CN215287595U - Ultra-deep foundation pit installation reverse construction elevator device - Google Patents

Ultra-deep foundation pit installation reverse construction elevator device Download PDF

Info

Publication number
CN215287595U
CN215287595U CN202121117869.6U CN202121117869U CN215287595U CN 215287595 U CN215287595 U CN 215287595U CN 202121117869 U CN202121117869 U CN 202121117869U CN 215287595 U CN215287595 U CN 215287595U
Authority
CN
China
Prior art keywords
standard festival
ultra
elevator device
lift
roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121117869.6U
Other languages
Chinese (zh)
Inventor
曹亦斌
梁森
谭智杰
尹志强
张如江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN202121117869.6U priority Critical patent/CN215287595U/en
Application granted granted Critical
Publication of CN215287595U publication Critical patent/CN215287595U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses an contrary formula of constructing elevator device of ultra-deep foundation ditch installation, attach wall spare including basement bottom plate, floor inner supporting structure, steel foundation platform, standard festival hoist system, lift, standard festival and roll, be fixed with the standard festival on the basement bottom plate, fixed mounting has the roll to attach wall spare on floor inner supporting structure, the roll attaches the lateral part fixed connection of wall spare and standard festival, installs the lift on the standard festival, installs steel foundation platform on the uppermost floor inner supporting structure, installs standard festival hoist system and layer door on steel foundation platform respectively. The utility model discloses an install lift on the standard festival and come transportation personnel and material, the effectual intensity of labour who alleviates the operation personnel has improved the efficiency of construction.

Description

Ultra-deep foundation pit installation reverse construction elevator device
Technical Field
The utility model relates to an contrary formula construction elevator device of ultra-deep foundation ditch installation belongs to construction technical field.
Background
With the rapid development of large cities and the rapid reduction of urban building space, ultra-deep foundation pits are more and more extensive. Because the foundation ditch is ultra-deep, lead to the operation personnel to waste time and energy from top to bottom, and the material transportation efficiency is lower, can not satisfy the construction progress requirement.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model provides a simple structure, simple to operate, safe and reliable's contrary construction elevator device of ultradeep foundation ditch installation to overcome not enough among the prior art.
The technical scheme of the utility model: the utility model provides an contrary formula of constructing elevator device of ultra-deep foundation ditch installation, includes basement bottom plate, floor inner supporting structure, steel foundation platform, standard festival hoist system, lift, standard festival and rolls and attaches the wall spare, is fixed with the standard festival on the basement bottom plate, and fixed mounting has the roll to attach the wall spare on the floor inner supporting structure, roll and attach the lateral part fixed connection of wall spare and standard festival, install the lift on the standard festival, install steel foundation platform on the uppermost floor inner supporting structure, install standard festival hoist system and layer door on steel foundation platform respectively.
Furthermore, a sliding contact line is installed on the standard knot, and a lifting motor on the elevator is electrically connected with the sliding contact line.
Furthermore, the bottom of the steel foundation platform is fixedly connected with an inclined strut.
Further, standard festival hoist and mount system includes monomer standard festival storage rack and the jib of fixed mounting at monomer standard festival storage rack top, the jib on install electric block.
Due to the adoption of the technical scheme, the utility model has the advantages of: the utility model discloses an install lift on the standard festival and come transportation personnel and material, the effectual intensity of labour who alleviates the operation personnel has improved the efficiency of construction. And simultaneously, the utility model discloses installed standard festival hoist and mount system at steel foundatin platform, along with the constantly rising of construction floor, can constantly increase the height of standard festival through standard festival hoist and mount system, extended the lift stroke of lift, improved the efficiency of construction. Furthermore, the utility model discloses a wiping line provides the power for the promotion motor on the lift, replaces the mode of current cable transmission electric power, has simplified circuit system, has improved the stability of lift.
Drawings
Fig. 1 is a front view of a schematic structural view of the present invention;
fig. 2 is a top view of fig. 1.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention is further described in detail with reference to the accompanying drawings and examples.
The embodiment of the utility model provides a: the structural schematic diagram of contrary formula construction elevator device of ultra-deep foundation ditch installation is shown as figure 1 ~ 2, including basement bottom plate 1, floor inner supporting structure 3, steel foundation platform 7, standard festival hoist system 4, lift 10, standard festival 12 and roll and attach wall spare 2, be fixed with standard festival 12 on basement bottom plate 1, fixed mounting has the roll to attach wall spare 2 on floor inner supporting structure 3, roll and attach wall spare 2 and the lateral part fixed connection of standard festival 12, install lift 10 on standard festival 12, install steel foundation platform 7 on the uppermost floor inner supporting structure 3, install standard festival hoist system 4 and layer door 6 on steel foundation platform 7 respectively. And a sliding contact line 11 is arranged on the standard knot 12, and a lifting motor 9 on the lifter 10 is electrically connected with the sliding contact line 11. And the bottom of the steel foundation platform 7 is fixedly connected with an inclined strut 8. Standard festival hoist and mount system 4 includes monomer standard festival storage rack and fixed mounting 5 at monomer standard festival storage rack top, jib 5 on install electric block.
The utility model discloses an install lift 10 on standard festival 12 and come transportation personnel and material, the effectual intensity of labour who alleviates the operation personnel has improved the efficiency of construction. And simultaneously, the utility model discloses installed standard festival hoist and mount system 4 at steel foundatin platform 7, along with the continuous rising of construction floor, can constantly increase the height of standard festival 12 through standard festival hoist and mount system 4, extended the lift stroke of lift 10, improved the efficiency of construction.
At present, most of outdoor elevators 10 in China are powered by traditional cables, the cables move up and down along with the elevators 10 when construction elevators operate, the cables in hundreds of meters do not have fixed suspension, construction safety is affected by strong wind weather, and the cables are short in service life due to dead weight, wind blowing, sunshine, rain and high-frequency operation. Therefore, the utility model discloses a wiping line 11 provides the power for lift motor 9 on the lift 10, replaces the mode of current cable transmission electric power, has simplified circuit system, has improved lift 10's stability. Because the influence of the external environment on the sliding contact line 11 is small, the service life of the sliding contact line 11 is 2-3 times that of the traditional cable, the long-term use cost of machinery is saved by more than 50%, meanwhile, the problems that the construction safety is influenced by strong wind weather and the cable is stolen are effectively solved, the use energy consumption of the elevator 10 can be reduced, the service life of the elevator 10 is prolonged, and more economic benefits are created for users after long-term use.

Claims (4)

1. The utility model provides an contrary formula construction elevator device of ultra-deep foundation ditch installation, includes basement bottom plate (1), floor inner supporting structure (3), steel foundation platform (7), standard festival hoist and mount system (4), lift (10), standard festival (12) and roll and attach wall spare (2), its characterized in that: be fixed with standard festival (12) on basement bottom plate (1), fixed mounting has the roll to attach wall spare (2) on support structure (3) in the floor, roll and attach wall spare (2) and the lateral part fixed connection of standard festival (12), install lift (10) on standard festival (12), install steel foundation platform (7) on support structure (3) in the superiors' floor, install standard festival hoist and mount system (4) and layer door (6) respectively on steel foundation platform (7).
2. The ultra-deep foundation pit installation inverted construction elevator device according to claim 1, wherein: and a sliding contact line (11) is installed on the standard knot (12), and a lifting motor (9) on the lifter (10) is electrically connected with the sliding contact line (11).
3. The ultra-deep foundation pit installation inverted construction elevator device according to claim 1, wherein: the bottom of the steel foundation platform (7) is fixedly connected with an inclined strut (8).
4. The ultra-deep foundation pit installation inverted construction elevator device according to claim 1, wherein: standard festival hoist and mount system (4) include monomer standard festival storage rack and fixed mounting jib (5) at monomer standard festival storage rack top, jib (5) on install electric block.
CN202121117869.6U 2021-05-24 2021-05-24 Ultra-deep foundation pit installation reverse construction elevator device Active CN215287595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121117869.6U CN215287595U (en) 2021-05-24 2021-05-24 Ultra-deep foundation pit installation reverse construction elevator device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121117869.6U CN215287595U (en) 2021-05-24 2021-05-24 Ultra-deep foundation pit installation reverse construction elevator device

Publications (1)

Publication Number Publication Date
CN215287595U true CN215287595U (en) 2021-12-24

Family

ID=79541774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121117869.6U Active CN215287595U (en) 2021-05-24 2021-05-24 Ultra-deep foundation pit installation reverse construction elevator device

Country Status (1)

Country Link
CN (1) CN215287595U (en)

Similar Documents

Publication Publication Date Title
CN102251486A (en) Jacking bracket system for segmented mounting of bridge tower and construction process thereof
CN108946509A (en) A kind of large-scale wind driven generator is from rising tower crane construction method
CN215287595U (en) Ultra-deep foundation pit installation reverse construction elevator device
CN114151296A (en) Gravity energy storage system based on efficient lifting and transferring of multiple objects
CN210563676U (en) Signal tower with high-efficiency maintenance and wind-proof stability
CN101660660B (en) Novel installing method of gas cabinet
CN201460186U (en) Adhesive lifting scaffold
CN215291325U (en) Whole promotion formula peripheral protection stores pylon
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN113864124B (en) Wind power blade hoisting construction method under mountain condition
CN211419277U (en) Super-large tonnage skip hoisting system of ultra-deep well driven by auxiliary vertical linear motor
CN210418844U (en) Outdoor solar elevator
CN201694777U (en) Self hoisting device of hydraulic turbine volute
CN207382480U (en) A kind of liftable steel tower base station combined cabinet
CN220519870U (en) Construction elevator shaft operation platform goes up and down to share rail device
CN221321911U (en) Temporary housing with light steel structure
CN206494613U (en) Outdoor elevator equipped with solar power supply apparatus
CN221219896U (en) Assembled power distribution room
CN106766256B (en) Sand prevention curtain for secondary reflection tower and lifting system thereof
CN218623235U (en) Electric hanging basket lifting height limiting system
CN202193551U (en) Wheel type lifting and conveying device for curtain wall plates
CN214653365U (en) Movable equipment for mounting wind power tower crane
CN212456650U (en) Street lamp convenient to installation and maintenance
CN217401071U (en) Gravity energy storage system based on single-channel multi-sequence lifting
CN218174467U (en) Tower crane is used in installation of microorganism ecological toilet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510030 room 904, 6th floor, traffic bureau building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: China Construction Fourth Engineering Bureau First Construction Co.,Ltd.

Country or region after: China

Address before: 510030 room 904, 6th floor, traffic bureau building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: China Construction Fourth Engineering Bureau First Construction Engineering Co.,Ltd.

Country or region before: China