CN215167909U - Construction equipment scaffold - Google Patents
Construction equipment scaffold Download PDFInfo
- Publication number
- CN215167909U CN215167909U CN202121429564.9U CN202121429564U CN215167909U CN 215167909 U CN215167909 U CN 215167909U CN 202121429564 U CN202121429564 U CN 202121429564U CN 215167909 U CN215167909 U CN 215167909U
- Authority
- CN
- China
- Prior art keywords
- bolt
- installation
- plate
- bolts
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 48
- 230000001681 protective effect Effects 0.000 claims description 25
- 238000004140 cleaning Methods 0.000 claims description 9
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 15
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 239000000428 dust Substances 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 3
- 239000013589 supplement Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 101100074187 Caenorhabditis elegans lag-1 gene Proteins 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model discloses a construction equipment scaffold, including lag, guard plate and slide bar, the fixed plate is installed through the bolt in the lag inside, and the connecting piece is installed through the bolt to the fixed plate inboard, and the inside installation pole that runs through of connecting piece is installed, and the installation pole outside is encircleed and is installed the installation piece, and the guard plate is installed through the bolt in installation piece top, and the guard plate is inside to be installed the protection network through the bolt, and the guard plate openly installs the access panel through the bolt, and the slide bar is installed through the bolt in the inside both sides of guard plate, and the slide bar outside is encircleed and is installed the installation cover. The utility model discloses an install the cable wheel bottom the mounting panel, the cable wheel can be convenient for the staff uses the steel cable to carry out the material transmission to can be convenient for the staff high altitude carry out the material and supply, do not need the staff to carry the material to the eminence and be under construction, reduced staff's work burden, improved the practicality of device, improved staff's efficiency of construction.
Description
Technical Field
The utility model relates to a scaffold technical field specifically is a construction equipment scaffold frame.
Background
Scaffold frame refers to the construction site and operates and solve perpendicular and horizontal transportation and various supports that set up for the workman, and the general term of building boundary refers to on the building site and is used in the place that outer wall, interior decoration or layer height are higher can't directly be under construction, mainly for constructor upper and lower dry life or peripheral safety net enclosure and high altitude installation component etc. say that exactly the shelf is set up, scaffold frame preparation material usually has: bamboo, wood, steel pipe or synthetic material etc. some projects also use scaffold as the template and in addition also widely used in departments such as advertising industry, municipal administration, traffic road bridge, mine, etc. need scaffold to assist when the staff carries out the high construction, at this moment need a construction equipment scaffold.
The existing scaffold for construction equipment has the following defects:
1. the existing scaffold for the construction equipment has fewer storage positions when providing assistance for workers, so that the workers need to climb down the scaffold to carry materials after the materials are used up, the work burden of the workers is increased, the practicability of the device is reduced, and meanwhile, the construction efficiency of the workers is reduced to a certain extent;
2. when current building equipment scaffold is used for a long time to the protection network, the dust that produces in the construction site and the dust in the air can be attached to the protection network surface, and a large amount of dusts can reduce the life of protection network, can cause the hindrance to staff's sight when protection network surface adnexed dust is blown by wind-force, produces the potential safety hazard when having the possibility to the staff construction simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction equipment scaffold to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for building equipment comprises a protective sleeve, a protective plate and a sliding rod, wherein a fixed plate is arranged in the protective sleeve through a bolt, the inner side of the fixed plate is provided with a connecting piece through a bolt, the inside of the connecting piece is provided with an installation rod in a penetrating way, the outer side of the mounting rod is provided with a fixing sleeve through a bolt, the bottom of the fixing sleeve is provided with a mounting plate through a bolt, the bottom of the mounting plate is provided with a cable pulley through a bolt, the outer side of the mounting rod is provided with a mounting block in a surrounding way, the top of the mounting block is provided with a protective plate through a bolt, the inner part of the protective plate is provided with a protective net through a bolt, the front surface of the protection plate is provided with an overhaul plate through bolts, the two sides inside the protection plate are provided with sliding rods through bolts, the installation cover is installed around the slide bar outside, the backup pad is installed through the bolt to the installation cover inboard, the clearance brush is installed through the bolt in the backup pad back.
Preferably, the front surface of the protective sleeve is provided with a fixed knob through a thread structure, and one end of the fixed knob is connected with the mounting rod through the thread structure.
Preferably, a fixing rod is installed on one side of the installation sleeve through a bolt, and a handle is installed on one side of the fixing rod through a bolt.
Preferably, an adjusting knob is installed on one side of the protection plate through a threaded structure, and one end of the adjusting knob is connected with the installation sleeve through the threaded structure.
Preferably, a thread block is installed at one end of the installation rod through a bolt, and a thread groove is formed in the other end of the installation rod.
Preferably, the top of the mounting block is provided with a pedal through a bolt, and the top of the pedal is provided with anti-skid lines.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install the cable wheel bottom the mounting panel, the cable wheel can be convenient for the staff uses the steel cable to carry out the material transmission to can be convenient for the staff high altitude carry out the material and supply, do not need the staff to carry the material to the eminence and be under construction, reduced staff's work burden, improved the practicality of device, improved staff's efficiency of construction.
2. The utility model discloses an at backup pad back mounted with the clearance brush, the clearance brush can clear up protection network surface dust, does not need the staff to look for the instrument and clears up to guaranteed the clean and tidy nature on protection network surface, improved the life of protection network, increased the functionality of device to a certain extent, improved the practicality of device.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic front sectional structure of the present invention;
fig. 3 is a schematic front structural view of the present invention;
fig. 4 is a schematic side view of the present invention;
fig. 5 is a schematic view of a partial section structure of the protection plate of the present invention.
In the figure: 1. a protective sleeve; 101. a fixing plate; 102. a connecting member; 103. fixing the knob; 2. fixing the rod; 201. a grip; 3. a protection plate; 301. a protective net; 302. adjusting a knob; 303. an access panel; 4. mounting a rod; 401. a thread block; 402. a thread groove; 5. mounting blocks; 501. a foot pedal; 6. a slide bar; 601. installing a sleeve; 602. a support plate; 603. cleaning a brush; 7. fixing a sleeve; 701. mounting a plate; 702. a cable pulley.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a construction equipment scaffold comprises a protective sleeve 1, a protective plate 3 and a sliding rod 6, wherein a fixed plate 101 is installed inside the protective sleeve 1 through a bolt, the protective sleeve 1 can provide an installation position for the fixed plate 101 to increase the stability of the fixed plate 101, the fixed plate 101 can provide an installation position for a connecting piece 102 to increase the stability of the connecting piece 102, the connecting piece 102 is installed on the inner side of the fixed plate 101 through a bolt, the connecting piece 102 can fix an installation rod 4 to increase the stability of the installation rod 4, the installation rod 4 is installed inside the connecting piece 102 in a penetrating mode and can provide an installation position for an installation block 5 to increase the stability of the installation block 5, a fixing sleeve 7 is installed on the outer side of the installation rod 4 through a bolt, the installation rod 4 can provide an installation position for the fixing sleeve 7 to increase the stability of the fixing sleeve 7, an installation plate 701 is installed at the bottom of the fixing sleeve 7 through a bolt, and the installation plate 701 can provide an installation position for a cable pulley 702, the stability of the cable wheel 702 is improved, the cable wheel 702 is arranged at the bottom of the mounting plate 701 through a bolt, the cable wheel 702 can be convenient for workers to use a steel cable for material transmission, so that the workers can conveniently supplement materials at high altitude, the workers are not required to carry the materials to the high altitude for construction, the work burden of the workers is reduced, the practicability of the device is improved, and the construction efficiency of the workers is improved, the mounting block 5 is arranged around the outer side of the mounting rod 4, the mounting block 5 can provide a mounting position for the protection plate 3, the stability of the protection plate 3 is improved, the protection plate 3 is arranged at the top of the mounting block 5 through a bolt, the mounting position can be provided for the protection net 301 by the protection plate 3, the stability of the protection net 301 is improved, the protection net 301 is arranged inside the protection plate 3 through a bolt, the protection net 301 can protect the workers during working, and the potential safety hazard generated by the workers during high altitude operation is avoided, the safety of workers in high-altitude operation is improved, foreign matters can be prevented from falling on the ground, the potential safety hazard of high-altitude parabolic operation during construction is avoided, the safety of the device is improved, the front surface of the protection plate 3 is provided with the maintenance plate 303 through bolts, the maintenance plate 303 can provide maintenance space for workers, the device can be conveniently maintained by the workers, the two sides in the protection plate 3 are provided with the sliding rods 6 through bolts, the sliding rods 6 can provide mounting positions for the mounting sleeve 601 and improve the stability of the mounting sleeve 601, the outer side of the sliding rod 6 is provided with the mounting sleeve 601 in a surrounding manner, the mounting sleeve 601 can provide mounting positions for the support plate 602 and improve the stability of the support plate 602, the inner side of the mounting sleeve 601 is provided with the support plate 602 through bolts, the support plate 602 provides mounting positions for the cleaning brushes 603 and improves the stability of the cleaning brushes 603, the back surface of the support plate 602 is provided with the cleaning brushes 603 through bolts, cleaning brush 603 can clear up protection network 301 surface dust, does not need the staff to look for the instrument and clears up to guaranteed the clean and tidy nature on protection network 301 surface, improved protection network 301's life, increased the functionality of device to a certain extent, improved the practicality of device.
Further, the front of lag 1 installs fixed knob 103 through helicitic texture, and the one end of fixed knob 103 is passed through helicitic texture and is connected with installation pole 4, and fixed knob 103 can be fixed installation pole 4, increases the stability of installation pole 4.
Further, dead lever 2 is installed through the bolt in installation cover 601 one side, and dead lever 2 can provide the mounted position to handle 201, increases handle 201's stability, and 2 one sides of dead lever install handle 201 through the bolt, and handle 201 can provide the hand space for the staff, and the staff of being convenient for uses the device.
Further, adjusting knob 302 is installed through helicitic texture in guard plate 3 one side, and adjusting knob 302 one end is connected with installation cover 601 through helicitic texture, and adjusting knob 302 can be fixed installation cover 601, increases installation cover 601's stability.
Further, install 4 one ends of pole and install screw thread piece 401 through the bolt, screw thread piece 401 accessible and screw thread groove 402 cooperation carry out multiunit installation pole 4 and are connected, increase the practicality of device, and install the pole 4 other end and be equipped with screw thread groove 402, and screw thread groove 402 accessible helicitic texture is connected with screw thread piece 401, and the staff of being convenient for carries out multiunit installation pole 4's connection.
Further, running-board 501 is installed through the bolt at 5 tops of installation piece, and running-board 501 stands when can be convenient for staff high altitude construction, increases the practicality of device, and running-board 501 top is equipped with anti-skidding line, and anti-skidding line can provide anti-skidding function for the staff, increases the security of staff during operation.
The working principle is as follows: before the device is used, a user firstly detects the device and confirms that no problem exists before using the device, a worker can fix the installation rod 4 by rotating the fixing knob 103, the protective net 301 can protect the worker during working, potential safety hazards caused by the worker during working at high altitude are avoided, the safety of the worker during working at high altitude is improved, foreign matters can be prevented from falling on the ground, the potential safety hazards caused by throwing at high altitude during construction are avoided, the worker can adjust the tightness of the installation sleeve 601 by rotating the adjusting knob 302, the worker can move the handle 201 downwards by holding the handle 201, the support plate 602 can be driven to move downwards by the downward movement of the handle 201, the cleaning brush 603 can be driven to move downwards by the downward movement of the support plate 602, the dust on the surface of the protective net 301 can be cleaned by the cleaning brush 603 without the worker searching for tools, and the cleanness of the surface of the protective net 301 is ensured, the service life of the protective net 301 is prolonged, the cable wheel 702 can facilitate workers to use a steel rope for material transmission, so that the workers can conveniently supplement materials in the high altitude, the workers do not need to carry the materials to the high altitude for construction, and the workload of the workers is reduced.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a construction equipment scaffold, includes lag (1), guard plate (3) and slide bar (6), its characterized in that: the protective sleeve is characterized in that a fixing plate (101) is installed inside the protective sleeve (1) through bolts, a connecting piece (102) is installed on the inner side of the fixing plate (101) through bolts, an installation rod (4) is installed inside the connecting piece (102) in a penetrating mode, a fixing sleeve (7) is installed on the outer side of the installation rod (4) through bolts, a mounting plate (701) is installed at the bottom of the fixing sleeve (7) through bolts, a cable pulley (702) is installed at the bottom of the mounting plate (701) through bolts, an installation block (5) is installed on the outer side of the installation rod (4) in a surrounding mode, a protective plate (3) is installed at the top of the installation block (5) through bolts, a protective net (301) is installed inside the protective plate (3) through bolts, an inspection plate (303) is installed on the front side of the protective plate (3) through bolts, and sliding rods (6) are installed on two sides of the inner side of the protective plate (3) through bolts, the utility model discloses a cleaning brush, including slide bar (6), mounting sleeve (601) are installed around in the slide bar (6) outside, backup pad (602) are installed through the bolt to mounting sleeve (601) inboard, cleaning brush (603) are installed through the bolt in backup pad (602) back.
2. A construction equipment scaffolding according to claim 1, wherein: the front surface of the protective sleeve (1) is provided with a fixed knob (103) through a thread structure, and one end of the fixed knob (103) is connected with the mounting rod (4) through the thread structure.
3. A construction equipment scaffolding according to claim 1, wherein: the fixing rod (2) is installed on one side of the installation sleeve (601) through a bolt, and the handle (201) is installed on one side of the fixing rod (2) through a bolt.
4. A construction equipment scaffolding according to claim 1, wherein: adjusting knob (302) is installed through helicitic texture in guard plate (3) one side, and adjusting knob (302) one end is connected with installation cover (601) through helicitic texture.
5. A construction equipment scaffolding according to claim 1, wherein: and a thread block (401) is installed at one end of the installation rod (4) through a bolt, and a thread groove (402) is formed at the other end of the installation rod (4).
6. A construction equipment scaffolding according to claim 1, wherein: the top of the mounting block (5) is provided with a pedal (501) through a bolt, and the top of the pedal (501) is provided with anti-skid lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121429564.9U CN215167909U (en) | 2021-06-25 | 2021-06-25 | Construction equipment scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121429564.9U CN215167909U (en) | 2021-06-25 | 2021-06-25 | Construction equipment scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215167909U true CN215167909U (en) | 2021-12-14 |
Family
ID=79382929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121429564.9U Expired - Fee Related CN215167909U (en) | 2021-06-25 | 2021-06-25 | Construction equipment scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215167909U (en) |
-
2021
- 2021-06-25 CN CN202121429564.9U patent/CN215167909U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215167909U (en) | Construction equipment scaffold | |
US8099910B1 (en) | Roof hatch grab bars | |
CN213837627U (en) | Construction platform convenient to remove | |
CN212249068U (en) | Highway tunnel maintenance reinforcing platform for traffic | |
CN210326628U (en) | External electric control cabinet | |
CN215368356U (en) | Fire alarm convenient to install at guardrail | |
CN215168672U (en) | Foundation ditch rail guard | |
CN217281870U (en) | Electric power construction high altitude construction auxiliary device | |
CN216056446U (en) | Emergency rescue device for road and bridge engineering | |
CN215907375U (en) | Guardrail structure for scaffold | |
CN215212744U (en) | Road construction sound insulation protective screen structure | |
CN220266635U (en) | Anti-falling net mounting structure of piping shaft | |
CN216577708U (en) | Electric tool extension auxiliary assembly of regularization | |
CN216109982U (en) | Effectual assembly type structure of anti vibration | |
CN213626587U (en) | Hanging flower basket for construction | |
CN220267150U (en) | Photovoltaic module installation maintenance device | |
CN217758428U (en) | Bridge construction is with warning rail guard | |
CN221066165U (en) | Electric hammer structure with labor-saving function | |
CN217699773U (en) | Protection device for spraying of artificial wood floor cutting surface | |
CN210526372U (en) | Electric power construction car for municipal building of area control | |
CN217602305U (en) | Building engineering site operation safety control rail | |
CN216109755U (en) | A hand tool for shower head installation on furred ceiling | |
CN217840832U (en) | Fall protection device for building safety | |
CN216150505U (en) | Municipal works are with instrument belt cleaning device that has stoving function | |
CN211856461U (en) | Building detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211214 |