CN215279685U - Positioning and manufacturing jig frame for steel reinforcement cage - Google Patents

Positioning and manufacturing jig frame for steel reinforcement cage Download PDF

Info

Publication number
CN215279685U
CN215279685U CN202121520116.XU CN202121520116U CN215279685U CN 215279685 U CN215279685 U CN 215279685U CN 202121520116 U CN202121520116 U CN 202121520116U CN 215279685 U CN215279685 U CN 215279685U
Authority
CN
China
Prior art keywords
shaped steel
steel
reinforcement cage
jig frame
manufacturing jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121520116.XU
Other languages
Chinese (zh)
Inventor
王泽坤
余扣成
胡松
王凤喜
金仁贵
王蕾
惠浩乾
谢好田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN202121520116.XU priority Critical patent/CN215279685U/en
Application granted granted Critical
Publication of CN215279685U publication Critical patent/CN215279685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a steel reinforcement cage location preparation bed-jig, two second H shaped steels including first H shaped steel and symmetry setting, its characterized in that: the fixed welding in top of first H shaped steel has two steel sheets that the symmetry set up, two second H shaped steel is fixed welding respectively in the top both ends of first H shaped steel, the top equidistance of first H shaped steel is equipped with a plurality of spacing grooves. The utility model discloses in through the setting of a plurality of H shaped steel and spacing groove, can be accurate when main muscle and reinforcement stirrup weld fix a position the main muscle interval to workman's work efficiency has been improved.

Description

Positioning and manufacturing jig frame for steel reinforcement cage
Technical Field
The utility model relates to a construction technical field especially relates to a steel reinforcement cage location preparation bed-jig.
Background
When the cast-in-place pile is constructed, a reinforcement cage needs to be bound in advance, then the reinforcement cage is placed in a pile hole, and concrete is poured inwards to form the reinforced concrete cast-in-place pile. Because the pile foundation is cylindrical mostly, therefore the steel reinforcement cage of pile foundation can't be just directly carried out the ligature like rectangular column is decided the reinforcing bar interval, and cylindrical steel reinforcement cage need carry out the ligature with the help of the bed-jig, otherwise can't form cylindrical shape. At present, a steel reinforcement cage jig adopts an arc-shaped structure, a round bar is welded at a position where a main reinforcement needs to be placed, and then the main reinforcement is placed on the round bar, so that the effect of positioning the position of the main reinforcement is achieved.
However, in the existing construction process, the main reinforcement of the cast-in-place pile reinforcement cage is longer and thicker, generally larger than phi 14, even phi 36, so that when the main reinforcement and the reinforcement stirrup are welded, due to factors such as the length and weight of the main reinforcement, the main reinforcement interval is difficult to fix, the main reinforcement interval accuracy is low, time and labor are wasted, the working efficiency of workers is low, and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the main reinforcement interval is difficult to fix and the precision of the main reinforcement interval is not high because of factors such as the length and the weight of the main reinforcement in the prior art, and providing a steel reinforcement cage positioning and manufacturing jig frame.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a steel reinforcement cage location preparation bed-jig, includes two second H shaped steels of first H shaped steel and symmetry setting, its characterized in that: the fixed welding in top of first H shaped steel has two steel sheets that the symmetry set up, two second H shaped steel is fixed welding respectively in the top both ends of first H shaped steel, the top equidistance of first H shaped steel is equipped with a plurality of spacing grooves.
Preferably, the length of the first H-section steel is 3.4 m.
Preferably, the second H-shaped steel has a height of 0.8m and a thickness of 0.2 m.
Preferably, the first H-shaped steel and the second H-shaped steel are both HEB200 in specification.
Preferably, the steel plate is made of Q345.
Preferably, the spacing between the main ribs of the limiting groove is determined.
Has the advantages that:
the setting of first H shaped steel can conveniently place main muscle, and the setting of two second H shaped steel simultaneously can support the steel reinforcement cage by the edgewise spacing, and the setting of spacing groove can conveniently carry out the accurate positioning to main muscle simultaneously, and the steel sheet can play certain supporting role to the base angle of steel reinforcement cage, the utility model discloses in through the setting of a plurality of H shaped steel and spacing groove, can be accurate when main muscle and reinforcement stirrup weld fix a position main muscle interval to workman's work efficiency has been improved.
Drawings
Fig. 1 is the utility model provides a structural schematic diagram of steel reinforcement cage location preparation bed-jig.
In the figure: 1 first H shaped steel, 2 two second H shaped steel, 3 steel sheets, 4 spacing grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, a steel reinforcement cage positioning manufacturing jig comprises a first H-shaped steel 1 and two second H-shaped steels 2 which are symmetrically arranged, wherein the length of the first H-shaped steel is 3.4m, the height of the second H-shaped steel is 0.8m, and the thickness of the second H-shaped steel is 0.2 m;
in the embodiment, the first H-shaped steel and the second H-shaped steel are both HEB200, two symmetrically arranged steel plates 3 are fixedly welded on the top of the first H-shaped steel 1, and the steel plates are made of Q345;
in this embodiment, two second H shaped steel 2 are fixed welding respectively in first H shaped steel 1's top both ends for carry out the side to the steel reinforcement cage and support, first H shaped steel 1's top equidistance is equipped with a plurality of spacing grooves 4, is used for fixing a position main muscle interval, and spacing groove 4's size main muscle interval is confirmed.
In this embodiment, the main muscle can conveniently be placed in the setting of first H shaped steel 1, and the setting of two second H shaped steel 2 simultaneously can support the steel reinforcement cage spacing from the side, and accurate positioning can conveniently be carried out to the main muscle to the setting of spacing groove 4 simultaneously, and certain supporting role can be played to the base angle of steel reinforcement cage to steel sheet 3.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a steel reinforcement cage location preparation bed-jig, includes two second H shaped steel (2) that first H shaped steel (1) and symmetry set up, its characterized in that: the fixed welding in top of first H shaped steel (1) has two steel sheets (3) that the symmetry set up, two second H shaped steel (2) are fixed welding respectively in the top both ends of first H shaped steel (1), the top equidistance of first H shaped steel (1) is equipped with a plurality of spacing grooves (4).
2. The reinforcement cage positioning and manufacturing jig frame as claimed in claim 1, wherein: the length of the first H-shaped steel (1) is 3.4 m.
3. The reinforcement cage positioning and manufacturing jig frame as claimed in claim 1, wherein: the height of the second H-shaped steel (2) is 0.8m, and the thickness of the second H-shaped steel is 0.2 m.
4. The reinforcement cage positioning and manufacturing jig frame as claimed in claim 1, wherein: the specification of the first H-shaped steel (1) and the specification of the second H-shaped steel (2) are both HEB 200.
5. The reinforcement cage positioning and manufacturing jig frame as claimed in claim 1, wherein: the steel plate (3) is made of Q345.
6. The reinforcement cage positioning and manufacturing jig frame as claimed in claim 1, wherein: the spacing of the main ribs of the limiting groove (4) is determined.
CN202121520116.XU 2021-07-06 2021-07-06 Positioning and manufacturing jig frame for steel reinforcement cage Active CN215279685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121520116.XU CN215279685U (en) 2021-07-06 2021-07-06 Positioning and manufacturing jig frame for steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121520116.XU CN215279685U (en) 2021-07-06 2021-07-06 Positioning and manufacturing jig frame for steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN215279685U true CN215279685U (en) 2021-12-24

Family

ID=79520729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121520116.XU Active CN215279685U (en) 2021-07-06 2021-07-06 Positioning and manufacturing jig frame for steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN215279685U (en)

Similar Documents

Publication Publication Date Title
CN210659276U (en) Template positioning device for thickness of shear wall and concrete protective layer
CN212715972U (en) Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar
CN210152251U (en) Device for using prefabricated composite floor slab as cast-in-situ beam side form support
CN102979108A (en) Locating sleeve rack for locating anchor bolt group
CN215279685U (en) Positioning and manufacturing jig frame for steel reinforcement cage
CN210918296U (en) Square steel pipe sleeve fixing device
CN210475352U (en) Be applied to standard bed-jig of empty core plate reinforcement
CN211368733U (en) Prefabricated assembled concrete pipe props structure
JP2014101654A (en) Reinforcement structure of concrete and reinforcement method
CN211257918U (en) Bottom plate steel bar and steel pipe scaffold support system
CN219175009U (en) Railway T beam baffle reinforcing bar positioner
CN215057453U (en) Adjustable positioning device for tunnel two-lining steel reinforcement framework
CN214574106U (en) Positioning and mounting structure of large-scale equipment foundation corrugated spiral sleeve
CN219219840U (en) Special rack for bent cap reinforcement
CN110670626A (en) Assembled foundation module and rapid construction method thereof
CN209891562U (en) Steel bar positioning tool structure
CN110468848B (en) Upright post reinforcing structure and reinforcing method
CN211772780U (en) Assembled bridge platform
CN217517582U (en) Positioning structure for improving positioning precision of miniature pile section steel
CN218801694U (en) Reinforced concrete structure tool positioning device and processing platform thereof
CN211341815U (en) Multifunctional steel bar positioning device
CN213326416U (en) Positioning device for improving installation precision of river-crossing gantry crane foundation pile
CN214658838U (en) A exempt from perforating device for template construction
CN212419462U (en) Steel reinforcement cage forming device
CN212169475U (en) Auxiliary arc-shaped steel grating welding forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant