CN215210937U - Integrated pile stabilizing platform - Google Patents
Integrated pile stabilizing platform Download PDFInfo
- Publication number
- CN215210937U CN215210937U CN202023185142.XU CN202023185142U CN215210937U CN 215210937 U CN215210937 U CN 215210937U CN 202023185142 U CN202023185142 U CN 202023185142U CN 215210937 U CN215210937 U CN 215210937U
- Authority
- CN
- China
- Prior art keywords
- platform
- frame
- pile
- flange
- upper platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses an integrated pile stabilizing platform, wherein an upper platform is connected with a lower platform through a frame, an inclined ladder is arranged between the upper platform and the lower platform, one side of the upper platform and the lower platform is provided with an opening, the opening of the upper platform and the lower platform is provided with a box girder, the corners of the upper platform and the lower platform and the inner side of the joint with the box girder are all provided with a jacking box, four corners of the upper platform and the lower platform are respectively provided with a guide sleeve, a positioning pile is connected with the guide sleeves arranged on the four corners of the upper platform and the lower platform, a plurality of locking blocks are arranged above the guide sleeves at the upper platform, the bottom of the frame is connected with the top end of a heightening frame through a connecting piece, a plurality of anti-sinking plates are arranged in the heightening frame, the utility model has reasonable structure and an integrated structure, the steps of lifting the positioning pile into a sinking pile and fixing with the pile stabilizing platform are reduced, the working time can be saved, and the working efficiency is improved.
Description
Technical Field
The utility model relates to a steady pile platform technical field specifically is a steady pile platform of integral type.
Background
The piling construction process of the traditional offshore wind turbine foundation pile is as follows: 1. hoisting and positioning a pile stabilizing platform; 2. pile turning and hoisting of the positioning pile; 3. pile sinking of the positioning pile and fixation with a pile stabilizing platform; 4. pile embracing devices are used for piling the fan foundation; 5. pile sinking of a fan foundation pile; 6. the pile-stabilizing platform is detached, and the window period of offshore construction is limited, so that the time consumption of the traditional construction process is long, and an improved technology is urgently needed to solve the problem in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steady stake platform of integral type to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an integrated pile stabilizing platform comprises an upper platform, a frame, a lower platform, an inclined ladder, a box girder, a push box, a guide sleeve, a positioning pile, a locking block, a connecting piece, a heightening frame and an anti-sinking plate, wherein the upper platform is connected with the lower platform through the frame, the inclined ladder is arranged between the upper platform and the lower platform, one side of the upper platform and one side of the lower platform are open, the box girder is arranged at the opening of the upper platform and the lower platform, the push box is arranged at the corners of the upper platform and the lower platform and at the inner side of the joint of the upper platform and the lower platform and the box girder, the guide sleeves are respectively arranged at four corners of the upper platform and the lower platform, the positioning pile is connected with the guide sleeves arranged at the four corners of the upper platform and the lower platform, the locking block is arranged above the guide sleeve at the upper platform, the bottom of the frame is connected with the top end of the heightening frame through the connecting piece, and a plurality of anti-sinking plates are arranged in the heightening frame.
Preferably, the outer edges of the upper platform and the lower platform are provided with guardrails, and a plurality of inclined struts are further arranged between the upper platform and the lower platform.
Preferably, the inside of the ejection box is provided with a roller frame through a roller, the inside of the roller frame is provided with a jack, and one end of the jack, far away from the roller frame, is connected with the adjusting block.
Preferably, the connecting piece includes upper junction plate, upper flange, lower connecting plate, lower flange and bolt, a plurality of upper junction plates have evenly been arranged to the upper surface of upper flange, the upper junction plate links to each other with the stand of frame bottom, a plurality of lower connecting plates have evenly been arranged to the lower surface of lower flange, lower connecting plate links to each other with the stand of heightening the frame top, the upper flange passes through the bolt with lower flange and links to each other.
Preferably, the surface of the positioning pile is provided with scales.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model relates to an integral type structure has reduced the guide pile and has turned over the stake and hang into in the pile sinking and with steady fixed step of stake platform, can practice thrift operating time to improve work efficiency.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
FIG. 2 is a schematic cross-sectional view taken along line A-A of FIG. 1.
Fig. 3 is a schematic cross-sectional view at B-B in fig. 2.
Fig. 4 is a schematic view of a push box structure.
Fig. 5 is a schematic view of the structure of the connector.
In the figure: the device comprises an upper-layer platform 1, a frame 2, a lower-layer platform 3, an inclined ladder 4, a box girder 5, a jacking box 6, a guide sleeve 7, a positioning pile 8, a locking block 9, a connecting piece 10, a heightening frame 11, an anti-sinking plate 12, a guardrail 13, an inclined strut 14, a roller 15, a roller frame 16, an adjusting block 17, a jack 18, an upper connecting plate 101, an upper flange 102, a lower connecting plate 103, a lower flange 104 and a bolt 105.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: an integrated pile stabilizing platform comprises an upper platform 1, a frame 2, a lower platform 3, an inclined ladder 4, a box girder 5, a push box 6, a guide sleeve 7, a positioning pile 8, a locking block 9, a connecting piece 10, a heightening frame 11 and an anti-sinking plate 12, wherein the upper platform 1 is connected with the lower platform 3 through the frame 2, the inclined ladder 4 is arranged between the upper platform 1 and the lower platform 3, the outer edges of the upper platform 1 and the lower platform 3 are respectively provided with a guardrail 13, a plurality of inclined struts 14 are also arranged between the upper platform 1 and the lower platform 3, one sides of the upper platform 1 and the lower platform 3 are provided with openings, the box girders 5 are arranged at the openings of the upper platform 1 and the lower platform 3, the push box 6 is arranged at the corners of the upper platform 1 and the lower platform 3 and at the inner sides of the joints with the box girders 5, the guide sleeves 7 are respectively arranged on the upper platform 1 and the lower platform 3, the positioning pile 8 is connected with guide sleeves 7 arranged at four corners of the upper-layer platform 1 and the lower-layer platform 3, scales are displayed on the surface of the positioning pile 8, a plurality of locking blocks 9 are arranged above the guide sleeves 7 at the upper-layer platform 1, the bottom of the frame 2 is connected with the top end of a heightening frame 11 through a connecting piece 10, and a plurality of anti-sinking plates 12 are arranged in the heightening frame 11.
As shown in FIG. 4, a roller frame 16 is arranged inside the ejector box 6 through the rollers 15, a jack 18 is arranged inside the roller frame 16, and one end of the jack 18 far away from the roller frame 16 is connected with an adjusting block 17.
As shown in fig. 5, the connecting member 10 includes an upper connecting plate 101, an upper flange 102, a lower connecting plate 103, a lower flange 104 and bolts 105, wherein a plurality of upper connecting plates 101 are uniformly arranged on the upper surface of the upper flange 102, the upper connecting plates 101 are connected to the columns at the bottom of the frame 2, a plurality of lower connecting plates 103 are uniformly arranged on the lower surface of the lower flange 104, the lower connecting plates 103 are connected to the columns at the top of the heightening frame 11, and the upper flange 102 is connected to the lower flange 104 through the bolts 105.
The use principle is as follows: the upper end and the lower end of a frame 2 are respectively connected with an upper layer platform 1 and a lower layer platform 3, an inclined ladder 4 is installed, a heightening frame 11 is connected with the bottom of the frame 2 through a connecting piece 10, then a box girder 5, a push box 6 and a guide sleeve 7 are installed, a positioning pile 8 is connected with the guide sleeve 7 and locked through a locking block 9, the pile stabilizing platform is assembled, the positioning pile 8 is fixed in the guide sleeve 7 through the locking block 9, then the whole is hung and positioned, the locking block 9 is loosened, the positioning pile 8 is sunk, a fan foundation pile is hung into a pile holder (namely the center position of the push box 6 is installed on the upper layer platform 1 and the lower layer platform 3), the fan foundation pile is sunk, and finally the pile stabilizing platform is dismantled, so that the steps that the positioning pile 8 is turned, hung into the sunk pile and fixed with the pile stabilizing platform are reduced, the operation time can be saved, and the working efficiency is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a steady stake platform of integral type which characterized in that: comprises an upper platform (1), a frame (2), a lower platform (3), an inclined ladder (4), a box girder (5), a push box (6), a guide sleeve (7), a positioning pile (8), a locking block (9), a connecting piece (10), a heightening frame (11) and an anti-sinking plate (12), wherein the upper platform (1) is connected with the lower platform (3) through the frame (2), the inclined ladder (4) is arranged between the upper platform (1) and the lower platform (3), one sides of the upper platform (1) and the lower platform (3) are provided with openings, the box girder (5) is arranged at the openings of the upper platform (1) and the lower platform (3), the push box (6) is arranged at the corners of the upper platform (1) and the lower platform (3) and at the inner side of the joint of the upper platform (1) and the lower platform (3) and the box girder (5), the guide sleeve (7) is respectively arranged at four corners of the upper platform (1) and the lower platform (3), guide sleeve (7) that establish on spud (8) and upper platform (1) and lower floor platform (3) four angles link to each other, are located guide sleeve (7) top of upper platform (1) department and are provided with a plurality of latch segments (9), frame (2) bottom is passed through connecting piece (10) and is increased frame (11) top and link to each other, it is provided with a plurality of heavy boards (12) to increase in the frame (11).
2. An integrated pile-stabilizing platform according to claim 1, wherein: the outer edges of the upper-layer platform (1) and the lower-layer platform (3) are provided with guardrails (13), and a plurality of inclined struts (14) are further arranged between the upper-layer platform (1) and the lower-layer platform (3).
3. An integrated pile-stabilizing platform according to claim 1, wherein: a roller frame (16) is arranged in the ejection box (6) through a roller (15), a jack (18) is arranged in the roller frame (16), and one end, far away from the roller frame (16), of the jack (18) is connected with an adjusting block (17).
4. An integrated pile-stabilizing platform according to claim 1, wherein: the connecting piece (10) comprises an upper connecting plate (101), an upper flange (102), a lower connecting plate (103), a lower flange (104) and bolts (105), wherein the upper surface of the upper flange (102) is uniformly provided with the upper connecting plates (101), the upper connecting plate (101) is connected with the upright column at the bottom of the frame (2), the lower surface of the lower flange (104) is uniformly provided with the lower connecting plates (103), the lower connecting plate (103) is connected with the upright column at the top of the heightening frame (11), and the upper flange (102) is connected with the lower flange (104) through the bolts (105).
5. An integrated pile-stabilizing platform according to claim 1, wherein: scales are displayed on the surface of the positioning pile (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023185142.XU CN215210937U (en) | 2020-12-25 | 2020-12-25 | Integrated pile stabilizing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023185142.XU CN215210937U (en) | 2020-12-25 | 2020-12-25 | Integrated pile stabilizing platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215210937U true CN215210937U (en) | 2021-12-17 |
Family
ID=79435806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023185142.XU Active CN215210937U (en) | 2020-12-25 | 2020-12-25 | Integrated pile stabilizing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215210937U (en) |
-
2020
- 2020-12-25 CN CN202023185142.XU patent/CN215210937U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121040A (en) | Lattice column welding device and welding method | |
CN215210937U (en) | Integrated pile stabilizing platform | |
CN211229458U (en) | A operation platform for cylinder mound concrete placement construction | |
CN210764005U (en) | Walking type small electric elevator suitable for transferring materials between floors by reverse construction method | |
CN109944164B (en) | Self-elevating hollow thin-wall pier roller die system and construction method thereof | |
CN201158932Y (en) | Self-chucking platform especially for high-rise building elevator shaft formwork supports | |
CN208167484U (en) | The steel construction overline bridge being easily installed | |
CN206971249U (en) | A kind of corner sleeve column jacket assembles wind power foundation | |
CN112227694B (en) | Integrated climbing frame system and assembling method thereof | |
CN212612506U (en) | Quick strutting arrangement of foundation ditch | |
CN211666622U (en) | Test device capable of climbing up and down and turning plate to stand in counter-force well | |
CN211057829U (en) | Fixed maintenance platform of formula relief well is encorbelmented to counter weight antitorque type | |
CN210563531U (en) | Steel structure support for building protection | |
CN106948367A (en) | A kind of corner sleeve column jacket assembling wind power foundation and its construction method | |
CN221051371U (en) | Prefabricated caisson post-cast strip solidifies hoist device | |
RU122397U1 (en) | TOWER BRIDGE | |
CN216305921U (en) | Shield starting reaction frame for covering and digging narrow space of top-down subway station | |
CN221343636U (en) | Hoisting equipment in steel pipe column hole | |
CN221095984U (en) | Assembled convenient horse way | |
CN109987533B (en) | Self-elevating platform of internal climbing tower crane | |
CN216305315U (en) | Hydraulic engineering is with changeing ladder | |
CN221218513U (en) | Frame-lifting type reverse mould structure of bridge constant-section thin-wall pier | |
CN213233138U (en) | Jacking operation platform | |
CN114319400B (en) | Assembling and lowering process of steel cofferdam for underwater bearing platform construction | |
CN213626817U (en) | Turnover vertical passing device for reverse splicing unit type deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |