CN215252855U CN202120631887.XU CN202120631887U CN215252855U CN 215252855 U CN215252855 U CN 215252855U CN 202120631887 U CN202120631887 U CN 202120631887U CN 215252855 U CN215252855 U CN 215252855U
Authority
CN
China
Prior art keywords
reinforcement cage
vibrator
limiting cylinder
cement
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120631887.XU
Other languages
Chinese (zh)
Inventor
谢辉辉
邹青
夏友芳
伍彦斌
蒋冬林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202120631887.XU priority Critical patent/CN215252855U/en
Application granted granted Critical
Publication of CN215252855U publication Critical patent/CN215252855U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an insert supplementary device that sinks of steel reinforcement cage behind cement fly ash gravel pile, this supplementary device that sinks includes: a vibrator; the limiting cylinder is arranged at the bottom of the vibrator; the bottom of a spacing section of thick bamboo is uncovered, forms the decurrent muff-coupling chamber that is used for inserting the steel reinforcement cage after the opening cup joints in a spacing section of thick bamboo. This supplementary device that sinks of cement fly ash gravel pile back insertion reinforcement cage simple structure, low cost, convenient to use can be accurate, will insert the reinforcement cage after and send into in cement fly ash gravel pile's pile body mixture filling layer fast.

Description

Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile
Technical Field
The utility model relates to a civil construction engineering technical field particularly, relates to a supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile that inserts steel reinforcement cage length within 6.0m after.
Background
The CFG pile (cement fly-ash Gravel) is a high-bonding-strength pile formed by mixing cement, fly ash, broken stone, stone chips or sand with water, and the pile, the soil among the piles and a mattress layer form a composite foundation together. The CFG pile composite foundation has the characteristics of large bearing capacity improvement range, small foundation deformation and the like, has a large application range, and is widely applied to foundation treatment of projects such as railways, highways, ports, buildings and the like.
In the CFG pile composite foundation, the pile body not only bears the vertical load distributed to the pile top by the cushion layer, but also bears the lateral thrust caused by the shearing deformation of the soil between the piles under the action of the vertical load, and the shearing resistance of the upper part of the pile body has important influence on the overall stability of the composite foundation.
The rear-inserted steel reinforcement cage CFG pile is a pile type appearing in recent years, and the steel reinforcement cage is inserted into a common CFG pile, so that the shearing resistance of a pile body is improved, the shallow pile body is prevented from being damaged due to local horizontal thrust, and the probability of defects such as diameter shrinkage, diameter expansion, pile breakage and the like in the construction process is reduced.
Because the steel reinforcement cage in the post-inserted steel reinforcement cage CFG pile is inserted after the pile body mixture is filled, the resistance is very large when the steel reinforcement cage is inserted; on the other hand, the CFG pile is usually longer and smaller in diameter (for example, in a vibration pipe sinking pile forming process, the diameter of the pile is generally 350-600 mm), the number of main reinforcements of the reinforcement cage is small, the overall rigidity of the reinforcement cage is small, and bending deformation or damage is easy to occur. Therefore, when the reinforcement cage is inserted, auxiliary sinking measures must be taken frequently.
Chinese patent CN201210116281.8 discloses a post-inserted reinforcement cage cement fly ash gravel pile and a pile forming method thereof, wherein a long steel pipe is arranged inside a reinforcement cage and used as a delivery rod, the bottom of the long steel pipe is fixedly connected with the bottom of the reinforcement cage, a flat vibrator is arranged at the top of the long steel pipe, and the reinforcement cage is dragged into a CFG pile body mixture filling layer through the long steel pipe under the action of the exciting force of the flat vibrator, and the method is mainly suitable for reinforcement cages with the length larger than 6.0 m. To being in short in 6.0 m's steel reinforcement cage, generally adopting the mode of static pressure to insert, because highly great, the static pressure is inconvenient to be exerted, and under the static pressure effect, the steel reinforcement cage easily takes place the slope and leads to steel reinforcement cage bottom to get into pile soil layer all around, influences pile shaft quality, and the efficiency of construction is low.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides an insert supplementary device that sinks of steel reinforcement cage behind cement fly ash gravel pile, should assist device simple structure, low cost, convenient to use that sinks, can be accurate, insert the steel reinforcement cage behind fast and send into in the pile body mixture filling layer.
In order to realize the above-mentioned purpose, the utility model provides an insert supplementary device that sinks of steel reinforcement cage behind cement fly ash gravel pile, include:
a vibrator;
the limiting cylinder is arranged at the bottom of the vibrator; the bottom of a spacing section of thick bamboo is uncovered, forms the decurrent muff-coupling chamber that is used for inserting the steel reinforcement cage after the opening cup joints in a spacing section of thick bamboo.
Further, still include:
the flat plate is arranged at the upper end of the limiting cylinder, and the vibrator is arranged on the flat plate.
Furthermore, a vibrator base is arranged on the flat plate, and the vibrator is installed on the vibrator base through bolt connection.
Further, the center of the vibrator is located on the axis of the limiting cylinder.
Further, still include:
and the protective cover covers the outer side of the vibrator and is fixedly arranged on the flat plate.
Furthermore, the safety cover comprises a safety cover body, the two ends of the safety cover body are provided with end sealing plates, the side face of the safety cover body is provided with a wiring window, and the top of the safety cover body is provided with a hoisting lug plate.
Furthermore, a lifting ring is arranged on the end sealing plate.
Furthermore, the limiting cylinder is a spiral steel pipe, the length of the limiting cylinder is 30 cm-40 cm, and the inner diameter of the limiting cylinder is 5 cm-15 cm larger than the outer diameter of the rear inserted reinforcement cage.
Further, the vibrator is a variable frequency vibrator.
Further, the length of the rear inserted reinforcement cage does not exceed 6 m.
By applying the technical scheme of the utility model, the bottom of the vibrator is provided with the limiting cylinder, and the bottom of the limiting cylinder is opened to form a sleeving cavity; when the pile body filling layer is used, the limiting cylinder is sleeved at the top of the rear insertion reinforcement cage, the rear insertion reinforcement cage extends into the sleeving cavity, the vibrator is started, the rear insertion reinforcement cage is made to sink under the action of exciting force of the vibrator, and the rear insertion reinforcement cage is inserted into the pile body mixing material filling layer of the cement fly ash gravel pile. The auxiliary sinking device is simple in structure, low in cost and convenient to use, and can accurately and quickly send the rear inserted reinforcement cage into the pile body mixture filling layer.
The present invention will be described in further detail below with reference to the accompanying drawings.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic diagram of an inserted state of a rear-inserted steel reinforcement cage CFG pile.
Fig. 2 is a schematic structural view of the auxiliary sinking device of the present invention.
Fig. 3 is an exploded view of the auxiliary sinking device of the present invention.
Wherein the figures include the following reference numerals:
1. a vibrator; 2. a limiting cylinder; 3. a flat plate; 4. a protective cover; 21. a socket cavity; 31. a vibrator base; 41. a protective cover body; 42. sealing the end plate; 100. inserting a reinforcement cage; 110. a cement fly ash gravel pile; 411. a wiring window; 412. hoisting the lug plate; 421. and (5) lifting a ring.
Detailed Description
To facilitate understanding of the present invention, the present invention will be described more fully and specifically with reference to the accompanying drawings and preferred embodiments, but the scope of the present invention is not limited to the specific embodiments described below. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
Unless otherwise defined, all terms of art used hereinafter have the same meaning as commonly understood by one of ordinary skill in the art. The use of "first," "second," and similar terms in the description and in the claims does not indicate any order, quantity, or importance, but rather the intention is merely to facilitate a distinction between corresponding parts. Also, the use of the terms "a" or "an" and the like do not denote a limitation of quantity, but rather denote the presence of at least one. The terms "connected" and "coupled" and the like are not restricted to direct connections, but may be indirectly connected through other intermediate connections. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships are changed accordingly.
Referring to fig. 2 and fig. 3, an auxiliary sinking device for inserting a reinforcement cage behind a cement fly ash gravel pile according to an embodiment of the present invention mainly includes a vibrator 1 and a limiting cylinder 2. Wherein, the limiting cylinder 2 is arranged at the bottom of the vibrator 1; the bottom of the limiting cylinder 2 is open, and a sleeving cavity 21 with a downward opening and used for sleeving the rear inserted reinforcement cage 100 is formed in the limiting cylinder 2. The rear insertion reinforcement cage CFG pile is inserted as shown in fig. 1, and the rear insertion reinforcement cage 100 is inserted into the pile body mixture filling layer of the cement-flyash-gravel pile 110.
In the auxiliary sinking device, the limiting cylinder 2 is arranged at the bottom of the vibrator 1, and the bottom of the limiting cylinder 2 is opened to form a sleeving connection cavity 21; when the cement-flyash-gravel pile is used, the limiting cylinder 2 is sleeved at the top of the rear insertion reinforcement cage 100, the rear insertion reinforcement cage 100 extends into the sleeving cavity 21, the vibrator 1 is started, the rear insertion reinforcement cage 100 sinks under the action of the exciting force of the vibrator 1, and the rear insertion reinforcement cage is inserted into the pile body mixture filling layer of the cement-flyash-gravel pile 110. The auxiliary sinking device is simple in structure, low in cost and convenient to use, and can accurately and quickly send the rear inserted reinforcement cage 100 into the pile body mixture filling layer.
Further, referring to fig. 2 and 3, the auxiliary sinking device further comprises a flat plate 3, wherein the bottom surface of the flat plate 3 is fixedly installed at the upper end of the limiting cylinder 2, the vibrator 1 is installed on the flat plate 3, and the flat plate 3 closes the upper end opening of the limiting cylinder 2. Like this, through set up dull and stereotyped 3 between spacing section of thick bamboo 2 and vibrator 1, on the one hand easy to assemble vibrator 1, on the other hand accessible dull and stereotyped 3 blocks back and inserts steel reinforcement cage 100, avoids back to insert steel reinforcement cage 100 and vibrator 1 direct contact.
Specifically, referring to fig. 3, a vibrator base 31 is provided on the upper surface of the flat plate 3, and the vibrator 1 is mounted on the vibrator base 31 by bolting. Thus, the vibrator 1 can be easily attached and detached. Further, in order to vertically transmit the excitation force generated by the vibrator 1 to the rear insertion reinforcement cage 100 and avoid the rear insertion reinforcement cage 100 from shifting, the center of the vibrator 1 is preferably disposed on the axis of the limiting cylinder 2.
Referring to fig. 2 and 3, in the present embodiment, the auxiliary sinking apparatus further includes a protecting cover 4, the protecting cover 4 is covered on the outer side of the vibrator 1, and the bottom of the protecting cover 4 is fixedly installed on the upper surface of the plate 3. By covering the outer side of the vibrator 1 with the protective cover 4, the vibrator 1 can be protected, and the service life of the vibrator 1 can be prolonged.
Specifically, referring to fig. 2 and 3, the protective cover 4 includes a protective cover body 41, and a seal plate 42 is mounted on each of both ends of the protective cover body 41. A wiring window 411 is formed on the side surface of the protective cover body 41 to facilitate wiring of the vibrator 1. A lifting ear plate 412 is further arranged at the top of the protective cover body 41, so that the auxiliary sinking device can be conveniently lifted. The protective cover 4 is made of a steel plate with a thickness of 3mm to 6mm by cutting, and the position and size of the wiring window 411 are adjusted according to the position and size of the wiring box of the vibrator 1.
Further, in this embodiment, a lifting ring 421 is further disposed on the top of the end-closing plate 42. A pulling rope can be connected to the lifting ring 421 to adjust the position of the auxiliary sinking apparatus during operation.
Specifically, in the embodiment, the limiting cylinder 2 is made by cutting a spiral steel pipe, the length of the limiting cylinder 2 is 30 cm-40 cm, and the inner diameter of the limiting cylinder 2 is 5 cm-15 cm larger than the outer diameter of the rear-inserted reinforcement cage 100. By the arrangement, the limiting cylinder 2 and the rear-inserted reinforcement cage 100 can be conveniently sleeved and taken down; the auxiliary sinking device can be prevented from generating large transverse displacement under vibration in the working process; and the limiting cylinder 2 can be prevented from being separated from the top of the rear-inserted reinforcement cage 100 under vibration.
If the length of the limiting cylinder 2 is too short, the limiting cylinder 2 may be separated from the top of the rear-inserted reinforcement cage 100 under the vibration action; if the inner diameter of the limiting cylinder 2 is too small, the limiting cylinder 2 is inconvenient to be sleeved on the rear-inserted reinforcement cage 100; if the internal diameter of spacing section of thick bamboo 2 is too big, supplementary device that sinks can take place lateral displacement by a relatively large margin under the vibration effect, probably makes back inserted reinforcement cage 100 take place the slope, influences the accuracy that back inserted reinforcement cage 100 sent into pile shaft mixture filling layer.
In this embodiment, the vibrator 1 is preferably a variable frequency vibrator, which can conveniently adjust the magnitude of the exciting force of the vibrator 1 according to the depth of the rear-inserted reinforcement cage 100 entering the mixture.
The auxiliary sinking device of the cement fly ash gravel pile 110 rear-inserted reinforcement cage 100 can be suitable for auxiliary sinking construction of a plurality of rear-inserted reinforcement cages 100 with different lengths; the auxiliary sinking construction method is particularly suitable for auxiliary sinking construction of the rear-inserted reinforcement cage 100 with the length within 6m, can enable the shorter rear-inserted reinforcement cage 100 to sink quickly, does not need to arrange a long steel pipe delivery rod, and does not need to adopt large-scale static pressure equipment.
The use method of the auxiliary sinking device comprises the following steps:
a lifting hook is arranged at the front end of the vibration pipe sinking equipment, the rear insertion reinforcement cage 100 is lifted by a winch arranged on the equipment, and the rear insertion reinforcement cage 100 is unhooked after the rear insertion reinforcement cage 100 is kept stable by manual assistance; then the auxiliary sinking device of the utility model is hoisted, the limiting cylinder 2 is sleeved on the top of the rear inserted reinforcement cage 100, and the vibrator 1 is started to lead the rear inserted reinforcement cage 100 to sink to the pile body mixture filling layer; in the process that the rear-inserted steel reinforcement cage 100 sinks, the verticality of the rear-inserted steel reinforcement cage 100 is kept in a manual assisting mode, the spatial position of the auxiliary sinking device is adjusted through the traction rope, and the accuracy of the plane position of the rear-inserted steel reinforcement cage 100 is guaranteed.
Generally, the auxiliary sinking device of the utility model limits the top of the rear-inserted reinforcement cage 100 by arranging the limiting cylinder 2 at the bottom of the vibrator 1, and can realize the quick sinking of the rear-inserted reinforcement cage 100 by matching with manual assistance; the long steel pipe delivery rod is not required to be arranged, and large-scale static pressure equipment is not required to be adopted. The auxiliary sinking device is simple in structure, low in cost, convenient to use and easy to operate, is suitable for auxiliary sinking construction of the multiple rear inserted reinforcement cages 100 with different lengths in CFG piles, is particularly suitable for auxiliary sinking construction of the short rear inserted reinforcement cages 100 with the lengths within 6.0m, and can enable the short rear inserted reinforcement cages 100 to sink into a pile body mixture filling layer quickly.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile which characterized in that includes:
a vibrator (1);
the limiting cylinder (2) is installed at the bottom of the vibrator (1); the bottom of the limiting cylinder (2) is open, and a sleeving cavity (21) with a downward opening and used for sleeving the rear inserted reinforcement cage (100) is formed in the limiting cylinder (2).
2. The auxiliary sinking device for inserting the reinforcement cage behind the cement-flyash-gravel pile as claimed in claim 1, further comprising:
the plate (3), the plate (3) is installed at the upper end of the limiting cylinder (2), and the vibrator (1) is installed on the plate (3).
3. The cement-flyash-gravel-pile rear-inserted reinforcement-cage auxiliary sinking device as claimed in claim 2, wherein a vibrator base (31) is arranged on the flat plate (3), and the vibrator (1) is mounted on the vibrator base (31) through a bolt connection.
4. The cement-flyash-gravel-pile rear-inserted reinforcement-cage auxiliary sinking device as claimed in claim 2, wherein the center of the vibrator (1) is located on the axis of the limiting cylinder (2).
5. The auxiliary sinking device for inserting the reinforcement cage behind the cement-flyash-gravel pile as claimed in claim 2, further comprising:
the protective cover (4), establish protective cover (4) cover the outside of vibrator (1), protective cover (4) fixed mounting be in on dull and stereotyped (3).
6. The cement fly ash gravel pile rear-inserted reinforcement cage auxiliary sinking device as claimed in claim 5, wherein the protection cover (4) comprises a protection cover body (41), the two ends of the protection cover body (41) are provided with end sealing plates (42), the side surface of the protection cover body (41) is provided with a wiring window (411), and the top of the protection cover body (41) is provided with a hoisting lug plate (412).
7. The auxiliary sinking device for the cement-flyash-gravel pile rear-inserted reinforcement cage of claim 5, wherein the end-sealing plate (42) is provided with a lifting ring (421).
8. The auxiliary sinking device for the cement fly ash gravel pile rear inserted reinforcement cage according to any one of claims 1 to 7, wherein the limiting cylinder (2) is a spiral steel pipe, the length of the limiting cylinder (2) is 30cm to 40cm, and the inner diameter of the limiting cylinder (2) is 5cm to 15cm larger than the outer diameter of the rear inserted reinforcement cage (100).
9. The auxiliary sinking device for the cement fly ash gravel pile rear inserted reinforcement cage according to any one of claims 1 to 7, wherein the vibrator (1) is a variable frequency vibrator.
10. The auxiliary sinking device for the cement-flyash-gravel pile rear-inserted reinforcement cage of the claim 1-7, wherein the length of the rear-inserted reinforcement cage (100) is not more than 6 m.
CN202120631887.XU 2021-03-29 2021-03-29 Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile Expired - Fee Related CN215252855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120631887.XU CN215252855U (en) 2021-03-29 2021-03-29 Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120631887.XU CN215252855U (en) 2021-03-29 2021-03-29 Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile

Publications (1)

Publication Number Publication Date
CN215252855U true CN215252855U (en) 2021-12-21

Family

ID=79505026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120631887.XU Expired - Fee Related CN215252855U (en) 2021-03-29 2021-03-29 Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile

Country Status (1)

Country Link
CN (1) CN215252855U (en)

Similar Documents

Publication Publication Date Title
CN110206493B (en) Construction process of full-sleeve full-rotation bored pile
CN101358453A (en) Composite boxed cofferdam and building method thereof
CN106948353A (en) A kind of deep water combined steel plate pile cofferdam construction method
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN215252855U (en) Supplementary device that sinks of inserting steel reinforcement cage behind cement fly ash gravel pile
CN114086555A (en) Combined device for breaking pile head of bored pile foundation and pile head breaking construction method
CN202247897U (en) Post-grouting device for pipe pile foundation
CN213978954U (en) Construction tool for quickly separating pile head of cast-in-place pile
CN211143062U (en) New and old combined foundation pile in high-groundwater-level complex construction environment
CN113931187A (en) Concrete precast square pile mechanical connector protection device
JP5027752B2 (en) Construction method of underground floor pillar and underground floor pillar
CN112982390A (en) Steel casing of rock-socketed cast-in-place pile capable of not sinking along with punching
CN112575794A (en) Deep silt geological foundation pit support structure and construction method thereof
CN112502137A (en) Construction method of pile and special equipment
CN211256956U (en) Prefabricated concrete hollow pile
CN112323792B (en) Internal-driving hammer pile pipe for holding-pressing type hammering pressure-grouting pile
JP6503608B2 (en) Construction method of underground structure and pneumatic caisson used therefor
CN217053379U (en) Foundation excavation collapse prevention supporting structure is built in room
CN217419585U (en) Device for assisting in breaking pile head of concrete cast-in-place pile
CN219508546U (en) Auxiliary structure for pile head wedge fracture of filling pile and filling pile
CN212250058U (en) Supporting frock system of salt rock tunnel stratum multilayer invert construction
CN219808378U (en) Breaking hammer device in cast-in-place pile pipe
CN219908992U (en) Supporting and blocking device suitable for mechanical operation platform at slope of scarp
CN217378855U (en) Novel pile wall combined type enclosure structure milling joint device
CN105908756A (en) Variable-stiffness foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221

CF01 Termination of patent right due to non-payment of annual fee