Prior art keywords
concrete
fixed
pouring
building foundation
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120848893.0U
Other languages
Chinese (zh)
Inventor
文武斌
肖湘明
黄喜军
龚群丁
周明山
毛鹏
陈韬
杨孟
杜斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202120848893.0U priority Critical patent/CN215165615U/en
Application granted granted Critical
Publication of CN215165615U publication Critical patent/CN215165615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete pouring equipment for building foundation construction under karst geology, which comprises a movable base, wherein, both sides of the movable base are all provided with storage clamping grooves, one side of the two storage clamping grooves is connected with an extension fixed frame in a sliding way, both ends of one side of the bottom of the two extension fixed frames are all fixedly provided with a telescopic fixed rod, one side of the top of the movable base is fixedly provided with a concrete collecting box, one side of the top of the concrete collecting box is fixedly provided with a concrete filling hopper, the concrete pouring equipment for building foundation construction under karst geology has reasonable structural design and convenient and rapid movement and use, the extension fixed frame is additionally arranged, the whole center of the pouring equipment is reduced to a certain extent, the concrete pouring equipment is more stable to use, is safe and reliable, a cleaning mechanism is additionally arranged in the concrete collecting box, and the concrete pouring equipment can be automatically cleaned by vibration with water flow after the use is finished, the cleaning efficiency is high, the quality is good, and time and labor are saved.

Description

Concrete pouring equipment for building foundation construction under karst geology
Technical Field
The utility model relates to a concrete placement technical field specifically is a concrete placement equipment is used in building foundation construction under karst geology.
Background
The concrete pouring refers to a process from pouring concrete into a mold until plasticizing, and the concrete pouring equipment is used as a concrete pouring tool and is widely applied to construction sites. Karst geology is widely distributed in China, when facilities are built on the geology, a foundation is usually required to be reinforced, and concrete pouring equipment is required in the process.
The existing concrete pouring equipment is easily influenced by the terrain in the using process, the center is high, the stability is relatively poor, the cleaning of concrete raw materials attached to the inside of the pouring equipment after the concrete pouring equipment is used and finished is time-consuming and labor-consuming, the cleaning quality is poor, and the structure is complex and the operation is inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement equipment is used in building foundation construction under karst geology to current concrete placement equipment that proposes in solving above-mentioned background art receives the influence of topography in the use easily, and the center is higher, and stability is relatively poor, uses simultaneously to accomplish the inside concrete raw materials clearance of being stained with of back pouring equipment and attaching to waste time and energy, and the clearance quality is poor, and the complicated inconvenient problem of operation of structure.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete pouring device for building foundation construction under karst geology comprises a movable base, wherein two sides of the movable base are respectively provided with a containing clamping groove, one side of each containing clamping groove is connected with an elongated fixed frame in a sliding way, two ends of one side of the bottom of each elongated fixed frame are respectively and fixedly provided with a telescopic fixed rod, one side of the top of the movable base is fixedly provided with a concrete collecting box, one side of the top of the concrete collecting box is fixedly provided with a concrete filling hopper, the center of the top of the concrete collecting box is fixedly provided with a stirring motor, the output end of the stirring motor penetrates through the concrete collecting box and is fixedly provided with a driving main shaft, the outer ring of the top of the inner wall of the concrete collecting box is fixedly provided with a cleaning mechanism, the cleaning mechanism comprises an annular washing pipe, a plurality of high-pressure washing nozzles and a washing pipe, the bottom of the annular washing pipe is fixedly communicated with a plurality of high-pressure washing nozzles which are uniformly distributed, the fixed flushing pipe that extends to the concrete case outside that gathers materials that is provided with in one side of annular wash pipe, one side fixed mounting of concrete case that gathers materials has the pump of pouring, the fixed intercommunication of the discharge gate of pouring the pump has a pay-off section of thick bamboo, the fixed intercommunication in one side at pay-off section of thick bamboo top has the concrete pouring pipe, the equal fixed mounting in both sides of concrete case inner wall that gathers materials has supersonic generator, the fixed switch board that is provided with in front of concrete case that gathers materials, the fixed surface of switch board installs pours switch and washing switch.
As an optimal technical scheme of the utility model, four the bottom of flexible dead lever is all fixed and is provided with mounting flange.
As an optimized technical scheme of the utility model, the fixed surface of driving spindle is provided with a plurality of evenly distributed's stirring fan blade.
As an optimal technical scheme of the utility model, the fixed U type carriage that is provided with of opposite side at removal base top, the top of U type carriage and the bottom fixed connection of a pay-off section of thick bamboo.
As an optimal technical scheme of the utility model, four corners of removal base bottom are all fixed and are provided with the universal wheel.
As an optimal technical scheme of the utility model, the inside of concrete filling fill is fixed and is provided with filter screen.
As a preferred technical scheme of the utility model, pour pump and agitator motor all through pour switch and external power supply electric connection, two supersonic generator all through washing switch and external power supply electric connection.
Compared with the prior art, the beneficial effects of the utility model are that: this concrete placement equipment structural design is reasonable, removes convenient to use swiftly, has add extension fixed frame and has reduced the whole center of equipment of pouring to a certain extent, uses more steadily, and safe and reliable adds wiper mechanism in concrete collection incasement, can utilize high-pressure rivers to vibrate the clearance to it automatically after using the completion, and the cleaning efficiency is high quality, labour saving and time saving, and easy operation convenient and practical is worth highly.
Drawings
FIG. 1 is a schematic view of the front view of the main body of the present invention;
FIG. 2 is a schematic view of the front cross-sectional structure of the concrete material collecting box of the present invention;
FIG. 3 is a schematic view of the front cross-sectional structure of the cleaning mechanism of the present invention;
fig. 4 is a schematic view of the front appearance structure of the driving spindle of the present invention.
In the figure: 1. fixing a flange plate; 2. lengthening the fixed frame; 3. moving the base; 4. pouring the concrete into a pipe; 5. a feed cylinder; 6. a U-shaped supporting frame; 7. a stirring motor; 8. a concrete filling hopper; 9. filtering the screen; 10. a flush tube; 11. a switch plate; 12. a storage slot; 13. a universal wheel; 14. pouring a pump; 15. a concrete collection box; 16. an ultrasonic generator; 17. a high pressure flush jet; 18. washing the pipe in a ring shape; 19. a cleaning mechanism; 20. a stirring fan blade; 21. driving the main shaft; 22. a telescopic fixing rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a concrete pouring device for building foundation construction under karst geology, which comprises a movable base 3, wherein both sides of the movable base 3 are respectively provided with a containing slot 12, one side of the two containing slots 12 is respectively connected with an elongated fixed frame 2 in a sliding way, both ends of one side of the bottom of the two elongated fixed frames 2 are respectively fixedly provided with a telescopic fixed rod 22, the elongated fixed frame 2 is additionally arranged to reduce the whole center of the pouring device to a certain extent, the use is more stable, safe and reliable, one side of the top of the movable base 3 is fixedly provided with a concrete collecting box 15, one side of the top of the concrete collecting box 15 is fixedly provided with a concrete filling hopper 8, the center of the top of the concrete collecting box 15 is fixedly provided with a stirring motor 7, the output end of the stirring motor 7 passes through the concrete collecting box 15 and is fixedly provided with a driving main shaft 21, a cleaning mechanism 19 is fixedly arranged on the outer ring of the top of the inner wall of the concrete collection box 15, the cleaning mechanism 19 comprises an annular washing pipe 18, a plurality of high-pressure washing nozzles 17 and a washing pipe 10, the bottom of the annular washing pipe 18 is fixedly communicated with the plurality of uniformly distributed high-pressure washing nozzles 17, one side of the annular washing pipe 18 is fixedly provided with the washing pipe 10 extending to the outside of the concrete collection box 15, one side of the concrete collection box 15 is fixedly provided with a pouring pump 14, a discharge port of the pouring pump 14 is fixedly communicated with a feeding barrel 5, one side of the top of the feeding barrel 5 is fixedly communicated with a concrete pouring pipe 4, two sides of the inner wall of the concrete collection box 15 are both fixedly provided with ultrasonic generators 16, the front of the concrete collection box 15 is fixedly provided with a switch plate 11, the surface of the switch plate 11 is fixedly provided with a pouring switch and a cleaning switch, the cleaning mechanism 19 is additionally arranged in the concrete collection box 15, can utilize high-pressure rivers to vibrate the clearance to it automatically after using the completion, the cleaning efficiency is high quality good, labour saving and time saving, and easy operation is convenient practical and is worth highly.
Preferably, four flexible dead levers 22's bottom is all fixed and is provided with mounting flange 1, and the installation is quicker, has add extension fixed frame 2 and has reduced the whole center of equipment of pouring to a certain extent, uses more steadily, safe and reliable.
Preferably, a plurality of uniformly distributed stirring blades 20 are fixedly arranged on the surface of the driving main shaft 21, so that the added concrete can be continuously stirred, and the phenomenon of solidification and aggregation is not easy to occur.
Preferably, the fixed U type carriage 6 that is provided with of opposite side at 3 tops of removal base, the top of U type carriage 6 and the bottom fixed connection of a pay-off section of thick bamboo 5 can carry out certain support to a pay-off section of thick bamboo 5, and is more reliable and more stable, and practical value is high.
Preferably, four corners of the bottom of the movable base 3 are all fixedly provided with universal wheels 13, the structural design is reasonable, and the movable base is convenient and quick to use.
Preferably, the inside of the concrete filling hopper 8 is fixedly provided with a filtering screen 9, which can filter the added concrete to a certain extent, so as to protect the pouring pump 14 to a certain extent.
Preferably, pour pump 14 and agitator motor 7 and all through pouring switch and external power supply electric connection, two supersonic generator 16 are all through washing switch and external power supply electric connection, and easy operation is convenient practical and worth highly.
When the concrete pouring equipment is used in detail, the utility model relates to a concrete pouring equipment for building foundation construction under karst geology, directly push the pouring equipment to the construction site, firstly lock the universal wheel 13, then pull out the lengthened fixed frame 2 to both sides forcibly, then pull out the telescopic fixed rod 22 with proper length according to the actual terrain in sequence, make the fixed flange plate 1 contact with the ground, fix with screws, add the lengthened fixed frame 2 to reduce the whole center of the pouring equipment to a certain extent, the use is more stable, safe and reliable, then, concrete can be added into the concrete collection box 15 through the concrete filling hopper 8, the filter screen 9 can filter the added concrete to a certain extent, thereby protecting the pouring pump 14 to a certain extent, then press the pouring switch, can finish the pouring work according to the normal pouring mode, close the pouring switch after the pouring is finished, the external water pipe is connected with the flushing pipe 10, the cleaning switch is pressed, high-pressure water flow can be utilized to automatically carry out high-pressure flushing on the concrete material collecting box 15, the ultrasonic generator 16 is matched to carry out vibration cleaning on the concrete material collecting box, the cleaning efficiency is high, the quality is good, time and labor are saved, and the operation is simple, convenient and practical.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides a concrete placement equipment is used in building foundation construction under karst geology, includes removal base (3), its characterized in that: remove the both sides of base (3) and all seted up and accomodate draw-in groove (12), two the equal sliding connection in one side of accomodating draw-in groove (12) has extension fixed frame (2), two the both ends of extension fixed frame (2) bottom one side are all fixed and are provided with flexible dead lever (22), one side of removing base (3) top is fixed and is provided with concrete collection case (15), one side at concrete collection case (15) top is fixed and is provided with concrete filling fill (8), the center fixed mounting at concrete collection case (15) top has agitator motor (7), the output of agitator motor (7) passes concrete collection case (15) and fixes and be provided with drive main shaft (21), the outer lane at concrete collection case (15) inner wall top is fixed and is provided with clearance mechanism (19), clearance mechanism (19) include annular wash tub (18), A plurality of high pressure washing terminals (17) and flushing pipe (10), the fixed intercommunication in bottom of annular washing pipe (18) has a plurality of evenly distributed's high pressure washing terminal (17), one side of annular washing pipe (18) is fixed to be provided with and extends to outside flushing pipe (10) of concrete collection case (15), one side fixed mounting of concrete collection case (15) has pouring pump (14), the fixed intercommunication of discharge gate of pouring pump (14) has feed cylinder (5), the fixed intercommunication in one side at feed cylinder (5) top has concrete pouring pipe (4), the equal fixed mounting in both sides of concrete collection case (15) inner wall has supersonic generator (16), the fixed switch board (11) that is provided with in front of concrete collection case (15), the fixed surface mounting of switch board (11) has pouring switch and cleaning switch.
2. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: and fixed flange discs (1) are fixedly arranged at the bottoms of the four telescopic fixed rods (22).
3. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: and a plurality of uniformly distributed stirring fan blades (20) are fixedly arranged on the surface of the driving main shaft (21).
4. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: the other side of the top of the movable base (3) is fixedly provided with a U-shaped supporting frame (6), and the top of the U-shaped supporting frame (6) is fixedly connected with the bottom of the feeding barrel (5).
5. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: four corners of the bottom of the movable base (3) are fixedly provided with universal wheels (13).
6. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: and a filtering screen (9) is fixedly arranged in the concrete filling hopper (8).
7. The concrete pouring device for the foundation construction of the karst geology building foundation according to claim 1, characterized in that: the pouring pump (14) and the stirring motor (7) are electrically connected with an external power supply through a pouring switch, and the two ultrasonic generators (16) are electrically connected with the external power supply through cleaning switches.
CN202120848893.0U 2021-04-23 2021-04-23 Concrete pouring equipment for building foundation construction under karst geology Expired - Fee Related CN215165615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120848893.0U CN215165615U (en) 2021-04-23 2021-04-23 Concrete pouring equipment for building foundation construction under karst geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120848893.0U CN215165615U (en) 2021-04-23 2021-04-23 Concrete pouring equipment for building foundation construction under karst geology

Publications (1)

Publication Number Publication Date
CN215165615U true CN215165615U (en) 2021-12-14

Family

ID=79362753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120848893.0U Expired - Fee Related CN215165615U (en) 2021-04-23 2021-04-23 Concrete pouring equipment for building foundation construction under karst geology

Country Status (1)

Country Link
CN (1) CN215165615U (en)

Similar Documents

Publication Publication Date Title
CN214813389U (en) Concrete sedimentation tank cleaning equipment
CN215165615U (en) Concrete pouring equipment for building foundation construction under karst geology
CN212167659U (en) Filth cleaning device for water conservancy and hydropower
CN210786361U (en) Filter press of electrolytic manganese production usefulness
CN212467162U (en) Ink solvent recovery unit with self-cleaning function
CN209810771U (en) Solar cell panel of convenient clearance
CN218465780U (en) Microbial manure fermentation cylinder washs recovery unit
CN210497422U (en) Can filter belt cleaning device of aluminium bits
CN213793110U (en) Battery piece processing erodees unit
CN113644007A (en) Water-saving ultrasonic cleaning device for photovoltaic silicon wafers
CN219723898U (en) Civil engineering construction waste material processing apparatus
CN218437062U (en) Concrete pouring equipment for foundation engineering
CN213761546U (en) Water paint production mixer
CN211802914U (en) Chemical barrel safety cleaning device for chemical field
CN213793270U (en) Adjustable tubular pile belt cleaning device
CN219424624U (en) Quartz powder chemical flotation machine
CN218485226U (en) Clarifying concentrator
CN219287453U (en) Self-cleaning device of photovoltaic power generation panel
CN220403015U (en) Water-saving and environment-friendly laver cleaning mechanism
CN216156007U (en) Chromium plating solution edulcoration device
CN215747231U (en) Laser engraving machine is with sculpture residual washing unit
CN216866727U (en) Underground guniting robot
CN219477927U (en) Photovoltaic power generation cleaning device
CN220049105U (en) Cleaning device for reinforced concrete drain pipe core mold production mold
CN214205448U (en) Photovoltaic power generation's energy collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214