CN215248682U - Electric power communication cable processing apparatus for electric power capital construction engineering - Google Patents

Electric power communication cable processing apparatus for electric power capital construction engineering Download PDF

Info

Publication number
CN215248682U
CN215248682U CN202121516861.7U CN202121516861U CN215248682U CN 215248682 U CN215248682 U CN 215248682U CN 202121516861 U CN202121516861 U CN 202121516861U CN 215248682 U CN215248682 U CN 215248682U
Authority
CN
China
Prior art keywords
fixedly connected
box
electric power
electric telescopic
communication cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121516861.7U
Other languages
Chinese (zh)
Inventor
刘建祎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121516861.7U priority Critical patent/CN215248682U/en
Application granted granted Critical
Publication of CN215248682U publication Critical patent/CN215248682U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to an electric power capital construction engineering technical field just discloses an electric power communication cable processing apparatus for electric power capital construction engineering, the power distribution box comprises a box body, the lower extreme fixedly connected with support column of box, the first backup pad of the inside upper end fixedly connected with of box, the front end of access door is provided with control panel. This electric power is communication cable processing apparatus for electric power capital construction engineering, increase the inside of box and can carry out lift adjustment's cutting device, the convenient better operation that cuts that carries out the cable, be convenient for better carry out the electric power construction, place on first conveying roller after carrying the box inside with the cable, later inwards promote, conveying device descends through electric telescopic handle simultaneously, contact with the cable, carry out the centre gripping with the cable through two sets of conveying rollers, later carry the cable through conveying device, cutting operation after convenient, the condition of artifical support has been reduced, time saving and labor saving, and convenient for operation, the practicality is greatly improved.

