CN215212689U - Protective wall for civil engineering - Google Patents

Protective wall for civil engineering Download PDF

Info

Publication number
CN215212689U
CN215212689U CN202121229278.8U CN202121229278U CN215212689U CN 215212689 U CN215212689 U CN 215212689U CN 202121229278 U CN202121229278 U CN 202121229278U CN 215212689 U CN215212689 U CN 215212689U
Authority
CN
China
Prior art keywords
screw
mounting bracket
plate
civil engineering
protective wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121229278.8U
Other languages
Chinese (zh)
Inventor
邢鑫源
周爱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN202121229278.8U priority Critical patent/CN215212689U/en
Application granted granted Critical
Publication of CN215212689U publication Critical patent/CN215212689U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses a protective wall for civil engineering relates to civil engineering technical field. The utility model provides a protective wall for civil engineering, includes wallboard, mounting bracket and stores up the sandbox, and the wallboard can be dismantled with the mounting bracket through wearing the cap screw and be connected, and mounting bracket one side is through screw and storage sandbox fixed connection, stores up the sandbox below and can dismantle through screw and limiting plate and be connected. The utility model provides a pair of protective wall for civil engineering, through burying the spud pile underground, then it is fixed with the mounting bracket with the spud pile top, fix the wall body from inside, the limiting plate and the ground contact of rethread mounting bracket both sides, insert the locating hole that corresponds in the limiting plate with a plurality of spacing inserted tips, further fix the wall body from the wall outside, the rethread advances husky pipe and pours sand into the box of mounting bracket both sides into, the weight of increase wall body bottom both sides, further strengthen protective wall stability, prevent under strong wind and some bad weather, the wall body takes place to turn on one's side.

Description

Protective wall for civil engineering
Technical Field
The utility model relates to a civil engineering technical field especially relates to a protective wall for civil engineering.
Background
The protective wall for civil engineering is a device commonly used in construction, and the main function of the wall is to protect the construction range, separate the construction site from the normal living environment, protect the constructed facility structure by constructing the protective wall when the construction is not completed or a long-time construction project needs to be carried out, prevent the personnel irrelevant to the construction from entering the construction site and causing danger, and simultaneously remind the pedestrians of going to and coming from paying attention.
For example, the protection wall for civil engineering provided by the Chinese patent authorization publication No. CN212716124U comprises a protection wall; the side surfaces of two ends of the protection wall are respectively provided with a first connecting wall and a second connecting wall which can be mutually inserted and sleeved; the first connecting wall and the second connecting wall are provided with longitudinal through holes which are matched with each other; still include with through-hole complex grafting locating lever. The utility model discloses can fix through the fixed knot structure that the grafting locating lever is constituteed after two sets of connection walls are good in fixed time, and the grafting locating lever runs through the bottom of device, can carry out more stable fixed with ground, it can fix to take out the grafting locating lever when needing to pull down, and can carry out a plurality of protecting walls according to the area of in-service use and splice fixedly, thereby the effectual practicality and the convenience that improve the device, but it is not firm still to have the wall body fixed with ground, under strong wind and some bad weather, easy emergence is turned on one's side, cause economic loss, and in the work progress, need often adjust the protecting wall position, and general protecting wall has the problem that the transport is wasted time and energy.
Therefore, it is necessary to provide a protective wall for civil engineering work to solve the above-mentioned technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a protective wall for civil engineering has solved but still has the wall body and fixed insecure with ground, under strong wind and some bad weather, takes place easily to turn on one's side, causes economic loss, and in the work progress, needs often to adjust the protective wall position, and general protective wall has the problem that the transport is wasted time and energy.
For solving above-mentioned technical problem, a protective wall for civil engineering, includes wallboard, mounting bracket and stores up the sandbox, the wallboard can be dismantled with the mounting bracket through wearing the cap screw and be connected, mounting bracket one side is through the screw with store up sandbox fixed connection, it can dismantle with the limiting plate through the screw and be connected to store up the sandbox below, limiting plate one side is through screw and mounting bracket fixed connection, the inside spacing inserted tip that is provided with of limiting plate, screw and spud pile fixed connection are passed through to the mounting bracket below, the mounting bracket passes through the screw and can dismantle with baffle one side and be connected.
Preferably, the mounting bracket still includes roof, bottom plate, connecting plate and fixed plate, bottom plate below is through screw and spud pile fixed connection, the roof passes through the screw and can dismantle with the connecting plate top and be connected, the connecting plate below can dismantle with the bottom plate through the screw and be connected, fixed plate one side is through screw and connecting plate fixed connection, the fixed plate is provided with a plurality ofly.
Preferably, store up the sandbox and still include the box, advance husky pipe, go out husky pipe and swash plate, box one side is through screw and mounting bracket fixed connection, advance husky pipe below and box flange joint, go out husky pipe one end and box flange joint, the swash plate passes through the fix with screw inside the box, it is provided with two to advance husky pipe.
Preferably, the surface of the limiting plate is provided with a plurality of positioning holes, the positioning holes are matched with the limiting pins, and the number of the positioning holes is multiple.
Preferably, threaded holes are formed in the surfaces of the top plate, the bottom plate and the fixing plate, the threaded holes are matched with the cap screws, and the threaded holes are provided with a plurality of threaded holes.
Preferably, a filter screen is fixed inside the sand inlet pipe through a screw, and the filter screen is a metal filter screen.
Preferably, the limiting plate is connected with the limiting pin in a sliding mode, the wall plate, the cap screw and the limiting pin are provided with a plurality of holes, and the sand storage box, the limiting plate and the fixing pile are respectively provided with two holes.
Compared with the prior art, the utility model provides a pair of protective wall for civil engineering has following beneficial effect:
the utility model provides a protective wall for civil engineering, utilize and store up the sandbox, the limiting plate, spacing inserted pin and spud pile, through burying the spud pile underground, then it is fixed with the mounting bracket to fix the spud pile top, fix the wall body from inside, the limiting plate and the ground contact of rethread mounting bracket both sides, insert the locating hole that corresponds in the limiting plate with a plurality of spacing inserted pins, further fix the wall body from the wall outside, the rethread advances husky pipe and pours husky into the box of mounting bracket both sides into, the weight of increase wall body bottom both sides, further strengthen protective wall stability, prevent under strong wind and some bad weather, the wall body takes place to turn on one's side, it is not firm with ground fixed to have solved the wall body, under strong wind and some bad weather, easy emergence is turned on one's side, cause economic loss's problem.
The utility model provides a protective wall for civil engineering, utilize wallboard and mounting bracket, it is fixed with the mounting bracket to wear the cap screw through the wallboard utilization, when needs adjustment protective wall position, can dismantle and wear the cap screw and take out the wallboard, roof in the mounting bracket again, the bottom plate, connecting plate and fixed plate are dismantled respectively, divide into a plurality of parts with the protective wall, remove respectively, the husky pipe of going out in will storing up the sandbox is emitted, the swash plate can accelerate husky outflow, the convenience is taken out bottom fixed part, and then can dismantle the protective wall into a plurality of subtotals, convenient transportation and installation, and its part structure takes place to damage, can replace this part, labour saving and time saving when making adjustment protective wall position, in the work progress has been solved, need often adjust the protective wall position, and general protective wall has the problem that the transport wastes time and energy.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a protective wall for civil engineering according to the present invention;
fig. 2 is a cross-sectional view of the present invention;
fig. 3 is a partial schematic view of the mounting bracket of the present invention;
fig. 4 is a partial schematic view of the sand storage box of the present invention.
Reference numbers in the figures: 1. a wallboard; 2. a mounting frame; 3. a sand storage box; 4. a screw is covered with a cap; 5. a limiting plate; 6. limiting and inserting a pin; 7. fixing the pile; 8. a partition plate; 9. positioning holes; 201. a top plate; 202. a base plate; 203. a connecting plate; 204. a fixing plate; 205. a threaded hole; 31. a box body; 32. a sand inlet pipe; 33. a sand outlet pipe; 34. a sloping plate; 35. and (4) a filter screen.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
as shown in figures 1-4, the protective wall for civil engineering comprises a wall plate 1, a mounting frame 2 and a sand storage box 3, wherein one side of the mounting frame 2 is fixedly connected with the sand storage box 3 through a screw, the lower part of the sand storage box 3 is detachably connected with a limiting plate 5 through a screw, one side of the limiting plate 5 is fixedly connected with the mounting frame 2 through a screw, a limiting inserted pin 6 is arranged inside the limiting plate 5, the lower part of the mounting frame 2 is fixedly connected with a fixing pile 7 through a screw, the mounting frame 2 is detachably connected with one side of a partition plate 8 through a screw, the sand storage box 3 further comprises a box body 31, a sand inlet pipe 32, a sand outlet pipe 33 and an inclined plate 34, one side of the box body 31 is fixedly connected with the mounting frame 2 through a screw, the lower part of the sand inlet pipe 32 is in flange connection with the box body 31, one end of the sand outlet pipe 33 is in flange connection with the box body 31, the inclined plate 34 is fixed inside the box body 31 through a screw, two sand inlet pipes 32 are arranged, positioning holes 9 are arranged on the surface of the limiting plate 5, locating hole 9 and 6 looks adaptations of spacing inserted pin, and locating hole 9 is provided with a plurality ofly, advances that husky pipe 32 is inside to have filter screen 35 through the fix with screw, and filter screen 35 adopts metal filters, and limiting plate 5 is sliding connection with spacing inserted pin 6's connected mode, and wallboard 1, wear cap screw 4 and spacing inserted pin 6 are provided with a plurality ofly, store up sandbox 3, limiting plate 5 and spud pile 7 and respectively be provided with two.
In this embodiment, through burying the spud pile 7 underground, then it is fixed with mounting bracket 2 with the spud pile 7 top, fix the wall body from inside, limiting plate 5 and the ground contact of rethread mounting bracket 2 both sides, insert a plurality of spacing inserted pins 6 locating hole 9 that correspond in the limiting plate 5, further fix the wall body from the wall is outer, the rethread advances husky pipe 32 and pours sand into the box 31 of mounting bracket 2 both sides, the weight of wall body bottom both sides increases, further strengthen protecting wall stability, prevent under strong wind and some bad weather, the wall body takes place to turn on one's side, it is not firm that wall body and ground are fixed to have solved, under strong wind and some bad weather, easy emergence is turned on one's side, cause economic loss's problem.
Example two:
referring to fig. 1-4, based on the first embodiment, the present invention provides a technical solution: wallboard 1 can be dismantled with mounting bracket 2 through wearing cap screw 4 and be connected, mounting bracket 2 still includes roof 201, bottom plate 202, connecting plate 203 and fixed plate 204, pass through screw and 7 fixed connection of spud pile below bottom plate 202, roof 201 can be dismantled with connecting plate 203 top through the screw and be connected, connecting plate 203 below can be dismantled with bottom plate 202 through the screw and be connected, fixed plate 204 one side is passed through screw and connecting plate 203 fixed connection, fixed plate 204 is provided with a plurality ofly, roof 201, threaded hole 205 has all been seted up on bottom plate 202 and fixed plate 204 surface, threaded hole 205 and 4 looks adaptations of wearing cap screw, threaded hole 205 is provided with a plurality ofly.
In this embodiment, it is fixed with mounting bracket 2 to utilize through wallboard 1 to wear cap screw 4, when needs adjustment protecting wall position, can dismantle and wear cap screw 4 and take out wallboard 1, roof 201 in mounting bracket 2 again, bottom plate 202, connecting plate 203 and fixed plate 204 are dismantled respectively, divide into a plurality of parts with the protecting wall, remove respectively, sand in storing up sandbox 3 is emitted through going out sand pipe 33, the swash plate 34 can accelerate the husky outflow, conveniently take out bottom fixed part, and then can dismantle the protecting wall into a plurality of parts, convenient transportation and installation, and its part structure takes place to damage, can replace this part, labour saving and time saving when making adjustment protecting wall position, the work progress has been solved, need often to adjust protecting wall position, and general protecting wall exists the problem that the transport wastes time and energy.
The utility model provides a pair of working principle of protective wall for civil engineering is as follows:
firstly, all the structures of the protective wall are placed at proper positions, then the fixing piles 7 are buried underground, and finally the rest structures are spliced from bottom to top. Firstly, burying a fixed pile 7 underground, fixing the upper part of the fixed pile 7 with an installation frame 2, fixing a wall body from the inside, contacting limiting plates 5 on two sides of the installation frame 2 with the ground, inserting a plurality of limiting insertion pins 6 into corresponding positioning holes 9 in the limiting plates 5, further fixing the wall body from the outside of the wall, finally pouring sand into box bodies 31 on two sides of the installation frame 2 by using a sand inlet pipe 32, increasing the weight of two sides of the bottom of the wall body, further enhancing the stability of the protective wall, and preventing the wall body from turning over in strong wind and some severe weather; when the position of the protective wall needs to be adjusted, the screw 4 with the cap can be demounted to take out the wallboard 1, the top plate 201 in the mounting rack 2 is detached again, the bottom plate 202, the connecting plate 203 and the fixing plate 204 are detached respectively, the protective wall is divided into a plurality of parts and is moved respectively, sand in the sand storage box 3 is discharged through the sand outlet pipe 33, the inclined plate 34 can accelerate sand flow out, the bottom fixing part is taken out conveniently, and further the protective wall can be detached into a plurality of small parts, transportation and installation are facilitated, and part of the structure is damaged, the part can be replaced, so that time and labor are saved when the position of the protective wall is adjusted.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a protective wall for civil engineering, includes wallboard (1), mounting bracket (2) and storage sandbox (3), its characterized in that: wallboard (1) can be dismantled with mounting bracket (2) through wearing cap screw (4) and be connected, mounting bracket (2) one side is through screw and storage sandbox (3) fixed connection, it can be dismantled with limiting plate (5) through the screw to store up sandbox (3) below and be connected, limiting plate (5) one side is through screw and mounting bracket (2) fixed connection, limiting plate (5) inside is provided with spacing inserted tip (6), mounting bracket (2) below is through screw and spud pile (7) fixed connection, mounting bracket (2) can be dismantled with baffle (8) one side through the screw and be connected.
2. A protective wall for civil engineering works according to claim 1, characterized in that: mounting bracket (2) still include roof (201), bottom plate (202), connecting plate (203) and fixed plate (204), bottom plate (202) below is through screw and spud pile (7) fixed connection, roof (201) can be dismantled with connecting plate (203) top through the screw and be connected, connecting plate (203) below can be dismantled with bottom plate (202) through the screw and be connected, fixed plate (204) one side is through screw and connecting plate (203) fixed connection, fixed plate (204) are provided with a plurality ofly.
3. A protective wall for civil engineering works according to claim 1, characterized in that: store up sandbox (3) and still include box (31), advance husky pipe (32), go out husky pipe (33) and swash plate (34), box (31) one side is through screw and mounting bracket (2) fixed connection, advance husky pipe (32) below and box (31) flange joint, go out husky pipe (33) one end and box (31) flange joint, swash plate (34) are inside box (31) through the fix with screw, it is provided with two to advance husky pipe (32).
4. A protective wall for civil engineering works according to claim 1, characterized in that: the surface of the limiting plate (5) is provided with a plurality of positioning holes (9), the positioning holes (9) are matched with the limiting pins (6), and the plurality of positioning holes (9) are arranged.
5. A protective wall for civil engineering works according to claim 2, characterized in that: threaded holes (205) are formed in the surfaces of the top plate (201), the bottom plate (202) and the fixing plate (204), the threaded holes (205) are matched with the cap-wearing screws (4), and the threaded holes (205) are provided with a plurality of holes.
6. A protective wall for civil engineering works according to claim 3, characterized in that: a filter screen (35) is fixed inside the sand inlet pipe (32) through screws, and the filter screen (35) is a metal filter screen.
7. A protective wall for civil engineering works according to claim 1, characterized in that: limiting plate (5) and the connected mode of spacing bolt (6) are sliding connection, wallboard (1), wear cap screw (4) and spacing bolt (6) are provided with a plurality ofly, storage sandbox (3), limiting plate (5) and spud pile (7) respectively are provided with two.
CN202121229278.8U 2021-06-02 2021-06-02 Protective wall for civil engineering Expired - Fee Related CN215212689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121229278.8U CN215212689U (en) 2021-06-02 2021-06-02 Protective wall for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121229278.8U CN215212689U (en) 2021-06-02 2021-06-02 Protective wall for civil engineering

Publications (1)

Publication Number Publication Date
CN215212689U true CN215212689U (en) 2021-12-17

Family

ID=79422996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121229278.8U Expired - Fee Related CN215212689U (en) 2021-06-02 2021-06-02 Protective wall for civil engineering

Country Status (1)

Country Link
CN (1) CN215212689U (en)

Similar Documents

Publication Publication Date Title
CN112227383A (en) Safe type housing construction underground structure supporting device
CN211215565U (en) Sand setting tank for detection
CN215212689U (en) Protective wall for civil engineering
CN106120712B (en) Underground continuous wall groove segment mud takes sizing device
CN205475275U (en) Landing stage face rainwater collection heat -extraction system
CN211285494U (en) Slope protection structure device
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN206308700U (en) A kind of Traffic Engineering Construction slope protection device
CN212452651U (en) A retaining structure for foundation ditch segmentation construction
CN210530485U (en) Building construction foundation ditch safety device
CN108979116A (en) A kind of reinforcing heightening type hanging basket connection system
CN104763045A (en) Protection drain well
CN209722861U (en) A kind of collapsible flood protection device and collapsible anti-flood wall
CN207761010U (en) Gully and drainage system
CN207032913U (en) A kind of construction anti-fall pit device for being easy to adjunction
CN206267871U (en) A kind of porous pre-buried channel flow
CN215407839U (en) Fender mounting structure is enclosed in municipal construction convenient to installation
CN219951688U (en) Hanging basket device for bridge auxiliary engineering construction
CN208472898U (en) Highway preserved pipeline trough rim mould
CN218940585U (en) Communication pipeline on-site protection device
CN215252867U (en) Auxiliary vertical equipment for inserting and driving steel pipe piles in flowing water
CN212313384U (en) Civil engineering pipeline storage loading and unloading vehicle
CN213597011U (en) Interim drainage structures of construction are built in room
CN212176041U (en) Device for cleaning sludge in pipeline
CN211341703U (en) Guardrail for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211217

CF01 Termination of patent right due to non-payment of annual fee