CN210140822U - Pile inserting for construction equipment - Google Patents

Pile inserting for construction equipment Download PDF

Info

Publication number
CN210140822U
CN210140822U CN201920659451.4U CN201920659451U CN210140822U CN 210140822 U CN210140822 U CN 210140822U CN 201920659451 U CN201920659451 U CN 201920659451U CN 210140822 U CN210140822 U CN 210140822U
Authority
CN
China
Prior art keywords
stake
butt joint
pile inserting
construction equipment
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920659451.4U
Other languages
Chinese (zh)
Inventor
蔡黎明
叶天秀
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Huayu Engineering Co Ltd
Original Assignee
Hubei Huayu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Huayu Engineering Co Ltd filed Critical Hubei Huayu Engineering Co Ltd
Priority to CN201920659451.4U priority Critical patent/CN210140822U/en
Application granted granted Critical
Publication of CN210140822U publication Critical patent/CN210140822U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a stake of inserting for construction equipment, including stake base and stake body, the inside stake groove of having seted up of stake base, stake body bottom is located the stake inslot side of stake base, stake body top is provided with the top frame, the top frame is located the stake body outside of inserting, top frame inboard is provided with inserts the position groove, the inside position groove of inserting of top frame installs external frame, stake body top fixedly connected with top butt joint plug, be provided with the installation roof between external frame and the top butt joint plug, butt joint equipment hole has all been seted up to stake body top and below, the utility model relates to a construction equipment technical field. This pile inserting for construction equipment has reached easy to assemble, and the purpose that the structure is firm after the installation, inserts through the connecting reinforcement after having set up the multiunit pile inserting and docks the equipment hole and dock the equipment hole perpendicularly in, can constitute the bolt network, guarantees the stability of whole structure.

Description

Pile inserting for construction equipment
Technical Field
The utility model relates to a construction equipment technical field specifically is an stake for construction equipment.
Background
Conventionally, post-construction anchors are classified into adhesive anchors and driving-in-body anchors (metal expansion anchors), and they are classified into a plurality of types. The construction of the post-construction anchor bolt of the bonding anchor bolt is that a capsule which encapsulates the adhesive or a perforation of the adhesive is formed in a concrete wall body in a buried mode, the anchor bolt is inserted, the adhesive is hardened to fix the concrete and the anchor bolt, the installation is completed, the existing pile inserting is designed independently, the later-stage connection needs an external steel frame, the installation is inconvenient, and the structure is not stable enough.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a stake is inserted for construction equipment has solved present stake and has been the independent design, and the later stage contact needs external steelframe to it is inconvenient to install, the problem that the structure is firm inadequately.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a pile inserting for construction equipment, includes pile inserting base and pile inserting body, the inside pile inserting groove of having seted up of pile inserting base, pile inserting body bottom is located the pile inserting inslot side of pile inserting base, pile inserting body top is provided with the top frame, the top frame is located the pile inserting body outside, top frame inboard is provided with the position groove of inserting, the internal position groove of inserting of top frame installs external frame, pile inserting body top fixedly connected with top butt joint plug, be provided with the installation roof between external frame and the top butt joint plug.
Preferably, the upper part and the lower part of the pile inserting body are provided with butt joint assembling holes, and the position of the middle part of the pile inserting body, which is vertically butted with the assembling holes, is provided with a vertical butt joint assembling hole.
Preferably, the butt joint assembling hole and the vertical butt joint assembling hole are both provided with connecting steel bars.
Preferably, the bottom of the pile inserting body is provided with a butt joint mounting head, two side faces of the pile inserting base are provided with mounting bolt holes, and the pile inserting base is fixedly connected with the butt joint mounting head through mounting bolts.
Preferably, bolt through holes are formed in the two sides of the mounting top plate, and the top of the mounting top plate is provided with the bolt through holes.
Preferably, the position of the outer side of the top frame, which corresponds to the external rack, is provided with an external mounting bolt, and the top frame is fixedly connected with the external rack through the external mounting bolt.
(III) advantageous effects
The utility model provides an stake for construction equipment. The method has the following beneficial effects:
this pile inserting for construction equipment, with pile inserting base fix ground or ground in advance, insert the butt joint installation head of pile inserting body in the pile inserting groove of pile inserting base, it is fixed with pile inserting body and pile inserting base to use mounting bolt, the top frame that sets up above the pile inserting body is the plug head, the top frame is through insertion groove and external mounting bolt installation external frame, the butt joint plug convenience that sets up at pile inserting body top docks with the butt joint hole of equipment, and the installation roof that sets up between external frame and top butt joint plug can be with equipment fixing on the installation roof through the bolt through-hole, easy to assemble has been reached, the purpose that the structure is firm after the installation, insert butt joint equipment hole and perpendicular butt joint equipment hole through the connecting reinforcement after having set up the multiunit pile inserting, can constitute the plug network, guarantee the stability of whole structure.
Drawings
Fig. 1 is a schematic overall structure diagram of the present invention;
FIG. 2 is a schematic view of the top of the plug of the present invention;
fig. 3 is a schematic structural view of the bottom of the plug of the present invention.
In the figure: the pile inserting device comprises a pile inserting base 1, a pile inserting body 2, a top frame 3, an external frame 4, an external mounting bolt 5, a mounting top plate 6, a top butt joint plug 7, a bolt through hole 8, a butt joint assembly hole 9, a connecting steel bar 10, a vertical butt joint assembly hole 11, a butt joint mounting head 12 and a mounting bolt 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a pile inserting for construction equipment, including pile inserting base 1 and pile inserting body 2, the pile inserting groove has been seted up to pile inserting base 1 inside, 2 bottoms of pile inserting body are located pile inserting base 1's pile inserting inslot sides, 2 tops of pile inserting body are provided with top frame 3, top frame 3 is located the pile inserting body 2 outsides, 3 inboards of top frame are provided with the position groove of inserting, external frame 4 is installed in the position groove of inserting of 3 insides of top frame, 2 top fixedly connected with top butt joint spigots 7 of pile inserting body, be provided with installation roof 6 between external frame 4 and the top butt joint spigots 7.
The butt joint equipment hole 9 has all been seted up to stake insertion body 2 top and below, and perpendicular butt joint equipment hole 11 has been seted up to the position of perpendicular butt joint equipment hole 9 in stake insertion body 2 middle part.
And connecting steel bars 10 are arranged in the butt joint assembling holes 9 and the vertical butt joint assembling holes 11.
The bottom of the pile inserting body 2 is provided with a butt joint mounting head 12, two side faces of the pile inserting base 1 are provided with mounting bolt holes, and the pile inserting base 1 is fixedly connected with the butt joint mounting head 12 through mounting bolts 13.
The top of the two sides of the mounting top plate 6 is provided with a bolt through hole 8.
The position of the outer side of the top frame 3 just corresponding to the external rack 4 is provided with an external mounting bolt 5, and the top frame 3 is fixedly connected with the external rack 4 through the external mounting bolt 5.
During the use, with pile inserting base 1 fix ground or ground in advance, insert the butt joint installation head 12 of pile inserting body 2 in the pile inserting groove of pile inserting base 1, use construction bolt 13 to fix pile inserting body 2 and pile inserting base 1, top frame 3 that sets up in pile inserting body 2 top is the plug head, external frame 4 is installed through insertion groove and external construction bolt 5 to top frame 3, the butt joint plug 7 of setting up at pile inserting body 2 top is convenient to dock with the butt joint hole of equipment, and the installation roof 6 that sets up between external frame 4 and top butt joint plug 7 can be with equipment installation on installation roof 6 through bolt through-hole 8, insert butt joint equipment hole 9 and perpendicular butt joint equipment hole 11 through connecting reinforcement 10 after having set up the multiunit pile inserting, can constitute the plug network, guarantee the stability of whole structure.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an stake is inserted for construction equipment, includes stake base (1) and stake body (2), its characterized in that: stake base (1) is inside to have seted up the stake pocket, stake body (2) bottom is located the stake pocket inboard of stake base (1), stake body (2) top is provided with top frame (3), top frame (3) are located the stake body (2) outside, top frame (3) inboard is provided with the position groove of inserting, external frame (4) are installed to the inside position groove of inserting of top frame (3), stake body (2) top fixedly connected with top butt joint plug (7), be provided with between external frame (4) and the top butt joint plug (7) installation roof (6).
2. The stake of claim 1 for construction equipment, characterized in that: the pile inserting device is characterized in that butt joint assembling holes (9) are formed in the upper portion and the lower portion of the pile inserting body (2), and vertical butt joint assembling holes (11) are formed in the position, perpendicular to the butt joint assembling holes (9), in the middle of the pile inserting body (2).
3. The stake of claim 2 for construction equipment, characterized in that: and connecting steel bars (10) are arranged in the butt joint assembly holes (9) and the vertical butt joint assembly holes (11).
4. The stake of claim 1 for construction equipment, characterized in that: the pile inserting device is characterized in that a butt joint mounting head (12) is arranged at the bottom of the pile inserting body (2), mounting bolt holes are formed in two side faces of the pile inserting base (1), and the pile inserting base (1) is fixedly connected with the butt joint mounting head (12) through mounting bolts (13).
5. The stake of claim 1 for construction equipment, characterized in that: and bolt through holes (8) are formed in the two sides of the mounting top plate (6) and mounted at the tops.
6. The stake of claim 1 for construction equipment, characterized in that: the outer side of the top frame (3) is provided with an external mounting bolt (5) at a position corresponding to the external rack (4), and the top frame (3) is fixedly connected with the external rack (4) through the external mounting bolt (5).
CN201920659451.4U 2019-05-09 2019-05-09 Pile inserting for construction equipment Expired - Fee Related CN210140822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920659451.4U CN210140822U (en) 2019-05-09 2019-05-09 Pile inserting for construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920659451.4U CN210140822U (en) 2019-05-09 2019-05-09 Pile inserting for construction equipment

Publications (1)

Publication Number Publication Date
CN210140822U true CN210140822U (en) 2020-03-13

Family

ID=69733713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920659451.4U Expired - Fee Related CN210140822U (en) 2019-05-09 2019-05-09 Pile inserting for construction equipment

Country Status (1)

Country Link
CN (1) CN210140822U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031010A (en) * 2020-08-12 2020-12-04 罗仁富 Building prestress absorption combined type connecting pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031010A (en) * 2020-08-12 2020-12-04 罗仁富 Building prestress absorption combined type connecting pile

Similar Documents

Publication Publication Date Title
CN210140822U (en) Pile inserting for construction equipment
CN211817025U (en) Prefabricated shear force wall of assembled
KR101341176B1 (en) Offshore pile-type support structure and construction method thereof
CN212670855U (en) Assembly type building node connection structure
CN214994945U (en) Assembled partition wall
CN214884742U (en) Take prefabricated floor of support connector
JPS63181848A (en) Construction method for clamping outer wall panel
JP7082173B1 (en) How to correct the height shortage of screw piles
CN210831857U (en) Combined street lamp mounting base
CN221481103U (en) Prefabricated wallboard for spliced wall
CN217379223U (en) Anti-seismic staggered truss steel frame structure
CN108612199B (en) Module building connection structure for steel structure core tube
CN216475614U (en) Building steel column connecting assembly
CN217500237U (en) Prefabricated component for assembled concrete side plate
CN214576286U (en) Protective fence upright post
CN216405735U (en) Primary and secondary beam connecting joint of steel structure
CN216706491U (en) Assembly part convenient to H shaped steel is established immediately to high efficiency
CN217840880U (en) Assembly type wall body assembly for opening
CN211714181U (en) Building beam column concrete prefabricated component
CN218148879U (en) Construction mechanism of steel structure cross column node
CN211816915U (en) Light steel corner node of assembled wall body
CN214544184U (en) Formula installing support is born on photovoltaic module's road surface
CN218497767U (en) Building wall extends and articulates structure
CN211080306U (en) Precast concrete piping lane
CN213062505U (en) Prefabricated shear force wall of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200313

Termination date: 20200509

CF01 Termination of patent right due to non-payment of annual fee