CN215290253U - Prefabricated retaining wall structure of building engineering - Google Patents
Prefabricated retaining wall structure of building engineering Download PDFInfo
- Publication number
- CN215290253U CN215290253U CN202120935631.8U CN202120935631U CN215290253U CN 215290253 U CN215290253 U CN 215290253U CN 202120935631 U CN202120935631 U CN 202120935631U CN 215290253 U CN215290253 U CN 215290253U
- Authority
- CN
- China
- Prior art keywords
- shingle nail
- groove
- seted
- base
- fixture block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a prefabricated retaining wall structure of building engineering, the on-line screen storage device comprises a base, the lower extreme fixedly connected with inserted bar of base, the first shingle nail of upper end intermediate position fixed connection of base, first connecting groove has been seted up to the upper end of first shingle nail, first joint groove has been seted up to the bottom in the first connecting groove, the fixed fixture block has been cup jointed in the first connecting groove, the upper end fixedly connected with second shingle nail of fixed fixture block, the second spread groove has been seted up to the upper end of second shingle nail, second joint groove has been seted up to the inside bottom of second spread groove. Fix first shingle nail in the regulation position that can be better through base, first shingle nail and the inserted bar that sets up, thereby insert the underground through the inserted bar and make firm more and stable of first wallboard, then splice the second wallboard that first spread groove and second spread groove through setting up can be better to be applicable to in the building of co-altitude not.
Description
Technical Field
The utility model belongs to the technical field of building engineering, especially, relate to a prefabricated retaining wall structure of building engineering.
Background
The retaining wall is a structure for supporting roadbed filling or hillside soil and preventing the filling or soil from deforming and destabilizing.
In the use of current retaining wall, because the retaining wall structure adopts the structure of integration more to lead to the bulky of retaining wall, the quality is heavy, has wasted a large amount of time and energy that the staff installed the retaining wall, moreover great reduction work efficiency.
SUMMERY OF THE UTILITY MODEL
The problem to prior art exists, the utility model provides a prefabricated retaining wall structure of building engineering, through the base that sets up, first shingle nail and inserted bar can be better fix first shingle nail in the regulation position, thereby insert the underground through the inserted bar and make more firm and stable of first wallboard, then can be better splice the second wallboard through the first spread groove that sets up and second spread groove to be applicable to in the building of co-altitude not.
The utility model discloses a realize like this, the on-line screen storage device comprises a base, the lower extreme fixedly connected with inserted bar of base, the first shingle nail of upper end intermediate position fixed connection of base, first connecting groove has been seted up to the upper end of first shingle nail, first joint groove has been seted up to the bottom in the first connecting groove, fixed fixture block has been cup jointed in the first connecting groove, the upper end fixedly connected with second shingle nail of fixed fixture block, the second spread groove has been seted up to the upper end of second shingle nail, second joint groove has been seted up to the inside bottom of second spread groove.
As the utility model discloses it is preferred, the lower extreme fixedly connected with joint piece of fixed fixture block, the joint piece is provided with two at the lower extreme of fixed fixture block.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a base, first shingle nail and the inserted bar that sets up can be better fix first shingle nail in the regulation position, thereby insert the underground through the inserted bar and make firmer and stable of first wallboard more, then can be better splice the second wallboard through the first spread groove and the second spread groove that set up to be applicable to in the not building of co-altitude.
2. The utility model discloses a joint piece that sets up, through the lower extreme fixed connection joint piece at fixed fixture block, then set up two with the joint piece at the lower extreme of fixed fixture block in order to better install the second shingle nail to make the more stability of joint.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a structural sectional view provided in the embodiment of the present invention.
In the figure: 1. a base; 2. inserting a rod; 3. a first shingle; 4. a first connecting groove; 5. a second shingle; 6. a second connecting groove; 7. a second clamping groove; 8. a first clamping groove; 9. fixing the fixture block; 10. and a clamping block.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 2, the embodiment of the utility model provides a pair of prefabricated retaining wall structure of building engineering, including base 1, base 1's lower extreme fixedly connected with inserted bar 2, the first shingle nail 3 of base 1's upper end intermediate position fixed connection, first connecting groove 4 has been seted up to the upper end of first shingle nail 3, first joint groove 8 has been seted up to the bottom in first connecting groove 4, the fixed fixture block 9 has been cup jointed in first connecting groove 4, the upper end fixedly connected with second shingle nail 5 of fixed fixture block 9, second connecting groove 6 has been seted up to the upper end of second shingle nail 5, second joint groove 7 has been seted up to the inside bottom of second connecting groove 6.
Referring to fig. 1 and 2, the lower end of the fixed fixture block 9 is fixedly connected with two clamping blocks 10, and the two clamping blocks 10 are arranged at the lower end of the fixed fixture block 9.
Adopt above-mentioned scheme: through the joint piece 10 that sets up, through the lower extreme fixed connection joint piece 10 at fixed fixture block 9, then set up two with joint piece 10 at the lower extreme of fixed fixture block 9 in order can be better to install second shingle nail 5 to make the more stability of joint.
The utility model discloses a theory of operation:
when using, at first place the device in the regulation position, then the inserted bar 2 through the setting of base 1 lower extreme, thereby insert ground with inserted bar 2 and fix base 1, then through the first shingle nail 3 at base 1 upper end fixed connection, be connected with second shingle nail 5 through first connecting groove 4 on the first shingle nail 3, thereby come to assemble first shingle nail 3 and second shingle nail 5 according to the height of difference, thereby make more convenience, make the transportation more convenient simultaneously, the time of work has been saved greatly, and the work efficiency is improved.
In summary, the following steps: this prefabricated retaining wall structure of building engineering, base 1 through setting up, inserted bar 2, first shingle nail 3, first connecting groove 4, second shingle nail 5, second connecting groove 6, second joint groove 7, first joint groove 8, the cooperation of fixed fixture block 9 and joint piece 10 is used, in the use of having solved current retaining wall, because the retaining wall structure adopts the structure of integration more, thereby the volume that has leaded to the retaining wall is big, the quality is heavy, the plenty of time and the energy of staff's installation retaining wall have been wasted, and great reduction work efficiency's problem.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (2)
1. The utility model provides a prefabricated retaining wall structure of building engineering, includes base (1), its characterized in that: the lower extreme fixedly connected with inserted bar (2) of base (1), the first shingle nail of upper end intermediate position fixed connection (3) of base (1), first connecting groove (4) have been seted up to the upper end of first shingle nail (3), first joint groove (8) have been seted up to the bottom in first connecting groove (4), fixed fixture block (9) have been cup jointed in first connecting groove (4), upper end fixedly connected with second shingle nail (5) of fixed fixture block (9), second connecting groove (6) have been seted up to the upper end of second shingle nail (5), second joint groove (7) have been seted up to the inside bottom of second connecting groove (6).
2. A construction-engineering prefabricated retaining wall structure according to claim 1, characterized in that: the lower extreme fixedly connected with joint piece (10) of fixed fixture block (9), joint piece (10) are provided with two at the lower extreme of fixed fixture block (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120935631.8U CN215290253U (en) | 2021-05-05 | 2021-05-05 | Prefabricated retaining wall structure of building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120935631.8U CN215290253U (en) | 2021-05-05 | 2021-05-05 | Prefabricated retaining wall structure of building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215290253U true CN215290253U (en) | 2021-12-24 |
Family
ID=79539067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120935631.8U Active CN215290253U (en) | 2021-05-05 | 2021-05-05 | Prefabricated retaining wall structure of building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215290253U (en) |
-
2021
- 2021-05-05 CN CN202120935631.8U patent/CN215290253U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207160344U (en) | A kind of plug-in PC wallboard connecting mechanisms of dot point parallel-moving type and device | |
CN206916774U (en) | The tool bracing system of spigot-and-socket piping lane bellmouth deformation slit formwork | |
CN215290253U (en) | Prefabricated retaining wall structure of building engineering | |
CN205777813U (en) | Be suitable to the electric power pylon of mountain terrain | |
CN212927043U (en) | Concrete form strutting arrangement for building engineering | |
CN210530407U (en) | Assembled steel constructs for construction support for construction | |
CN213763862U (en) | Hydraulic engineering rebar connection fixing device | |
CN203755503U (en) | Point supporting type glass curtain wall fully-hidden supporting device | |
CN210140822U (en) | Pile inserting for construction equipment | |
CN207339731U (en) | Photovoltaic module support base for concrete roof | |
CN215926989U (en) | Be used for building engineering assembled guardrail of maintaining | |
CN206800452U (en) | A kind of assembled pipe gallery support of industrialized production | |
CN2828212Y (en) | Adjustable bracket for scaffold | |
CN209924123U (en) | Transformer substation's assembled close rib steel construction | |
CN212773614U (en) | Reinforcing apparatus for container room | |
CN206529796U (en) | A kind of outer wall formwork of basement installs strengthening construction platform | |
CN214006763U (en) | Fender device is enclosed with environmental protection to construction | |
CN215670747U (en) | Adjustable decoration keel | |
CN211080984U (en) | Scaffold frame stabilising arrangement of pre-buried formula | |
CN110805316A (en) | Container assembly type frame steel assembly structure house | |
CN219604400U (en) | Ecological retaining wall for hydraulic engineering | |
CN211447241U (en) | High-temperature-resistant composite steel structure | |
CN212248314U (en) | Firm in structure's combination formula foundation pile | |
CN214301723U (en) | Novel environmental protection concrete pipe pile | |
CN212011978U (en) | Temporary cable erecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |