CN218437062U - Concrete pouring equipment for foundation engineering - Google Patents

Concrete pouring equipment for foundation engineering Download PDF

Info

Publication number
CN218437062U
CN218437062U CN202222122258.1U CN202222122258U CN218437062U CN 218437062 U CN218437062 U CN 218437062U CN 202222122258 U CN202222122258 U CN 202222122258U CN 218437062 U CN218437062 U CN 218437062U
Authority
CN
China
Prior art keywords
fixedly connected
motor
concrete
holds
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222122258.1U
Other languages
Chinese (zh)
Inventor
刘爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Geotechnical Engineering Co ltd
Original Assignee
Guangdong Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Geotechnical Engineering Co ltd filed Critical Guangdong Geotechnical Engineering Co ltd
Priority to CN202222122258.1U priority Critical patent/CN218437062U/en
Application granted granted Critical
Publication of CN218437062U publication Critical patent/CN218437062U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a concrete placement equipment for foundation engineering, the on-line screen storage device comprises a base, the top of base is provided with pneumatic push rod, pneumatic push rod's top fixedly connected with holds the case, the top that holds the case is provided with the slush pump, the inside that holds the case is provided with clearance mechanism. At first the second motor starts, it smashes the concrete that holds incasement portion to drive crushing shaft, then the slush pump starts, the concrete gets into the discharging pipe through the slush pump by the passage, take out material in-process stirring vane and rotate, reduce the concrete bubble production, the discharging pipe can be pour the ground engineering this moment, need clear up holding incasement portion after finishing using, the first motor of control panel control starts this moment, the connecting rod can drive the cleaning brush and rotate, the booster pump starts simultaneously, water in the water tank gets into by the inlet tube and holds incasement portion, can scrub the inner wall that holds the case, at last sewage is derived can from the outlet pipe.

Description

Concrete pouring equipment for foundation engineering
Technical Field
The utility model relates to a ground engineering technical field specifically is a concrete placement equipment for ground engineering.
Background
The foundation treatment generally refers to engineering measures taken to improve the bearing capacity of the foundation (soil or rock) supporting the building or to improve the deformation properties or permeability properties thereof, and is usually reinforced by means of concrete pouring, so that concrete pouring equipment is indispensable.
For example, the energy-saving concrete pouring equipment provided by the Chinese patent CN216740735U is connected with a conduit through the arrangement of a slurry pump, the concrete in a tank body can be directly pumped out, and meanwhile, the inner wall of the tank body is cleaned through the arrangement of a hairbrush, but the structure cannot clean all the four walls of the tank body, the cleaning efficiency is low, and meanwhile, the pumping of the slurry pump easily causes the generation of bubbles in the concrete, so that the problem of poor pouring effect is caused.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a concrete placement equipment for foundation engineering possesses the advantage that cleaning efficiency is high and reduce the inside bubble of concrete and produce, has solved current casting equipment and can not all clear up the four walls of the jar body, and cleaning efficiency is lower, and the extraction of slush pump leads to the inside bubbly of concrete easily simultaneously to lead to pouring the not good problem of effect.
In order to achieve the above object, the utility model provides a following technical scheme: the concrete pouring equipment for the foundation engineering comprises a base, wherein a pneumatic push rod is arranged at the top of the base, a containing box is fixedly connected to the top of the pneumatic push rod, a mud pump is arranged at the top of the containing box, and a cleaning mechanism is arranged inside the containing box;
the cleaning mechanism comprises a cylinder, a first motor, a connecting rod, an electric push rod, a cleaning brush, a water tank and a water inlet pipe, wherein the cylinder is arranged at the top of the accommodating box, the first motor is connected to the bottom of the cylinder, the connecting rod is fixedly connected to the output shaft of the first motor, the electric push rod is fixedly connected to the right side of the connecting rod, the cleaning brush is connected to the right side of the electric push rod, the water tank is arranged on the right side of the accommodating box, and the water inlet pipe is arranged at the bottom of the water tank.
Further, the quantity of pneumatic push rod is two, two pneumatic push rod's bottom all with the top fixed connection of base, two pneumatic push rod's top all with the bottom fixed connection who holds the case, the interior back wall fixed mounting who holds the case has the motor.
Further, the bottom of the slurry pump is fixedly connected with a material guide pipe, an output shaft of the motor is fixedly connected with a stirring blade, the stirring blade is located inside the material guide pipe, and the left side of the slurry pump is fixedly connected with a material discharge pipe.
Further, the top of holding the case has seted up the feed inlet, the bottom fixed mounting who holds the case has the second motor, the output shaft fixedly connected with crushing axle of second motor department, crushing axle is located the inside that holds the case.
Further, the bottom of cylinder and the top fixed connection of first motor, the connecting rod is L shape, electric putter's quantity is two, two electric putter's left side all with the left side fixed connection of connecting rod.
Further, two one side that electric putter kept away from the connecting rod all with the left side fixed connection of cleaning brush, the left side of water tank and the right side outer wall fixed connection who holds the case.
Further, the top of inlet tube and the bottom fixed connection of water tank, the right side fixedly connected with booster pump of inlet tube, the front side fixed mounting who holds the case has control panel.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this concrete placement equipment for foundation engineering, through setting up pneumatic putter, control panel control pneumatic putter lift adjustment holds the height of case, thereby the convenience is pour the foundation engineering building of co-altitude not, the setting is holding incasement portion's clearance mechanism, can be through the combined action of each structure, to holding incasement portion and clearing up, it is extravagant to prevent that the concrete from solidifying and causing the concrete in the inside that holds the case, the slush pump starts can be by the passage suction with concrete mud, and pump by the discharging pipe, thereby the realization is to each building purpose of pouring of foundation engineering.
2. According to the concrete pouring equipment for the foundation engineering, the cylinder is arranged, the control panel clamping seat cylinder drives the first motor to lift, so that the purpose of driving the connecting rod and the cleaning brush to lift is achieved, when the containing box needs to be cleaned, the first motor is started to drive the connecting rod and the cleaning brush to rotate circumferentially, the cleaning brush can clean the inner wall of the containing box, the electric push rod can drive the cleaning brush to be attached to the inner wall of the containing box through stretching, and the cleaning is more convenient; the motor is arranged to drive the stirring blades to rotate so as to more uniformly stir the concrete and reduce bubbles, and the crushing shaft is rotated to further stir the concrete so as to prevent the concrete from solidifying.
Drawings
Fig. 1 is a three-dimensional schematic view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
fig. 3 is a schematic view of the cleaning mechanism of the present invention.
In the figure: the device comprises a base 1, a pneumatic push rod 2, a containing box 3, a mud pump 4, a cleaning mechanism 5, an air cylinder 501, a first motor 502, a connecting rod 503, an electric push rod 504, a cleaning brush 505, a water tank 506, a water inlet pipe 507, a stirring blade 6, a material guide pipe 7 and a crushing shaft 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, a concrete pouring equipment for foundation engineering, including base 1, the top of base 1 is provided with pneumatic push rod 2, through setting up pneumatic push rod 2, control panel control pneumatic push rod 2 goes up and down to adjust the height that holds case 3, thereby conveniently pour the foundation engineering building of co-altitude not, the top fixedly connected with of pneumatic push rod 2 holds case 3, the top that holds case 3 is provided with slush pump 4, the inside that holds case 3 is provided with clearance mechanism 5, the setting is at the clearance mechanism 5 that holds the inside of case 3, can be through the combined action of each structure, to holding the inside clearance that clears up of case 3, prevent that the concrete from solidifying and causing the concrete waste in the inside that holds case 3.
Cleaning mechanism 5 includes cylinder 501, first motor 502, connecting rod 503, electric putter 504, cleaning brush 505, water tank 506 and inlet tube 507, the top that holds case 3 is provided with cylinder 501, through setting up cylinder 501, control panel cassette cylinder 501 drives first motor 502 to go up and down, thereby reach the purpose that drives connecting rod 503 and cleaning brush 505 lift, the bottom of cylinder 501 is connected with first motor 502, when holding case 3 needs the clearance, first motor 502 starts, can drive connecting rod 503 and cleaning brush 505 and be the circumference and rotate, cleaning brush 505 can be cleared up the inner wall that holds case 3 this moment, fixedly connected with connecting rod 503 is located to the output shaft of first motor 502, the right side fixedly connected with electric putter 504 of connecting rod 503, electric putter 504 can drive cleaning brush 505 and hold the case 3 inner wall through flexible pasting, it is more convenient to scrub, the right side of electric putter 504 is connected with cleaning brush 505, the right side that holds case 3 is provided with water tank 506, the bottom of water tank 506 is provided with inlet tube 507, it rotates the more evenly to reduce the bubble production with the stirring to drive stirring blade 6 through setting up the motor rotation, further concrete rotation, it solidifies to prevent to stir concrete.
When the method is implemented, the method comprises the following steps:
1) Firstly, the second motor is started to drive the crushing shaft 8 to crush the concrete in the accommodating box 3;
2) Then a slurry pump 4 is started, concrete enters a discharge pipe from a material guide pipe 7 through the slurry pump 4, a stirring blade 6 rotates in the material pumping process, the generation of concrete bubbles is reduced, and the discharge pipe can be used for pouring foundation engineering;
3) After the cleaning brush is used, the interior of the accommodating box 3 needs to be cleaned, at the moment, the control panel controls the first motor 502 to be started, the connecting rod 503 can drive the cleaning brush 505 to rotate, and meanwhile, the booster pump is started;
4) Water in the water tank 506 enters the containing box 3 through the water inlet pipe 507, the inner wall of the containing box 3 can be scrubbed, and finally, sewage is guided out of the water outlet pipe.
In conclusion, this concrete placement equipment for foundation engineering, through setting up pneumatic putter 2, control panel control pneumatic putter 2 goes up and down to adjust the height that holds case 3, thereby conveniently pour the foundation engineering building of co-altitude not, the setting is holding the inside clearance mechanism 5 of case 3, can be through the combined action of each structure, to holding the inside clearance of case 3, it is extravagant to prevent that the concrete from solidifying and causing the concrete in the inside that holds case 3, slush pump 4 starts can be with concrete mud by the suction of passage 7, and pump out by the discharging pipe, thereby realize the purpose of pouring each building of foundation engineering.
And, at first the second motor starts, it smashes to drive crushing axle 8 to holding the inside concrete of case 3, then slush pump 4 starts, the concrete gets into the discharging pipe through slush pump 4 by passage 7, take out material in-process stirring vane 6 and rotate, reduce concrete bubble production, the discharging pipe can be pour the ground engineering this moment, need clear up holding the inside of case 3 after finishing using, control panel controls first motor 502 and starts this moment, connecting rod 503 can drive cleaning brush 505 and rotate, the booster pump starts simultaneously, water in the water tank 506 gets into by inlet tube 507 and holds the case 3 inside, can scrub the inner wall that holds case 3, it can to derive from the outlet pipe at last sewage.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a concrete placement equipment for foundation engineering, includes base (1), its characterized in that: the top of the base (1) is provided with a pneumatic push rod (2), the top of the pneumatic push rod (2) is fixedly connected with a containing box (3), the top of the containing box (3) is provided with a slurry pump (4), and a cleaning mechanism (5) is arranged inside the containing box (3);
cleaning mechanism (5) are including cylinder (501), first motor (502), connecting rod (503), electric putter (504), cleaning brush (505), water tank (506) and inlet tube (507), the top of holding case (3) is provided with cylinder (501), the bottom of cylinder (501) is connected with first motor (502), the output shaft fixedly connected with connecting rod (503) of department of first motor (502), the right side fixedly connected with electric putter (504) of connecting rod (503), the right side of electric putter (504) is connected with cleaning brush (505), the right side of holding case (3) is provided with water tank (506), the bottom of water tank (506) is provided with inlet tube (507).
2. Concrete casting equipment for foundation engineering according to claim 1, characterized in that: the number of the pneumatic push rods (2) is two, the bottoms of the two pneumatic push rods (2) are fixedly connected with the top of the base (1), the tops of the two pneumatic push rods (2) are fixedly connected with the bottom of the containing box (3), and a motor is fixedly mounted on the inner rear wall of the containing box (3).
3. Concrete pouring equipment for foundation works according to claim 2, characterized in that: the bottom of the mud pump (4) is fixedly connected with a material guide pipe (7), an output shaft of the motor is fixedly connected with a stirring blade (6), the stirring blade (6) is located inside the material guide pipe (7), and the left side of the mud pump (4) is fixedly connected with a material discharge pipe.
4. Concrete pouring equipment for foundation works according to claim 1, characterized in that: the feed inlet has been seted up at the top that holds case (3), the bottom fixed mounting that holds case (3) has the second motor, the output shaft fixedly connected with crushing axle (8) of second motor department, crushing axle (8) are located the inside that holds case (3).
5. Concrete pouring equipment for foundation works according to claim 1, characterized in that: the bottom of cylinder (501) and the top fixed connection of first motor (502), connecting rod (503) are the L shape, the quantity of electric putter (504) is two, two the left side of electric putter (504) all with the left side fixed connection of connecting rod (503).
6. Concrete pouring equipment for foundation works according to claim 1, characterized in that: one side of each electric push rod (504) far away from the connecting rod (503) is fixedly connected with the left side of the cleaning brush (505), and the left side of the water tank (506) is fixedly connected with the outer wall of the right side of the containing box (3).
7. Concrete pouring equipment for foundation works according to claim 1, characterized in that: the top of inlet tube (507) and the bottom fixed connection of water tank (506), the right side fixedly connected with booster pump of inlet tube (507), the front side fixed mounting who holds case (3) has control panel.
CN202222122258.1U 2022-08-11 2022-08-11 Concrete pouring equipment for foundation engineering Active CN218437062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222122258.1U CN218437062U (en) 2022-08-11 2022-08-11 Concrete pouring equipment for foundation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222122258.1U CN218437062U (en) 2022-08-11 2022-08-11 Concrete pouring equipment for foundation engineering

Publications (1)

Publication Number Publication Date
CN218437062U true CN218437062U (en) 2023-02-03

Family

ID=85092698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222122258.1U Active CN218437062U (en) 2022-08-11 2022-08-11 Concrete pouring equipment for foundation engineering

Country Status (1)

Country Link
CN (1) CN218437062U (en)

Similar Documents

Publication Publication Date Title
CN218437062U (en) Concrete pouring equipment for foundation engineering
CN218014678U (en) Reation kettle belt cleaning device with cleaning ball
CN209771483U (en) Small-size domestic sewage treatment recycles device
CN212092459U (en) Recovery unit for environmental protection building engineering
CN212926425U (en) Sedimentation tank sludge cleaning device for rainwater pump station
CN208293561U (en) A kind of mud conditioning device suitable for two-wheel flute milling machine
CN213611009U (en) A sewage stirring storage device for boring adopt job site
CN220918980U (en) Sewage treatment sludge discharge mechanism
CN218365587U (en) Building cement agitating unit
CN214130433U (en) Sand setting device for sewage treatment
CN219855272U (en) Dry-wet mixing equipment for machine-made sand
CN215165615U (en) Concrete pouring equipment for building foundation construction under karst geology
CN213116575U (en) Environment-friendly integrated pump station
CN218608197U (en) Sludge discharge equipment for sewage treatment sedimentation tank
CN220696490U (en) Mixing equipment for high polymer coating production
CN216073137U (en) Integrated sewage air-flotation treatment device
CN220014485U (en) Concrete slurry removing device
CN215327613U (en) Sludge treatment device
CN214424706U (en) Self-suction centrifugal pump water inlet pipe mouth refitting device
CN218508198U (en) Highway crack patching device
CN210583867U (en) Pretreatment fishing device for domestic sewage treatment
CN219355530U (en) Adjusting tank for treating waste liquid in circuit board production
CN221030598U (en) Septic tank smashes pine utensil
CN213859989U (en) Building ground self-leveling mortar backfill pump station device
CN218221418U (en) Hydraulic engineering pump station structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant