CN205777813U - Be suitable to the electric power pylon of mountain terrain - Google Patents

Be suitable to the electric power pylon of mountain terrain Download PDF

Info

Publication number
CN205777813U
CN205777813U CN201620722659.2U CN201620722659U CN205777813U CN 205777813 U CN205777813 U CN 205777813U CN 201620722659 U CN201620722659 U CN 201620722659U CN 205777813 U CN205777813 U CN 205777813U
Authority
CN
China
Prior art keywords
tower
linkage section
long
leg
tower leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620722659.2U
Other languages
Chinese (zh)
Inventor
周恩平
郭艳军
赵庆斌
敬捷
于学玉
蒲奥
张洪侨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Design and Consulting Co Ltd
Original Assignee
Sichuan Electric Power Design and Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Design and Consulting Co Ltd filed Critical Sichuan Electric Power Design and Consulting Co Ltd
Priority to CN201620722659.2U priority Critical patent/CN205777813U/en
Application granted granted Critical
Publication of CN205777813U publication Critical patent/CN205777813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

This utility model relates to the electric power pylon being suitable to mountain terrain, including tower body, also includes the short tower leg that is connected with tower body and long tower leg, and described short tower leg is used for being connected to upward slope pile foundation, and upward slope pile foundation inserts the below ground of uphill side;Described long tower leg is used for being connected to descending pile foundation, and descending pile foundation inserts the below ground of descending side;Being connected by linkage section between described long tower leg and tower body, described linkage section is truss structure.Above-mentioned electric power pylon, arranges linkage section between long tower leg and tower body, in the range of making long leg structure be positioned at design limit, and the differential expansion of the long and short lower limb of steel tower, the domatic landform that adapting to property is the most precipitous;When linkage section uses dismountable optimal way, can choose whether linkage section is installed according to on-the-spot actual steep.

Description

Be suitable to the electric power pylon of mountain terrain
Technical field
This utility model relates to the steel tower of high voltage power transmission, and a kind of being suitable to builds the transmission of electricity ferrum at mountain terrain Tower.
Background technology
China is with a varied topography various, and during power grid construction, transmission line of electricity inevitably needs to pass through high mountains and steep cliffs, And set up electric power pylon at mountain terrain and be always the difficult point of engineering.
Existing electric power pylon is the truss structure being made up of main material, oblique material and horizontal material, steel tower include from top to bottom tower head, Tower body and tower leg.For general gentle slope, short tower leg and long tower leg can be designed to, be separately mounted to uphill side and descending side is come Ensure that tower body is vertical.
But the main material oblique material angle that tower leg prolongation can make tower leg diminishes, and tower leg stress is bad, and therefore steel tower is long and short Lower limb has the height spacing of a limit, is i.e. that the limit is differential.If domatic extreme is precipitous, then the long and short lower limb of steel tower reach knot The structure limit still can not adaptation to the ground.Now it is accomplished by carrying out earth excavation, builds retaining wall, on domatic, artificially build one Plane or reduce domatic differential, as it is shown in figure 1, carry out bored concrete pile and the construction of top steel tower on artificial platform, but so makes Become engineering cost to increase, and owing to changing pre-existing topography on a large scale, be unfavorable for water and soil conservation and environmental conservation.
Utility model content
Technical problem to be solved in the utility model is: provides a kind of electric power pylon being suitable to mountain terrain, not be used in Domatic excavation plane, and can be suitably used for mountain terrain.
This utility model solves its technical problem and be the technical scheme is that
Be suitable to the electric power pylon of mountain terrain, including tower body, also include the short tower leg that is connected with tower body and long tower leg, described Short tower leg is used for being connected to upward slope pile foundation, and upward slope pile foundation inserts the below ground of uphill side;Described long tower leg is used for being connected to down Slope pile foundation, descending pile foundation inserts the below ground of descending side;It is connected by linkage section between described long tower leg and tower body, described company The section of connecing is truss structure.
Further, between described linkage section and tower body, it is between linkage section and long tower leg and removably connects.
Further, the main material outside described linkage section is the main material of linkage section, and the main material of tower body is the main material of tower body, described length The main material of tower leg is long tower leg main material, and the main material of described linkage section, the main material of tower body are identical with the bearing of trend of long tower leg main material;Described Linkage section is the first connection end with the connection end of tower body, and linkage section is the second connection end with the connection end of tower leg, and described first even Connect to hold to be connected with second and hold row level with both hands, and length is identical.
Further, described linkage section is that dismountable shaped steel assembles formation.
The beneficial effects of the utility model are: above-mentioned electric power pylon, arrange linkage section between long tower leg and tower body, make long In the range of lower limb structure is positioned at design limit, and the differential expansion of the long and short lower limb of steel tower, the domatic landform that adapting to property is the most precipitous; When linkage section uses dismountable optimal way, can choose whether linkage section is installed according to on-the-spot actual steep.
Accompanying drawing explanation
Fig. 1 be in prior art steel tower construction at the schematic diagram of domatic artificial platform;
Fig. 2 is that steel tower construction of the present utility model is at domatic schematic diagram;
In figure, reference is: short tower leg 1, long tower leg 2, long tower leg main material 21, linkage section 3, the main material of linkage section 31, first Connect end 32, second and connect end 33, upward slope pile foundation 41, descending pile foundation 42, the main material of tower body 51.
Detailed description of the invention
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings:
Be suitable to the electric power pylon of mountain terrain, including tower body, also include short tower leg 1 and the long tower leg 2 being connected with tower body, institute Stating short tower leg 1 for being connected to upward slope pile foundation 41, upward slope pile foundation 41 inserts the below ground of uphill side;Described long tower leg 2 is used for Being connected to descending pile foundation 42, descending pile foundation 42 inserts the below ground of descending side;By being connected between described long tower leg 2 and tower body Section 3 linking, described linkage section 3 is truss structure.
As shown in Figure 2: electric power pylon of the present utility model, being suitable to installation and build precipitous domatic, it includes short tower leg 1 He Long tower leg 2, is respectively used to be connected to upward slope pile foundation 41 and descending pile foundation 42, as in figure 2 it is shown, upward slope pile foundation 41 is i.e. to insert to go up a slope The bored concrete pile of the below ground of side, descending pile foundation 42 is i.e. the bored concrete pile of the below ground inserting descending side.
It is connected by linkage section 3 between described long tower leg 2 and tower body, is i.e. that linkage section 3 top connects tower body, linkage section 3 Bottom connects long tower leg 2.Owing to being provided with linkage section 3, make the main material of long tower leg 2 and the oblique material angle can be in design limit scope In, and short tower leg 1 is differential extended with the height of long tower leg 2, adapts to the most precipitous domatic.
Preferably, can be between described linkage section 3 and tower body, be between linkage section 3 and long tower leg 2 and detachably connect Connect.
When being i.e. to reach the spot, dismantle or connect linkage section 3.The mode of removably connecting can use any existing skill Art, preferably can be being to use the modes such as bolt and anchor ear, pipe clamp, connecting plate to realize removably connecting.So-called connecting plate is Refer to be connected with several parts respectively by bolt, make several parts connect into an overall structural member.
It is further preferred that can be the main material outside described linkage section 3 be the main material of linkage section 31, the main material of tower body is tower The main material of body 51, the main material of described long tower leg 2 is long tower leg main material 21, the main material of described linkage section 31, the main material of tower body 51 and long tower leg The bearing of trend of main material 21 is identical;Described linkage section 3 is the first connection end 32 with the connection end of tower body, linkage section 3 and tower leg Connecting end is the second connection end 33, and it is parallel that described first connection end 32 connects end 33 with second, and length is identical.
As in figure 2 it is shown, the first connection end 32 is parallel with the second connection end 33, and length is identical, therefore can be according to scene Domatic situation, chooses whether to install linkage section 3, the most domatic more slow, can directly use long tower leg 2 to be connected with tower body, if Domatic precipitous, then one or more linkage sections 3 can be installed between long tower leg 2 and tower body, increase long and short lower limb differential.Connect Section main material 31, the main material of tower body 51 is identical with the bearing of trend of long tower leg main material 21, it is simple to support force transmits along main material.
Can also be preferably that described linkage section 3 assembles formation for dismountable shaped steel.For having inconvenient traffic, it is difficult to transport The environment of large component, can deliver to shaped steel Assembling and become the truss structure of linkage section 3 with connector, and shaped steel preferably may be used To be angle steel, round steel, connector can be preferably bolt, connecting plate, chuck, anchor ear etc..

Claims (4)

1. be suitable to the electric power pylon of mountain terrain, it is characterised in that include tower body, also include the short tower leg (1) being connected with tower body With long tower leg (2), described short tower leg (1) is used for being connected to upward slope pile foundation (41), and upward slope pile foundation (41) inserts the ground of uphill side Below;Described long tower leg (2) is used for being connected to descending pile foundation (42), and descending pile foundation (42) inserts the below ground of descending side;Institute Stating and be connected by linkage section (3) between long tower leg (2) and tower body, described linkage section (3) is truss structure.
Be suitable to the electric power pylon of mountain terrain the most as claimed in claim 1, it is characterised in that described linkage section (3) and tower body Between, it is between linkage section (3) and long tower leg (2) and removably connects.
Be suitable to the electric power pylon of mountain terrain the most as claimed in claim 2, it is characterised in that described linkage section (3) outside Main material is the main material of linkage section (31), and the main material of tower body is the main material of tower body (51), and the main material of described long tower leg (2) is long tower leg main material (21), the main material of described linkage section (31), the main material of tower body (51) are identical with the bearing of trend of long tower leg main material (21);Described linkage section (3) the connection end with tower body is the first connection end (32), and linkage section (3) is the second connection end (33) with the connection end of tower leg, institute State the first connection end (32) parallel with the second connection end (33), and length is identical.
Be suitable to the electric power pylon of mountain terrain the most as claimed in claim 2 or claim 3, it is characterised in that described linkage section (3) is can The shaped steel of dismounting assembles and is formed.
CN201620722659.2U 2016-07-11 2016-07-11 Be suitable to the electric power pylon of mountain terrain Active CN205777813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620722659.2U CN205777813U (en) 2016-07-11 2016-07-11 Be suitable to the electric power pylon of mountain terrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620722659.2U CN205777813U (en) 2016-07-11 2016-07-11 Be suitable to the electric power pylon of mountain terrain

Publications (1)

Publication Number Publication Date
CN205777813U true CN205777813U (en) 2016-12-07

Family

ID=58125444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620722659.2U Active CN205777813U (en) 2016-07-11 2016-07-11 Be suitable to the electric power pylon of mountain terrain

Country Status (1)

Country Link
CN (1) CN205777813U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661399A (en) * 2017-03-29 2018-10-16 中国电力科学研究院 A kind of interim shaft tower of transmission line of electricity
CN109083479A (en) * 2018-08-09 2018-12-25 绵阳鹏志远科技有限公司 A kind of anti-collapse monitoring lever apparatus applied to hillside
CN114525806A (en) * 2022-03-31 2022-05-24 四川电力设计咨询有限责任公司 Iron tower single-pile combined foundation and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661399A (en) * 2017-03-29 2018-10-16 中国电力科学研究院 A kind of interim shaft tower of transmission line of electricity
CN109083479A (en) * 2018-08-09 2018-12-25 绵阳鹏志远科技有限公司 A kind of anti-collapse monitoring lever apparatus applied to hillside
CN114525806A (en) * 2022-03-31 2022-05-24 四川电力设计咨询有限责任公司 Iron tower single-pile combined foundation and construction method thereof

Similar Documents

Publication Publication Date Title
US10253473B2 (en) Rock anchor foundation structure suitable for mountain photovoltaic module and construction method of rock anchor foundation structure
CN202132187U (en) Guyed tower structure of wind generating set
US20200277936A1 (en) Off shore wind energy installation foundation system
CN205777813U (en) Be suitable to the electric power pylon of mountain terrain
US20140193259A1 (en) Offshore wind turbine generator connection arrangement and tower system
CN102777333A (en) Truss structure of wind turbine generator set
CN202202327U (en) Screw anchor with adjustable upright installation height
CN106150924A (en) A kind of mixed steel tower and wind power generating set
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN207891824U (en) A kind of safeguard structure of hydraulic and hydroelectric engineering side slope
CN103967055A (en) Offshore wind turbine large-diameter single-pile foundation with ice-resistant structures
CN206035725U (en) Mix steel tower frame and wind generating set
KR101383159B1 (en) Gravity type slab foundation for offshore wind power
CN203866868U (en) Offshore wind turbine large-diameter single-pile foundation with ice-resistant structures
CN104674839A (en) Foundation structure for wind-driven generator
CN209082546U (en) A kind of composite base structure suitable for marine wind electric field fan
CN103790156A (en) Square buckle plate mechanical pile splicing method for precast square piles
CN103790157A (en) Circular buckle plate mechanical pile splicing method for precast square piles
CN207960846U (en) A kind of blower fan pylon structure
CN207714358U (en) A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation
CN106320360A (en) Prestressed self-locking anchor bolt reinforced variable-diameter single-pile fan foundation under offshore rock foundation condition and construction method thereof
CN213805472U (en) Transmission line tower anchor rope screw pile-cushion cap foundation structure
CN208266902U (en) A kind of anti-pulling piling bar for photovoltaic power plant bracket basis
CN210917329U (en) Movable connection anchor disc of prefabricated single tubular pile of overhead transmission line shaft tower
CN207891893U (en) A kind of multi-functional deep foundation pit supporting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant