CN215168704U - Dustproof fender that encloses of highway construction - Google Patents

Dustproof fender that encloses of highway construction Download PDF

Info

Publication number
CN215168704U
CN215168704U CN202120733423.XU CN202120733423U CN215168704U CN 215168704 U CN215168704 U CN 215168704U CN 202120733423 U CN202120733423 U CN 202120733423U CN 215168704 U CN215168704 U CN 215168704U
Authority
CN
China
Prior art keywords
pole
rod
horizontal pole
construction
road construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120733423.XU
Other languages
Chinese (zh)
Inventor
胡奇
刘宗权
程柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120733423.XU priority Critical patent/CN215168704U/en
Application granted granted Critical
Publication of CN215168704U publication Critical patent/CN215168704U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a highway construction is dustproof encloses fender, including the horizontal pole, the pole setting, prop up the ground pole, fixed foot, the installation pole, connecting pipe etc. of intaking, in constructions such as town road, with enclosure materials such as emulation lawn through installation pole installation back, apopore through setting up on the cavity horizontal pole, form vaporific rivers and carry out the dust removal effect at enclosure materials inboard, then through setting up at the catch basin that encloses the fender lower part, the effect of dead lever and play water pole, collect emission or reutilization with rivers, this design encloses the fender with dust collector and construction and combines, play fine dust removal effect in the construction, utilize the effect of gravity action or water pump simultaneously, will make used waste water collection or utilize, play environmental protection and cleaning effect, the construction in green building site has been ensured.

Description

Dustproof fender that encloses of highway construction
Technical Field
The utility model relates to a construction technical field, concretely relates to dustproof fender that encloses of highway construction.
Background
Since the 'thirteen-five' planning construction, various capital construction projects and urban reconstruction projects in various regions are very fierce, along with the increasing scale of cities, most of the originally planned and designed roads can not meet the daily use requirements of the cities, so that various municipal road and highway reconstruction and extension projects are very popular, but in the urban road construction and reconstruction, how to make civilized construction is performed, so that the urban life is prevented from generating a plurality of environmental protection problems due to the road reconstruction and construction, and the construction method is a difficult problem which many construction units have to face in construction; the condition in the construction at present sees, the construction that most road transformation construction adopted encloses the fender and all is stereoplasm such as entity enclosure and encloses the fender, then encloses fender top and erect the water pipe and spray water and remove dust, and this kind of dustproof mode is first uneconomic not environmental protection, and the second consequently produces construction site sewage all around, influences that the city is pleasing to the eye, and inconvenient pedestrian vehicle is current.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a highway construction is dustproof encloses fender to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fender is enclosed in dustproof of highway construction which characterized in that: including propping up the ground pole, two liang of parallel symmetry settings of propping up the ground pole still include the pole setting, the pole setting lower extreme sets up perpendicularly respectively in the crossing department of propping up the ground pole, and the pole setting upper end is provided with and props up the corresponding horizontal pole of ground pole, the horizontal pole includes main horizontal pole and vice horizontal pole, main horizontal pole includes first main horizontal pole and the main horizontal pole of second, first main horizontal pole is the cavity design, has seted up a plurality of apopores on it, first main horizontal pole both ends still are equipped with the detachable connecting pipe.
Through the design of the ground pole of symmetry, stability is guaranteed, conveniently places and install, and first main horizontal pole cavity design, both ends set up the connecting pipe in water route, can carry out the connection of water pipe, make rivers get into the horizontal pole after, spout from a plurality of apopores that set up on the horizontal pole, form water smoke to carry out the dust fall effect to the raise dust in construction place.
Preferably, the upper part of the first main cross rod is further provided with an installation rod for the enclosure material, the installation rod comprises a first installation rod and a second installation rod, and the second installation rod protrudes out of a plane formed by the first main cross rod and the ground supporting rod.
Through the design of enclosure material installation pole for peripheral enclosure material is higher than the apopore of first main horizontal pole, thereby avoids rivers blowout to enclose when the dust fall effect and keeps off outward, thereby influences the surrounding environment.
Preferably, the lower side of the first main cross rod is provided with a fixing rod of a corresponding enclosure material along the vertical rod, the fixing rod is in close contact with the enclosure material through a water collecting tank, the fixing rod is in a hollow design, a water passing tank connected with the water collecting tank is arranged on the fixing rod, and a connecting position of the enclosure material is arranged on the lower side of the water collecting tank.
The two ends of the enclosure material are arranged on the fixing rod and the mounting rod at the top, so that the enclosure material is in close contact with the water collecting tank on the fixing rod, when the dust falling water flow falls on the inner side wall of the enclosure material, the water flow after dust falling flows into the annular water collecting tank through the action of gravity, and then enters the fixing rod through the water flowing tank on the fixing rod, and the outflow of sewage is avoided.
Preferably, the fixing rod is provided at both ends thereof with connection pipes.
After enclosing fender interconnect, through the connecting pipe, can unify the collection through the sump pump with the sewage in the dead lever.
Preferably, the two ends of the fixing rod are connected with water outlet pipes, and the water outlet side of each water outlet pipe is lower than one side of the fixing rod.
The design of outlet pipe through the action of gravity, with the sewage flow direction construction site inboard of collecting in the dead lever, has avoided the outflow of sewage, and simultaneously, the outlet pipe setting can increase the stability of pole setting between two pole settings.
Preferably, the fixed rod and the ground supporting rod are sealed, and warning signs are arranged on the outer sides of the fixed rod and the ground supporting rod.
The sealing design between the fixed rod and the ground supporting rod, and the warning sign arranged on the outer side can play a warning role at night, so that the safety of construction at night is guaranteed.
Preferably, the mutual connection part of the ground supporting rods is provided with a fixing foot.
Through enclosing the design that keeps off fixed foot position, can guarantee when connecting, two adjacent fender connections that enclose are inseparable to guaranteed to enclose the wholeness of keeping off, when enclosing the fender in the installation, can enclose through mounting such as inflation screw and keep off and fix subaerial, thereby guaranteed to enclose the fastness when keeping off the installation.
Preferably, the vertical rod adopts a detachable telescopic adjustment type design, so that the height can be adjusted.
The pole setting adopts the design of adjustable height formula, can satisfy the demand of the construction site of different grade type that encloses the fender height to realize the multi-purpose function of a thing, increase the circulation of material, reduce the cost, and but the split design can conveniently be transported.
Preferably, the distance between the first main cross bar and the second main cross bar is greater than 24 cm.
The size of a mark brick is 240mm 115mm 53mm, needs the entity to enclose the construction highway section that keeps off in the part, can guarantee to enclose the intensity that keeps off in enclosing the fender by the mode of laying bricks to make and guarantee the construction interval of sufficient laying bricks between first main horizontal pole and the second main horizontal pole.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic structural view of the first main cross bar of the present invention;
FIG. 3 is a side view of the structural connection between the water outlet pipe, the fixing rod and the water collecting tank of the present invention;
FIG. 4 is a schematic view of the sealing structure between the fixing rod and the ground supporting rod of the present invention;
FIG. 5 is a schematic view of the position of the outlet pipe of the present invention;
fig. 6 is a schematic view of the vertical rod structure of the present invention.
In the figure: 1. prop up ground pole, 2, pole setting, 3, first main horizontal pole, 4, vice horizontal pole, 5, connecting pipe, 6, first installation pole, 7, second installation pole, 8, dead lever, 9, water catch bowl, 10, outlet pipe, 11, fixed foot, 12, apopore, 13, staple bolt, 14, water flowing trough, 15, hookup location, 16, locking hole, 17, locking piece.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows: referring to fig. 1-4 and fig. 6, the utility model discloses a road construction dustproof fence, which comprises a ground supporting rod 1, a vertical rod 2 and a cross rod, wherein the ground supporting rod 1 is arranged in parallel in pairs to form a rectangular foundation, the vertical rod 2 is respectively arranged at the intersection of the ground supporting rods 1 in pairs and is perpendicular to the plane formed by the ground supporting rods 1, the vertical rod 2 is in adjustable telescopic design, and the height of the vertical rod 2 is adjusted through a locking hole 16 and a locking block 17 which are respectively arranged on the upper vertical rod and the lower vertical rod; the upper part of the upright rod 2 is provided with a cross rod corresponding to the ground supporting rod 1, the cross rod comprises a main cross rod with longer length and an auxiliary cross rod 4 with shorter length, wherein the main cross rod is divided into a first main cross rod 3 and a second main cross rod, the first main cross rod 3 is in a hollow design, a plurality of water outlet holes 12 are formed in the first main cross rod 3, two ends of the first main cross rod 3 are connected with a connecting pipe 5 through a hoop 13, the connecting pipe 5 is in a flexible design, the enclosure baffles can be conveniently connected with each other and adjusted in front and back positions, and can be connected with a water pump or a tap water pipe and the like through the connecting pipe 5, so that water flow for dust removal is provided; the upper end of the first main cross rod 3 is provided with an installation rod, the installation rod comprises a first installation rod 6 and a second installation rod 7, the second installation rod 7 protrudes out of a plane formed by the first main cross rod 3 and the ground supporting rod 1, a fixed rod 8 is arranged between the lower ends of the vertical rods 2 on one side of the first main cross rod 3, the fixed rod 8 corresponds to the first installation rod 6, a water collecting tank 9 is connected onto the fixed rod 8, a connecting position of enclosure materials is arranged on the water collecting tank 9, the enclosure materials on the periphery of the enclosure can be installed on the outer side of the enclosure under the action of the connecting positions on the first installation rod, the second installation rod, the fixed rod and the water collecting tank 9, the upper part of the enclosure materials is higher than the first main cross rod 3 under the action of the second installation rod 7 and the water collecting tank 9, the lower part of the enclosure materials is in close contact with the water collecting tank 9, when the enclosure is used, the inner side of the enclosure materials is selected from waterproof materials, the exterior can choose the material of imitating the grass, install the enclosure material outside the enclosure, after connecting pipe 5 on the first main horizontal pole 3 couples to joint pipe of the water pump or couples to running water pipe, insert the rivers, the rivers flow into the first main horizontal pole 3, after the rivers are sprayed out through the apopore 12 that locates on the pole, form the water fog, thus carry on the dust removal to the raise dust that the construction produces, can set up the apopore in different directions on the first main horizontal pole 3 at the same time, make some apopores face the inside of enclosure material, the rivers form the water fog to act on the inside of enclosure material after 12 blowout of apopore, the rivers flow to the lower part from the upper portion, form the water curtain, remove dust, under the collection of the water catch bowl 9 of the lower part, collect the flowing water after removing dust to the hollow dead lever 8 of the inside, collect the rivers after removing dust after the suction pump through the joint pipe of both ends of the dead lever 8, can carry on the secondary utilization, thereby preventing the overflow of water flow from affecting the appearance of the city.
Embodiment 2, referring to fig. 1 to 6, on the premise of referring to embodiment one, the connecting pipes at the two ends of the fixing rod may be eliminated, and two sides of the connecting pipe are provided with a water outlet pipe 10 connected with the fixing rod 8, one side of a water outlet of the water outlet pipe 10 is lower than one side of the fixing rod 8, so that after water flow inside the enclosure material is collected in use, the water flow flows to one side of the construction site after being collected, and a drainage ditch may be formed at the lower side of the water outlet to perform secondary recycling on the water flow after dust removal, so that under the condition of avoiding overflow pollution of the water flow, the water flow can be recycled, and the environment is protected.
Embodiment 3, see fig. 1-6, in-service use, when some highway sections construction needs the stereoplasm to enclose the fender, because interval between first main horizontal pole and the second main horizontal pole is greater than 24 centimetres, can make things convenient for the length of a mark brick or the width of two mark bricks to pile up, thereby can enclose the fender back after having installed, enclose and keep off inside and build by laying bricks or stones with the mark brick, make to enclose to keep off and become the stereoplasm and enclose the fender, thereby can satisfy the needs of different construction sites, and simultaneously, also can adopt the same design of pole setting with propping up the ground pole, carry out telescopic design, thereby satisfy the needs of different in service behavior.
Embodiment 4, see fig. 1-6, in the in-service use, in order to satisfy the requirement of warning at night, enclose to keep off the closed design outside of lower part and increase reflection of light warning mark to play the warning effect at night, also can design into cavity with second owner horizontal pole, inside penetrates the cable conductor, thereby can enclose at two and set up night warning light on the upper portion between the fender, satisfy the construction demand at night.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a fender is enclosed in dustproof of highway construction which characterized in that: including propping up the ground pole, two liang of parallel symmetry settings of propping up the ground pole still include the pole setting, the pole setting lower extreme sets up perpendicularly respectively in the crossing department of propping up the ground pole, and the pole setting upper end is provided with and props up the corresponding horizontal pole of ground pole, the horizontal pole includes main horizontal pole and vice horizontal pole, main horizontal pole includes first main horizontal pole and the main horizontal pole of second, first main horizontal pole is the cavity design, has seted up a plurality of apopores on it, first main horizontal pole both ends still are equipped with the detachable connecting pipe.
2. The road construction dustproof fence of claim 1, characterized in that: the upper part of the first main cross rod is further provided with an installation rod for the enclosure material, the installation rod comprises a first installation rod and a second installation rod, and the second installation rod protrudes out of a plane formed by the first main cross rod and the ground supporting rod.
3. The road construction dustproof fence of claim 1, characterized in that: the fixing rod is in close contact with the enclosure material through a water collecting groove, the fixing rod is in a hollow design, a water passing groove connected with the water collecting groove is formed in the fixing rod, and a connecting position of the enclosure material is arranged on the lower side of the water collecting groove.
4. The road construction dustproof fence of claim 3, characterized in that: and connecting pipes are arranged at two ends of the fixed rod.
5. The road construction dustproof fence of claim 3, characterized in that: and the two ends of the fixing rod are connected with water outlet pipes, and the water outlet side of each water outlet pipe is lower than one side of the fixing rod.
6. The road construction dustproof fence of claim 3, characterized in that: between the fixed rod and the ground supporting rod, a closed design is adopted, and a warning sign is arranged on the outer side of the fixed rod.
7. The road construction dustproof fence of claim 1, characterized in that: the mutual connection part of the ground supporting rods is provided with a fixed foot.
8. The road construction dustproof fence of claim 1, characterized in that: the pole setting adopts the design of removable flexible regulation formula of splitting, can carry out height control.
9. The road construction dustproof fence of claim 1, characterized in that: the distance between the first main cross bar and the second main cross bar is larger than 24 cm.
CN202120733423.XU 2021-04-10 2021-04-10 Dustproof fender that encloses of highway construction Expired - Fee Related CN215168704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120733423.XU CN215168704U (en) 2021-04-10 2021-04-10 Dustproof fender that encloses of highway construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120733423.XU CN215168704U (en) 2021-04-10 2021-04-10 Dustproof fender that encloses of highway construction

Publications (1)

Publication Number Publication Date
CN215168704U true CN215168704U (en) 2021-12-14

Family

ID=79356241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120733423.XU Expired - Fee Related CN215168704U (en) 2021-04-10 2021-04-10 Dustproof fender that encloses of highway construction

Country Status (1)

Country Link
CN (1) CN215168704U (en)

Similar Documents

Publication Publication Date Title
CN101270561B (en) Method for resolving surface drainage and communal facilities paving problem of city
CN201072932Y (en) High altitude stereo greening groove
CN108894277A (en) Highway rainwater-collecting and exhaust system based on sponge urban construction
CN208763116U (en) Highway rainwater-collecting and exhaust system based on sponge urban construction
CN215168704U (en) Dustproof fender that encloses of highway construction
CN215593749U (en) Road culvert structure
CN205475651U (en) Non - infiltration detention pond of rising to a height shape cast member
CN216516048U (en) Ecological sponge urban water storage and drainage system
CN214061409U (en) Municipal works urban road guardrail that can spray water smoke
CN212077584U (en) Green type bridge of steel construction equipment
CN213805773U (en) Water collecting device of residential area sponge facility
CN209742487U (en) Totally enclosed green construction encloses fender
CN112814026A (en) Hidden vent structure of assembled utility tunnel
CN217973883U (en) Novel municipal administration road engineering road bed
CN216712615U (en) High water permeability structure of town road
CN206625107U (en) A kind of new road discharge structure
CN219527732U (en) Multifunctional common ditch access hole component transformation module
CN205742466U (en) Prestressing force is to adding series rain dirt shunting underground pipe gallery
CN216238906U (en) High slope solar panel rainwater collection and filtration device
CN211549053U (en) Sun shade
CN217500503U (en) Multifunctional cover plate of underground reservoir
CN213296047U (en) Highway bridge drainage structures
CN214574019U (en) Protection device for highway slope greening
CN215011948U (en) Landscape design's plant buffering area structure
CN214272693U (en) Corridor ceiling drainage structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214

CF01 Termination of patent right due to non-payment of annual fee