prior art keywords
hanger
pipeline
cross beam
temporary
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222061981.3U
Other languages
Chinese (zh)
Inventor
郭泳
张鹏
宋飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN202222061981.3U priority Critical patent/CN218294758U/en
Application granted granted Critical
Publication of CN218294758U publication Critical patent/CN218294758U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline hanger and a pipeline hanger system using the same, wherein the pipeline hanger comprises a suspension part and a cross beam, and the suspension part is provided with a first connecting position and a second connecting position; the cross beam is detachably connected with the suspension piece and used for supporting a pipeline, the cross beam is connected to one of the first connecting position and the second connecting position, the other of the first connecting position and the second connecting position is suitable for installing a temporary cross beam, and the temporary cross beam is suitable for temporarily supporting the pipeline when the cross beam is replaced. The utility model discloses pipeline gallows has the advantage of being convenient for change.

Description

Pipeline hanger and pipeline hanger system
Technical Field
The utility model relates to the technical field of supports, specifically, relate to a pipeline gallows and applied this pipeline gallows's pipeline gallows system.
Background
The pipeline gallows is used for a plurality of pipelines of top hoist and mount in the building to reduce the space that indoor pipeline took, the maintenance and the maintenance of the pipeline of being convenient for, pipeline gallows among the correlation technique is difficult for changing.
SUMMERY OF THE UTILITY MODEL
The present invention is made based on the discovery and recognition by the inventors of the following facts and problems:
pipeline to in the industrial factory building that has corrosive gas or liquid need pass through pipeline gallows hoist and mount a plurality of pipelines, because corrosive gas and liquid cause the corruption to the pipeline gallows, so need change the maintenance to the pipeline gallows, pipeline gallows among the correlation technique need strut the pipeline temporarily when changing at the in-process that uses to for the pipeline provides stable support when changing the pipeline gallows, make pipeline gallows change process loaded down with trivial details, change efficiency is lower.
The present invention aims at solving at least one of the technical problems in the related art to a certain extent. Therefore, the embodiment of the utility model provides a pipeline hanger, this pipeline hanger has the advantage of being convenient for change.
The embodiment of the utility model provides a pipeline gallows system is still provided.
The pipeline hanger provided by the embodiment of the utility model comprises a hanging piece, wherein the hanging piece is provided with a first connecting position and a second connecting position; a cross beam detachably connected with the hanger and used for supporting a pipeline, wherein the cross beam is connected with one of the first connection position and the second connection position, the other of the first connection position and the second connection position is suitable for installing a temporary cross beam, and the temporary cross beam is suitable for temporarily supporting the pipeline when the cross beam is replaced.
The utility model discloses pipeline gallows has the advantage of being convenient for change.
In some embodiments, the suspension includes a connection portion adapted to mount and fix the suspension, the first connection site is opposite to the connection portion in an axial direction along the suspension, and the second connection site is spaced from the first connection site in a direction orthogonal to the axial direction.
In some embodiments, the connection part is provided with a mounting groove, and the first connection part is opposite to the mounting groove in an axial direction along the suspension.
In some embodiments, the suspension member is provided in plurality, and the suspension members are arranged at intervals along the extending direction of the cross beam.
In some embodiments, the pipe hanger includes a temporary cross-beam that is removably coupled to the hanger.
In some embodiments, the pipe hanger includes a temporary hanger detachably connected to the cross member, and the temporary hanger is adapted to temporarily suspend the cross member when the hanger is replaced.
In some embodiments, the suspension comprises a first part and a second part, the first part and the second part are arranged at intervals along the length direction of the cross beam, and the pipeline is positioned between the first part and the second part.
In some embodiments, the temporary hanger is located between the first piece and the second piece.
The pipeline hanger system provided by the embodiment of the utility model comprises a pipeline hanger which is the pipeline hanger according to any one of the above embodiments; the installation department, pipeline gallows detachably locates the installation department, the installation department is suitable for supporting the pipeline gallows.
In some embodiments, at least a portion of the mounting portion fits within the mounting slot, and the connecting portion is removably coupled to the mounting portion.
Drawings
Fig. 1 is a schematic structural view of a pipe hanger according to an embodiment of the present invention.
Fig. 2 isbase:Sub>A schematic cross-sectional view atbase:Sub>A-base:Sub>A in fig. 1.
Fig. 3 is a schematic structural diagram of the temporary hanging bracket and the temporary cross beam for installing the pipe hanging bracket according to the embodiment of the present invention.
Fig. 4 is a schematic cross-sectional view at B-B in fig. 3.
Fig. 5 is a schematic structural diagram of a temporary hanger of a pipe hanger according to an embodiment of the present invention.
Reference numerals are as follows:
a suspension frame 1; a connecting portion 11; a first wall 111; a second wall 112; a support portion 12; a boom 121; reinforcing ribs 122; a first plate 123; a second plate 124; a first connection site 13; a second connection bit 14; a first piece 101; a second piece 102;
a cross beam 2; a pipe 3; a temporary hanger 4; a temporary cross member 5; and a mounting portion 6.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings. The embodiments described below by referring to the drawings are exemplary intended for explaining the present invention, and should not be construed as limiting the present invention.
The pipe hanger using the novel embodiment of the present invention will be described with reference to fig. 1 to 5.
The utility model discloses 3 gallows of pipeline include and suspend piece 1 and crossbeam 2 in midair.
The suspension member 1 is provided with a first connecting position 13 and a second connecting position 14. Specifically, the suspension piece 1 extends in the vertical direction, the first connection position 13 and the second connection position 14 are located at the lower end of the suspension piece 1, the first connection position 13 is provided with a plurality of mounting holes, the second connection position 14 is provided with a plurality of mounting holes, and the first connection position 13 and the second connection position 14 are arranged in parallel.
The cross beam 2 is detachably connected with the hanger 1 and used for supporting the pipeline 3, the cross beam 2 is connected with one of the first connecting position 13 and the second connecting position 14, the other one of the first connecting position 13 and the second connecting position 14 is suitable for installing the temporary cross beam 5, and the temporary cross beam 5 is suitable for temporarily supporting the pipeline 3 when the cross beam 2 is replaced.
Specifically, be equipped with the through-hole on crossbeam 2, pipeline 3 passes through and supports and leans on the upper end at crossbeam 2 from the upside of crossbeam 2 to make crossbeam 2 support a plurality of pipelines 3, the through-hole can coincide with the mounting hole of first connection position 13, make the fastener can pass crossbeam 2 and first connection position 13, link up crossbeam 2 with hanging up 1 detachably, the through-hole also can coincide with the mounting hole of first connection position 13, make the fastener can pass crossbeam 2 and first connection position 13, link up crossbeam 2 with hanging up 1 detachably.
The utility model discloses the lower extreme of piece 1 that suspends in midair of 3 gallowses of pipeline is equipped with first connection position 13 and second connection position 14, can all set up crossbeam 2 on first connection position 13 and the second connection position 14, in order to support a plurality of pipelines 3, therefore, when changing single crossbeam 2 that sets up on arbitrary one in first connection position 13 and the second connection position 14, can set up crossbeam 2 and support pipeline 3 temporarily at another one of first connection position 13 and second connection position 14, thereby dismantle crossbeam 2 that will change, maintain and change.
Therefore, the utility model discloses 3 gallows of pipeline are when changing crossbeam 2, compare in the correlation technique and need not to set up support piece temporary support pipeline 3 on ground, have simplified the procedure of changing crossbeam 2, thereby make the utility model discloses the 3 gallows of pipeline have the advantage of being convenient for change.
In some embodiments, the suspension 1 includes a connection portion 11, the connection portion 11 is adapted to mount and fix the suspension 1, the first connection location 13 is opposite to the connection portion 11 in an axial direction along the suspension 1, and the second connection location 14 is arranged at a distance from the first connection location 13 in a direction orthogonal to the axial direction.
Specifically, the connection part 11 is located at the upper half part of the suspension member 1, the connection part 11 is provided with a mounting hole to be suitable for a connector to detachably connect the connection part 11 with the convex part of the concrete roof, the first connection position 13 is located right below the connection part 11 with the convex part of the concrete roof, and the second connection position 14 is located at one side of the first connection position 13 and is arranged at a distance from the first connection position 13.
It should be noted that when the hanger for 3 pipes of the present invention works normally, the cross beam 2 is connected to the first connecting portion 13, the second connecting portion 14 is vacant, and only the cross beam 2 supports the pipe 3 at this time.
From this, first connection position 13 is located connecting portion 11 directly below, makes power along the extending direction transmission that suspends in midair 1, thereby has improved the utility model discloses the stability and the structural strength of pipeline 3 gallows when normal work of embodiment.
In some embodiments, the suspension element 1 further includes a support portion 12, the support portion 12 includes a suspension rod 121, a first plate 123 and a second plate 124, the first plate 123 and the second plate 124 are located at a lower end of the suspension rod 121, and the first plate 123 and the second plate 124 are arranged at intervals along a radial direction of the suspension rod 121, the first plate 123 is provided with a plurality of through holes for the connection members to pass through, so that the first connection position 13 is formed on a side of the first plate 123 facing away from the suspension rod 121, and the second plate 124 is provided with a plurality of through holes for the connection members to pass through, so that the second connection position 14 is formed on a side of the second plate 124 facing away from the suspension rod 121.
The support portion 12 further includes a plurality of reinforcing bars 122 arranged at intervals in the circumferential direction of the hanger bar 121, a first plate 123 connected to one or more of the reinforcing bars 122, and a second plate 124 connected to one or more of the reinforcing bars 122.
Thus, the first plate 123 and the second plate 124 are connected to the hanger bar 121 by the reinforcing ribs 122, and when the cross member 2 is provided at any one of the first connection site 13 and the second connection site 14, the support portion 12 has a high structural strength to support the cross member 2.
In some embodiments, the connection part 11 is provided with a mounting groove, and the first connection site 13 is opposite to the mounting groove in an axial direction along the suspension 1.
Specifically, the mounting groove is located at the top end of the connection portion 11, the opening of the mounting groove is upward, the mounting groove vertically extends downward from the upper end of the suspension member 1, the mounting groove facilitates the connection of the connection portion 11 with the protruding portion of the concrete ceiling, and the center of the first connection portion 13 is located in the extending direction of the mounting groove.
From this, the mounting groove is convenient for improve the utility model discloses the stability that the 3 gallowss of pipeline and the bulge of concrete roof board are connected, first connection position 13 makes relatively in the mounting groove along suspending in midair 1's axial direction the utility model discloses the 3 gallowss of pipeline are at normal during operation, and crossbeam 2's atress extends along suspending in midair 1, thereby has improved the utility model discloses the structural strength of the 3 gallowss of pipeline.
In some embodiments, the suspension 1 is provided in plurality, and the plurality of suspensions 1 are arranged at intervals along the extending direction of the cross beam 2.
Specifically, a plurality of tops of suspending in midair 1 link to each other with the bulge of concrete roof respectively, a plurality of lower extremes of suspending in midair 1 link to each other with crossbeam 2 respectively, and a plurality of length direction that suspend in midair 1 along crossbeam 2 extends, are equipped with a plurality of mounted positions on crossbeam 2, and a plurality of mounted positions are arranged along the length direction interval of crossbeam 2, and the quantity of mounted position is greater than the quantity that suspends in midair 1, and a plurality of fulcrum positions that suspend in midair 1 to crossbeam 2 extend along the length direction of crossbeam 2.
From this, a plurality of fulcrums quantity that suspend in midair 1 increase crossbeam 2 on the one hand to increase crossbeam 2's stability, on the other hand a plurality of weight that suspend in midair 1 and undertake crossbeam 2 and partial pipeline 3 jointly have reduced the single atress that suspends in midair 1, thereby make suspend in midair 1 difficult emergence fatigue failure, thereby improve the utility model discloses the life-span of the 3 gallows of pipeline.
In some embodiments, the pipe 3 hanger comprises a temporary cross beam 5, the temporary cross beam 5 being detachably connected with the suspension 1.
Specifically, the temporary cross member 5 extends in the same direction as the cross member 2, the temporary cross member 5 can be detachably connected to the suspension member 1 through the second connection site 14, and the temporary cross member 5 is adapted to be mounted at the second connection site 14 to temporarily support the pipeline 3 when the cross member 2 is replaced or maintained. In order to reduce the bearing capacity of hanging part 1, accomplish at crossbeam 2 and change or maintain the back, dismantle with reduction with interim crossbeam 5 the utility model discloses the dead weight of pipeline 3 gallows of embodiment.
From this, through setting up interim crossbeam 5, when crossbeam 2 is dismantled and is changed or maintain, interim crossbeam 5 can support pipeline 3, compare in the correlation technique and need not to set up support piece in ground and support pipeline 3 temporarily, has simplified the procedure of changing crossbeam 2, thereby makes the utility model discloses a 3 gallows of pipeline have the advantage of being convenient for change.
In some embodiments, the pipe 3 hanger comprises a temporary hanger 4, the temporary hanger 4 being detachably connected to the cross beam 2, and the temporary hanger 4 being adapted to temporarily suspend the cross beam 2 when replacing the suspension 1.
Specifically, the temporary hanger 4 extends in the vertical direction, and the upper end of the temporary hanger 4 is detachably connected to the concrete ceiling, the lower end of the temporary hanger 4 is detachably connected to the cross member 2, and the temporary cross member 5 includes a temporary connecting portion 11, and the temporary connecting portion 11 is adapted to be connected to a protrusion of the concrete ceiling in a fitting manner.
Therefore, the utility model discloses 3 gallows of pipeline need suspend in midair 1 with arbitrary one when hanging in the change and dismantle, through interim gallows 4 temporary connection between concrete roof and crossbeam 2, make the atress of hanging in midair 1 that is not dismantled roughly the same with the atress of normal during operation, avoid suspending in midair 1 because dismantle single and lead to the pulling force that the surplus hung in midair 1 and received to exceed the limit bearing tension who suspends in midair 1, thereby improved the utility model discloses 3 gallows of pipeline are changing the structural strength who suspends in midair 1 in the change.
In some embodiments, the suspension 1 includes a first member 101 and a second member 102, the first member 101 and the second member 102 are arranged at intervals along the length direction of the cross beam 2, and the pipe 3 is located between the first member 101 and the second member 102.
Specifically, the suspension 1 includes a first member 101 and a second member 102, the first member 101 and the second member 102 are arranged in parallel at an interval along the extending direction of the cross beam 2, the lower end of the first member 101 is connected to one end of the cross beam 2, and the lower end of the second member 102 is connected to the other end of the cross beam 2.
Therefore, the first piece 101 and the second piece 102 are respectively connected with two ends of the cross beam 2, and the maximum span is formed between the connection point of the first piece 101 and the cross beam 2 and the connection point of the second piece 102 and the cross beam 2, so that the first piece 101 and the second piece 102 can stably support the cross beam 2 and the cross beam 2 is prevented from swinging along the extending direction of the cross beam 2.
In some embodiments, the temporary hanger 4 is located between the first piece 101 and the second piece 102.
Specifically, before any one of the first and second members 101 and 102 is replaced, the temporary hanger 4 is connected between the concrete roof and the cross member 2 so that the temporary hanger 4 temporarily supports the cross member 2 in place of the first or second member 101 or 102 that needs to be replaced. The position of the temporary hanger 4 in the extending direction of the cross beam 2 is between the first piece 101 and the second piece 102.
Therefore, when any one of the first part 101 and the second part 102 is replaced, the other one of the first part 101 and the second part 102 and the temporary hanger 4 support the cross beam 2 together, the temporary hanger 4 is located between the first part 101 and the second part 102, so that the temporary hanger 4 and any one of the first part 101 and the second part 102 have a better supporting effect when supporting the cross beam 2 and the pipeline 3, thereby the pipeline 3 hanger provided by the embodiment of the invention can still have a better supporting effect on the pipeline 3 when the suspension part 1 is replaced, the process of temporary support on the ground is omitted, and the pipeline 3 hanger provided by the embodiment of the invention has the advantage of convenient replacement.
The pipe 3 hanger system according to the embodiment of the present invention will be described with reference to the accompanying drawings.
The pipeline 3-hanger system provided by the embodiment of the utility model comprises a pipeline 3-hanger, wherein the pipeline 3-hanger is the pipeline 3-hanger according to any one of the embodiments; a mounting portion 6 to which the pipe 3 hanger is detachably attached, the mounting portion 6 being adapted to support the pipe 3 hanger.
Specifically, the bulge of the concrete roof forms a mounting portion 6, and the cross beam 2 is arranged in parallel with the mounting portion 6 at a spacing to define a plurality of mounting spaces between the cross beam 2 and the mounting portion 6 through which the pipes 3 pass. The installation part 6 is provided with a plurality of connection parts 11, the connection parts 11 are arranged at intervals along the extension direction of the beam 2, and the connection parts 11 correspond to the installation positions on the beam 2 one by one.
From this, 6 protrusions of installation department in the concrete roof, be convenient for on the one hand the utility model discloses the pipeline 3 gallows of embodiment links to each other through installation department 6 with the concrete roof, has reduced the utility model discloses the work load of the 3 gallows installations of pipeline, have between the lower extreme of on the other hand installation department 6 and the concrete roof and set for the interval to increased the interval between pipeline 3 and the concrete roof, thereby avoided corrosive gas or the corrosive liquid among the pipeline 3 to destroy the concrete roof.
In some embodiments, at least a portion of the mounting portion 6 fits within the mounting slot, and the connecting portion 11 is removably coupled to the mounting portion 6.
Specifically, the mounting parts 6 extend in the extending direction of the cross beam 2, the mounting parts 6 protrude downward from the concrete ceiling so that the mounting parts 6 can be fitted into the mounting grooves, and the connection member penetrates through the groove walls of the mounting grooves and the mounting parts 6 so as to connect the hanger 1 of the hanger for the pipeline 3 with the mounting parts 6.
The mounting groove has a first wall 111 and a second wall 112, the first wall 111, the second wall 112, and an upper end of the suspension rod 121 define the mounting groove, the first wall and the second wall 112 are connected to both end surfaces of the mounting part 6 in a thickness direction of the mounting part 6 when the mounting part 6 is assembled to the mounting groove, and the upper end of the suspension rod 121 is connected to a lower end of the mounting part 6.
From this, when installation department 6 assembles in the mounting groove, will through first wall 111 and second wall 112 the utility model discloses pipeline 3 gallows is fixed in installation department 6 along the extending direction of pipeline 3 to prevent that pipeline 3 gallows from along the extending direction swing of pipeline 3, making the utility model discloses the pipeline 3 gallows is connected stably with installation department 6.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrated; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be interconnected within two elements or in a relationship where two elements interact with each other unless otherwise specifically limited. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present application, unless expressly stated or limited otherwise, a first feature "on" or "under" a second feature may be directly contacting the second feature or the first and second features may be indirectly contacting the second feature through intervening media. Also, a first feature "on," "above," and "over" a second feature may be directly on or obliquely above the second feature, or simply mean that the first feature is at a higher level than the second feature. A first feature "under," "beneath," and "under" a second feature may be directly under or obliquely under the second feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
In the present disclosure, the terms "one embodiment," "some embodiments," "an example," "a specific example," or "some examples" or the like mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Moreover, various embodiments or examples and features of various embodiments or examples described in this specification can be combined and combined by one skilled in the art without being mutually inconsistent.
Although the above embodiments have been shown and described, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations to the above embodiments by those of ordinary skill in the art are intended to be within the scope of the present invention.

Claims (10)

1. A pipe hanger, comprising:
the suspension piece is provided with a first connecting position and a second connecting position;
a cross beam detachably connected with the hanger and supporting a pipeline, the cross beam being connected to one of the first connection location and the second connection location, the other of the first connection location and the second connection location being adapted to mount a temporary cross beam adapted to temporarily support the pipeline when the cross beam is replaced.
2. The pipe hanger of claim 1, wherein the hanger includes a connecting portion adapted to fit and fix the hanger, the first connecting portion is opposite to the connecting portion in an axial direction along the hanger, and the second connecting portion is spaced apart from the first connecting portion in a direction orthogonal to the axial direction.
3. The piping hanger of claim 2, wherein the connection part is provided with a mounting groove, and the first connection part is located opposite to the mounting groove in an axial direction of the hanger.
4. The piping hanger of claim 1, wherein said hanger is plural, and plural hangers are arranged at intervals along an extending direction of said cross member.
5. The pipe hanger defined in claim 1, including a temporary cross member that is removably connected to the hanger.
6. A pipe hanger as claimed in claim 1, including a temporary hanger removably connected to the cross beam and adapted to temporarily suspend the cross beam during replacement of the hanger.
7. A pipe hanger as claimed in claim 6, wherein the suspension member comprises first and second members spaced apart along the length of the cross member, the pipe being located between the first and second members.
8. The pipe hanger defined in claim 7, wherein the temporary hanger is located between the first member and the second member.
9. A pipe hanger system, comprising:
a pipe hanger according to any one of claims 3-8;
the installation department, pipeline gallows detachably locates the installation department, the installation department is suitable for supporting the pipeline gallows.
10. The pipe hanger system of claim 9, wherein at least a portion of said mounting portion fits within said mounting slot of said pipe hanger, said connecting portion of said pipe hanger being removably connected to said mounting portion of said pipe hanger.
CN202222061981.3U 2022-08-04 2022-08-04 Pipeline hanger and pipeline hanger system Active CN218294758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222061981.3U CN218294758U (en) 2022-08-04 2022-08-04 Pipeline hanger and pipeline hanger system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222061981.3U CN218294758U (en) 2022-08-04 2022-08-04 Pipeline hanger and pipeline hanger system

Publications (1)

Publication Number Publication Date
CN218294758U true CN218294758U (en) 2023-01-13

Family

ID=84793516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222061981.3U Active CN218294758U (en) 2022-08-04 2022-08-04 Pipeline hanger and pipeline hanger system

Country Status (1)

Country Link
CN (1) CN218294758U (en)

Similar Documents

Publication Publication Date Title
CN218294758U (en) Pipeline hanger and pipeline hanger system
CN108105476B (en) Anti-shaking fixing method for siphon drain pipe crossing grid structure
CN107178658B (en) Footstock structure of lifting rod type support and hanger
CN213236327U (en) Eight-character adjustable pipe bracket
CN215981218U (en) Pipeline installation gallows under L shaped steel roof beam
CN212957194U (en) Connecting device
CN220247546U (en) Hanging basket assembly encorbelments
KR101361594B1 (en) System air-conditioner installation setting means and method thereof
CN219429489U (en) Fixing device and hoisting system
CN220366561U (en) Auxiliary device for hanging plate house water heater
CN107143697B (en) Hanger rod type support hanger
CN216158488U (en) Pipeline installation gallows under I-steel roof beam
CN113684962B (en) Pipeline layout and suspended ceiling integrated construction system for industrial and commercial places
CN215290884U (en) Mounting structure capable of realizing rapid mounting of UHPC (ultra high performance polycarbonate) plate
CN213361342U (en) Indoor oblique hoisting frame for fan coil water supply and return pipeline
KR200275103Y1 (en) fixing structure of slab support pipe for building
CN204681017U (en) A kind of joist steel upright base
CN217734539U (en) Adjustable assembled suspended ceiling reverse supporting device
CN217002354U (en) A industry fan hoisting structure for concrete beam
CN220060797U (en) Detachable pipeline supporting and hanging frame
CN219975635U (en) Fixed establishment and pipeline gallows
CN218713990U (en) Anti-seismic profile steel structure
CN214834681U (en) Scaffold assembling structure
CN218541439U (en) Suspension type operation platform