CN215168015U CN202120485244.9U CN202120485244U CN215168015U CN 215168015 U CN215168015 U CN 215168015U CN 202120485244 U CN202120485244 U CN 202120485244U CN 215168015 U CN215168015 U CN 215168015U
Authority
CN
China
Prior art keywords
frame unit
square steel
square
steel
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120485244.9U
Other languages
Chinese (zh)
Inventor
袁博
黄聪
张大伟
范骐震
王须
刘玉桂
王宇
陈琳
程弓
贾庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 6 Co Ltd
Original Assignee
Sinohydro Bureau 6 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 6 Co Ltd filed Critical Sinohydro Bureau 6 Co Ltd
Priority to CN202120485244.9U priority Critical patent/CN215168015U/en
Application granted granted Critical
Publication of CN215168015U publication Critical patent/CN215168015U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application provides a be used for veneer clear water concrete wall wood former steel back of body stupefied connecting device, including first frame unit and second frame unit, first frame unit with be provided with the piece on the second frame unit and reserve the tongue-and-groove, first frame unit with the second frame unit passes through the piece is reserved the tongue-and-groove and is connected formation back of body stupefied frame unit, first frame unit with the second frame unit all include horizontal square steel, horizontal square steel sets up in the inside including first frame unit and second frame unit, the both ends of horizontal square steel are provided with respectively vertical square steel and the vertical square steel of second, the frame unit outside horizontal square steel is provided with the square timber on the side, this connecting device constitutes simply, site operation easy and simple to handle, save operating time, reinforce the wholeness, can effectively improve veneer clear water concrete formwork installation efficiency, the formwork reinforcing and installing quality is guaranteed, and the requirement for rapid construction is met.

Description

Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device
Technical Field
The utility model discloses a patent application relates to veneer clear water concrete construction technical field, especially relates to a be used for stupefied connecting device of veneer clear water concrete wall wood former steel back of body.
Background
The facing clear concrete is also called decoration-free concrete, is formed by one-time casting without any external decoration, and the natural surface of the cast-in-place concrete is directly adopted as the facing after the template is removed. The requirements on appearance, construction period and construction period are strict. The influence of the environmental temperature condition in winter is more obvious in northern, especially northeast industrial areas, and the effective construction time period in the year is shorter.
According to the conventional method, the wall member concrete structures of the hydropower engineering industrial factory building are basically consistent in design style and higher in height, the wall concrete pouring needs layering operation, and the layering height is generally 1-3 m. The carpenter needs to wait that the basal plane clearance is accomplished, the reinforcing bar installation is accomplished after, begins to carry out the template installation, and the template installation is accomplished and is opened a warehouse and pour the concrete after passing the acceptance check, gets into next operation circulation during lower floor's wall body construction, and is accomplished to the project organization height until pouring. When the wood formwork is installed and constructed, a large number of small-size wood formwork assembling and transverse and longitudinal back edge reinforcing operations are required, the standard size of the wood formwork on the market at present is generally 2.44m 1.22m 15mm in length, width and thickness, and the square wood back edge or the steel back edge is adopted to be screwed and reinforced through split bolts and connected into a whole. The construction is influenced by the requirements of operation environment conditions and procedure connection, the high-altitude construction operation is inconvenient, the width of a scaffold operation platform is small, the operation personnel is inconvenient to install and reinforce, the formwork installation can be started only after the reinforcing steel bar installation procedure is completed, the formwork assembling quality is extremely easy to influence, the bin number preparation time is long, and the requirement on the vertical transportation capacity of materials is high. The mounting quality and the mounting efficiency of the template become key factors which directly influence the appearance and the quality of the fair-faced concrete and restrict the construction progress.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the invention provides a connecting device for steel back edges of wood templates of facing fair-faced concrete walls.
The first frame unit and the second frame unit are connected through the splicing reserved tongue-and-groove to form a back ridge frame unit, the first frame unit and the second frame unit respectively comprise a plurality of transverse square steels, a first longitudinal square steel, a second longitudinal square steel and square wood, the transverse square steels are arranged inside the first frame unit and the second frame unit, the longitudinal square steels and the second longitudinal square steel are arranged at two ends of each transverse square steel respectively, and the square wood is arranged on the transverse square steel at the outermost side of the frame unit.
Preferably, the transverse square steel is connected with the square timber through bolts.
Preferably, the upper surfaces of the first frame unit and the second frame unit are provided with wooden templates.
Preferably, a lifting lug is arranged on the first longitudinal direction.
According to the technical scheme, the beneficial effects of the application are as follows:
(1) in the aspect of operation time consumption, the restriction of procedure connection requirements is thoroughly eliminated, the welding manufacture of the whole steel back edge frame unit of the wooden template with standard size and the pre-splicing of the small-size wooden template can be started in advance in a template processing factory, and the length, the width and the length are combined
The small-size formwork with the length of 1.22m by 2.44m is spliced into the standard-size wood formwork integral steel back edge frame unit with the length of 3.66m by 2.44m, the standard-size wood formwork integral steel back edge frame unit is transported to the site for standby, and after the operation of the reinforcing steel bar installation process is finished, the quick splicing installation among the plurality of frame units is directly carried out. By advancing the starting time of the woodworking operation, a large amount of time consumed by process conversion waiting is saved.
(2) In the aspect of the operation space, the wooden template assembling operation is transferred to a wide and flat field of a template processing factory for the woodworker can select the wider and flat field to perform the fine pre-assembling operation of the wall template in the template processing factory outside the warehouse. The assembling quality requirements of the template manufacturing and installing procedures on technical indexes such as flatness, levelness, diagonal deviation, seam tightness and the like can be better guaranteed, and the conditions that the operation space of a scaffold construction platform is narrow and small, the overhead operation is difficult, and the lifting capacity of vertical transportation equipment is higher when templates are assembled in bin numbers are greatly relieved.
(3) The integral steel back edge assembling unit is simple in composition, simple and convenient to operate in site construction, high in connecting speed, high in mounting precision and integral strength of a frame, operation time is saved, and disassembly is facilitated.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
Fig. 1 is a schematic structural diagram of a back edge frame unit provided in the present application.
Fig. 2 is a schematic diagram of splicing a back ridge frame unit provided by the present application.
The method comprises the following steps of 1-first frame unit, 2-second frame unit, 3-square timber, 4-bolt, 5-wood template, 6-lifting lug, 31-transverse square steel, 32-first longitudinal square steel, 33-second longitudinal square steel and 111-splicing reserved tongue and groove.
Detailed Description
Referring to fig. 1, a schematic structural diagram of a back edge frame unit provided in the present application is shown.
A connecting device for steel back edges of wood templates of facing fair-faced concrete walls comprises a first frame unit 1 and a second frame unit 2, the first frame unit 1 and the second frame unit 2 are provided with splicing reserved grooves and tongues 111, the first frame unit 1 and the second frame unit 2 are connected through the splicing reserved tongue-and-groove 111 to form a back-edge frame unit, the first frame unit 1 and the second frame unit 2 each comprise a transverse square steel 31, a first longitudinal square steel 32, a second longitudinal square steel 33, and a square wood 3, the number of the transverse square beams 31 is several, the transverse square beams 31 are arranged in the inner part comprising the first frame unit 1 and the second frame unit 2, the longitudinal square steel 32 and the second longitudinal square steel 33 are respectively arranged at two ends of the transverse square steel 31, and the square timber 3 is arranged on the transverse square steel 31 at the outermost side of the frame unit.
When in application, the wall concrete standard-size wooden template integral steel back edge frame unit can be manufactured by welding and connecting square steel (specification: 90mm x 50mm) and square wood (specification: 90mm x 50mm) through bolts. After the square steel side is perforated, the square wood can be screwed up and fixed to the steel back edge side by utilizing bolt connection, and the wood formwork can be conveniently and temporarily fixed during pre-assembling operation.
Preferably, the transverse square steel 31 is connected with the square timber 3 through a bolt 4.
Preferably, the upper surfaces of the first frame unit 1 and the second frame unit 2 are provided with wooden templates 5.
Preferably, the first longitudinal square steel 32 is provided with a lifting lug 6.
Referring to fig. 2, a back edge frame unit splicing schematic diagram provided by the present application is shown.
The manufacturing size of the single standard-size wood formwork integral steel back-ridge frame unit is 2.44m by 3.66m, the single standard-size wood formwork integral steel back-ridge frame unit is manufactured into a whole by welding 90mm by 50mm by 3mm square steel, and three small-size clear water concrete civil formworks with the length, the width and the thickness of 2.44m by 1.22m by 15mm can be fully paved. Through trompil at the square steel side, utilize phi 14mm bolt, supporting nut and gasket with square timber (90mm 60mm) and square steel (90mm 50mm) frame connection fixed to with square timber and the contact one side of small-size clear water wooden template plane, can make a perfect balance when guaranteeing the concatenation of small-size template and laminate on the stupefied frame of steel back.
After the frame unit is welded and manufactured, pre-assembly of small-size wooden templates with the length, the width and the thickness of 2.44m, 1.22m and 15mm is carried out, joints between the boards are tight and flat, and double-sided adhesive tapes with the thickness of 2mm are adhered to cicada seams for sealing. When the small-size wooden template panel is connected with the square timber, the steam nails are vertically nailed into the side of the panel, the nail holes form a straight line, and the surface is kept parallel and level with the surface after the steam nails are nailed into the panel, so that the defect of pits left on the surface of the wall body is avoided. The template splicing among the plurality of frame units is kept according to the rabbet joint so as to ensure that the template panels among the plurality of frame units are uniformly arranged on the square timber in the splicing way, and the subsequent plurality of frame units are nailed and fastened when being spliced.
And after the assembly operation is finished, the frame units are transported to a construction site for standby, and after the reinforcing steel bars are installed, the vertical transportation equipment is adopted to carry out integral hoisting, splicing and reinforcing on the plurality of frame units. And after all the template frame units in the same bin are assembled, reinforcing and installing the split bolts and the transverse back edges.
According to the technical scheme, the beneficial effects of the application are as follows:
(1) in the aspect of operation time consumption, the restriction of procedure connection requirements is thoroughly eliminated, the welding manufacture of the whole steel back edge frame unit of the wooden template with standard size and the pre-splicing of the small-size wooden template can be started in advance in a template processing factory, and the length, the width and the length are combined
The small-size formwork with the length of 1.22m by 2.44m is spliced into the standard-size wood formwork integral steel back edge frame unit with the length of 3.66m by 2.44m, the standard-size wood formwork integral steel back edge frame unit is transported to the site for standby, and after the operation of the reinforcing steel bar installation process is finished, the quick splicing installation among the plurality of frame units is directly carried out. By advancing the starting time of the woodworking operation, a large amount of time consumed by process conversion waiting is saved.
(2) In the aspect of the operation space, the wooden template assembling operation is transferred to a wide and flat field of a template processing factory for the woodworker can select the wider and flat field to perform the fine pre-assembling operation of the wall template in the template processing factory outside the warehouse. The assembling quality requirements of the template manufacturing and installing procedures on technical indexes such as flatness, levelness, diagonal deviation, seam tightness and the like can be better guaranteed, and the conditions that the operation space of a scaffold construction platform is narrow and small, the overhead operation is difficult, and the lifting capacity of vertical transportation equipment is higher when templates are assembled in bin numbers are greatly relieved.
(3) The integral steel back edge assembling unit is simple in composition, simple and convenient to operate in site construction, high in connecting speed, high in mounting precision and integral strength of a frame, operation time is saved, and disassembly is facilitated.
Other embodiments of the invention will be apparent to those skilled in the art from consideration of the specification and practice of the invention disclosed herein. This application is intended to cover any variations, uses, or adaptations of the invention following, in general, the principles of the invention and including such departures from the present disclosure as come within known or customary practice within the art to which the invention pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.
It will be understood that the invention is not limited to the precise arrangements described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

Claims (4)

1. The connecting device for the steel back edge of the wood formwork of the fair-faced concrete wall comprises a first frame unit (1) and a second frame unit (2), wherein splicing reserved grooves (111) are formed in the first frame unit (1) and the second frame unit (2), the first frame unit (1) and the second frame unit (2) are connected through the splicing reserved grooves (111) to form a back edge frame unit, each of the first frame unit (1) and the second frame unit (2) comprises a plurality of transverse square steels (31), a plurality of first longitudinal square steels (32), a plurality of second longitudinal square steels (33) and square woods (3), the transverse square steels (31) are arranged inside the first frame unit (1) and the second frame unit (2), and the longitudinal square steels (32) and the second longitudinal square steels (32) are respectively arranged at two ends of the transverse square steels (31) 33) The transverse square steel (31) on the outermost side of the frame unit is provided with the square wood (3).
2. A device for connecting the steel back edges of faced bare concrete wall wood formworks according to claim 1, characterized in that the transverse square bars (31) are connected with the square bars (3) through bolts (4).
3. A device for connecting a faced bare concrete wall wood formwork steel back ridge according to claim 1, characterized in that the upper surfaces of the first frame unit (1) and the second frame unit (2) are provided with wood formwork (5).
4. A device for connecting a steel back ridge of a faced bare concrete wall wood formwork according to claim 1, wherein the first longitudinal square steel (32) is provided with a lifting lug (6).
CN202120485244.9U 2021-03-08 2021-03-08 Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device Active CN215168015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120485244.9U CN215168015U (en) 2021-03-08 2021-03-08 Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120485244.9U CN215168015U (en) 2021-03-08 2021-03-08 Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device

Publications (1)

Publication Number Publication Date
CN215168015U true CN215168015U (en) 2021-12-14

Family

ID=79413976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120485244.9U Active CN215168015U (en) 2021-03-08 2021-03-08 Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device

Country Status (1)

Country Link
CN (1) CN215168015U (en)

Similar Documents

Publication Publication Date Title
US10837166B2 (en) Building structure and construction method for same
CN106320691B (en) Aluminum wood template construction method
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN211369521U (en) Concrete building frame template system
CN105926936A (en) Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN101824908A (en) Shear wall large template and shear wall large template system
CN106639306A (en) Material-saving type inclination linking and supporting plate column cap wood formwork and construction method thereof
CN114046041A (en) Formwork reinforcing structure of as-cast finish concrete wall post-cast strip and construction method thereof
CN111535488A (en) Prefabricated steel bar truss of assembled exempts from to tear open building carrier plate and cast-in-place and exempt from to strut truss floor
CN112227404B (en) Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall
CN215168015U (en) Be used for veneer fair-faced concrete wall body wood former steel back of body stupefied connecting device
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN210622306U (en) Assembly type floor post-cast strip template splicing structure
CN111364659A (en) Novel form-removal-free steel bar truss floor bearing plate structure and construction method thereof
CN111155759A (en) Novel unit truss type concrete frame structure formwork supporting system and construction method thereof
CN101089329B (en) Assemblied polyvinyl chloride building engineering shuttering
CN216109252U (en) Assembled coincide floor convenient to installation
CN214143782U (en) Combined pile foundation bearing platform mould
CN212026788U (en) Prefabricated formula reinforced concrete superimposed sheet
CN201635386U (en) Large shear wall template and large shear wall template system
CN216840607U (en) Stair well department arc wood grain clear water concrete beam template construction system
CN210369912U (en) Cast-in-place concrete stair formwork
CN211850598U (en) Elevator shaft shear wall
CN217353546U (en) Column cap formwork structure
CN218668499U (en) Wall soft mold system with angle steel and clamping piece as connecting pieces