Description

Electric power communication cable processing apparatus for electric power capital construction engineering
Technical Field
The utility model relates to an electric power capital construction engineering technical field specifically is an electric power communication cable processing apparatus for electric power capital construction engineering.
Background
The electric power infrastructure is to plan, coordinate, supervise, control and summarize the operation process of the system such as establishment, feasibility study, evaluation, decision-making, design, equipment acquisition, construction, debugging, acceptance inspection, commissioning and fund recovery of the construction project so as to achieve the purposes of ensuring the quality of the investment project, shortening the construction period and improving the investment benefit, and the electric power infrastructure management is to plan, coordinate, supervise, control and summarize the operation process of the system such as establishment, feasibility study, evaluation, decision-making, design, equipment acquisition, construction, debugging, acceptance inspection, commissioning and fund recovery of the construction project so as to achieve the purposes of ensuring the quality of the investment project, shortening the construction period and improving the investment benefit.
However, current electric power communication cable for electric power capital construction engineering, when communication cable installs and uses, need cut communication cable's use length, select suitable length to install and lay, but thicker communication cable manual operation cuts inconveniently a bit, the incision is also level and smooth inadequately, influence communication cable's later stage and use, the operation is got up and is wasted time and energy, some communication cable are heavier simultaneously, when cutting, the manual work supports the operation inconvenient, do not have the structure that can carry out centre gripping and transport to communication cable, it is not very convenient to make the operation get up when cutting, the efficiency is lower, greatly reduced the practicality.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model is not enough to prior art, the utility model provides a power communication cable processing apparatus for electric power infrastructure engineering, with the current power communication cable for electric power infrastructure engineering who proposes in solving above-mentioned background art, when communication cable installs and uses, need cut communication cable's use length, select suitable length to install and lay, but the artifical manual operation of thicker communication cable cuts inconveniently a bit, the incision is also level and smooth inadequately, the later stage that influences communication cable uses, it wastes time and energy to operate, communication cable is heavier a bit simultaneously, when cutting, it is inconvenient that the manual work supports the operation, do not have the structure that can carry out centre gripping and transport to communication cable, it is not very convenient to make the operation get up when cutting, the efficiency is lower, greatly reduced the problem of practicality.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a power communication cable processing device for power infrastructure engineering comprises a box body, wherein a support column is fixedly connected to the lower end of the box body, a first support plate is fixedly connected to the upper end inside the box body, a first electric telescopic rod is fixedly connected to the lower end of the first support plate, a conveying device is fixedly connected to the lower end of the first electric telescopic rod, a second electric telescopic rod is fixedly connected to the upper end center inside the box body, a second support plate is fixedly connected to the lower end of the second electric telescopic rod, a connecting plate is fixedly connected to the lower end of the second support plate, a cutting wheel is arranged on the right side of the connecting plate, a first motor is fixedly connected to the left side of the connecting plate, the transmission end of the first motor is in transmission connection with the cutting wheel, a mounting frame is fixedly connected to the inside of the box body, and a first support block is fixedly connected to the upper end of the mounting frame, be provided with first conveying roller between the first supporting block, logical groove has been seted up respectively to the left and right sides of box, the inside bottom fixedly connected with third electric telescopic handle of box, third electric telescopic handle's upper end fixedly connected with third backup pad, the upper end of third backup pad is provided with the same first supporting block and first conveying roller, the front end of box is provided with the access door, the front end of access door is provided with control panel.
Preferably, the support columns are symmetrically arranged in two groups about the vertical central line of the box body, and each group of the support columns is provided with two support columns, so that the structural stability is improved.
Preferably, conveyor includes mounting panel, second supporting shoe, second conveying roller, installation axle, belt and second motor, the lower extreme fixedly connected with second supporting shoe of mounting panel, be provided with the second conveying roller between the second supporting shoe, the one end fixedly connected with installation axle in the second conveying roller outside, the outside of installation axle is provided with the belt, the outside of installation axle is provided with the second motor, and convenient better carries the operation.
Preferably, the second supporting block is symmetrically provided with two second supporting blocks about the vertical center line of the mounting plate, the second conveying roller is rotatably connected with the second supporting block, the mounting shaft is in transmission connection with the transmission end of the second motor, and the belt is in transmission connection with the mounting shaft, so that the conveying operation is convenient and better.
Preferably, first supporting block and first conveying roller are provided with a plurality ofly respectively at equidistant, first supporting block and first conveying roller rotate to be connected, cooperate the better transport that carries out the cable of conveyor.
Preferably, control panel and first electric telescopic handle, second electric telescopic handle, first motor, third electric telescopic handle and second motor electric connection are convenient for control and adjust in real time.
Compared with the prior art, the utility model provides an electric power communication cable processing apparatus for electric power capital construction engineering possesses following beneficial effect:
1. this electric power communication cable processing apparatus for electric power capital construction engineering, through the setting of second electric telescopic handle, cutting wheel and first motor, increase the inside cutting device that can carry out lift adjustment of box, can carry the inside back of box at the cable, from the centre decline begin to cut off the cable, the convenient better operation that cuts that carries on of cable, the operation convenient and fast that gets up, the better electric power construction that carries on of being convenient for has improved the practicality greatly.
2. This electric power communication cable processing apparatus for electric power capital construction engineering, through the setting of conveyor and first conveying roller, place on first conveying roller after carrying the box inside with the cable, later inwards promote, conveyor passes through electric telescopic handle decline simultaneously, contact with the cable, carry out the centre gripping with the cable through two sets of conveying rollers, later carry the cable through conveyor, cutting operation after convenient, the condition of artifical support has been reduced, time saving and labor saving, and convenient for operation has improved the practicality greatly.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 4 is a left side view structure schematic diagram of the first conveying roller of the present invention;
fig. 5 is a left-side view structural schematic diagram of the second conveying roller of the present invention.
Wherein: 1. a box body; 2. a support pillar; 3. a first support plate; 4. a first electric telescopic rod; 5. a conveying device; 6. a second electric telescopic rod; 7. a second support plate; 8. a connecting plate; 9. a cutting wheel; 10. A first motor; 11. a mounting frame; 12. a first support block; 13. a first conveying roller; 14. a through groove; 15. A third electric telescopic rod; 16. a third support plate; 17. an access door; 18. a control panel; 51. mounting a plate; 52. a second support block; 53. a second conveying roller; 54. installing a shaft; 55. a belt; 56. a second motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: a power communication cable processing device for power infrastructure engineering comprises a box body 1, wherein a support column 2 is fixedly connected at the lower end of the box body 1, a first support plate 3 is fixedly connected at the upper end inside the box body 1, a first electric telescopic rod 4 is fixedly connected at the lower end of the first support plate 3, a conveying device 5 is fixedly connected at the lower end of the first electric telescopic rod 4, a second electric telescopic rod 6 is fixedly connected at the upper end center inside the box body 1, a second support plate 7 is fixedly connected at the lower end of the second electric telescopic rod 6, a connecting plate 8 is fixedly connected at the lower end of the second support plate 7, a cutting wheel 9 is arranged at the right side of the connecting plate 8, a first motor 10 is fixedly connected at the left side of the connecting plate 8, the driving end of the first motor 10 is in transmission connection with the cutting wheel 9, a mounting frame 11 is fixedly connected inside the box body 1, and a first support block 12 is fixedly connected at the upper end of the mounting frame 11, be provided with first conveying roller 13 between first supporting block 12, logical groove 14 has been seted up respectively to the left and right sides of box 1, the inside bottom fixedly connected with third electric telescopic handle 15 of box 1, the upper end fixedly connected with third backup pad 16 of third electric telescopic handle 15, the upper end of third backup pad 16 is provided with the same first supporting block 12 and first conveying roller 13, the front end of box 1 is provided with access door 17, the front end of access door 17 is provided with control panel 18.
Further, the support column 2 is provided with two sets of about the vertical central line symmetry of box 1, and every group support column 2 is provided with two, improves the stability of structure.
Further, conveyor 5 includes mounting panel 51, second supporting block 52, second conveying roller 53, installation axle 54, belt 55 and second motor 56, and mounting panel 51's lower extreme fixedly connected with second supporting block 52 is provided with second conveying roller 53 between the second supporting block 52, and the one end fixedly connected with installation axle 54 in the second conveying roller 53 outside, the outside of installation axle 54 is provided with belt 55, and the outside of installation axle 54 is provided with second motor 56, conveniently carries the cable.
Further, the second supporting block 52 is symmetrically arranged about the vertical center line of the mounting plate 51, the second conveying roller 53 is rotatably connected with the second supporting block 52, the mounting shaft 54 is in transmission connection with the transmission end of the second motor 56, and the belt 55 is in transmission connection with the mounting shaft 54, so that the conveying operation is convenient and better.
Further, first supporting block 12 and first conveying roller 13 are provided with a plurality ofly respectively at equidistant, and first supporting block 12 and first conveying roller 13 rotate to be connected, and conveyor 5 is in coordination better carries out the transport of cable.
Further, control panel 18 and first electric telescopic handle 4, second electric telescopic handle 6, first motor 10, third electric telescopic handle 15 and second motor 56 electric connection are convenient for control and adjust in real time.
When the cable cutting device is used, one end of a cable penetrates through the through groove 14, the cable is placed on the first conveying roller 13, the first electric telescopic rod 4 is lowered, the second conveying roller 53 in the conveying device 5 is in contact with the outer side of the cable, the cable is clamped, the second motor 56 is started to drive the conveying device 5 to run, the cable is moved towards the inside of the box body 1, one end of the cable penetrates through the box body 1 and penetrates out of the through groove 14 in the other end, the third supporting plate 16 is lowered through the third electric telescopic rod 15 after the length and the position needing to be cut are determined, the cutting wheel 9 is lowered to the position of the cable through the second electric telescopic rod 6, cutting is started, the cable is pulled out after the cutting is completed, and then cutting of the next cable is continued.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a power communication cable processing apparatus for electric power capital construction engineering, includes box (1), its characterized in that: the lower end of the box body (1) is fixedly connected with a support column (2), the upper end inside the box body (1) is fixedly connected with a first support plate (3), the lower end of the first support plate (3) is fixedly connected with a first electric telescopic rod (4), the lower end of the first electric telescopic rod (4) is fixedly connected with a conveying device (5), the upper end center inside the box body (1) is fixedly connected with a second electric telescopic rod (6), the lower end of the second electric telescopic rod (6) is fixedly connected with a second support plate (7), the lower end of the second support plate (7) is fixedly connected with a connecting plate (8), the right side of the connecting plate (8) is provided with a cutting wheel (9), the left side of the connecting plate (8) is fixedly connected with a first motor (10), and the transmission end of the first motor (10) is in transmission connection with the cutting wheel (9), the utility model discloses a storage box, including box (1), the inside fixedly connected with mounting bracket (11) of box (1), the first supporting block of upper end fixedly connected with (12) of mounting bracket (11), be provided with first conveying roller (13) between first supporting block (12), logical groove (14) have been seted up respectively to the left and right sides of box (1), the inside bottom fixedly connected with third electric telescopic handle (15) of box (1), the upper end fixedly connected with third supporting plate (16) of third electric telescopic handle (15), the upper end of third supporting plate (16) is provided with same first supporting block (12) and first conveying roller (13), the front end of box (1) is provided with access door (17), the front end of access door (17) is provided with control panel (18).
2. The power communication cable processing device for power infrastructure engineering according to claim 1, wherein: the support columns (2) are symmetrically arranged in two groups about the vertical central line of the box body (1), and each group of the support columns (2) is provided with two.
3. The power communication cable processing device for power infrastructure engineering according to claim 1, wherein: the conveying device (5) comprises a mounting plate (51), a second supporting block (52), a second conveying roller (53), a mounting shaft (54), a belt (55) and a second motor (56), the second supporting block (52) is fixedly connected to the lower end of the mounting plate (51), the second conveying roller (53) is arranged between the second supporting blocks (52), the mounting shaft (54) is fixedly connected to one end of the outer side of the second conveying roller (53), the belt (55) is arranged on the outer side of the mounting shaft (54), and the second motor (56) is arranged on the outer side of the mounting shaft (54).
4. The power communication cable processing device for power infrastructure engineering according to claim 3, wherein: the two second supporting blocks (52) are symmetrically arranged about the vertical center line of the mounting plate (51), the second conveying rollers (53) are rotatably connected with the second supporting blocks (52), the mounting shafts (54) are in transmission connection with the transmission ends of the second motors (56), and the belts (55) are in transmission connection with the mounting shafts (54).
5. The power communication cable processing device for power infrastructure engineering according to claim 1, wherein: first supporting block (12) and first conveying roller (13) are equidistant to be provided with a plurality ofly respectively, first supporting block (12) and first conveying roller (13) rotate and are connected.
6. The power communication cable processing device for power infrastructure engineering according to claim 1, wherein: the control panel (18) is electrically connected with the first electric telescopic rod (4), the second electric telescopic rod (6), the first motor (10), the third electric telescopic rod (15) and the second motor (56).
CN202121516861.7U 2021-07-06 2021-07-06 Electric power communication cable processing apparatus for electric power capital construction engineering Expired - Fee Related CN215248682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121516861.7U CN215248682U (en) 2021-07-06 2021-07-06 Electric power communication cable processing apparatus for electric power capital construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121516861.7U CN215248682U (en) 2021-07-06 2021-07-06 Electric power communication cable processing apparatus for electric power capital construction engineering

Publications (1)

Publication Number Publication Date
CN215248682U true CN215248682U (en) 2021-12-21

Family

ID=79487038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121516861.7U Expired - Fee Related CN215248682U (en) 2021-07-06 2021-07-06 Electric power communication cable processing apparatus for electric power capital construction engineering

Country Status (1)

Country Link
CN (1) CN215248682U (en)

Similar Documents

Publication Publication Date Title
CN105186385A (en) Intelligent cabling trolley
CN205304119U (en) Restore damaged high tension cable's wire stripping equipment
CN112110300A (en) Electric power communication construction pay off rack
CN110890180A (en) Draw gear is used in cable manufacture
CN215248682U (en) Electric power communication cable processing apparatus for electric power capital construction engineering
CN114039299B (en) Cable paying-off cutting device for power engineering
CN210926185U (en) Cylindrical lithium battery cap assembling machine
CN205223557U (en) Frame platform is traded in pneumatic lift
CN216998179U (en) Double-station glass cutting device
CN209777587U (en) Transfer system of disposable plant fiber tableware production usefulness
CN212608663U (en) Cable conveying equipment for electric power construction
CN212350235U (en) Construction steel bar cutting equipment
CN204938594U (en) A kind of tapetum fibrosum cuts into winding apparatus
CN204978119U (en) Aircraft tire numerical control pressure equipment, decomposition machine
CN210549826U (en) Loading frame of plate cutting machine
CN208122344U (en) A kind of architectural engineering protective stent
CN209156761U (en) A kind of full-automatic plate shape-calibration machine
CN214505129U (en) Guider is used in wire and cable processing
CN211811933U (en) Transfer device for insulators of power supply station
CN220754386U (en) Portable new energy storage module
CN212734390U (en) Steel cutting device is used in production of lift garage
CN207010095U (en) Light-duty ac cable conveyer
CN216056043U (en) Electric power transmission cable bearing device
CN215048170U (en) Temporary storage and transfer equipment in piston rod machining process
CN217732551U (en) Switch board handling device that switch board shifted

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221

CF01 Termination of patent right due to non-payment of annual fee